2023 AGM Presentation
Released
Released
Announcement PDF
THETA GOLDMINES LIMITED
ANNUAL GENERAL MEETING
November 28, 2023
FS to recover 1.08Moz Au over 12.9 years LOM at TGME
underground mine.
6.1Moz Gold Resource and Growing
1
Disclaimer
FORWARD LOOKING AND CAUTIONARY STATEMENTS
DISCLAIMER AND COMPETENT PERSONS STATEMENT
This presentation may refer to the intention of Theta Gold Mines regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such as
“Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”, “Predicted”,
“Estimated” or similar expressions. Forward looking statements, opinions and estimates included in this
announcement are based on assumptions and contingencies which are subject to change without notice, and may
be influenced by such factors including but not limited to funding availability, market-related forces (commodity
prices, exchange rates, stock market indices and the like) and political, environmental or economic events (including
government or community issues, land owners, global or systemic events). Forward looking statements are provided
as a general reflection of the intention of the Company as at the date of release of the document, however are subject
to change without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its nature,
and related activities including mineral exploration, are subject to a large number of variables and risks, many of
which cannot be adequately addressed, or be expected to be assessed, in this document. Work contained within or
referenced in this report may contain incorrect statements, errors, miscalculations, omissions and other mistakes.
For this reason, any conclusions, inferences, judgments, opinions, recommendations or other interpretations either
contained in this announcement, or referencing this announcement, cannot be relied upon. There can be no assurance
that future results or events will be consistent with any such opinions, forecasts or estimates. The Company believes
it has a reasonable basis for making the forward looking statements contained in this document, with respect to any
production targets, resource statements or financial estimates, however further work to define Mineral Resources or
Reserves, technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the sufficiency or
completeness of the information, opinions or beliefs contained in this announcement.
DISCLAIMER
This announcement or presentation has been prepared by and issued by Theta Gold Mines Limited (ASX:TGM |
OTCQB: TGMGF) to assist in informing interested parties about the Company and should not be considered as an
offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer
or invitation with respect to those securities. No agreement to subscribe for securities in the Company will be entered
into on the basis of this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to support
the estimation of Ore Reserves. There is no assurance that the intended development referred to will proceed as
described, and will rely on access to future funding to implement. Theta Gold Mines believes it has reasonable grounds
the results of the Feasibility Study. At this stage there is no guarantee that funding will be available, and investors are
to be aware of any potential dilution of existing issued capital. The production targets and forward looking statements
referred to are based on information available to the Company at the time of release, and should not be solely relied
upon by investors when making investment decisions. Theta Gold cautions that mining and exploration are high
risk, and subject to change based on new information or interpretation, commodity prices or foreign exchange rates.
Actual results may differ materially from the results or production targets contained in this release. Further evaluation
is required prior to a decision to conduct mining being made. The estimated Mineral Resources quoted in this release
have been prepared by Competent Persons as required under the JORC Code (2012). Material assumptions and
other important information are contained in this release. The Company confirms that all material assumptions
underpinning the production target, or the forecast financial information derived from the production target continue
to apply and have not materially changed from that released in the definitive Feasibility Study released to ASX on 27
July 2022.
This announcement or presentation may contain forward looking statements. Whilst Theta Gold Mines has no reason
to believe that any such statements and projections are either false, misleading or incorrect, it does not warrant
or guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax or other
advice. This overview of Theta Gold Mines does not purport to be all inclusive or to contain all information which its
recipients may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to making
any investment decision. To the maximum extent permitted by law, the Company makes no representation and gives
no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for,
the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omissions, from any information,
statement or opinion contained in this announcement. This announcement contains information, ideas and analysis
which are proprietary to Theta Gold.
COMPETENT PERSONS STATEMENT
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.),
Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South African Council for
Natural Scientific Professions and Mr Daniel van Heerden (B.Ing (Mining M.Com (Business Management), member
of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director of Minxcon (Pty) Ltd and a fellow of
the South African Institute of Mining and Metallurgy (FSAIMM Reg. No. 37309).
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” dated 16 May 2019, “Optimised
Mine Schedule for Theta Open Pit Starter Project Delivers Significant Improvements” dated 20 April 2020 and “Initial
Maiden Underground Mining Reserve 419,000 oz Gold” dated 8 April 2021 were released to the Australian Securities
Exchange (ASX) on those dates. The Company confirms that:
•
•
it is not aware of any new information or data that materially affects the information included in the ASX
announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX announcements
continue to apply and have not materially changed.
