Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM) is pleased to report on its
activities for the three months ended 30 September 2019. The Company had a strong quarter
with post Feasibility Study activities centred around engineering, social licence and permitting
of the Theta open‐cut gold project (“Theta Project”).
Subsequent to the end of the quarter, the Company acquired a quality, secondhand 2.5MW ball
mill. The Theta Project Feasibility Study demonstrated robust project economics which will be
further enhanced by the purchase of the ball mill which has a capacity beyond the 500 Ktpa of
ore throughput used in the Feasibility Study.
HIGHLIGHTS
Ball Mill purchase post quarter‐end (ASX announcement 2 October 2019)
Optimised gold plant layout completed (ASX announcement 22 August 2019)
2019 Annual Report released (ASX announcement 27 September 2019)
A$8.0 million capital raising completed (ASX announcement 30 September 2019)
Site Activities
Engineers calculated Optimised Ball Mill production rates 500 ‐ 1,000Ktpa
Engineers commenced planning to move 2.5MW ball mill to the TGME site
Contractor engaged to expand power grid transformer for the Theta Project
Community rally to support and embrace Theta Gold’s sponsorship and participation in
annual South African National Gold Panning Championships
Theta Gold increasing its social and community engagement
Current Resources
Gold Resource 6 Moz (44.78 Mt @ 4.18g/t)
1.3 Moz open cut resources (13.1 Mt @ 3.12 g/t Au)
4.5 Moz underground resources (26.3Mt @ 5.4g/t Au)
Theta Project Open Cut Resource 870 Koz (10.1 Mt @ 2.7g/t Au) (Indicated & Inferred,
0‐130m depth)
Maiden Mining Reserve 205 Koz (2.31 Mt @ 2.76 g/t Au at a 0.4 g/t Au cut‐off), Maiden
Probable Ore Reserve (Refer Appendix A Table 2 )
Theta Gold Mines Limited ABN 30 131 758 177
Level 32, 101 Miller Street, North Sydney NSW 2060
Tel: +61 2 8912 2126 Email: info@thetagoldmines.com
www.thetagoldmines.com
Chairman, Bill Guy commented: “The Theta Project Feasibility Study is a great starter project
which will allow the Company to unlock the potential of the East Transvaal goldfield. The ball
mill purchase, a key long lead item will allow for initial production as well as providing for
potential expansion production rate ranging between 500 ‐ 1,000Ktpa. The mill is expected on
site in February 2020.
Strong support from the locals was evident during the South African National Gold Panning
Championships. It was a great day for Pilgrim’s Rest and our staff, with the event well
supported. The Company is pleased to sponsor the event in this rural region of South Africa.
There are many talented gold panners in the district due to 130 years of gold mining history.
In the next quarter, the Company will look to finalising permitting studies, engineering, project
finance options, exploration and opportunities to leverage the new ball mill’s extra capacity.
Permitting is in progress, with the Environmental Impact Report expected to be submitted in
late 2019.”
SOCIAL LICENCE
The Company continues to work with the local community in Pilgrim’s Rest who are very
supportive of the Company’s efforts to restart gold mining and processing operations in the
area. The Company has again supported the annual South African National Gold Panning
Championships and its three‐man sponsored team won silver while the sponsored five‐man
team took gold in the event.
The Company is committed to supporting the local population (less than 3,000 people at
Pilgrim’s Rest) through employment, local ownership and education initiatives. The Company
has supported the local school with teachers, maintenance and funds for over five years.
Figure 1 : Local GPS Newspaper article
2
Figure 2 : Theta Gold Supports South African National Gold Panning Championships
OPTIMISED BALL MILL TEST
SGS Mineral Services and METS South Africa Pty Ltd (part of the UMS Group) completed the mill
calculations on the 2.5MW ball mill using Theta ore bond index (Max 12.1). In summary the mill
can do 1Mtpa at a feed size of 20mm using the assumptions below ‐
1. Mill BWI ‐ 12.1 kW/t (this is the highest recorded by SGS)
2. Ball charge ‐ 32%
3. Critical speed based on 65% of mill speed
Further increases in mill capacity (1.2 Mtpa) would require a change in plant design to include a
tertiary crusher to reduce the feed size for the mill to 4mm.
