Theta Selects Digmin as Preferred Mining Contractor
Released
Released
Announcement PDF
20 July 2020
ASX ANNOUNCEMENT
THETA SELECTS DIGMIN AS PREFERRED MINING CONTRACTOR
Theta Gold Mines Limited (“Theta” or “Company”) (ASX: TGM, TGMO | OTCQB: TGMGF) is
pleased to announce a key project development milestone for the Starter Theta Project has been
achieved with the selection of an experienced and respected mining contractor in order that the
Company is positioned to rapidly advance trial mining activities.
After a comprehensive tendering process, Digmin Group (‘Digmin’) has been selected. The
Digmin Group has a solid track record providing contract mining services throughout Africa and
also provides bulk earthworks, roads and civils, mine infrastructure development as well as
surface and underground drilling services. Digmin is a proven contract miner currently engaged
in a number of gold, copper, niobium and coal projects across the African continent. To date, the
group has completed over US$2 billion worth of civil and mining works in South Africa alone.
Further information is available at www.digmingroup.com.
The selection of Digmin will allow Theta to rapidly mobilise trial mining operations. These
operations are expected to commence once final permitting has been achieved (environmental
authorisation for open pit mining on Theta’s existing underground mining right). This
authorisation is expected to be received in the near term in Q4 2020.
A summary of the works Digmin will undertake is referenced in Appendix A.
Theta Chairman Mr Bill Guy stated, “The Company has delivered another key milestone in the
development of the Theta Project with Digmin selected as our preferred mining contractor. They
have intimate knowledge of the Theta Open Pit Project having spent many months with our mining
team in order to deliver a well costed schedule of works which presently remain in line with our
May 2019 Feasibility Study costs.”
“Having a reputable, experienced mining contractor on board adds significant credibility and will
assist in financing the project development as it provides potential project financiers, of which
there are several still under consideration, comfort in terms of execution and cost management.”
“The Digmin team will be a strong partner for us in South Africa and they have in-depth knowledge
of the Pilgrim’s Rest area with their founder living only 40 km from the Theta Project. Digmin’s
broad range of capabilities including mining, rehabilitation, civil and road works, and open pit and
underground drilling give Theta’s project development team the flexibility to now focus on the
successful build and operation of the Theta Open Pit Project.”
“We are making excellent progress in a number of critical project development initiatives. There
is broad enthusiasm at a community and government level for the Theta Project and we are now
Theta Gold Mines Limited ABN 30 131 758 177
Suite 80, Level 35 (Servcorp), International Tower One, 100 Barangaroo Avenue, Sydney NSW 2000
Tel: +61 2 8046 7584 Email: info@thetagoldmines.com
www.thetagoldmines.com
at the point where significant value will start to be realised. I look forward to keeping shareholders
abreast of our developments.”
Figure 1: TGME and Digmin Directors at Barlows-Caterpillar Equipment Johannesburg
Trial Mining and Civils
Post final permitting, a trial mining phase is planned for the end of 2020 (permit dependent),
where two box cuts will be mined in the future Iota and Browns Hill pits, during which final mining
equipment and grade control practices will be selected. Following the trial mining phase, it is
anticipated that Digmin will also do some of the bulk earthworks and civils as part of the project
infrastructure establishment.
Post permitting of MR83 and trial mining, the final mining contract is expected to be negotiated
with Digmin. Synergies between different EPC contractors will also be explored which potentially
could reduce the overall and already low capital cost of the project.
Digmin have also agreed to partner with Theta to facilitate local employment and social
upliftment programs in the small Pilgrim’s Rest community. Residents have been eagerly awaiting
this progress towards an official start of construction and mining in the area.
The Company has also made good progress with the first stage 600,000tpa gold plant construction
tender process, based on a Lump Sum Turnkey (LSTK) contract. An announcement is expected to
be made in Q3 2020.
2
Figure 2: Digmin - Production Drilling at New Luika Gold Mine Tanzania for Shanta Gold
This announcement was authorised for release by the Board of Directors.
For more information please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
United States - Michael Porter, Porter, LeVay & Rose Inc: +1 212 564 4700,
theta@plrinvest.com
3
Appendix A: Aspects of provisional mining contract review as quoted by Digmin Mining Engineers
Production Profile
The 600kt per annum scope, as per the optimised Feasibility Study, has been
confirmed, and further ramp-up is fully feasible.
Digmin Qualifications
Mining Cost
Mining Method
Plant Feed and
Tailings Disposal
Waste Rock Disposal
Their excellent safety culture and track record, and a commitment to social
upliftment programs in the areas where they operate, makes Digmin very
suitable as a key Theta Gold Mines partner.
Digmin management offers collective experience of over 250 years in Africa,
with excellent depth in operational personnel, who are all well trained and
incentivised.
They are able to mobilize trial mining equipment from their existing fleet,
while procuring long-lead machinery timeously for full scale mining.