AUTHORISATION
This announcement was authorised for release by the Board of Theta Gold Mines Limited.
NOTE BUSINESS ARRANGEMENT
Theta Gold Mines holds 100% issued capital of its South African subsidiary Theta Gold SA (Pty) Ltd (“TGSA”).
TGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty)
Ltd (“Sabie Mines”). TGME holds the various exploration and mining permits. The balance of shareholding is held
by Black Economic Empowerment (“BEE”) entities. The South African Mining Charter requires a minimum of 26%
meaningful economic participation by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding
in TGME and Sabie Mines is comprised of a combination of local community trusts, an employee trust and a strategic
entrepreneurial partner.
2
Significant Milestones
• Feasibility Study (FS) completed underpinning an initial 12.9-year mine life to deliver up to free cash flows of up to US$500m and 1.24Moz contained gold
production;
• Execution of A$110m (US$70m) non-binding Term Sheet (“TGME Stream”) signed with Sprott Streaming and Royalty (Sprott) for pre-development, development
capital and operating expenditure to bring the TGME Gold Project into production subject to completion of due diligence;
• Granted a Water Use License (WUL) for Frankfort mine by the South African Department of Water and Sanitation (DWS) resulting in Frankfort being fully permitted.
• Received the Water Use License for its TGME Gold Project over Mining Right 83 from the Department of Water and Sanitation (DWS) of South Africa
• Received blasting license approval to underground blasting operations at Frankfort mine;
• Frankfort Mine commercial bulk sample mining preparation and operations initiated with drill and blast options underway for the first delivery of 3,000 tones;
• Final Environmental Authorisation (EA) received for Mining Right 83 from the Department of Mineral Resource and Energy (DMRE) of South Africa
Refer to ASX Release dated 26 July 2023 Final Environmental Authorisation Granted MR83
Refer to ASX Release dated 19 July 2023 Drill and Blast of Frankfort Gold Mine Commences
Refer to ASX Release dated 15 May 2023 titled, “Operational Update”.
Refer to ASX Release dated 11 April 2023 Theta Receives Water Use Licence for Mining Right 83
Refer to ASX Release dated 2 November 2022 Water Use License Granted for the Frankfort Mine
Refer to ASX Release dated 19 October 2022 Theta Gold executes A$110M Term Sheet with Sprott
Refer to ASX Release dated 27 July 2022 Theta Gold’s TGME Project DFS confirms NPV of AUD432 Million.
3
ASX Listing
Ordinary
Shares ASX: TGM
Out-of-the-money
unlisted options and
management performance
rights
706M¹
110M
Market
Capitalisation1
(undiluted)
~A$71M (~US$65M)
Top Shareholders:
BNP PARIBAS NOMINEES PTY LTD
12.1%
CITICORP NOMINEES PTY LIMITED
10.7%
HSBC CUSTODY NOMINEES LTD
6.9%
ZENITH (HK) HOLDING LIMITED
6.6%
2INVEST AG
6.2%
TASMAN FUNDS MANAGEMENT LTD
4.6%
Note: 1 As of 28 November 2023 using the last closing price of US$0.09, (AU$0.14) on 24 November 2023 and RBA Exchange rate of 0.6563.
4
Theta Gold expected Catalysis 2024
• Execution Plan Theta Underground Project
• Commencement of trucking of bulk sample from Frankfort mine
• Permitting completion for Mining Right 83 (EIA)
• Completion of Sprott due diligence → Binding Streaming Agreement
• Commercial Bulk Sampling – Metallurgical Results
• Early Cashflow Options
• Project fully funded
• Final Investment Decision (FID)
• Construction Commencement
Note: First gold produced timing will be subject to securing funding and obtaining all necessary regulatory permitting approvals.
DFFE -Forestry permits for the continuation of miming are in progress – refer to ASX Release dated 18 July 202
5
Summary
Theta Gold Mines South Africa Gold Mine developer
Reviving South Africa’s first gold rush
➢ 6 M oz of High-grade Gold under management (One of the largest Resources
bases on ASX held by Junior)
➢ The Kirkland Lake Strategy- Back to First Gold Rush for the next generation of
mines.
