TGME Underground Mine Feasibility Study Information Booklet
Released
Released
Announcement PDF
FEASIBILITY STUDY TO MINE
1.24 Moz Au
12.9-Years LOM initially to recover
1.08 Moz contained gold at TGME
Underground Gold Mine
6.1 Moz Au
Gold Resource and growing
TGME UNDERGROUND GOLD MINE PROJECT
FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
DISCLAIMER
FORWARD-LOOKING AND
CAUTIONARY STATEMENTS
This announcement may refer to the intention of
Theta Gold Mines regarding estimates or future
events which could be considered forward looking
statements. Forward looking statements are
typically preceded by words such as “Forecast”,
“Planned”, “Expected”, “Intends”, “Potential”,
“Conceptual”, “Believes”, “Anticipates”, “Predicted”,
“Estimated” or similar expressions. Forward looking
statements, opinions and estimates included in
this announcement are based on assumptions and
contingencies which are subject to change without
notice, and may be influenced by such factors
including but not limited to funding availability,
market-related
forces
(commodity
prices,
exchange rates, stock market indices and the like)
and political, environmental or economic events
(including government or community issues, land
owners, global or systemic events). Forward looking
statements are provided as a general reflection
of the intention of the Company as at the date of
release of the document, however are subject to
change without notice, and at any time. Future
events are subject to risks and uncertainties, and
as such results, performance and achievements
may in fact differ from those referred to in this
announcement. Mining, by its nature, and related
activities including mineral exploration, are subject
to a large number of variables and risks, many
of which cannot be adequately addressed, or
be expected to be assessed, in this document.
Work contained within or referenced in this
report may contain incorrect statements, errors,
miscalculations, omissions and other mistakes.
For this reason, any conclusions, inferences,
judgments, opinions, recommendations or
other interpretations either contained in this
announcement, or referencing this announcement,
cannot be relied upon. There can be no assurance
that future results or events will be consistent with
any such opinions, forecasts or estimates. The
Company believes it has a reasonable basis for
making the forward looking statements contained
in this document, with respect to any production
targets, resource statements or financial
estimates, however further work to define Mineral
Resources or Reserves, technical studies including
feasibilities, and related investigations are required
prior to commencement of mining. No liability is
accepted for any loss, cost or damage suffered
or incurred by the reliance on the sufficiency or
completeness of the information, opinions or
beliefs contained in this announcement.
2
The Feasibility Study referred to in this
announcement is based on technical and
economic assessments to support the estimation
of Ore Reserves. There is no assurance that the
intended development referred to will proceed as
described, and will rely on access to future funding
to implement. Theta Gold Mines believes it has
reasonable grounds the results of the Feasibility
Study. At this stage there is no guarantee that
funding will be available, and investors are to be
aware of any potential dilution of existing issued
capital. The production targets and forward looking
statements referred to are based on information
available to the Company at the time of release,
and should not be solely relied upon by investors
when making investment decisions. Theta Gold
cautions that mining and exploration are high risk,
and subject to change based on new information
or interpretation, commodity prices or foreign
exchange rates. Actual results may differ materially
from the results or production targets contained in
this release. Further evaluation is required prior
to a decision to conduct mining being made.
The estimated Mineral Resources quoted in this
release have been prepared by Competent Persons
as required under the JORC Code (2012). Material
assumptions and other important information are
contained in this release.
NOTE BUSINESS ARRANGEMENT
Theta Gold Mines holds 100% issued capital of its
South African subsidiary Theta Gold SA (Pty) Ltd
(“TGSA”). TGSA holds a 74% shareholding in both
Transvaal Gold Mining Estates Limited (“TGME”)
and Sabie Mines (Pty) Ltd (“Sabie Mines”). TGME
holds the various exploration and mining permits.
The balance of shareholding is held by Black
Economic Empowerment (“BEE”) entities. The
South African Mining Charter requires a minimum
of 26% meaningful economic participation by
the historically disadvantaged South Africans
(“HDSAs”). The BEE shareholding in TGME and
Sabie Mines is comprised of a combination of
local community trusts, an employee trust and a
strategic entrepreneurial partner.
