Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM, TGMO | OTCQB: TGMGF) is
pleased to report on its activities for the period from 1 January 2020 to 31 March 2020.
The Company has made good progress in bringing the Theta Project closer towards production
as well as strengthening its social licence in the area. Various permitting activities continue to
progress as the Company works towards becoming a gold producer.
HIGHLIGHTS
Optimised Theta Open Pit Starter Project
Optimised mine schedule delivers additional 40,000 oz gold with 260 Koz delivered to
plant over 6.5 years Life of Mine (“LoM”)
Total Capital Cost of US$31.4 million, with pay-back period of 8 months
LoM All-In Sustaining Cost (AISC) of US$855/oz at bottom quartile for South African
producers
EBITDA over LoM of US$150 million
NPV5 of US$85 million
Plant Construction
Tender documents issued for plant construction on an Engineering, Procurement,
Construction (EPC)/Lump Sum Turnkey (LSTK) basis
Tender based on the Plant Optimisation Study design work with throughput increased to
600 Ktpa (ASX announcement 28 Jan 2020)
Designs for Tender have incorporated the 2.5 MW ball mill purchased in October 2019
Company engaging with multiple credentialed engineering and contracting groups
Final contractor selection expected H1 2020
Ball Mill arrived and unloaded safely at mine site
Mining Contract
Mining contract being negotiated with preferred mining contractor
Indicative draft mining costs remain in line with costs released in May 2019 Feasibility
Study
Mining Right 83 (MR83) Environmental Authorisations
Amendment application being updated to reflect optimised mine schedule
The Company is pleased with the continued strong project development progress including that
the 2.5 MW mill purchased in October 2019 has arrived safely and been offloaded. Pre
construction tender processes are underway including for the 600,000tpa process plant. The
Company is updating the environmental authorisation documentation to reflect the optimised
study. A mining contract is now being finalized with the preferred mining contractor.
OPTIMISED THETA OPEN PIT STARTER PROJECT
Subsequent to the end of the quarter, the Company released the results of an optimised study
for the Theta Open Pit Starter Project (ASX announcement 24 April 2020). The study
incorporates a new optimised mine schedule that includes the mining of several old mine waste
rock dumps and allows for an increase in the production rate from 500 ktpa to 600 ktpa. The
recently acquired 2.5 MW ball mill, which has a capacity of up to 1.2Mtpa, was also
incorporated into the study. This ball mill will provide the flexibility to expand as the project
grows.
The result of the study is a significant improvement over the May 2019 Feasibility Study (“May
’19 FS”) and adds 40,000 oz of gold to the life of mine plan. The table below sets out the
comparison of the May ’19 FS to the Optimised Study at various gold price scenarios. Salient
details between the Optimised Study run at US$1,500/oz vs the May ’19 FS base case at
US$1,257/oz include:
1.
2.
3.
4.
The IRR nearly doubling from 65% to 123%;
Mine life increases from 5 years to over 6.5 years;
EBITDA increases by US$50 million over the LoM to US$150 million; and
NPV5 increases by US$35 million to US$85 million.
Optimised Study compared May ‘19 FS
Real Discount Rate
Unit
Lower Case
US$1 369/
oz
NPV @ 5%
Internal Rate of Return (IRR)
Total ounces in Mine plan (Annexure A)
Total Oz Recovered
Average Payback Period (From Start of
Production)
Total Capital Requirement
All In Sustaining Cost (AISC)
Return on investment
EBITDA over LOM
Gold Price
Exchange Rate
USDm
%
oz
oz
61
92.7%
259 607
234 063
Base
Case
US$1 500/
oz
85
123.0%
259 607
234 063
Stretch
Case
US$1 600/
oz
104
157.2%
259 607
234 063
Month
9
8
6
14
USDm
USD/oz
USDm
USDm
USD/oz
ZAR/USD
31.4
911
206%
108.5
1 369
14.64
31.4
855
350%
150.2
1 500
16.00
31.4
822
476%
181.4
1 600
17.00
34.3
760
182%
99.6
1 257
14.01
May ’19 FS
US$1 257/
oz
50
65.1%
219 425
200 905
2
PLANT CONSTRUCTION TENDER
As mentioned in the ASX announcement dated 3 March 2020, the Company has started the
tender process based on a Lump Sum Turnkey (LSTK) contract for the first stage 600,000tpa gold
plant construction. The Company is engaging with multiple South African based engineering
and construction groups with the necessary capability to deliver on time, budget and design
quality. The design work supporting the Tender has been prepared by METS Engineering SA
(Part of the UMS Group) following plant design optimization work announced on 28 Jan 2020.
