IMARC Investor Presentation
Released
Released
Announcement PDF
AISC $905 USD
580 koz Mining Reserve & growing
Targeting organic 160 kozpa production
620 km2 of pregnant goldfield
South Africa a real home of Gold
INVESTOR PRESENTATION
- IMARC Mines & Money 2021
Top 3 undeveloped gold resource on the ASX
not owned by majors
High Growth, Low Cost Gold Developer
October 2021
ASX : TGM | OTC : TGMGF | FSE: 3LM
1
DISCLAIMER
Forward looking and cautionary statements
This announcement or presentation may refer to the intention of Theta Gold Mines regarding estimates or future events which
could be considered forward looking statements. Forward looking statements are typically preceded by words such as
“Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”, “Predicted”, “Estimated” or
similar expressions. Forward looking statements, opinions and estimates included in this announcement are based on
assumptions and contingencies which are subject to change without notice, and may be influenced by such factors including
but not limited to funding availability, market-related forces (commodity prices, exchange rates, stock market indices and the
like) and political, environmental or economic events (including government or community issues, land owners, global or
systemic events). Forward looking statements are provided as a general reflection of the intention of the Company as at the
date of release of the document, however are subject to change without notice, and at any time. Future events are subject to
risks and uncertainties, and as such results, performance and achievements may in fact differ from those referred to in this
announcement. Mining, by its nature, and related activities including mineral exploration, are subject to a large number of
variables and risks, many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations, omissions and other
mistakes. For this reason, any conclusions, inferences, judgments, opinions, recommendations or other interpretations either
contained in this announcement, or referencing this announcement, cannot be relied upon. There can be no assurance that
future results or events will be consistent with any such opinions, forecasts or estimates. The Company believes it has a
reasonable basis for making the forward looking statements contained in this document, with respect to any production
targets, resource statements or financial estimates, however further work to define Mineral Resources or Reserves, technical
studies including feasibilities, and related investigations are required prior to commencement of mining. No liability is
accepted for any loss, cost or damage suffered or incurred by the reliance on the sufficiency or completeness of the
information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to support the
estimation of Ore Reserves. There is no assurance that the intended development referred to will proceed as described, and
will rely on access to future funding to implement. Theta Gold Mines believes it has reasonable grounds the results of the
Feasibility Study. At this stage there is no guarantee that funding will be available, and investors are to be aware of any
potential dilution of existing issued capital. The production targets and forward looking statements referred to are based on
information available to the Company at the time of release, and should not be solely relied upon by investors when making
investment decisions. Theta Gold cautions that mining and exploration are high risk, and subject to change based on new
information or interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the results
or production targets contained in this release. Further evaluation is required prior to a decision to conduct mining being
made. The estimated Mineral Resources quoted in this release have been prepared by Competent Persons as required
under the JORC Code (2012). Material assumptions and other important information are contained in this release.
NOTE BUSINESS ARRANGEMENT
Theta Gold Mines holds 100% issued capital of its South African subsidiary Theta Gold SA (Pty) Ltd (“TGSA”). TGSA holds a
74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty) Ltd (“Sabie Mines”). TGME
holds the various exploration and mining permits. The balance of shareholding is held by Black Economic Empowerment
(“BEE”) entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation by the
historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is comprised of a
combination of local community trusts, an employee trust and a strategic entrepreneurial partner.
Disclaimer and Competent Persons Statement
DISCLAIMER
This announcement or presentation has been prepared by and issued by Theta Gold Mines Limited (ASX:TGM |
OTCQB: TGMGF) to assist in informing interested parties about the Company and should not be considered as an
offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or
invitation with respect to those securities. No agreement to subscribe for securities in the Company will be entered
into on the basis of this announcement.
This announcement or presentation may contain forward looking statements. Whilst Theta Gold Mines has no reason
to believe that any such statements and projections are either false, misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax or other
advice. This overview of Theta Gold Mines does not purport to be all inclusive or to contain all information which its
recipients may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to making any
investment decision. To the maximum extent permitted by law, the Company makes no representation and gives no
assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the
authenticity, validity, accuracy, suitability or completeness of, or any errors in or omissions, from any information,
statement or opinion contained in this announcement. This announcement contains information, ideas and analysis
which are proprietary to Theta Gold.