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
DISCLAIMER AND COMPETENT PERSONS
STATEMENT
DISCLAIMER
COMPETENT PERSONS STATEMENT
This announcement or presentation has been
prepared by and issued by Theta Gold Mines Limited
(ASX:TGM | OTCQB: TGMGF) to assist in informing
interested parties about the Company and should
not be considered as an offer or invitation to
subscribe for or purchase any securities in the
Company or as an inducement to make an offer
or invitation with respect to those securities.
No agreement to subscribe for securities in the
Company will be entered into on the basis of this
announcement.
The information in this report relating to mineral
resources and ore reserves is based on, and
fairly reflects, the information and supporting
documentation compiled by Mr Uwe Engelmann
(BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No.
400058/08, MGSSA), a director of Minxcon (Pty)
Ltd and a member of the South African Council
for Natural Scientific Professions and Mr Daniel
van Heerden (B.Ing (Mining M.Com (Business
Management), member of Engineering Council
of South Africa (Pr.Eng. Reg. No. 20050318)), a
director of Minxcon (Pty) Ltd and a fellow of the
South African Institute of Mining and Metallurgy
(FSAIMM Reg. No. 37309).
This announcement or presentation may contain
forward looking statements. Whilst Theta Gold
Mines has no reason to believe that any such
statements and projections are either false,
misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in
this announcement constitutes investment, legal,
tax or other advice. This overview of Theta Gold
Mines does not purport to be all inclusive or to
contain all information which its recipients may
require in order to make an informed assessment
of the Company’s prospects. Before making an
investment decision, you should consult your
professional adviser, and perform your own analysis
prior to making any investment decision. To the
maximum extent permitted by law, the Company
makes no representation and gives no assurance,
guarantee or warranty, express or implied, as to,
and take no responsibility and assume no liability
for, the authenticity, validity, accuracy, suitability or
completeness of, or any errors in or omissions, from
any information, statement or opinion contained
in this announcement. This announcement
contains information, ideas and analysis which are
proprietary to Theta Gold.
The original reports titled “Theta Gold Increases
Mineral Resource to over 6Moz” dated 16 May
2019, “Optimised Mine Schedule for Theta
Open Pit Starter Project Delivers Significant
Improvements” dated 20 April 2020 and “Initial
Maiden Underground Mining Reserve 419,000 oz
Gold” dated 8 April 2021 and 25 October 2021
(TGME Project Permitting Update) were released to
the Australian Securities Exchange (ASX) on those
dates. The Company confirms that:
It is not aware of any new information or data that
materially affects the information included in the
ASX announcements; and
All material assumptions and technical
parameters underpinning the estimates in the ASX
announcements continue to apply and have not
materially changed.
AUTHORISATION
This booklet was authorised for release by the
Board of Theta Gold Mines Limited.
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
3
Theta Gold Mines has completed its FS
on its first 4 gold mines – with up to 40
historical gold mines to be developed.
The strategy is to become one of
South Africa’s Lowest Cost Producers
through an efficient modular designed
and engineered metallurgical plant that
can process multiple streams of ore.