➢ 43 Historical Mine /620 km2 of Goldfield/ kms of gold reefs
➢ First four Mines to generate over ½ Billion USD Free Cash post Tax
➢ High margin low-cost project AISC $834 USD (A$1112) (Bottom quartile of costs)
➢ Gold Discovery costs less than 12 USD per Gold ounce
➢ Not a typical South Africa/ provincial location with a small population
➢ The local people, our shareholders Signed petitions and lobbied Government for
the Project
➢ ESG –Environmental offsets and Small Foot Print/Community Forums/ Local Jobs
This is where South Africa’s gold mining industry began 130 years ago, and we’re
bringing this large, rich, shallow, predeveloped goldfield back to life.
6
Theta Gold Highlights
• High Growth Gold Investment Opportunity
• Existing Historic Goldfield - Multiple pre-developed, shallow, high grade historic gold mines –
ready to be brought back into production
• Large, Growing Resource - 6.1Moz gold resource @ 4.17g/t and continuously growing, with
more than 40 other existing pre-developed shallow underground mines not yet reflected in the
stated resource (Underground 4.5 Mt reef grade 14.68 -15.93g/t)
• Low Capital Start-up - < US$100m capital required to reach >90koz/a within 2 years
• Organic Growth - Self-funded expansion to >160koz within 5 years
• Lowest-Cost Quartile Producer - Forecasted operating cost half the current gold price
(<US$900/oz) to become the lowest cost producer in South Africa and Australia
• Competent Execution Team - Executive team that have successfully developed and optimised
many mines in South Africa and other developing countries
• Execution-Ready - FS completed with full front-end engineering designs (FEED)¹ – ready for
execution²
• Funding – Non-binding funding Term Sheet executed with Sprott Streaming and Royalty
Corporation for up to US$70m stream funding arrangement to bring the TGME Gold Project into
production.
1. Refer to ASX Release dated 20 June 2022 “TGME Underground Gold Update”
2. Refer to ASX Release dated 27 July 2022 “ Theta’s TGME Project Definitive FS Confirms NPV10% of A$432 million at US$1,642 oz Gold price”
3. Refer to ASX Release dated 19 October 2022 “Theta Gold executes a A$110m (US$70m) non-binding funding Term Sheet with Sprott for its TGME Gold
Project”
7
South Africa’s “Newest” Gold Field
Pilgrims Rest
Johannesburg
The Transvaal Gold System sits
geological on the eastern side of
Bushveld Complex the largest layered
igneous intrusion on earth. Our
goldfield already produced ~7Moz Au
since 1870s.
Theta have generated and delivered
one of the largest undeveloped gold
resources 6.1Moz on the ASX, a ”NEW”
kid on the block.
SA host the 3rd largest gold
reserves in the world, mostly
within this Witwatersrand gold
field region (~6,000T Au)
8
Key FS Takeaways1
Underground ore
Project Life
Theta Gold Mines Limited, controls
the Eastern Transvaal Gold Fields,
where South Africa’s gold mining
industry began almost 130 years ago.
12.9 years
mined
Peak Funding
Metallurgical
6.46Mt @ 5.95g/t
Requirements
Recovery
Au for 1.24Moz of
US$ 77M2
87%
contained gold
Project Life of Mine schedule
contained Gold 1.24Moz to recover
1.08Moz.
1FFeasibility figures to refer to ASX Release dated 27 July 2022 “FS Confirms
NPV10% of A$432 million at US$1642/oz Gold Price
Payback Period
Pre-Tax
AISC
Start of Project –
NPV 10%
US$788oz
31 Months
US$324m @ Avg
(Year 1-4)
Start of Mining –
USD/oz $1,642
US$847/oz
IRR of 65%
(LOM)
18 Months
2TGM is currently in discussion with debt financiers and has engaged an experienced debt advisory to assist in
the negotiation of term-sheets for funding of the Project. Further equity raises are also planned to fund
working capital and part of the project capital if required, which may lead to dilution to existing shareholders.
3First gold produced timing will be subject to securing funding
Incorporating only 4 of more than 40 previously
developed mines
9
9
Getting Ready for Construction/Production - Deliverables
• Initial startup Feasibility Study (FS) completed in July 20221 to produce 1.24Moz Gold with a FS Life of
Mine of 12.9 years.
