Unlisted Performance Rights Lapsed
Released
Released
Announcement PDF
5 August 2020
ASX ANNOUNCEMENT
UNLISTED PERFORMANCE RIGHTS LAPSED
Theta Gold Mines Limited (ASX: TGM, TGMO | OTCQB: TGMGF) refers to its announcement on
11 May 2020 that Managing Director, Mr Robert Thomson, has stepped down from executive
duties with effect from 5 August 2020. In this connection, the Company advises that 4,000,000
unlisted performance rights expiring 27 June 2024 have lapsed, as follows –
Performance Hurdle/Vesting Condition
Delineating a total of 300,000 ounces of gold ore reserves (in accordance
with the JORC Code 2012) at grade of at least 2.5g/t Au, amenable to
open-cut mining on Mining Right 83, Mining Right 341 and Mining Right
10167 (under application).
Decision to Mine (Board approval to commence development of a gold
mining operation) with all regulatory approvals secured.
Achieving annualised production of 50,000 ounces of gold per annum
over a consecutive period of 3 months.
Achieving annualised production of 100,000 ounces of gold per annum
over a consecutive period of 3 months.
Total
Number
1,100,000
600,000
850,000
1,450,000
4,000,000
Following the lapse of the above options, the capital structure of the Company is as follows –
Fully paid ordinary shares (ASX: TGM, OTCQB: TGMGF)
Listed options exercisable at $0.30 each on or before 31 October 2020
(ASX: TGMO)
Unlisted options and performance rights (details in Annexure A)
Number
454,415,950
33,754,663
23,870,265
This announcement was authorised for release by the Board of Directors.
For more information please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
M: +61 2 8046 7584
billg@thetagoldmines.com
Theta Gold Mines Limited ABN 30 131 758 177
Suite 80, Level 35 (Servcorp), International Tower One, 100 Barangaroo Avenue, Sydney NSW 2000
Tel: +61 2 8046 7584 Email: info@thetagoldmines.com
www.thetagoldmines.com
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM, TGMO | OTCQB: TGMGF) is a gold development company that holds a
range of prospective gold assets in a world-renowned South African gold mining region. These assets include
several surface and near-surface high-grade gold projects which provide cost advantages relative to other
gold producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga
Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). Following small scale production from 2011 – 2015, the Company is currently
focussing on the construction of a new gold processing plant within its approved footprint at the TGME plant,
and for the processing of the Theta Open Pit oxide gold ore. Nearby surface and underground mines and
prospects are expected to be further evaluated in the future.
The Company aims to build a solid production platform to over 160Kozpa based primarily around shallow,
open-pit or adit-entry shallow underground hard rock mining sources. Theta Gold has access to over 43
historical mines and prospect areas that can be accessed and explored, with over 6.7Moz of historical
production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Stonewall Mining (Pty) Ltd (“Stonewall”).
Stonewall holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines
(Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”)
entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation by
the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is
comprised of a combination of local community trusts, an employee trust and a strategic entrepreneurial
partner.
Annexure A
Theta Gold Mines Limited
Unlisted Options and Performance Rights
Number
OPTIONS
345,265
2,325,000
2,670,265
Performance Hurdle/Vesting Date
(if applicable)
Exercise
Price
Expiry Date
$0.19
$0.40
13 Aug 2020
27 Apr 2022
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
TOTAL OPTIONS
PERFORMANCE RIGHTS
50,000
All systems, licences, insurances, regulatory and
statutory compliance in place to meet South Africa
Mining regulations, laws, Mining Charter 111,
commercial contacts. (Mine ready).
3,570,000
Delineating a total of 300,000 ounces of gold ore
reserves (in accordance with the JORC Code 20121)
at grade of at least 2.5g/t Au, amenable to open-cut
mining on Mining Right 83, Mining Right 341 and
Mining Right 10167 (under application).
4,770,000
Decision to Mine (Board approval to commence
development of a gold mining operation) with all
regulatory approvals secured.
This performance hurdle must be achieved on or
before 27 Dec 2020, being 18 months from the date
of issue of the performance right.
6,780,000
Achieving annualised production of 50,000 ounces of
gold per annum over a consecutive period of 3
months.
This performance hurdle must be achieved on or
before 27 Dec 2021, being 30 months from the date
of issue of the performance right.
6,030,000
Achieving annualised production of 100,000 ounces
of gold per annum over a consecutive period of 3
months.
This performance hurdle must be achieved on or
before 27 Jun 2023, being 48 months from the date
of issue of the performance right.
21,200,000
TOTAL PERFORMANCE RIGHTS
23,870,265
TOTAL OPTIONS AND PERFORMANCE RIGHTS
Share your feedback
Discover