COMPETENT PERSONS STATEMENT
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.),
Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South African Council for
Natural Scientific Professions and Mr Daniel van Heerden (B.Ing (Mining M.Com (Business Management), member of
Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director of Minxcon (Pty) Ltd and a fellow of the
South African Institute of Mining and Metallurgy (FSAIMM Reg. No. 37309).
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” dated 16 May 2019, “Optimised Mine
Schedule for Theta Open Pit Starter Project Delivers Significant Improvements” dated 20 April 2020 and “Initial Maiden
Underground Mining Reserve 419,000 oz Gold” dated 8 April 2021 were released to the Australian Securities Exchange
(ASX) on those dates. The Company confirms that:
•
•
it is not aware of any new information or data that materially affects the information included in the ASX
announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX announcements continue
to apply and have not materially changed.
AUTHORISATION
This announcement was authorised for release by the Board of Theta Gold Mines Limited.
2
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
COMPANY OVERVIEW
Theta Gold Mines Limited controls the
Eastern Transvaal Gold Fields, where
South Africa’s gold mining industry
began almost 130 years ago.
Initiating the
Controls over
62,000 hectares of
gold mining rights
Incorporating only
Rapid production
operationalisation
6 of more than 40
ramp-up over the
of its development-
previously developed
next five years to
ready 6m oz initial
mines
+160koz/a
resource base
The Transvaal Gold System sits
geological on the eastern side of
Bushveld Complex the largest igneous
intrusion on earth (Figure 1), where
40-50% of world’s gold production
came out of the globally-known
Witwatersrand Goldfield.
3
Low initial
Can be self-funded
A high growth
development capital
due to early net cash
investment
generation
opportunity
3
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
SOUTH AFRICA AN ATTRACTIVE INVESTMENT DESTINATION
SOUTH AFRICA - 16% OF THE AFRICAN CONTINENT’S GDP
Logistical Advantages
•
•
•
Jurisdiction Benefits
Largest road system network in Africa
Local commercial airports
Close to Johannesburg industrial hub
•
•
English Common Law
Democratic society government
by the elected parliament
Labor Force and Talent Pool
•
•
•
460,000 miners currently employed
A-Grade mining and geological schools
Self-sufficient with all mining supplies
Mining Sector
•
•
South Africa’s mining industry production increased by 10.3%
year-on-year in July
The largest positive contributors came from the production of iron ore (42.9
percent), PGMs (10.3 percent), chromium ore (45.8 percent) and gold (13.4
percent)
Note: 1. The extracts were from “The Case For Investing in South Africa” compiled by the Industrial Development Corporation (IDC) and InvestSA published in October 2019.
2. Mining industry in South Africa - Statistics & Facts published on Stats SA in August 2021.
4
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
CAPITAL STRUCTURE & INFORMATION
TGM CHART
$0.40
$0.35
Ordinary Shares
Dual-listed on ASX: TGM |
OTC: TGMGF
Unlisted options and
management performance
rights
Market Capitalisation
(18 October 2021,
undiluted)
524.71m
$0.30
$0.25
5
67.76m
$0.20
~A$105M
(~US$72M)
Oct
Nov
Dec
2021
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
XGD – ASX All Ordinary Gold Index (during same trading period)
68%
Top 10
shareholding
9%
Directors &
Management
5
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
CORE TEAM
TGME Plant Office
COO / CEO / Mine Manger / Chairman / SA Director / SA Director
Jacques Du Trio / Mitford Mundell / Freddy Leshoto Moketla / Bill Guy / Terrence Mokale / Finn Behken
(ex-Harmony / ex-Harmony / ex-Harmony / ex-Jupiters / Sibanye-Stillwaters & Glencor / Auramet Intl.)