• Strong support from stakeholders, including local NGOs, farmers, neighboring enterprises,
government departments, final Environmental Impact Assessment and Water Use License pending.
• Very significant ESG Initiatives and Coverage:
• Environmental offsets offered with a portion of project cashflow to fund the improvement of the
township, local river and general landscape, and
• A project designed to have a very small surface footprint – already existing plant zoning, existing
TSF, designed for future underground tailings deposition, and
• Regular Community Forums and the long needed local jobs creations as we will be the only
commercial mining operator within the local area.
1. Refer to ASX Release dated 27 July 2022 “ Theta’s TGME Project Definitive FS Confirms NPV10% of A$432 million at US$1,642 oz Gold price”
2. Refer to ASX Release dated 19 October 2022 “Theta Gold executes a A$110m (US$70m) non-binding funding Term Sheet with Sprott for its TGME Gold Project”
10
Strategy to build up to >160,000oz/a Au production profile within 5 years (only 6 of >40 pre-developed mines)
CURRENT
FS PHASE 1
90,000 oz/a
• 4 mining production units
• 45 kt/m Metallurgical plant
• Recommission existing Tailings
Storage Facility (TSF)
• Production from UG (Beta,
Rietfontein, Frankfort, CDM,)
• Production 90 koz/a
PHASE
2
>160,000 oz/a
• Expand to 7 mining production
units
• Expand gold plant to 80 kt/m
• Expand production to Vaalhoek,
Desire, and Glynn’s Mines
• Production >160 koz/a
Assess other >40 old mines, expand reserves through on-reef exploration, development
and drilling on operating mines and new exploration targets
11
6 UG Mines targeted first out of potential > 40
Solid Growth Potential
5
2
Pre-construction
• Surface footprint
• Underground
rehabilitation
• Operational
readiness
Permitting the next
phase of Mines
3
1
LEGEND
1.
Beta
2.
Frankfort
3.
CDM
4.
Rietfontein
5.
Vaalhoek
6.
Glynn’s Lydenburg
6
4
Exploration
Program
• Underground
sampling
• Surface drilling
Commercial Bulk
Sampling
• 3 000 tons
Targeting Increase in
Ore Reserves
• JORC update
Note: Subject to exploration success
12
Snapshot – Reviving South Africa’s first gold rush
• Provincial location with a small population
• The local people, our stakeholders, lobbied government for the Project
• ESG – Environmental offsets and Small Footprint, Community Forums, Local Jobs created
• First four Mines to generate over ½ Billion USD Free Cash post Tax
• High margin low-cost project AISC US$834 (A$1,112) (Bottom quartile among gold producers)
• Gold Discovery costs less than US$12 per ounce
• 43 Historical Mines 620km2 of Goldfield
• Kilometers of extended gold reefs
This is where South Africa’s gold mining industry began 130 years ago, and we’re bringing this large, rich,
shallow, predeveloped goldfield back to life.
13
APPENDICES
14
Project Economics at Various Gold Prices – Base Case (AUD)
Unit
Forecast
(USD1,642/ oz
Avg)
USD1,500/oz
USD1,600/oz
USD1,800/oz
USD2,000/oz
USD2,200/oz
NPV @ 10% (real) Pre-tax
AUDm
432
339
405
536
669
802
NPV @ 10% (real) Post-tax
AUDm
292
232
274
359
447
533
%
%
65%
57%
57%
50%
64%
56%
77%
67%
90%
78%
102%
87%
AISC
AUD/oz
1,112
1,096
1,107
1,129
1,149
1,167
EBITDA annual average
AUDm
92
77
87
107
128
148
EBIT annual average
AUDm
80
66
76
96
116
136
Free Cash Flow (Pre-tax)
AUDm
956
768
897
1,158
1,421
1,686
Free Cash Flow (Post-tax)
AUDm
678
550
638
814
996
1,175
Development Capital – Peak Funding
AUDm
102
102
102
102
102
102
Capital Sustaining
AUDm
49
49
49
49
49
49
Payback post-tax
Months
31
33
31
28
25
24
Capital Efficiency (Pre-Tax NPV/Dev Capital
%
422%
332%
395%
524%
653%
783%
Capital Efficiency (Post-Tax NPV/Dev Capital
%
285%
226%
268%
351%
437%
521%
Project Economics at gold price
IRR (%) Pre-tax
IRR (%) Post-tax
Note: Converted to AUD from using AUD:USD exchange rate of 1.333