BALL MILL PURCHASE
2.5MW ball mill secured for ZAR5.5m (A$550,000 or US$360,000) – considerably cheaper
than new build.
Mill can process 820Ktpa of ore based on current ball charge ‐ potential to increase to
1Mtpa capacity with adjustments.
Last operated at Glencore’s chrome pelletizing operation in Rustenburg, South Africa.
Equipment in excellent condition – 2 spare motors and 2 spare gearboxes included.
All engineering and installation drawings available reducing future erection time.
Following the completion of the Feasibility Study on the Theta Project, which demonstrated a
low cost open cut mine, Theta Gold proceeded to identify appropriate long‐lead items for the
project. The ball mill is considered one of the critical pieces of plant equipment for the new
gold processing plant.
3
In July 2019, the Company visited the site where the mill is located with plant engineers from
METS South Africa Pty Ltd and conducted a detailed inspection of the mill. The equipment was
reported to be in excellent condition with all associated parts being well maintained.
Figure 3 : 2.5 MW Ball Mill
In addition to the essential drive train components, the purchase includes two spare motors,
two spares gearboxes (one brand new and one used), a seasoned ball charge and a full set of
liners (~50% life remaining). There are also spare slipper pads and various miscellaneous spare
parts including liners and bearings for gearboxes. There is a full set of engineering and
installation drawings, which will serve to reduce installation costs. Ordinarily, an operation
would hold one of each critical spare and it is rare to have this duplication. The girth gear for
the mill is still in new condition and clearly has minimal wear.
Figure 4 : Spare 2.5 MW Motor
Figure 5 : Spare Gearboxes
4
ENGINEERS PLANNING MILL RELOCATION
With the recent acquisition of the 2.5 MW ball mill as a key long‐lead plant item, the Company
has commenced with the planning for the removal and relocation of the mill to the TGME site.
This marks another key step as the Company systematically progresses towards production
from the low‐cost Theta open cut project.
Figure 6 : Engineers on site to plan transport of 2.5 MW ball mill
OPTIMISED GOLD PLANT LAYOUT
The new metallurgical plant layout position will create the flexibility to materially increase the
Company’s gold production profile. This exercise is in terms of the Company’s strategy to
achieve a production profile of 100,000 ounces per annum.
Summary
Phase 1: 500,000tpa Open Cut Oxide CIL Plant (Theta Project FS Design May 2019)
Phase 2: Permitted plant space to expand Open Cut Oxide CIL Plant to 1 Mtpa
Phase 3: Permitted plant space available for Underground Ore process circuit
The Company wanted to ensure that in the future it had the flexibility to scale production from
the Feasibility Study envisaged gold plant throughput of 500,000tpa to 1Mtpa and further to
have the ability to treat potential underground ore resources. The study explored potential
5
future plant expansion possibilities that makes use of TGME’s large footprint of permitted plant
area that is currently un‐utilized in terms of the May 2019 Feasibility Study (“FS”).
In terms of the studies undertaken, the process and engineering teams reviewed the ability to
expand the plant to 1Mtpa of open cut oxide ore (see Figure 7 below) and also to further ensure
that the plant’s design and spatial layout is flexible enough to allow for the installation of
additional process circuits to treat potential underground ore. The proposed new plant will be
built with a minor design alteration to allow for scaling up to these potential production
profiles. This approach will allow the Company to more than double the production profile in
future with minimal disturbance to gold production at the Theta Project.