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
6
Trial Mining Opening Up
6
SOUTH AFRICA’s “GOLDEN TRIANGLE”
Theta Gold – 6.1Moz Au Developer – to produce >160Kozpa
Theta’s
Eastern Transvaal Goldfields
South Africa host the 3rd largest
gold reserves in the world
(~6,000t Au)
Barberton
Greenstone
Goldfields
Witwatersrand Goldfields
West Wits Mining (ASX), Au
(MC: A$70m)
DRD Gold (NYSE/JSE), Au
(MC: US$788m)
Note: Market Capitalization data gathered on 18 October 2021
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
Pan African Resources (LSE/JSE), Au
(MC: GBP 275m)
7
7
OUR GEOLOGY / OUR MINING RIGHTS
“Our Mining Leases, covering one of the most AMAZING geological
structure where the gold is trapped between both the Chemical Traps &
Structural Traps, all linked to the one-and-only Bushveld Complex”
8
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
8
TGME UNDERGROUND PFS
INITIAL 16 % OF
UNDERGROUND
MINERAL
RESOURCE
Pay-back period from
first gold 13 months
Pay-back period from
start of mining 22
months
419 Koz delivered to
plant over Life of Mine
By third year of production,
almost 70 koz / year
(3 production units)
9
Life of Mine (LoM)
7.67 years
$241.2 million EBITDA
over LoM
Internal Rate of
Return 82%
Surface infrastructure plan Beta Underground Mine and plant layout
$ 905 / oz all-in sustaining
cost (AISC) over LoM
(bottom quartile SA
Producer)
$91.2 million Net
Present Value
Total Capital Expenditure (CAPEX)
$79 million LOM includes:
•
•
•
•
Peak CAPEX - $36M (Start-up
Plant and Beta Mine development )
Total Direct CAPEX - $54M
Total SIB CAPEX - $13.7M
Total contingent CAPEX - $10.8 M
9
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
LOW-COST SUSTAINABLE GOLD PRODUCER WITH HIGH MARGINS
Theta’s initial production would sit comfortably at the bottom 25 percentile in the cost rankings
TGME Gold Project
(~A$1210)
10
AISC Curve Public Reported by Australian/New Zealand producing Mines | June Qrt 2021
Source: Aurum Analytics’ Australia Producing Mines public reported
10
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
OPTIMISED RESOURCE USE PRODUCING HIGH GRADE ORE
Theta’s expected production grade sits
within the top 25% percentile among
Australian producing peers
TGME Stage 1 to
recover 353Koz
@ 5.51g/t Au
TGME Gold global resources
6.1Moz @ 4.17g/t Au
11
Mill Feed /Head Grade Public Reported by Australian/New Zealand producing Mines | June Q 2021 | See Appendix for Theta JORC Tables
Source: Aurum Analytics Report - Australia Producing Mines public reported.
11
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
TARGETING >160,000 OUNCES ANNUAL PRODUCTION
Now
Future
Solid Growth Potential
First Economic Studies
completed
•
•
•
First three-mine operation, central
plant and tailings facility >60koz/a
@ 30-37kt/m
Three Mining Production Units
Modern mining and treatment
methodologies enable low-cost
operations (AISC US$900/oz) and
reserve expansion
•
•
•
•
Develop multiple mines, reaching
>160koz/a within five years, from
the resource base of +6mil ounces
Seven Mining production Units
Expand to >160koz/a - 6 mine
operation @ 80kt/m
Various expansion opportunities to
increase production and the
resource base for >3 decades
Development Drill Rig
Long Hole Drill Rig
LHD
Old Days
Beta pay limit was 18.7g/t,
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
Now
Beta pay limit now 1+g/t,
12
12
TGME NORTHERN TENEMENTS
New access into old adits, sampling Q4 2021 planned
13
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
ENVIRONMENTAL, SOCIAL & GOVERNANCE (ESG)
ESG IS INTEGRAL TO THE DEVELOPMENT STRATEGY AND IS
BASED ON:
•
•
•
Holistic risk management
Zero harm approach to health and safety
Environmental stewardship
•
•
•
•
Conservation of biodiversity
Responsible production practices
Positive impact on host communities
Transparent stakeholder engagement and reporting
ENVIRONMENT
SOCIAL
GOVERNANCE
14
•
Creating regional
Environmental
•
Development Trusts for
•
alien invasive plants removals
Establish nature reserves and
and strategic black entrepreneur
partners
•
targeted environmental study
programs
26% of project ownership held by
local labour force, host communities
•
•
Ethical business practices
Culture of high ethical standards
throughout the organisation
Projects structured for broad based
economic participation
•
•
Alleviation of poverty
TGME will be the biggest employer
in the area
14
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
SEPTEMBER 2021 – A RATHER BUSY MONTH
•
•
•
•
•
•
Mine site staff and labour Covid-19 vaccinations
completed
Covid-care training
Underground safety training
Frankfort Mine underground adit re-opening
Adits support
Trial mining and sampling preparations
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
15
OCTOBER 2021 - TRIAL MINING AND DFS IN PROGRESS
•
•
•
•
Trial mining is advancing at
Frankfort mine
The results from this program being
is instrumental for determining and
optimizing the selected mining and
blasting method
Results from the trial mining and
further metallurgical testwork will be
incorporated, as well as more
accurate costs and detailed mine,
ventilation, metallurgical plant,
tailings and surface infrastructure
designs
The DFS is due for completion
during Q1 2022
16
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
BEYOND THE FIRST 6 UG MINES – MANY MORE
ACCESSABLE TARGETS UNDER INVESTIGATION
Desire Mine access and pre-development
5
2
3
Modern mining and treatment
methodologies enable
low-cost operations (AISC
US$900/oz) and reserve
expansion
1
LEGEND
1.
