Final Environmental Authorisation Granted for MR83
Released
Released
Announcement PDF
26 July 2023
ASX ANNOUNCEMENT
(ASX: TGM)
FINAL ENVIRONMENTAL AUTHORISATION GRANTED FOR
MR83 AT OUR FLAGSHIP TGME GOLD MINE
Highlights
•
•
•
Environmental Authorisation (EA) received for Mining Right 83 (MR83) from the
Department of Mineral Resource and Energy (DMRE)
Three of the four mines (Beta, CDM, and Frankfort) included in Feasibility Study
released on 27 July 2022 can now operate within the scope of the approved mining
licence, subject to a 90-day public review process
DMRE permitting is a major de-risking step for the first TGME Underground Gold
Project
Theta Gold Mines Limited (“Theta Gold” or the “Company”) (ASX: TGM|OTC: TGMGF) is pleased to
advise that the South African Department of Minerals Resources and Energy (DMRE) has granted the
Company’s Environmental Authorisation (EA) application over Mining Right 83 (MR83).
As a result of the DMRE approval, three (3) of the four (4) mines within the initial TGME Underground
Gold Project are now fully permitted, following the Company having successfully secured the funding
to instal the environmental bond as previously announced1. The DMRE approval is subject to a 90-day
public participation and appeal period which enables interested and affected parties an opportunity
to review and/or lodge an appeal to the DMRE decision to approve the EA for MR83.
Theta Gold is now able to commence mine planning, subject to securing capital expenditure funding
for the development and construction of its gold operations. While the Company actively seeks to
finalise its funding packages, it will commence delivery of a series of bulk samples from its fully
permitted Frankfort mine to the Barberton gold plant to begin early cashflow generation for the
Company2.
1
Refer to ASX Release dated, 7 July 2023 “$5 million Private Placement and Corporate Update”.
Ref to ASX Release dated, 3 April 2023 titled, “$5 million to fund Bulk Sampling Trial at Theta’s Frankfort
mine”.
2
1
Theta Gold Chairman, Bill Guy, commented: “Formal approval by the DMRE for Theta’s Environmental
Authorisation application is a major de-risking event for Theta’s long-term mine development strategy,
and marks the successful culmination of a multi-year engagement process with regulators and
policymakers. With the granting of the final environmental authority over MR83, Theta is now able to
commence mine planning for its 1.24Moz Life of Mine plan developed from the 6.1Moz Resource at its
first TGME Underground Gold Mine3. Importantly, the approval also allows the Company to move
closer to finalising the necessary funding requirements to build the project.
“The granting of the final EA approvals for the TGME Underground Gold Mine signifies the recognition
of the hard work and commitment Theta Gold has displayed to ensure it meets all necessary regulatory,
social and environmental compliance requirements of the government’s departments as well as the
local communities in the regions in which we operate. Theta’s application included an extensive ESG
program, which has been custom-designed to rehabilitate the hydrology of the local catchment area
to the benefit of local landowners, farmers and the natural environment.
“I would like to thank our management team and consultants who worked tirelessly over the last 24
months in achieving such positive outcomes for the Company. We look forward to updating
shareholders on further progress in the coming months with respect to finalising the group’s long-term
project funding arrangements, expected in the second half of 2023.”
Figure 1: Map location of first 6 gold mines
3
Ref to ASX Release dated, 27 July 2022 titled, “Theta Golds TGME Project DFS confirms NPV of $A432
million".
2
This announcement was approved for release by Theta Gold Mines Limited’s Board.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8046 7584
E: billg@thetagoldmines.com
Investor Relations and Social Media:
Australia: Ben Jarvis, Six Degrees Investor Relations: +61 (0) 413 150 448
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
Webpage: www.thetagoldmines.com
Interactive Investor Hub: http://investors.thetagoldmines.com
Theta Gold Mines Interactive Investor Hub
The Company encourages shareholders to please join the Theta
Investor Hub which allows you to ask questions directly to the
Company, view video’s and keep up to date on progress of the
TGME Gold Project at investors.thetagoldmines.com or scan the
QR code below.
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTCQB: TGMGF) is a gold development company that holds a
range of prospective gold assets in a world-renowned South African gold mining region. These assets
include several surface and near-surface high-grade gold projects which provide cost advantages
relative to other gold producers in the region.
3
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit
(Capital City of Mpumalanga Province).
Following small scale production from 2011 – 2015, the Company is currently focussing on the
construction and financing of a new gold processing plant within its approved footprint at the TGME
plant. The company has completed a FS for the first four mines Beta, CDM, Frankfort and Rietfontein
(TGME Underground Project). The Base Case LOM plan will comprise a 12.9-year mining operation
starting in 2023 and delivering production of 1.24 million ounces of contained gold.