4
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
CONTENTS
About Theta Gold Mines Limited
6
Key Features of Project
7
Feasibility Study Highlights
9
Feasibility Study Metrics
10
Project Description
14
Environmental, Social and Governance (ESG)
48
Capital and Operating Costs
56
Project Financials
64
Upside Opportunities
75
Key Risks
76
Competent Persons Statement
78
CORPORATE DIRECTORY
Board of Directors
Registered and Principle Office
Bill Guy
Executive Chairman
Richie Yang
Non-Executive Director
100 Barangaroo Avenue
Finn Behnken
Non-Executive Director
Barangaroo | Sydney NSW 2000
Byron Dumpleton
Non-Executive Director
Brett Tang
Non-Executive Director
Telephone: 02 8046 7584
Simon Liu
Non-Executive Director
Email: info@thetagoldmines.com
Level 35 | International Tower One
Website: thetagoldmines.com
Company Secretary
Brent Hofman
ASX Code: TGM
Senior Management
OTC Code: TGMGF
Jacques du Triou
Chief Operating Officer
Terence Mokale
SA Director of Social Corporate Services
Puseletso Matete
SA Director ESG
Market Cap A$33M^
Brent Hofman
Chief Financial Officer (Australia)
^ As at 22 July 2022
Ordinary Shares on Issue 550M^
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
5
About Theta Gold Mines
RESPONSIBLE MINING
PROFITABLE MINING
A ‘NEW’ Goldfield in South Africa with
resources from the surface is awakening.
Theta Gold Mines Limited is a Listed
(“Theta Gold” or “Company”) (ASX:TGM)
| (OTC: TGMGF) Company that controls
and dominates the Eastern Transvaal Gold
Fields, where South Africa’s gold mining
industry began almost 130 years ago.
And we’re bringing this large forgotten
historical shallow goldfield back to life.
The Transvaal Gold System sits geological
on the eastern side of Bushveld Complex
the largest igneous intrusion on earth.
We have already generated and delivered
one of the largest gold resources of up to
6.1 Million Oz on the ASX, not controlled
by major mining houses.
6
The gold plant is near the towns of Pilgrim’s
Rest and Sabie in Mpumalanga Province,
370km northeast of Johannesburg.
The TGME Project has more than 43
historical mines identified across the vast
prospective gold field of 620 square km (or
62,000 hectares).
Theta Gold team is active on site to deliver
into a steady state of production initially
from four existing mines, Beta, Frankfort,
Clewer-Dukes Hill-Morgenzon (CDM), and
Rietfontein which allows the Company to
fully self fund numerous other mines over
5 years to target a production profile of
160,000 oz Au per year.
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
Key Features
THETA GOLD MINES LIMITED CONTROLS THE EASTERN
TRANSVAAL GOLD FIELDS, WHERE SOUTH AFRICA’S GOLD
MINING INDUSTRY BEGAN ALMOST 130 YEARS AGO
Project
Life
12.9 Years
Underground ore mined
6.46Mt @ 5.95g/t Au for
1.24M oz of contained gold
Peak Funding Requirements
US $77M
Payback Period Start of
Project – 31 Months
Metallurgical
Recovery
87%
Start of Mining – 18 Months
Pre-Tax NPV 10% US$324M
@ USD/oz 1,642 (avg-Base
Case) IRR 65%
AISC US$788oz
(Year 1-4) US$847/oz
(LOM)
First Gold Pour
2nd Quarter
20241
Incorporating only 4 of more than
40 previously developed mines
First gold is subject to securing finance and permit approvals.
1
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
7
Solid growth potential
Develop multiple
mines, reaching
>160koz/a within
five years, from
the resource base
of +6Moz
Modern mining
and treatment
methodologies enable
low-cost operations
(AISC <US$900/oz)
and reserve expansion
First four-mine operation,
central plant and
tailings facility
up to 100koz/a
Expand to >160koz/a
6 mine operation @ 80kt/m
Various expansion
opportunities to
increase production and
the resource base for
>3 decades
6 UG MINES TARGETED FIRST OUT OF POTENTIAL >40
FIGURE 1. MAP LOCATION OF FIRST 6 GOLD MINES.
8
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
FS Highlights
Theta Gold Mines technical team, along with
independent consultant, Minxcon (Pty) Ltd, all based
in South Africa, completed a Feasibility Study for
Theta Gold’s TGME Underground Gold Mine Project
in July 2022 to restart the following historical
underground projects situated in Mpumalanga
Province, South Africa:
Beta (including the Beta North, Beta Central and
Beta South sections);
Frankfort;
Clewer-Dukes Hill-Morgenzon (or CDM); and
Rietfontein.