Beta
2.
Frankfort
3.
CDM
4.
Rietfontein
5.
Vaalhoek
6.
Glynn’s Lydenburg
6
First three-mine operation,
central plant and tailings
facility >60koz/a @ 30-37kt/m
Various expansion
opportunities to increase
production and the resource
base for >3 decades
4
Expand to >160koz/a - 6
mine operation @ 80kt/m
17
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
BEYOND THE FIRST 6 UG MINES – MANY MORE
ACCESSABLE TARGETS UNDER INVESTIGATION
Modern mining and treatment
methodologies enable
low-cost operations (AISC
US$900/oz) and reserve
expansion
Various expansion
opportunities to increase
production and the resource
base for >3 decades
Expand to >160koz/a - 6
mine operation @ 80kt/m
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
181818
RAMPING UP TO PRODUCTION
RESOURCE UPDATE
FUNDING
Further metallurgical test work
continue on Sulphide ore from
Frankfort Mine and free milling
ore from Beta Mine
Q3
2021
Theta Gold Mines
secured a A$10 million
funding package,
released to market on 2
August 2021
Trail Mining to start Q4 2021- Opening
up trail mining at the Frankfort Bevetts
will start during the next quarter
focusing on drilling and blasting to refine
the mining method. The planned drill
holes will be with a Boart Longyear S26
drilling machine. Reputable explosives
suppliers will participate in the explosive
trail of pumpable emulsion explosives.
Q4
2021
Definitive feasibility Study for
TGME Underground
completed
(with Minxcon)
Q3
2021
Beta Mine South Sampling Program
Q3 2021 – Beta southern section will
be sampled during this period with an
expectation to include this section of the
Beta Mine into the Resource Statement
Q4
2021
PERMITTING
Permitting activities focused
on the completion of the Mine
works program, and biodiversity
studies to strengthen
the Mining rights and
environmental authorisation
application process
Detailed engineering designs
for the integrated waste
management system - support
to the legislative applications,
focusing on waste classification
for the final tailings dam design
Exploration drilling Q4 2021 - The
current surface sources study will be
completed during this quarter with a
planned exploration drilling program
from underground for Beta North,
Frankfort Beverly Hills and Rietfontein
Q1
2022
19
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
COMPELLING INVESTMENT RATIONALE
SIZE
INVESTOR
VALUE
POTENTIAL
GROWTH
LOW-COST
PRODUCER
EXPERIENCED
TEAM
FLEXIBILITY
POSITIVE
SOCIO-ECONOMIC
IMPACT
+6Moz of Gold
Resources, a top 3
undeveloped gold
resource on the ASX
not owned by majors
Undervalued
compared to similar
size peers Bellevue
(ASX: BGL); Nova
(ASX: NVA); DRD
Gold (NYSE/JSE:
DRD)
Low-cost expansion
based on >130years
data (+40 old mines
and exploration)
+160koz pa (within 5
years) from predeveloped
near-surface gold
resources
Production costs
significantly lower
than current gold
20
price (AISC)
Resource
optimisation
specialists with over
250 years’ combine
experience
Multiple entry points
provide optionality in
the development
strategy
1,500 jobs created
over 5 years,
revitalization of
Piligrim’s Rest
tourism, knock-on
positive effect on
host community
economy
20
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
TIMING IS EVERYTHING
Continuous
Production Growth
Timing
of Entry
21
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
21
Question Time
Bill Guy – Chairman
Email: billg@thetagoldmines.com
www.thetagoldmines.com
Ticker: TGM (trade in AU$)
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
https://twitter.com/ThetaGoldMines
Ticker: TGMGF (trade in US$)
22
22
APPENDIX
23
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
23
COMBINED MINERAL RESOURCES STATEMENT (~6.1Moz)
Combined Mineral Resource
Resource Classification
Type of Operation
Tonnage
Gold Grade
Mt
g/t
Underground
Gold Content
Kg
koz
0.091
5.37
489
15.7
0.091
5.37
489
15.7
Underground
4.774
6.21
29 661
953.7
Open Pit
8.109
2.14
17 364
558.2
Tailings
5.244
0.83
4 373
140.6
18.128
2.84
51 398
1652.5
Underground
21.452
5.22
111 880
3597.0
Open pit
4.907
5.11
25 057
805.6
Tailings
0.023
0.57
13
0.4
Rock Dump
0.885
1.20
1 059
34.0
Total Inferred
27.267
5.06
138 009
4 437.0
Grand Total
45.485
4.17
189 896
6 105.2
Measured
Open pit
Tailings
Total Measured
Indicated
Total Indicated
Inferred
Notes:
1.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35 g/t.