Figure 7 : Plant Layout Showing Expansion Opportunities
YELLOW/ORANGE: FS Phase 1 – 500 ktpa GREEN: Phase 2 Expansion to 1 Mtpa+
RED: Phase 3 Expansion to above ~1.5Mtpa or more
EXPANSION OF POWER GRID TRANSFORMERS
The Theta Project will require additional power draw capacity off the national power grid to
cater for the overall increase in power requirements for the new plant. The incoming
powerline from the main grid is large enough to accommodate this additional power draw
6
however the transformer yard that deals with the incoming 22 KVA line is not large enough to
cater for the additional power draw in the plant.
The Company is working with the national power provider, ESKOM, to increase the transformer
capacity within the incoming ESKOM yard. The Company has engaged electrical engineers from
the capital of the province who work with ESKOM on a regular basis and who are fully
conversant with the process required to apply for, and if necessary, building, testing and
commissioning an expansion of this nature.
Figure 8 : ESKOM Transformer Yard
Figure 9 : Engineers ‐ Site Inspection of Transformer Yard
7
CORPORATE
Cash Position and Funding
As at 30 September 2019, the Group had US$3,624,000 in cash.
On 23 July 2019, the Company announced that it had entered into subscription agreements
with specialist global resource investors for the placement of 53,333,334 shares at A$0.15 per
share to raise a total of A$8,000,000. The placement was completed in three tranches, with the
final tranche of A$4,000,000 received and shares issued on 30 September 2019. The shares are
voluntarily escrowed until 31 December 2020.
The funds raised is being used for completion of pre‐development activities and applied
towards the purchase of equipment for the Company’s Theta open‐cut gold project in South
Africa. The placement funds will also contribute to environmental related work, including
environmental bond obligations for a number of newly granted Mining Rights as well as for
general working capital.
Capital Structure
As stated above, the Company issued 53,333,334 shares at A$0.15 per share during the quarter
to raise a total of A$8,000,000. A total of 10,161,121 options have also expired since the end of
the previous quarter and up to the date of this report.
The current capital structure of the Company is as follows –
Fully paid ordinary shares
(ASX: TGM)
Listed options exercisable at $0.30 each on or before 31 October
2020 (ASX: TGMO)
Unlisted options and performance rights
(details in Appendix B)
Number
436,706,585
31,429,663
28,932,183
Annual General Meeting
The 2019 Annual General Meeting will be held on Monday 18 November 2019 at –
Boardroom Pty Limited
Level 12, 225 George Street
SYDNEY NSW 2000
A notice of meeting has been despatched to all shareholders.
Annual Report 2019
The 2019 Annual Report was released on 27 September 2019. A copy of the report is available
on the Company’s website at https://www.asx.com.au/asxpdf/20190927/pdf/448z2r1pt7b199.pdf.
8
For more information please visit www.thetagoldmines.com or contact:
Project Enquiries
Rob Thomson, Managing Director
Theta Gold Mines Limited
M: +61 409 843 963
robt@thetagoldmines.com
or
Investor Enquiries
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8912 2126
billg@thetagoldmines.com
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM, TGMO) is a gold development company that holds a range of
prospective gold assets in a historic South African gold mining region. These assets include several surface
and near‐surface high‐grade gold projects which provide cost advantages relative to other gold producers in
the region.
Theta Gold Mines’ core project (the Theta Project) is located next to the historical gold mining town of
Pilgrim’s Rest, in Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of
Nelspruit (Capital City of Mpumalanga Province). Following small scale production from 2011 – 2015, the
Company is currently focussing on the planned refurbishment of the existing CIL plant and nearby
mines/prospects with the intention of resuming gold production and is considering open pit mining on
certain identified mineral resources amenable to open pit production. The Company has completed a
detailed feasibility study and is in the process of seeking approvals for open pit mining on the existing mining
licences held.
The Company aims to build a solid production platform to over 100,000ozpa based primarily around shallow,
open‐cut or adit‐entry hard rock mining sources. Theta Gold Mines has access to over 43 historical mines and
prospect areas that can be accessed and explored, with over 6.7Moz of historical production recorded.