The design incorporates the newly purchased (October 2019) 2.5 MW ball mill. The mill design
and operating parameters have been incorporated into the revised and optimised plant design
and offers the project flexibility to easily expand production up to 1.2Mtpa should the project
grow.
.
As part of this design work, METS and the Company have also delivered sufficient detail to allow
for a Tender based on a Lump Sum Turnkey (LSTK) basis. The Company expects to complete the
plant build tenders by H1 of 2020.
The 60 tonne 2.5 MW ball mill has arrived on site and been safely off-loaded at the permitted
mine site, ready for future installation.
The Pilgrim’s Rest community welcomed the arrival of the mill with a parade amongst much
excitement and anticipation, eager to see the progress towards an official start of construction
and mining which will bring back much needed jobs and income for this historic mining town.
Click link to see video - https://www.youtube.com/watch?v=gzOqosaDgeQ&feature=youtu.be
Ball Mill
landed
on site
TGME our
130-year-old
operating
company
welcomes its
largest mill
yet at
Pilgrim's
Rest.
youtu.be
3
Figure 1: 2.5MW Ball Mill drum arriving at Pilgrim’s Rest
Figure 2: Ball Mill drum being offloaded upon arrival at Theta Gold’s TGME CIL Plant site
4
DRAFT MINING CONTRACT
The Company has been working with Minxcon and a South African owned and based mining
contractor group. This work has included matching and fine-tuning the mining schedule in
relation to the recently announced increase in process production capacity to 600,000tpa and
accordingly revising the schedule of rates. The mining costs developed for the 600,000tpa
mining schedule are in line with those developed in the Feasibility Study released on 16 May
2019. The next steps will be further detailed negotiations with the selected Mining Contractor
to finalise all legal, commercial and technical aspects required before final sign off.
MINING RIGHT 83 (MR83) ENVIRONMENTAL AUTHORISATIONS
As part of the approval process for a mining right, the Mineral and Petroleum Resources
Development Act, No. 28 of 2002 and in terms of the One Environmental System, an application
for, and approval of, Environmental Authorisation is required. This EA comprises a complete
Environmental Management Programme Report (“EMPR”), incorporating an Environmental
Impact Assessment (“EIA”) and Environmental Management Programme (“EMP”), which must
be submitted and approved. The general process is described below.
Figure 3 : Simplified Environmental Authorisations Process and Timeline
The Theta Project is situated on MR83 and has some additional resources in the adjacent
MR341 to the south. MR83 is an approved and executed mining right and has an approved
Environmental Authorisation for underground mining activities, as well as approval for
processing of ore and deposition of residues onto an existing tailings dam.
5
In order to bring in open cut mining approvals, the Company is required to gain an approved
amendment to MR83 and complete an EIA process. The Company has advanced the
environmental authorisation process and is currently finalising documentation to reflect the
environmental improvements, including changes to the mining areas, as identified by the
specialists and as part of step 4 in the simplified schematic above.
LOCAL COMMUNITY SUPPORT FOR COMPANY
TGME underground operations and gold processing only ceased in 2015. The community and
local businesses have been partnering with TGME and other historical mining companies around
Pilgrim’s Rest for more than a century. The local township of Schoonplaas attached to Pilgrim’s
Rest was originally built to provide accommodation for the local mining industry as was much of
Pilgrim’s Rest.
The Company continues to be actively involved in various Pilgrim’s Rest social projects including
Local School Support, Cooking and Heating Fuel for Community, School Infrastructure Repairs
and the Sabie Feeding Scheme.