2.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
3.
Gold price used for the cut-off calculations is USD1,500/oz.
4.
Mineral Resources are stated as inclusive of Ore Reserves.
5.
Mineral Resources are reported as total Mineral Resources and are not attributed.
24
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
24
MINERAL RESOURCES STATEMENT - UNDERGROUND (~4.5Moz)
Mineral Resource
Classification
Measured
Mine
Reef
Frankfort
Bevetts
Frankfort
CDM
Beta
Rietfontein
Vaalhoek
Olifantsgeraamte
Bevetts
Rho
Beta
Rietfontein
Vaalhoek
Olifantsgeraamte
Reef Grade
Stope Grade
Reef Width
Stope width
Content
g/t
g/t
cm
cm
cm.g/t
7.13
7.13
7.86
13.19
21.66
14.57
13.90
16.97
16.26
15.93
Total Measured
Indicated
Total Indicated
Total Measured & Indicated
Mineral Resource
Classification
Inferred
UG Mine
Frankfort
CDM
Beta
Rietfontein
Olifantsgeraamte
Vaalhoek
Vaalhoek
Glynns Lydenburg
Ponieskrantz*
Frankfort Theta*
Nestor*
Reef
Bevetts
Rho
Beta
Rietfontein
Olifantsgeraamte
Vaalhoek
Thelma Leaders
Glynns
Portuguese
Theta
Sandstone
Total Inferred
5.37
5.37
5.13
3.80
6.58
8.20
6.34
4.62
6.21
6.20
73
73
58
23
23
52
36
25
36
38
103
103
96
90
90
92
90
90
91
91
Reef Tonnes
Stope Tonnes
Mt
Mt
520
520
452
307
499
755
499
416
591
600
Au Content
kg
0.069
0.069
0.243
0.258
0.716
0.517
0.064
0.026
1.824
1.893
0.091
0.091
0.373
0.895
2.357
0.919
0.140
0.091
4.774
4.865
Reef Grade
Stope Grade
Reef Width
Stope width
Content
Reef Tonnes
Stope Tonnes
g/t
g/t
cm
cm
cm.g/t
Mt
Mt
koz
15.7
15.7
61.5
109.4
498.5
242.2
28.5
13.6
953.7
969.4
489
489
1,912
3,401
15,506
7,534
887
422
29,661
30,150
Au Content
7.41
10.06
16.51
14.06
18.33
16.28
12.18
15.87
13.26
7.22
5.54
4.27
3.02
5.43
8.52
4.68
4.77
9.47
5.19
3.99
3.24
2.92
48
24
25
57
23
22
96
25
22
34
41
93
90
90
94
90
90
123
90
90
90
90
356
244
414
803
422
361
1166
397
287
244
225
0.343
0.544
1.107
1.190
0.059
0.873
0.023
3.218
0.064
0.099
0.101
0.596
1.811
3.367
1.962
0.248
2.980
0.030
9.833
0.213
0.220
0.193
kg
2,543
5,472
18,285
16,721
1,162
14,209
284
51,078
849
714
562
14.68
5.22
31
91
458
7.622
21.452
111,880
koz
81.8
175.9
587.9
537.6
37.3
456.8
9.1
1 642.2
27.3
23.0
18.1
3,597 597.0
Notes:
1. Mineral Resource cut-off of 160 cm.g/t applied.
2. Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
3. Gold price used for the cut-off calculations is USD1,500/oz.
4. cm.g/t and g/t figures will not back calculate due to variable densities in reef and waste rock.