Two scheduling strategies have been investigated,
namely:
Base Case: Life of Mine (LOM) plan targeting the
total Mineral Resources (Measured, Indicated and
Inferred); and
Ore Reserve Plan: LOM plan targeting only
Measured and Indicated Mineral Resources.
Beta is scheduled as the first operation to commence
production, followed by Rietfontein, and finally CDM
and Frankfort simultaneously. Beta and Rietfontein
are higher-grade mines compared to CDM and
Frankfort.
The Base Case LOM plan will comprise a 12.9-year
mining operation starting in 2023 and delivering
production of 1.24 million ounces of contained gold.
The estimated development capital or peak funding
requirement is USD77 million (AUD102 million)2,
with the Project forecast to generate a pre-tax
NPV10% of USD324 million (AUD432 million) and
pre-tax Internal Rate of Return (IRR) of 65% at the
forecast gold price of averaging USD1,642/oz over
the LOM.
Based on these metrics, the Project has a projected
payback period of 31 months. First gold production
is planned for Q2 20243.
TGM is currently in discussion with debt financiers and has engaged an experienced debt advisor to assist in the negotiation of term-sheets for
funding of the Project. Further equity raises are also planned to fund working capital and part of the project capital if required, which may lead to
dilution to existing shareholders.
2
First gold is subject to securing finance and permit approvals.
3
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBLITY STUDY INFORMATION BOOKLET | JULY 2022
9
FS Key metrics
Table 1: Key Project Metrics
(IWGVMTXMSR
9RMXW
&EWI'EWI
6IWIVZI4PER
4VSNIGX7XEVX(EXI
5XV]]]]
5
5
'SQQIVGMEP4VSHYGXMSR7XEVX(EXI
5XV]]]]
5
5
4VSHYGXMSRFYMPHYTTIVMSH
1SRXLW
0MJISJQMRI
]IEVW
9RHIVKVSYRHSVIQMRIH 031
1X
1MRIH+VEHI
KX
+SPH1MRIH 031
1S^
4VSHYGXMSR6EXI
/XE
4VSHYGXMSR6EXI
/XQ
+VMRHWM^I
v
+SPHVIGSZIVIH EZIVEKI031
1S^
+SPHVIGSZIVIH 031
Note: *Start date is subject to project finance and permitting approvals.
Base Case
Table 2 and Table 3 detail the Project economics of the Base Case at various price scenarios in USD terms
and AUD terms, respectively.
Table 2: Project Economics at Various Gold Prices – Base Case
(USD)
8EFPI4VSNIGX)GSRSQMGWEX:EVMSYW+SPH4VMGIW–&EWI'EWI
97(
Project Economics at gold
price
NPV @ 10% (real) Pre-tax
NPV @ 10% (real) Post-tax
IRR (%) Pre-tax
IRR (%) Post-tax
AISC
EBITDA annual average
EBIT annual average
Free Cash Flow (Pre-tax)
Free Cash Flow (Post-tax)
Development Capital – Peak
Funding
Capital Sustaining
Payback post-tax
Capital Efficiency (Pre-Tax
NPV/Dev Capital
Capital Efficiency (Post-Tax
NPV/Dev Capital
10
Unit
USDm
USDm
%
%
USD/oz
USDm
USDm
USDm
USDm
Forecast
(USD1,642/ USD1,500/oz USD1,600/oz USD1,800/oz USD2,000/oz USD2,200/oz
oz Avg)
324
255
304