TGME has been working with the local Primary School Headmaster in Pilgrim’s Rest and
teachers to support the school for more than 5 years. The Company has recently embarked on
a new SLP (Social Labour Plan) drive to assist this school with the following:
Payment of three teachers and an administration person at the school
Assisting with School water issues. The Company is working with the school to ensure
there is a permanent water supply
Company engineering group is assisting with maintenance of school facilities
Providing extra educational toys and learning equipment
Figure 4. Company Staff (in red) and CEO George Jenkins (grey shirt) at the local school
6
Chairman Mr Bill Guy stated, “During the quarter, the team continued to prepare for the later
construction phase. The Company has issued tenders for the plant construction, completed
draft mining contracts, completed all required environmental studies for submission of the
Environmental Impact Assessment (EIA) for “Starter Theta Open-pit Project” (which includes the
amendment of MR83 from an underground to open-pit mining method), and now has
transported this 60-tonne 2.5MW ball mill to the mine site.”
“Following the quarter-end , the Company successfully completed an optimization plant design
study which significantly improved an already strongly viable project development (ASX
announcement 10 April 2020). The Theta Project continues to progress strongly towards
production.”
CORPORATE
Cash Position and Funding
As at 31 March 2020, the Group had US$295,000 in cash.
In April 2020, the Company raised $930,000 from a share placement of 4,650,000 fully paid
ordinary shares (with free attaching options ) at $0.20 per share. For every 2 shares subscribed,
the applicants were issued the following free attaching options –
(a)
(b)
1 listed option exercisable at $0.30 per share on or before 31 October 2020. The
options are of the same class as the existing listed option (ASX: TGMO); and
1 unlisted option exercisable at $0.40 per share on or before 27 April 2022.
OTC Markets – DTC Eligibility Application
The Company’s shares are dual listed on the ASX and the OTCQB market in the United States
(ASX: TGM, TGMO | OTCQB: TGMGF). The Company's primary listing continues to be the
Australian Securities Exchange.
The Company has now lodged an application for DTC eligibility with the Depository Trust and
Clearing Corporation, part of the US Federal Reserve System1 (DTC).
Once approved, DTC
eligibility will facilitate electronic trading of securities by individual investors that use selfmanaged online broking accounts (such as TD Ameritrade and E-Trade), as opposed to restricted
trading through market makers.
The Company has been advised that approval for DTC eligibility is expected during the current
calendar quarter.
Half Year Report
The Half Year Report for the six months ended 31 December 2019 was lodged with ASX on 12
March 2020.
1
https://www.stctransfer.com/dtc-eligibility-information/
7
A copy of the report is available at https://www.asx.com.au/asxpdf/20200312/pdf/44fzvy5zwx6y2y.pdf.
Capital Structure
The following are movements in the capital structure since the end of the previous quarter and
up to the date of this report –
a)
b)
c)
d)
e)
4,650,000 fully paid ordinary shares were issued on 29 April 2020 at $0.20 each;
2,325,000 listed options (ASX: TGMO) exercisable at $0.30 each on or before 31 October
2020 were issued on 29 April 2020;
2,325,000 unlisted options exercisable at $0.40 each on or before 27 April 2022 were
issued on 29 April 2020;
A total of 2,427,970 unlisted options have lapsed;
300,000 options were exercised on 14 January 2020 at $0.19 per share;
The current capital structure of the Company is as follows –
Fully paid ordinary shares (ASX: TGM | OTCQB: TGMGF)
Listed options exercisable at $0.30 each on or before 31 October
2020 (ASX: TGMO)
Unlisted options and performance rights (Refer Appendix A)
Number
441,656,585
33,754,663
28,529,213
This announcement was authorised for release by the Board of Directors.
For more information please visit www.thetagoldmines.com or contact:
Project Enquiries
Rob Thomson, Managing Director
Theta Gold Mines Limited
M: +61 409 843 963
robt@thetagoldmines.com
or
Investor Enquiries
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8912 2126
billg@thetagoldmines.com
United States - Michael Porter, Porter, LeVay & Rose Inc: +1 212 564 4700,
theta@plrinvest.com
Competent Person Statement
The information in this report relating to Mineral Resources is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons
(Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South
African Council for Natural Scientific Professions.