The estimated development capital or peak funding requirement is USD77 million (AUD102 million)2,
with the Project forecast to generate a pre-tax NPV10% of USD324 million (AUD432 million) and pretax Internal Rate of Return (IRR) of 65% at the forecast gold price of averaging USD1,642/oz over the
LOM. The Company aims to build a solid production platform to over next 5 years to 160kozpa based
primarily around shallow, open-pit or adit-entry shallow underground hard rock mining sources. Theta
Gold has access to over 43 historical mines and prospect areas that can be accessed and explored, with
over 6.7Moz of historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“TGSA”).
TGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie
Mines (Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment
(“BEE”) entities. The South African Mining Charter requires a minimum of 26% meaningful economic
participation by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in
TGME and Sabie Mines is comprised of a combination of local community trusts, an employee trust
and a strategic entrepreneurial partner.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in
informing interested parties about the Company and should not be considered as an offer or invitation
to subscribe for or purchase any securities in the Company or as an inducement to make an offer or
invitation with respect to those securities. No agreement to subscribe for securities in the Company
will be entered into on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to
believe that any such statements and projections are either false, misleading or incorrect, it does not
warrant or guarantee such statements. Nothing contained in this announcement constitutes
investment, legal, tax or other advice. This overview of Theta Gold does not purport to be all inclusive
or to contain all information which its recipients may require in order to make an informed assessment
of the Company’s prospects. Before making an investment decision, you should consult your
professional adviser, and perform your own analysis prior to making any investment decision. To the
maximum extent permitted by law, the Company makes no representation and gives no assurance,
guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for,
the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omissions, from
4
any information, statement or opinion contained in this announcement. This announcement contains
information, ideas and analysis which are proprietary to Theta Gold.
The Company confirms that all material assumptions underpinning the production target, or the
forecast financial information derived from the production target continue to apply and have not
materially changed from those previously released to ASX in a Feasibility Study dated 27 July 2022.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events
which could be considered forward looking statements. Forward looking statements are typically
preceded by words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”,
“Believes”, “Anticipates”, “Predicted”, “Estimated” or similar expressions. Forward looking
statements, opinions and estimates included in this announcement are based on assumptions and
contingencies which are subject to change without notice, and may be influenced by such factors as
funding availability, market-related forces (commodity prices, exchange rates, stock market indices
and the like) and political or economic events (including government or community issues, global or
systemic events). Forward looking statements are provided as a general reflection of the intention of
the Company as at the date of release of the document, however are subject to change without notice,
and at any time. Future events are subject to risks and uncertainties, and as such results, performance
and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables
and risks, many of which cannot be adequately addressed, or be expected to be assessed, in this
document. Work contained within or referenced in this report may contain incorrect statements,
errors, miscalculations, omissions and other mistakes. For this reason, any conclusions, inferences,
judgments, opinions, recommendations or other interpretations either contained in this
announcement, or referencing this announcement, cannot be relied upon. There can be no assurance
that future results or events will be consistent with any such opinions, forecasts or estimates. The
Company believes it has a reasonable basis for making the forward looking statements contained in
this document, with respect to any production targets, resource statements or financial estimates,
however further work to define Mineral Resources or Reserves, technical studies including feasibilities,
and related investigations are required prior to commencement of mining. No liability is accepted for
any loss, cost or damage suffered or incurred by the reliance on the sufficiency or completeness of the
information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments
to support the estimation of Ore Reserves. There is no assurance that the intended development
referred to will proceed as described, and will rely on access to future funding to implement. Theta
Gold Mines believes it has reasonable grounds the results of the Feasibility Study. At this stage there
is no guarantee that funding will be available, and investors are to be aware of any potential dilution
of existing issued capital. The production targets and forward looking statements referred to are based
on information available to the Company at the time of release, and should not be solely relied upon
by investors when making investment decisions. Theta Gold cautions that mining and exploration are
high risk, and subject to change based on new information or interpretation, commodity prices or
foreign exchange rates. Actual results may differ materially from the results or production targets
contained in this release. Further evaluation is required prior to a decision to conduct mining being
made. The estimated Mineral Resources quoted in this release have been prepared by Competent
Persons as required under the JORC Code (2012). Material assumptions and other important
information are contained in this release.
5
Cautionary Statement for the LOM Base Case – The Base Case is referred to” In about Theta Gold
Mines Limited” as potential upside to the Project. However, the Base Case is supported by a significant
portion of Inferred Mineral Resources. Inferred Mineral Resources inherently have a lower level of
confidence and although it would be reasonable to expect that the majority of Inferred Mineral
Resources would upgrade to Indicated Mineral Resources with continued exploration, it should not be
assumed that such upgrading will occur. The realisation of the full potential of the Base Case as
presented thus cannot be guaranteed.
6