There is good depth in their industry network, from which Theta Gold Mines
can draw when required, and which provides flexibility in the mining methods
and equipment that can be utilised.
Apart from mining contract services, Digmin also provides bulk earthworks,
roads and civils, mine infrastructure development as well as surface and
underground drilling services, which provide Theta Gold Mines with cost
effective mobilisation synergies for current and future projects.
Digmin has concluded a highly detailed study of the scope of the project, and the
rates at which they can supply all the required mining services. The rates supplied
are in line with the feasibility study rates, which will be further refined during trial
mining before final contracting is concluded.
Items reviewed and costed by Digmin:
P & G – management, operations support and camp site
Site and camp site establishment
Mobilisation
Organogram and labour cost
Grubbing and topsoil
Haul roads and terracing
Ripping rates – dozer and xcentric ripper
Loading – ore and waste
Hauling – ore and waste
Plant feed and material handling
Waste rock dump maintenance and rehabilitation
Mining equipment and day rates
Earthworks, civils and construction
Fuel usage
The application of the modified terrace mining method has been confirmed in
terms of rippability of different rock types and mining production rates. Dozer
and xcentric ripping will be utilized, with nonex blasting where required. The
mining method, together with the grade control practices will also be further
enhanced during trial mining.
A simplified run-of-mine plant feed arrangement is planned, and mining trucks
will be optimised by hauling filtered tailings on return trips to the tailings dump.
Backfilling of waste rock into mined-out voids will be optimised to minimise
hauling distances, dozing and dump shaping, as well as rehabilitation
requirements.
4
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM, TGMO | OTCQB: TGMGF) is a gold development company that holds a
range of prospective gold assets in a world-renowned South African gold mining region. These assets include
several surface and near-surface high-grade gold projects which provide cost advantages relative to other gold
producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga
Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). Following small scale production from 2011 – 2015, the Company is currently
focussing on the construction of a new gold processing plant within its approved footprint at the TGME plant,
and for the processing of the Theta Open Pit oxide gold ore. Nearby surface and underground mines and
prospects are expected to be further evaluated in the future.
The Company aims to build a solid production platform to over 160kozpa based primarily around shallow, openpit or adit-entry shallow underground hard rock mining sources. Theta Gold has access to over 43 historical
mines and prospect areas that can be accessed and explored, with over 6.7Moz of historical production
recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Stonewall Mining (Pty) Ltd (“Stonewall”).
Stonewall holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines
(Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”) entities.
The South African Mining Charter requires a minimum of 26% meaningful economic participation by the
historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is
comprised of a combination of local community trusts, an employee trust and a strategic entrepreneurial
partner.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe
for or purchase any securities in the Company or as an inducement to make an offer or invitation with
respect to those securities. No agreement to subscribe for securities in the Company will be entered into
on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe
that any such statements and projections are either false, misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax
or other advice. This overview of Theta Gold does not purport to be all inclusive or to contain all
information which its recipients may require in order to make an informed assessment of the Company’s
prospects. Before making an investment decision, you should consult your professional adviser, and
perform your own analysis prior to making any investment decision. To the maximum extent permitted by
law, the Company makes no representation and gives no assurance, guarantee or warranty, express or
implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy,
5
suitability or completeness of, or any errors in or omissions, from any information, statement or opinion
contained in this announcement. This announcement contains information, ideas and analysis which are
proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which
could be considered forward looking statements. Forward looking statements are typically preceded by
words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”,
“Anticipates”, “Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and
estimates included in this announcement are based on assumptions and contingencies which are subject
to change without notice, and may be influenced by such factors as funding availability, market-related
forces (commodity prices, exchange rates, stock market indices and the like) and political or economic
events (including government or community issues, global or systemic events). Forward looking
statements are provided as a general reflection of the intention of the Company as at the date of release
of the document, however are subject to change without notice, and at any time. Future events are subject
to risks and uncertainties, and as such results, performance and achievements may in fact differ from
those referred to in this announcement. Mining, by its nature, and related activities including mineral
exploration, are subject to a large number of variables and risks, many of which cannot be adequately
addressed, or be expected to be assessed, in this document. Work contained within or referenced in this
report may contain incorrect statements, errors, miscalculations, omissions and other mistakes. For this
reason, any conclusions, inferences, judgments, opinions, recommendations or other interpretations
either contained in this announcement, or referencing this announcement, cannot be relied upon. There
can be no assurance that future results or events will be consistent with any such opinions, forecasts or
estimates. The Company believes it has a reasonable basis for making the forward looking statements
contained in this document, with respect to any production targets, resource statements or financial
estimates, however further work to define Mineral Resources or Reserves, technical studies including
feasibilities, and related investigations are required prior to commencement of mining. No liability is
accepted for any loss, cost or damage suffered or incurred by the reliance on the sufficiency or
completeness of the information, opinions or beliefs contained in this announcement.
6