The original report titled “Optimised Mine Schedule for Theta Open Pit Starter Project Delivers Significant
Improvements” was dated 20 April 2020 and was released to the Australian Securities Exchange (ASX) on
that date. The Company confirms that –
it is not aware of any new information or data that materially affects the information included in the
ASX announcement; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcement continue to apply and have not materially changed.
8
Annexure A
JORC Mineral Resources for the Total Theta Project (as at May 2019)
Mineral
Resource
Classification
Open Pit Mine
Reef
Indicated
Theta Hill & Browns Hill
Theta Hill & Browns Hill
Theta Hill & Browns Hill
Theta Hill & Browns Hill
Theta Hill & Browns Hill
Iota
Iota
Iota
Iota
Shale
Bevett's
Upper Theta
Lower Theta
Beta
Bevetts
Upper Rho
Lower Rho
Upper Theta
Open Pit Mine
Reef
Theta Hill & Browns Hill
Theta Hill & Browns Hill
Theta Hill & Browns Hill
Theta Hill & Browns Hill
Theta Hill & Browns Hill
Iota
Shale
Bevetts
Upper Theta
Lower Theta
Beta
Upper Rho
Total Indicated
Mineral
Resource
Classification
Inferred
Total Inferred
Mineral
Resource
Open Pit Mine
Classification
Indicated
Total Theta Project
Inferred
Total Theta Project
Total Indicated and Inferred
Notes:
1.
2.
3.
4.
5.
6.
7.
Reef
All
All
Reef
Grade
g/t
1.02
1.10
2.41
3.70
2.49
2.89
2.43
2.51
1.08
2.29
Reef
Grade
g/t
1.11
1.07
1.86
8.11
2.23
5.13
3.87
Reef
Grade
g/t
2.29
3.87
3.02
Reef
Width
cm
200
221
100
100
100
114
393
550
114
252
Reef
Width
cm
216
213
100
100
100
106
131
Reef
Width
cm
252
131
197
Content
cmgt
204
244
241
370
249
330
956
1381
123
577
Content
cmgt
240
227
186
811
223
544
508
Content
cmgt
577
508
593
Reef
Tonnes
Mt
0.395
0.802
0.652
0.799
0.345
0.105
0.808
0.815
0.158
4.879
Reef
Tonnes
Mt
0.598
0.551
0.910
1.397
0.636
0.099
4.190
Reef
Tonnes
Mt
4.879
4.190
9.069
Au Content
Kg
402
886
1568
2956
859
303
1965
2047
171
11 157
koz
12.9
28.5
50.4
95.0
27.6
9.7
63.2
65.8
5.5
358.7
Au Content
Kg
666
589
1692
11329
1417
507
16 202
koz
21.4
19.0
54.4
364.3
45.6
16.3
520.9
Au Content
Kg
11157
16202
27 359
koz
358.7
520.9
879.6
Theta Project (Theta Hill, Browns Hill and Iota) cut-off is 0.35 g/t;
The gold price used for the cut-off calculations is USD 1 500/oz;
Geological losses applied are 10% for inferred and 5% for Indicated;
Theta Hill and Browns Hill - Upper Theta Reef, Lower Theta Reef and Beta Reef are diluted grades over 100 cm;
Historical mine voids have been depleted from the Mineral Resource;
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion
thereof will be converted to Ore Reserves;
Mineral Resource fall within the mining right 83MR and 341MR.
JORC Mineral Resources for the Waste Rock Dumps (as at April 2020)
Mineral
Resource
Surface Operation
Category
Inferred
Vaalhoek
Inferred
South East (DGs)
Inferred
Peach Tree
Inferred
Ponieskrantz
Inferred
Dukes Clewer
Total Inferred
Notes:
1.
2.
3.
Reef
Rock Dump
Rock Dump
Rock Dump
Rock Dump
Rock Dump
Tonnage
Gold Grade
Gold Content
Mt
g/t
Kg
koz
0.121
0.408
0.092
0.129
0.134
0.885
1.64
0.93
1.23
1.63
1.16
1.20
199
379
114
211
156
1059
6.4
12.2
3.7
6.8
5.0
34.0
Waste rock dump cut-off is 0.35 g/t;
The gold price used for the cut-off calculations is USD 1 500/oz;
No Geological losses applied;
9
4.