15
15
FS Project Economics at Various Gold Prices – Base Case (USD)
Project Economics at gold price
Unit
Base Forecast
(USD1,642/oz USD1,500/oz USD1,600/oz USD1,800/oz USD2,000/oz USD2,200/oz
LoM Avg)
NPV @ 10% (Pre-tax)
USDm
324
255
304
402
501
601
NPV @ 10% (Post-tax)
USDm
219
174
206
269
335
400
IRR (Pre-tax)
%
65%
57%
64%
77%
90%
102%
IRR (Post-tax)
%
57%
50%
56%
67%
78%
87%
All-in Sustaining Costs (AISC)
USD/oz
834
822
831
847
862
876
EBITDA annual average
USDm
69
58
66
81
96
111
EBIT annual average
USDm
60
49
57
72
87
102
Free Cash Flow (Pre-tax)
USDm
717
576
673
869
1 066
1 264
Free Cash Flow (Post-tax)
USDm
508
412
478
611
747
881
Average Payback Period (from Start of Mining)
Months
31
33
31
28
25
24
Peak Funding Requirement
USDm
77
77
77
77
77
77
Sustaining Capital
USDm
37
37
37
37
37
37
Capital Efficiency (Pre-Tax NPV/Dev Capital*)
%
422%
332%
395%
524%
653%
783%
Capital Efficiency (Post-Tax NPV/Dev Capital*)
%
285%
226%
268%
351%
437%
521%
16
FS – Key Metrics Base/Ore Reserve Cases
Units
Base Case
Ore Reserve Case
Project Targeted Start Date
Quarter-yyyy
Q1 2023
Q1 2023
Commercial Production Start Date
Quarter-yyyy
Q2 2024
Q2 2024
Production build up period
Months
14
14
Life of mine
years
12.9
7.3
Underground ore mined (LOM)
Mt
6.46
2.85
Mined Grade
g/t
5.95
6.09
Gold Mined (LOM)
Moz
1.24
0.56
Production Rate
Kt/a
540
540
Production Rate
Kt/m
45
45
Grind size
µ
106
106
Gold recovered (average LOM)
%
87
87
Gold recovered (LOM)
Moz
1.08
0.49
Description
Cautionary Statement for the LOM Base Case – The Base Case is presented as potential upside to the Project. However, the Base Case is supported by a significant portion of Inferred Mineral Resources. Inferred Mineral Resources
inherently have a lower level of confidence and although it would be reasonable to expect that the majority of Inferred Mineral Resources would upgrade to Indicated Mineral Resources with continued exploration, it should not be
assumed that such upgrading will occur. The realization of the full potential of the Base Case as presented thus cannot be guaranteed.
Start date will be subject too securing necessary funding and approval of regulatory permits.
17
FS - Operating Costs in Dollar per Ton (Project over LoM)
AUD/Milled
tonne
USD/Milled
tonne
Mine Cost
96
72
Plant Costs
41
31
Other Costs
20
15
Royalties
15
11
Adjusted Operating Costs
172
128
Renewals and Replacements
8
6
Reclamation
3
2
Off-mine Overheads
4
3
All-in Sustaining Costs (AISC)
187
139
Operational Cost
• Adjusted Operating Costs against the milled tonnes per year
• The increase in feed tonnes in years 9 to 12 is due to Frankfort mine being mined, and the tonnes
reflected are prior to the Density Media Separation.
Average AUD:USD conversion rate for Adjusted Operating Costs is 1.333
Average AUD:USD conversion rate for All-in Sustaining Costs (AISC) is 1.333
Average ZAR:USD conversion rate for Adjusted Operating Costs is 15.52
Average ZAR:USD conversion rate for All-in Sustaining Costs (ASIC) is 15.50
18
FS - Phase 1 Plant Rendering
19
FS - Free Milling Ore Process Plant
20
FS - Process Selection and Metallurgical Test Work
Individual Mine
Metallurgical Test Work
% of 1.24M Oz into Mine
Schedule
Test Work Recovery
DFS Recovery Used
Comments
Beta
60.4%
87-95%
88%
• Beta showed to be amenable to
conventional CIL processing with 86-95%
recoveries
Rietfontein
27.3%
88-93%
90%
• Rietfontein showed to be amenable to
conventional
Frankfort
7.4%
61-82%
69%
• 82% CIL recovery of sulphide flotation
• 61% CIL recovery on sulphide float tails
CDM
4.9%
93-95%
88%
• Dukes from CDM orebody indicated total
recoveries of 93% and higher with
combined flotation and CIL processing
• Additional Metallurgical test work is currently ongoing on all the Mines with the objective to improve on the current recovery grades.