402
501
601
219
174
206
269
335
400
65%
57%
64%
77%
90%
102%
57%
50%
56%
67%
78%
87%
834
822
831
847
862
876
69
58
66
81
96
111
60
49
57
72
87
102
717
576
673
869
1066
1264
508
412
478
611
747
881
USDm
77
77
77
77
77
77
USDm
Months
37
31
37
33
37
31
37
28
37
25
37
24
%
422%
332%
395%
524%
653%
783%
%
285%
226%
268%
351%
437%
521%
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
Table 3: Project Economics at Various Gold Prices – Base Case (AUD)
*SVIGEWX
97( 97(S^ 97(S^ 97(S^ 97(S^ 97(S^
S^%ZK
%9(Q
24:$ VIEP 4VIXE\
Table 3: Project Economics at Various Gold Prices – Base Case (AUD)
%9(Q
24:$ VIEP 4SWXXE\
Forecast
Project4VIXE\
Economics at gold
-66
Unit
(USD1,642/ USD1,500/oz USD1,600/oz USD1,800/oz USD2,000/oz USD2,200/oz
price
oz Avg)
-66 4SWXXE\
AUDm
432
339
405
536
669
802
%9(S^
NPV
%-7'@ 10% (real) Pre-tax
4VSNIGX)GSRSQMGWEXKSPH
TVMGI
NPV
@ 10% (real) Post-tax
)&-8(%ERRYEPEZIVEKI
IRR
(%)
Pre-tax
)&-8ERRYEPEZIVEKI
IRR
(%) Post-tax 4VIXE\
*VII'EWL*PS[
AISC
*VII'EWL*PS[ 4SWXXE\
(IZIPSTQIRX'ETMXEP–4IEO
EBITDA
annual average
*YRHMRK
EBIT
annual average
9RMX
AUDm
%9(Q
%
%9(Q
%
%9(Q
AUD/oz
%9(Q
AUDm
%9(Q
AUDm
%9(Q
AUDm
292
65%
57%
1,112
92
80
956
678
232
274
359
57%
64%
77%
50%
1,096
77
66
768
550
'ETMXEP7YWXEMRMRK
Free
Cash Flow (Pre-tax)
1SRXLW
4E]FEGOTSWXXE\
AUDm
Free
Cash Flow (Post-tax)
'ETMXEP)JJMGMIRG]
Development
Capital4VI8E\
– Peak
AUDm
102
102
24:(IZ'ETMXEP
Funding
'ETMXEP)JJMGMIRG] 4SWX8E\
49
49
AUDm
Capital Sustaining
24:(IZ'ETMXEP
Months
31
33
Payback post-tax
CapitalConverted
Efficiencyto(Pre-Tax
NOTE:
AUD from USD using
AUD:USD
exchange
rate
of
1.333.
%
422%
332%
NPV/Dev Capital
Capital Efficiency (Post-Tax
%
285%
226%
NPV/Dev Capital
447
90%
533
102%
87%
56%
1,107
87
76
897
638
67%
1,129
107
96
1,158
814
78%
1,149
128
116
1,421
996
102
102
102
102
49
31
49
28
49
25
49
24
395%
524%
653%
783%
268%
351%
437%
521%
1,167
148
136
1,686
1,175
NOTE: Converted to AUD from USD using AUD:USD exchange rate of 1.333.
Figure2:2:annual
Annual
Gold
Production
– Base
Figure
gold
production
– base
case Case
11
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBLITY STUDY INFORMATION BOOKLET | JULY 2022
11
Figure 3: Annual and Cumulative Cash Flow (Post-Tax) – Base Case (AUD)
NOTES:
NOTES:
Forecast Prices averaging USD1,642/oz over LOM.
1.
1. Forecast Prices averaging USD1,642/oz over LOM.
2. Converted to AUD from USD at exchange rate of 1.333 AUD:USD>
2. Converted to AUD from USD at exchange rate of 1.333 AUD:USD.
RReserve
eserve PPlan
lan
Table
Table4 and
4 and Table 5 detail the Project economics of the Reserve Plan at various price scenarios in USD terms
Table
5 detail
the Project
economics of the Reserve Plan at various price scenarios in USD terms and AUD terms, respectively.
and AUD
terms,
respectively.