BUSINESS ARRANGEMENT
Theta Gold Mines holds 100% issued capital of its South African subsidiary Stonewall Mining (Pty) Ltd
(“Stonewall”). Stonewall holds a 74% shareholding in both Transvaal Gold Mining Estates Limited
(“TGME”) and Sabie Mines (Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black
Economic Empowerment (“BEE”) entities. The South African Mining Charter requires a minimum of 26%
meaningful economic participation by the historically disadvantaged South Africans (“HDSAs”). The BEE
shareholding in TGME and Sabie Mines is comprised of a combination of local community trusts, an
employee trust and a strategic entrepreneurial partner.
9
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold Mines regarding estimates or future events
which could be considered forward looking statements. Forward looking statements are typically
preceded by words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”,
“Believes”, “Anticipates”, “Predicted”, “Estimated” or similar expressions. Forward looking statements,
opinions and estimates included in this announcement are based on assumptions and contingencies
which are subject to change without notice, and may be influenced by such factors as funding
availability, market‐related forces (commodity prices, exchange rates, stock market indices and the like)
and political or economic events (including government or community issues, global or systemic events).
Forward looking statements are provided as a general reflection of the intention of the Company as at
the date of release of the document, however are subject to change without notice, and at any time.
Future events are subject to risks and uncertainties, and as such results, performance and achievements
may in fact differ from those referred to in this announcement. Mining, by its nature, and related
activities including mineral exploration, are subject to a large number of variables and risks, many of
which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable
basis for making the forward looking statements contained in this document, with respect to any
production targets, resource statements or financial estimates, however further work to define Mineral
Resources or Reserves, technical studies including feasibilities, and related investigations are required
prior to commencement of mining. No liability is accepted for any loss, cost or damage suffered or
incurred by the reliance on the sufficiency or completeness of the information, opinions or beliefs
contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments
to support the estimation of Ore Reserves. There is no assurance that the intended development
referred to will proceed as described, and will rely on access to future funding to implement. Theta Gold
Mines believes it has reasonable grounds the results of the Feasibility Study. At this stage there is no
guarantee that funding will be available, and investors are to be aware of any potential dilution of
existing issued capital. The production targets and forward looking statements referred to are based on
information available to the Company at the time of release, and should not be solely relied upon by
investors when making investment decisions. Theta Gold cautions that mining and exploration are high
risk, and subject to change based on new information or interpretation, commodity prices or foreign
exchange rates. Actual results may differ materially from the results or production targets contained in
this release. Further evaluation is required prior to a decision to conduct mining being made. The
estimated Mineral Resources quoted in this release have been prepared by Competent Persons as
required under the JORC Code (2012). Material assumptions and other important information are
contained in this release.
10
Appendix A ‐ JORC 2012 Tables
Table 1: Combined Mineral Resources as at 1 May 2019
Mt
Gold
Grade
g/t
Kg
0.091
5.37
489
koz
15.7
0.091
5.37
489
15.7
Underground
4.774
6.21
29,661
953.7
Open Pit
7.161
2.11
15,091
485.2
Tailings
5.244
0.83
4,373
140.6
17.179
2.86
49,126
1,579.4
Underground
21.452
5.22
111,880
3,597.0
Open Pit
5.922
4.35
25,730
827.3
Tailings
0.023
0.57
13
0.40
Rock Dump
0.121
1.64
199
6.40
Total Inferred
27.518
5.01
137,823
4,431.0
Grand Total
44.788
4.18
187,438
6,026.2
Mineral
Resource
Classification
Measured
Type of Operation
Tonnage
Underground
Total Measured
Indicated
Total Indicated
Inferred
Gold Content
Notes:
1. Columns may not add up due to rounding.
2. Gold price used for the cut‐off calculations is USD1,500/oz.
3. UG Mineral Resources are reported at a cut‐off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and
rock dumps at 0.35 g/t.
4. Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
5. Mineral Resources are stated as inclusive of Ore Reserves.
6. Mineral Resources are reported as total Mineral Resources and are not attributed.
Table 2: Theta Project Ore Reserves for MR83 Only, 1 May 2019
Mineral Resource
Category in LoM Plan
Probable
Probable
Probable
Pit
Browns Hill
Iota (Columbia
Hill)
Theta Hill
Grade
g/t
3.24
Reef Tonnes
kt
564
kg
1,826
oz
58,699
2.54
1,253
3,189
102,513
2.76
493
1,362
43,798
2,310
6,377
205,010
Total
2.76
The Ore Reserves exclude Inferred Mineral Resources.
Au Content
Notes:
1. Totals in the Ore Reserve may not add‐up due to rounding.
2. Mineral Resources are for MR83 only and excludes MR341.
3. No Inferred Mineral Resources are included in the Ore Reserve.
11
Table 3: Total Theta Project ‐ Mineral Resources, 1 May 2019
Mineral
Resource
Classification
Open Pit Mine
Indicated
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Columbia Hill
Columbia Hill
Columbia Hill
Columbia Hill
Reef
Grade
g/t
Reef
Width
cm
cm.g/t
Reef
Tonnes
Mt
Shale
1.02
200
204
Bevetts
1.10
221
Upper Theta
2.41
Lower Theta
Reef
Content
Au Content
Kg
koz
0.439
402
12.9
244
0.891
886
28.5
100
241
0.724
1,568
50.4
3.70
100
370
0.888
2,956
95.0
Beta
2.49
100
249
0.383
859
27.6
Bevetts
Upper Rho
Lower Rho
Upper Theta
Total Indicated
2.89
2.43
2.51
1.08
2.14
114
393
550
114
246
330
956
1381
123
526
0.105
0.808
0.815
0.158
5.211
303
1,965
2,047
171
11,157
9.7
63.2
65.8
5.5
358.7
Mineral
Resource
Classification
Open Pit Mine
Reef
Grade
g/t
Reef
Width
cm
Shale
1.11
Bevetts
Inferred
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Columbia Hill
cm.g/t
Reef
Tonnes
Mt
216
240
1.07
213
Upper Theta
1.86
Lower Theta
Reef
Content
Au Content
Kg
koz
0.703
666
21.4
227
0.648
589
19.0
100
186
1.071
1,692
54.4
8.11
100
811
1.643
11,329
364.3
Beta
2.23
100
223
0.748
1,417
45.6
Upper Rho
Total Inferred
5.13
3.30
106
132
544
434
0.099
4.912
507
16,202
16.3
520.9
Mineral
Resource
Classification
Reef
Grade
g/t
Reef
Width
cm
All
2.14
All
Open Pit Mine
Total Theta
Project
Total Theta
Inferred
Project
Total Indicated and Inferred
Indicated
Reef
cm.g/t
Reef
Tonnes
Mt
246
526
3.30
132
2.70
190
Content
Au Content
Kg
koz
5.2
11,157
358.7
435
4.9
16,202
520.9
514
10.1
27,359
879.6
Notes:
1.
2.
3.
4.
5.
Theta Project (Theta Hill, Browns Hill and Iota) cut‐off is 0.35 g/t;
The gold price used for the cut‐off calculations is USD 1,500 / oz;
Geological losses applied are 10% for inferred and 5% for Indicated and Measured;
Theta Hill and Browns Hill ‐ Upper Theta Reef, Lower Theta Reef and Beta Reef are diluted grades over
100cm;
Historical mine voids have been depleted from the Mineral Resource;
12
6.
7.
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or
a portion thereof will be converted to Ore Reserves;
Mineral Resources fall within the mining right MR83 and MR341.
Competent Persons Statement
Mineral Resources and Ore Reserves
The information in this report relating to Mineral Resources is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons
(Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South
African Council for Natural Scientific Professions.
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information and
supporting documentation compiled by Mr Daniel van Heerden (B Eng (Min.), MCom (Bus. Admin.), MMC,
Pr.Eng. No. 20050318, FSAIMM, AMMSA), a director of Minxcon (Pty) Ltd and a member of the
Engineering Council of South Africa.