5. Mineral Resources are stated as inclusive of Ore Reserves.
6. Mineral Resources are reported as total Mineral Resources and are not attributed.
25
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
25
MINERAL RESOURCES STATEMENT – OPEN PITS (~1.4Moz)
Mineral Resource Classification
Indicated
Open Pit Mine
Hermansburg
DG1
DG2
Vaalhoek
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Iota
Iota
Iota
Iota
Reef Grade
g/t
1.79
2.24
0.66
17.25
1.02
1.08
2.41
3.79
2.51
2.98
2.33
2.51
1.06
Reef
Eluvial
Eluvial
Eluvial
Vaalhoek
Shale
Bevett's
Upper Theta
Lower Theta
Beta
Bevett's
Upper Rho
Lower Rho
Upper Theta
0
0
0
33
200
223
100
100
100
114
402
520
114
0
0
0
574
204
241
241
379
251
340
937
1306
121
Reef Tonnes
Mt
0.505
0.640
1.586
0.111
0.397
0.856
0.651
0.839
0.373
0.108
0.897
0.981
0.163
168
360
8.109
0
0
0
43
97
215
217
100
100
100
0
0
0
880
1 388
240
254
186
806
217
Reef Tonnes
Mt
0.110
0.000
0.000
0.213
0.293
0.600
0.451
0.948
1.384
0.778
5.12
134
687
0.131
673
21.6
5.11
121
617
4.907
25 057
805.6
2.14
Total Indicated
Mineral Resource Classification
Inferred
Open Pit Mine
Reef Grade
g/t
0.88
0.00
0.00
20.32
14.25
1.12
1.17
1.86
8.06
2.17
Reef
Hermansburg
DG1
DG2
Vaalhoek
Vaalhoek
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Eluvial
Eluvial
Eluvial
Vaalhoek
Thelma Leaders
Shale
Bevett's
Upper Theta
Lower Theta
Beta
Iota
Upper Rho
Total Inferred
Notes:
1. Mineral Resource cut-off of 0.5 g/t and 0.35 g/t applied.
2. Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
3. Gold price used for the cut-off calculations is USD1,500/oz.
4. Vaalhoek, Theta Hill, Browns Hill and Iota Mineral Resources stated utilising pit optimisation.
5. Mineral Resources are stated as inclusive of Ore Reserves.
6. Mineral Resources are reported as total Mineral Resources and are not attributed.
CORPORATE PRESENTATION – October 2021 (ASX: TGM | OTC: TGMGF | FSE: TGMGF)
Reef Width
cm
Reef Width
cm
Content
cm.g/t
Content
cm.g/t
Au Content
kg
koz
905
1 432
1 041
1920
404
925
1571
3178
938
323
2090
2464
173
29.1
46.0
33.5
61.7
13.0
29.7
50.5
102.2
30.1
10.4
67.2
79.2
5.6
17 364
558.2
Au Content
kg
koz
97
0
0
4 319
4 172
668
528
1762
11153
1686
3.1
0.0
0.0
138.9
134.1
21.5
17.0
56.6
358.6
54.2
26
26
ORE RESERVE STATEMENT
Grade
Tonnes
g/t
kt
kg
koz
4,24
60
254
8,16
4,24
60
254
8,16
6,51
1 662
10 822
347,94
Frankfort
4,11
259
1 063
34,16
CDM
2,31
385
889
28,58
Theta Project (MR 83)
2,31
2 164
4 996
160,61
3,98
4 470
17 770
571,29
Operation
Ore Reserve Classification
Proved
Frankfort
Total Proved
Beta
Probable
Total Probable
Au Content
Notes:
Underground Operations
1. An Ore Reserve cut-off of 170 cm.g/t has been applied for the Beta Mine.
2. An Ore Reserve cut-off of 150 cm.g/t has been applied for the Frankfort Mine.
3. An Ore Reserve cut-off of 121 cm.g/t has been applied for the CDM Mine.
4. A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut- off calculation.
5. Ore Reserves are reported as total Ore Reserves and are not attributed.
Theta Project (Open Pit MR 83)
1. An Ore Reserve cut – off of 0.4 g/t was applied.
2. A gold price of USD 1,300 / oz was used for the cut - off calculation.
27