Table
4: Project Economics at Various Gold Prices – Reserve Plan (USD)
8EFPI4VSNIGX)GSRSQMGWEX:EVMSYW+SPH4VMGIW–6IWIVZI4PER
97(
Forecast
Forecast
Project Economics at gold
Project Economics at gold
Unit
(USD1,635/ USD1,500/oz USD1,600/oz USD1,800/oz USD2,000/oz USD2,200/oz
Unit
(USD1,635/ USD1,500/oz USD1,600/oz USD1,800/oz USD2,000/oz USD2,200/oz
price
price
oz Avg)
oz Avg)
NPV @ 10% (real) Pre-tax
USDm
144
105
134
191
250
308
NPV @ 10% (real) Pre-tax
USDm
144
105
191
250
308
NPV @ 10% (real) Post-tax
USDm
98
71
91
130
169
207
NPV @ 10% (real) Post-tax
USDm
98
71
130
169
207
IRR (%) Pre-tax
%
58%
48%
57%
72%
85%
98%
IRR (%) Pre-tax
%
58%
48%
72%
85%
98%
IRR (%) Post-tax
%
50%
41%
48%
61%
74%
84%
IRR (%) Post-tax
%
50%
41%
61%
74%
84%
AISC
USD/oz
846
835
843
859
874
888
AISC
USD/oz
846
835
859
874
888
EBITDA annual average
USDm
57
48
55
67
80
93
EBITDA annual average
USDm
57
48
67
80
93
EBIT annual average
USDm
45
36
42
55
67
80
EBIT annual average
USDm
45
36
55
67
80
Free Cash Flow (Pre-tax)
USDm
247
186
230
318
407
497
Free Cash Flow (Pre-tax)
USDm
247
186
318
407
497
Free Cash Flow (Post-tax)
USDm
179
136
167
229
292
353
Free Cash Flow (Post-tax)
USDm
179
136
229
292
353
Development Capital – Peak
USDm
78
78
78
78
78
78
Development Capital – Peak
USDm
78
78
78
78
78
Funding
Funding
Capital Sustaining
USDm
18
18
18
18
18
18
Capital Sustaining
USDm
18
18
18
18
18
Payback post-tax
Months
31
34
32
28
25
24
Payback post-tax
Months
31
34
28
25
24
Capital Efficiency (Pre-Tax
%
185%
134%
171%
246%
320%
395%
Capital Efficiency (Pre-Tax
%
185%
134%
246%
320%
395%
NPV/Dev Capital
NPV/Dev Capital
Capital Efficiency (Post-Tax
%
125%
92%
117%
166%
217%
266%
Capital Efficiency (Post-Tax
%
125%
92%
166%
217%
266%
NPV/Dev Capital
NPV/Dev Capital
12
12
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
8EFPI4VSNIGX)GSRSQMGWEX:EVMSYW+SPH4VMGIW–6IWIVZI4PER %9(
Project Economics at gold
price
Unit
Forecast
(USD1,635/ USD1,500/oz USD1,600/oz USD1,800/oz USD2,000/oz USD2,200/oz
oz Avg)
192
140
178
255
333
411
130
95
121
173
226
276
58%
48%
57%
72%
85%
98%
50%
41%
48%
61%
74%
84%
1,127
1,113
1,124
1,145
1,165
1,184
76
65
73
90
107
124
59
48
56
73
90
107
330
248
307
425
543
662
239
181
223
305
389
470
AUDm
NPV @ 10% (real) Pre-tax
AUDm
NPV @ 10% (real) Post-tax
%
IRR (%) Pre-tax
%
IRR (%) Post-tax
AUD/oz
AISC
AUDm
EBITDA annual average
AUDm
EBIT annual average
AUDm
Free Cash Flow (Pre-tax)
AUDm
Free Cash Flow (Post-tax)
Development Capital – Peak
AUDm
104
104
Funding
24
24
AUDm
Capital Sustaining
Months
Payback post-tax
31
34
Capital Efficiency (Pre-Tax
%
185%
134%
NPV/Dev Capital
Capital Efficiency (Post-Tax
%
125%
92%
NPV/Dev Capital
NOTE: Converted to AUD from USD using AUD:USD exchange rate of 1.333.