The original reports titled “Theta Gold increases Mineral Resource to over 6Moz” and “Positive Feasibility
Study for Theta Project” were dated 16 May 2019 and were released to the Australian Securities Exchange
(ASX) on that date. The Company confirms that –
it is not aware of any new information or data that materially affects the information included in the
ASX announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcements continue to apply and have not materially changed.
13
Appendix B ‐ Unlisted Options and Performance Rights
Number
OPTIONS
727,970
1,000,000
1,000,000
604,213
200,000
Performance Hurdle/Vesting Date
(if applicable)
20 day VWAP above $0.030. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
200,000
20 day VWAP above $0.035. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
3,732,183
TOTAL OPTIONS
PERFORMANCE RIGHTS
50,000
All systems, licences, insurances, regulatory and
statutory compliance in place to meet South Africa
Mining regulations, laws, Mining Charter 111,
commercial contacts. (Mine ready).
4,670,000
Delineating a total of 300,000 ounces of gold ore
reserves (in accordance with the JORC Code 20121)
at grade of at least 2.5g/t Au, amenable to open‐cut
mining on Mining Right 83, Mining Right 341 and
Mining Right 10167 (under application).
5,370,000
Decision to Mine (Board approval to commence
development of a gold mining operation) with all
regulatory approvals secured.
This performance hurdle must be achieved on or
before the date that is 18 months from the date of
issue of the performance right.
7,630,000
Achieving annualised production of 50,000 ounces of
gold per annum over a consecutive period of 3
months.
This performance hurdle must be achieved on or
before the date that is 30 months from the date of
issue of the performance right.
7,480,000
Achieving annualised production of 100,000 ounces
of gold per annum over a consecutive period of 3
months.
This performance hurdle must be achieved on or
before the date that is 48 months from the date of
issue of the performance right.
25,200,000
TOTAL PERFORMANCE RIGHTS
28,932,183
TOTAL OPTIONS AND PERFORMANCE RIGHTS
Exercise
Price
Expiry Date
$0.19
$0.25
$0.30
$0.19
$0.35
15 Jan 2020
18 Jan 2020
18 Jan 2020
13 Aug 2020
19 July 2022
$0.40
19 July 2022
Nil
27 June 2024
Nil
27 June 2024
Nil
27 June 2024
Nil
27 June 2024
Nil
27 June 2024
14
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
THETA GOLD MINES LIMITED
ABN
Quarter ended (“current quarter”)
30 131 758 177
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
30 September 2019
Current quarter
US$’000
Year to date
(3 months)
US$’000
(950)
(950)
(d) staff costs
(137)
(137)
(e) administration and corporate costs
(923)
(923)
2
2
(204)
(204)
(2,212)
(2,212)
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Research and development refunds
1.8
Other
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
+ See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
2.2
Current quarter
US$’000
Year to date
(3 months)
US$’000
Proceeds from the disposal of:
(a) property, plant and equipment
32
32
32
32
5,466
5,466
(123)
(123)
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of
shares, convertible notes or options
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
(28)
(28)
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
5,315
5,315
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
489
489
(2,212)
(2,212)
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
32
32
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
5,315
5,315
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
3,624
3,624
+ See chapter 19 for defined terms
1 September 2016
Page 2
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
5.
Reconciliation of cash and cash
equivalents
Current quarter
US$’000
Previous quarter
US$’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
3,624
489
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,624
489
6.
Payments to directors of the entity and their associates
Current quarter
US$'000
6.1
Aggregate amount of payments to these parties included in item 1.2
149
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Payments for salaries and consulting fees.
Current quarter
US$'000
7.
Payments to related entities of the entity and their
associates
7.1
Aggregate amount of payments to these parties included in item 1.2
7.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
7.3
Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
+ See chapter 19 for defined terms
1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
US$’000
Amount drawn at
quarter end
US$’000
2,800
2,800
8.1
Loan facilities
8.2
Credit standby arrangements
8.3
Other (please specify)
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
Details of the l
Share your feedback
Discover