• Average gold recovery rate is 87.1%.
21
Environmental, Social & Governance (ESG)
ESG IS INTEGRAL TO THE DEVELOPMENT STRATEGY AND IS
BASED ON:
•
•
•
•
Holistic risk management
Zero harm approach to health and safety
Environmental stewardship
•
•
•
Conservation of biodiversity
Responsible production practices
Positive impact on host communities
Transparent stakeholder engagement and reporting
ENVIRONMENT
•
•
Creating regional
SOCIAL
•
26% of project ownership held by
Environmental
Development Trusts for
local labour force, host communities
and strategic black entrepreneur
alien invasive plants removals
Establish nature reserves and
targeted environmental study
programs
partners
Projects structured for broad based
•
GOVERNANCE
•
•
Ethical business practices
Culture of high ethical standards
throughout the organisation
economic participation
•
•
Alleviation of poverty
TGME will be the biggest employer
in the area
22
Combined Minerals Resource Statement (~6.1Moz)
Combined Mineral Resource
Resource Classification
Type of Operation
Underground
Tonnage
Gold Grade
Mt
g/t
Gold Content
Kg
koz
0.091
5.37
489
15.7
0.091
5.37
489
15.7
Underground
4.774
6.21
29 661
953.7
Open Pit
8.109
2.14
17 364
558.2
Tailings
5.244
0.83
4 373
140.6
18.128
2.84
51 398
1652.5
Underground
21.452
5.22
111 880
3597.0
Open pit
4.907
5.11
25 057
805.6
Tailings
0.023
0.57
13
0.4
Rock Dump
0.885
1.20
1 059
34.0
Total Inferred
27.267
5.06
138 009
4 437.0
Grand Total
45.485
4.17
189 896
6 105.2
Measured
Open pit
Tailings
Total Measured
Indicated
Total Indicated
Inferred
Notes:
1.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35 g/t.
2.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
3.
Gold price used for the cut-off calculations is USD1,500/oz.
4.
Mineral Resources are stated as inclusive of Ore Reserves.
5.
Mineral Resources are reported as total Mineral Resources and are not attributed.
23
Total Mineral Resources of the 4 Mines included in the DFS - Combined as of 1 February 2021
Mineral Resource
Classification
Measured
Total Measured
Indicated
Mine
Reef
Frankfort
Bevetts
Frankfort
CDM
Beta
Rietfontein
Bevetts
Rho
Beta
Rietfontein
Total Indicated
Total Measured & Indicated
Mineral Resource
Classification
Inferred
UG Mine
Frankfort
CDM
Beta
Rietfontein
Total Inferred
Reef
Bevetts
Rho
Beta
Rietfontein
Reef Grade
g/t
7.13
7.13
7.86
13.19
21.66
14.57
16.35
16.00
Reef Grade
g/t
7.41
10.06
16.51
14.06
13.51
Stope
Reef Width Stope width
Grade
g/t
cm
cm
5.37
73
103
5.37
73
103
5.13
58
96
3.80
23
90
6.58
23
90
8.20
52
92
6.24
30
91
6.22
32
92
Stope
Reef Width Stope width
Grade
g/t
cm
cm
4.27
48
93
3.02
24
90
5.43
25
90
8.52
57
94
5.56
39
92
Content
cm.g/t
520
520
452
307
499
755
540
540
Content
cm.g/t
356
244
414
803
524
Reef Tonnes
Mt
0.069
0.069
0.243
0.258
0.716
0.517
1.734
1.803
Reef Tonnes
Mt
0.343
0.544
1.107
1.190
3.184
Stope
Tonnes
Mt
0.091
0.091
0.373
0.895
2.357
0.919
4.543
4.634
Stope
Tonnes
Mt
0.596
1.811
3.367
1.962
7.736
Au Content
kg
489
489
1,912
3,401
15,506
7,534
28,352
28,841
koz
15.7
15.7
61.5
109.4
498.5
242.2
912
927
Au Content
kg
2,543
5,472
18,285
16,721
43,022
koz
81.8
175.9
587.9
537.6
1,383.2
Notes:1.