104
104
104
104
24
32
24
28
24
25
24
24
171%
246%
320%
395%
117%
166%
217%
266%
Figure 4: Annual Gold Production – Reserve Plan
Figure 5: Annual and Cumulative Cash Flow (Post-Tax) – Reserve Plan (AUD)
NOTES:
1.
Forecast Prices averaging USD1,635/oz over LOM
2. Converted to GOLD
AUD from
USD at
exchange rate
of 1.333 AUD:USD.
TGME UNDERGROUND
MINE
PROJECT
| FEASIBLITY
STUDY INFORMATION BOOKLET | JULY 2022
13
Figure 5: Annual and Cumulative Cash Flow (Post-Tax) – Reserve Plan (AUD)
NOTES:
NOTES:
1.
Forecast Prices averaging USD1,635/oz over LOM
1. Forecast Prices averaging USD1,635/oz over LOM
2. Converted to AUD from USD at exchange rate of 1.333 AUD:USD.
2. Converted to AUD from USD at exchange rate of 1.333 AUD:USD.
PROJECT DESCRIPTION
gold mining region in the Mpumalanga Province of South
Africa. The Project Areas are centred on the town of
Pilgrims Rest, some 300 km due northeast of
Project description
The TGM Underground Project aims to restart historical
underground gold mines located in a historically prolific
The TGM Underground Project aims to restart
historical underground gold mines located in
a historically prolific gold mining region in the
Mpumalanga Province of South Africa. The Project
Areas are centred on the town of Pilgrims Rest,
some 370 km due northeast of Johannesburg, and
ownership has always been vested in TGM or its
partners.
The Project targets the Beta (including the Beta
North, Beta Central and Beta South sections),
Rietfontein, Frankfort and Clewer-Dukes HillMorgenzon (“CDM”) Mines. A significant amount of
gold resources remain underground which were not
mined historically due to technological limitations,
or limiting ore characteristics.
Beta is scheduled as the first operation to commence
production, followed by Rietfontein, and finally CDM
and Frankfort simultaneously. In comparison to
CDM and Frankfort, Beta and Rietfontein are highergrade mines.
14
14
A metallurgical plant, which acts as the central
processing plant for all the historical operations,
is situated in close proximity with a maximum
distance to operations of ~40km. A new facility will
be established on this footprint and will treat all the
ore from the underground operations.
Two scheduling strategies have been investigated
in the FS. The Base Case considers a life of mine
(“LOM”) plan targeting the total Mineral Resources
(Measured, Indicated and Inferred). The Ore Reserve
Plan considers a LOM plan targeting only Measured
and Indicated Mineral Resources.
This FS demonstrates the ability to achieve
optimised cash flows by scheduling production from
the operations. The mine designs and associated
costs per operational element feed into a combined
operations financial model. The Ore Reserve Plan
supports the declaration of compliant JORC Code
2012 Ore Reserves.
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBILITY STUDY INFORMATION BOOKLET | JULY 2022
Mineral resources
Based on stope grade and tonnes, the JORC Code 2012 Mineral Resources utilised for the FS totals 0.09 Mt
of Measured (77%) material at 5.37 g/t Au, 4.54 Mt of Indicated material at 6.24 g/t Au, and 7.74 Mt Inferred
material 5.56 g/t Au. This equates 15.7 koz Measured, 911.5 koz Indicated and 1,383.2 koz of contained gold
(see Table 6 below).