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion
thereof will be converted to Ore Reserves;
Production Target - Theta Project
Mineral Resource
Category in LoM Plan
Indicated
Inferred
Subtotal
Indicated
Inferred
Subtotal
Indicated
Inferred
Subtotal
Indicated
Inferred
Subtotal
Total Indicated
Total Inferred
Total
Pit
Browns Hill
Iota section of
Columbia Hill
Theta Hill
Dumps
Grade
g/t
2.30
2.03
2.23
2.38
5.53
2.53
1.60
1.32
1.48
1.49
1.49
2.21
1.81
2.09
Reef Tonnes
kt
489
181
670
1 696
83
1 778
557
438
995
418
418
2 741
1 119
3 861
Au Content
kg
oz
1 124
36 135
368
11 831
1 492
47 967
4 033
129 673
457
14 694
4 490
144 367
891
28 662
579
18 604
1 470
47 266
622
20 007
622
20 007
6 049
194 470
2 026
65 137
8 075
259 607
10
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTCQB: TGMGF) is a gold development company that
holds a range of prospective gold assets in a world-renowned South African gold mining region.
These assets include several surface and near-surface high-grade gold projects which provide
cost advantages relative to other gold producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of
Nelspruit (Capital City of Mpumalanga Province). Following small scale production from 2011 –
2015, the Company is currently focussing on the construction of a new gold processing plant
within its approved footprint at the TGME plant, and for the processing of the Theta Open Pit
oxide gold ore. Nearby surface and underground mines and prospects are expected to be
further evaluated in the future.
The Company aims to build a solid production platform to over 160 kozpa based primarily
around shallow, open-cut or adit-entry hard rock mining sources. Theta Gold has access to over
43 historical mines and prospect areas that can be accessed and explored, with over 6.7Moz of
historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Stonewall Mining (Pty) Ltd
(“Stonewall”). Stonewall holds a 74% shareholding in both Transvaal Gold Mining Estates
Limited (“TGME”) and Sabie Mines (Pty) Ltd (“Sabie Mines”). The balance of shareholding is held
by Black Economic Empowerment (“BEE”) entities. The South African Mining Charter requires a
minimum of 26% meaningful economic participation by the historically disadvantaged South
Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is comprised of a
combination of local community trusts, an employee trust and a strategic entrepreneurial
partner.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in
informing interested parties about the Company and should not be considered as an offer or
invitation to subscribe for or purchase any securities in the Company or as an inducement to
make an offer or invitation with respect to those securities. No agreement to subscribe for
securities in the Company will be entered into on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason
to believe that any such statements and projections are either false, misleading or incorrect, it
does not warrant or guarantee such statements. Nothing contained in this announcement
11
constitutes investment, legal, tax or other advice. This overview of Theta Gold does not purport
to be all inclusive or to contain all information which its recipients may require in order to make
an informed assessment of the Company’s prospects. Before making an investment decision,
you should consult your professional adviser, and perform your own analysis prior to making
any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and
take no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability
or completeness of, or any errors in or omissions, from any information, statement or opinion
contained in this announcement. This announcement contains information, ideas and analysis
which are proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future
events which could be considered forward looking statements. Forward looking statements are
typically preceded by words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”,
“Conceptual”, “Believes”, “Anticipates”, “Predicted”, “Estimated” or similar expressions.
Forward looking statements, opinions and estimates included in this announcement are based
on assumptions and contingencies which are subject to change without notice, and may be
influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including
government or community issues, global or systemic events). Forward looking statements are
provided as a general reflection of the intention of the Company as at the date of release of the
document, however are subject to change without notice, and at any time. Future events are
subject to risks and uncertainties, and as such results, performance and achievements may in
fact differ from those referred to in this announcement. Mining, by its nature, and related
activities including mineral exploration, are subject to a large number of variables and risks,
many of which cannot be adequately addressed, or be expected to be assessed, in this
document. Work contained within or referenced in this report may contain incorrect
statements, errors, miscalculations, omissions and other mistakes. For this reason, any
conclusions, inferences, judgments, opinions, recommendations or other interpretations either
contained in this announcement, or referencing this announcement, cannot be relied upon.