Mineral Resource cut-off of 160 cm.g/t applied.
2.
3.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
Gold price used for the cut-off calculations is USD1,500/oz.
4.
5.
6.
cm.g/t and g/t figures will not back calculate due to variable densities in reef and waste rock.
Mineral Resources are stated as inclusive of Ore Reserves.
Mineral Resources are reported as total Mineral Resources and are not attributed.
24
Mineral Resource Statement – Underground Only (~4.5Moz)
Mineral Resource
Classification
Mine
Reef
Reef Grade
Stope Grade
Reef Width
Stope width
Content
Reef Tonnes
Stope Tonnes
g/t
g/t
cm
cm
cm.g/t
Mt
Mt
Au Content
7.13
5.37
73
103
520
0.069
0.091
489
koz
15.7
7.13
5.37
73
103
520
0.069
0.091
489
15.7
7.86
13.19
21.66
14.57
13.90
16.97
5.13
3.80
6.58
8.20
6.34
4.62
58
23
23
52
36
25
96
90
90
92
90
90
452
307
499
755
499
416
0.243
0.258
0.716
0.517
0.064
0.026
0.373
0.895
2.357
0.919
0.140
0.091
1,912
3,401
15,506
7,534
887
422
61.5
109.4
498.5
242.2
28.5
13.6
Total Indicated
16.26
6.21
36
91
591
1.824
4.774
29,661
953.7
Total Measured & Indicated
15.93
6.20
38
91
600
1.893
4.865
30,150
969.4
Measured
Frankfort
Bevetts
Total Measured
Indicated
Mineral Resource
Classification
Inferred
Frankfort
CDM
Beta
Rietfontein
Vaalhoek
Olifantsgeraamte
UG Mine
Frankfort
CDM
Beta
Rietfontein
Olifantsgeraamte
Vaalhoek
Vaalhoek
Glynns Lydenburg
Ponieskrantz*
Frankfort Theta*
Nestor*
Bevetts
Rho
Beta
Rietfontein
Vaalhoek
Olifantsgeraamte
Reef
Bevetts
Rho
Beta
Rietfontein
Olifantsgeraamte
Vaalhoek
Thelma Leaders
Glynns
Portuguese
Theta
Sandstone
Total Inferred
kg
Reef Grade
Stope Grade
Reef Width
Stope width
Content
Reef Tonnes
Stope Tonnes
g/t
g/t
cm
cm
cm.g/t
Mt
Mt
Au Content
7.41
10.06
16.51
14.06
18.33
16.28
12.18
15.87
13.26
7.22
5.54
4.27
3.02
5.43
8.52
4.68
4.77
9.47
5.19
3.99
3.24
2.92
48
24
25
57
23
22
96
25
22
34
41
93
90
90
94
90
90
123
90
90
90
90
356
244
414
803
422
361
1166
397
287
244
225
0.343
0.544
1.107
1.190
0.059
0.873
0.023
3.218
0.064
0.099
0.101
0.596
1.811
3.367
1.962
0.248
2.980
0.030
9.833
0.213
0.220
0.193
kg
2,543
5,472
18,285
16,721
1,162
14,209
284
51,078
849
714
562
14.68
5.22
31
91
458
7.622
21.452
111,880
koz
81.8
175.9
587.9
537.6
37.3
456.8
9.1
1 642.2
27.3
23.0
18.1
3,597.0
Notes:
1. Mineral Resource cut-off of 160 cm.g/t applied.
2. Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
3. Gold price used for the cut-off calculations is USD1,500/oz.
4. cm.g/t and g/t figures will not back calculate due to variable densities in reef and waste rock.
5. Mineral Resources are stated as inclusive of Ore Reserves.
6. Mineral Resources are reported as total Mineral Resources and are not attributed.
25
Mineral Resource Statement – Open Pit Only (~1.4Moz)
Mineral Resource Classificati