8EFPI8+19RHIVKVSYRH4VSNIGXW1MRIVEP6IWSYVGIWEWEX*IFVEYV]
Mineral
Reef Grade
Resource
Mine
Reef
Classification
g/t
Measured
Frankfort
Bevetts
7.13
Total Measured
7.13
Indicated
Frankfort
Bevetts
7.86
CDM
Rho
13.19
Beta
Beta
21.66
Rietfontein Rietfontein
14.57
Total Indicated
16.35
Total Measured & Indicated
16.00
Mineral
Resource
Classification
Inferred
Mine
Reef
Frankfort
CDM
Beta
Rietfontein
Bevetts
Rho
Beta
Rietfontein
Total Inferred
Reef Grade
Stope
Grade
g/t
5.37
5.37
5.13
3.80
6.58
8.20
6.24
6.22
Stope
Grade
Reef
Width
cm
73
73
58
23
23
52
37
38
Reef
Width
Stope
width
cm
103
103
96
90
90
92
91
91
Stope
width
Content
cm.g/t
520
520
452
307
499
755
597
606
Content
Reef
Tonnes
Mt
0.069
0.069
0.243
0.258
0.716
0.517
1.734
1.803
Reef
Tonnes
Stope
Tonnes
Mt
0.091
0.091
0.373
0.895
2.357
0.919
4.543
4.634
Stope
Tonnes
Au Content
kg
489
489
1912
3401
15506
7534
28,352
28,841
koz
15.7
15.7
61.5
109.4
498.5
242.2
911.5
927.3
Au Content
g/t
g/t
cm
cm
cm.g/t
Mt
Mt
kg
koz
7.41
10.06
16.51
14.06
4.27
3.02
5.43
8.52
48
24
25
57
93
90
90
94
356
244
414
803
0.343
0.544
1.107
1.190
0.596
1.811
3.367
1.962
2543
5472
18285
16721
81.8
175.9
587.9
537.6
13.51
5.56
39
91
532
3.184
7.736
43,022
1383.2
Notes:
1. Mineral Resource cut-off of 160 cm.g/t applied.
2. Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
3. Gold price used for the cut-off calculations is USD1,500/oz.
4. cm.g/t and g/t figures will not back calculate due to variable densities in reef and waste rock.
5. Mineral Resources are stated as inclusive of Ore Reserves.
6. Mineral Resources are reported as total Mineral Resources and are not attributed.
7. Discrepancy in summation may occur due to rounding.
The Mineral Resources were independently
estimated by Minxcon (Pty) Ltd as at 1 February
2021. No further ground work or Mineral Resource
revisions have taken place since then, thus the
estimate is still valid. The Mineral Resources for the
underground in situ operations are declared a 160
cm.g/t cut-off (1.76 g/t) over a diluted stoping width
of 90 cm. Mineral Resources where applicable have
been depleted with the historical workings of the
respective Project Areas.
The Projects represent either historical and/
or mature operations. Drilling and channel chip
sampling have been completed over Beta, Frankfort
and CDM, with the majority of datasets being
historical data.
All historical sample types were agglomerated, and
data type biases were not investigated due to the
small number of drill-hole intersections. Only full reef
composite data was available for the chip sample
data while full reef composites were calculated for
each drill-hole intersection.
Data aggregation methods utilised in generating
the full reef composites of the sampling are not
available for review due to the historical nature of
the data.
The reef widths are however generally narrow so the
reef samples would probably have been one sample.
The drill-hole data is expressed as a single weighted
composited point for the mother hole and deflections
where applicable. In addition, drill-holes with wedges,
or multiple reef intersections, weighted mean reef
widths and grades were calculated for each drillhole for use in the Mineral Resource estimation.
TGME UNDERGROUND GOLD MINE PROJECT | FEASIBLITY STUDY INFORMATION BOOKLET | JULY 2022
15
and data type biases were not investigated due to
(when on-reef) were applied. Where the reefs
the small number of drillhole intersections. Only
outcropped on surface and cut against
full reef composite data was available for the chip
topography, the model was sub-celled to this
sample data while full reef composites were
outcrop
in
to accurately
assess
reef was sub-celled
Where stretch values were used in the estimation
cutorder
against
topography,
thethe
model
calculated for each drillhole intersection. Data
volume occurring in these areas. A 90 cm stope
these were methods
composited
to ain 3generating
m composite
to this outcrop in order to accurately assess the reef
aggregation
utilised
the basedwidth based
on historical mining was applied to
on
a
minimum
stretch
Share your feedback