There can be no assurance that future results or events will be consistent with any such
opinions, forecasts or estimates. The Company believes it has a reasonable basis for making the
forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources
or Reserves, technical studies including feasibilities, and related investigations are required prior
to commencement of mining. No liability is accepted for any loss, cost or damage suffered or
incurred by the reliance on the sufficiency or completeness of the information, opinions or
beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic
assessments to support the estimation of Ore Reserves. There is no assurance that the
intended development referred to will proceed as described, and will rely on access to future
funding to implement. Theta Gold believes it has reasonable grounds the results of the
Feasibility Study. At this stage there is no guarantee that funding will be available, and investors
are to be aware of any potential dilution of existing issued capital. The production targets and
forward looking statements referred to are based on information available to the Company at
the time of release, and should not be solely relied upon by investors when making investment
decisions. Theta Gold cautions that mining and exploration are high risk, and subject to change
based on new information or interpretation, commodity prices or foreign exchange rates.
12
Actual results may differ materially from the results or production targets contained in this
release. Further evaluation is required prior to a decision to conduct mining being made. The
estimated Mineral Resources quoted in this release have been prepared by Competent Persons
as required under the JORC Code (2012). Material assumptions and other important
information are contained in this release.
13
Annexure A
Theta Gold Mines Limited
Unlisted Options and Performance Rights
Number
OPTIONS
604,213
2,325,000
200,000
Performance Hurdle/Vesting Date
(if applicable)
20 day VWAP above $0.030. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
200,000
20 day VWAP above $0.035. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
3,329,213
TOTAL OPTIONS
PERFORMANCE RIGHTS
50,000
All systems, licences, insurances, regulatory and
statutory compliance in place to meet South Africa
Mining regulations, laws, Mining Charter 111,
commercial contacts. (Mine ready).
4,670,000
Delineating a total of 300,000 ounces of gold ore
reserves (in accordance with the JORC Code 20121)
at grade of at least 2.5g/t Au, amenable to open-cut
mining on Mining Right 83, Mining Right 341 and
Mining Right 10167 (under application).
5,370,000
Decision to Mine (Board approval to commence
development of a gold mining operation) with all
regulatory approvals secured.
This performance hurdle must be achieved on or
before the date that is 18 months from the date of
issue of the performance right.
7,630,000
Achieving annualised production of 50,000 ounces of
gold per annum over a consecutive period of 3
months.
This performance hurdle must be achieved on or
before the date that is 30 months from the date of
issue of the performance right.
7,480,000
Achieving annualised production of 100,000 ounces
of gold per annum over a consecutive period of 3
months.
This performance hurdle must be achieved on or
before the date that is 48 months from the date of
issue of the performance right.
25,200,000
TOTAL PERFORMANCE RIGHTS
28,529,213
TOTAL OPTIONS AND PERFORMANCE RIGHTS
Exercise
Price
Expiry Date
$0.19
$0.40
$0.35
13 Aug 2020
27 Apr 2022
19 Jul 2022
$0.40
19 Jul 2022
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
THETA GOLD MINES LIMITED
ABN
Quarter ended (“current quarter”)
30 131 758 177
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation (if expensed)
31 March 2020
Current quarter
$US’000
Year to date
(9 months)
$US’000
(156)
(481)
(d) staff costs
(146)
(561)
(e) administration and corporate costs
(820)
(2,107)
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
20
22
1.5
Interest and other costs of finance paid
(15)
(15)
1.6
Income taxes paid
-
(204)
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
(1,117)
(3,346)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(c) property, plant and equipment
(198)
(613)
(d) exploration & evaluation (if capitalised)
(193)
(1,345)
-
(50)
(a) entities
(b) tenements
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$US’000
Year to date
(9 months)
$US’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
-
62
(391)
(1,946)
39
5,506
(34)
(368)
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
-
63
3.6
Repayment of borrowings
(12)
(103)
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
(7)
5,098
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,810
489
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,117)
(3,346)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(391)
(1,946)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(7)
5,098
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Li
Share your feedback
Discover