Theta Gold Increases Mineral Resource To Over 6Moz
Released
Released
Announcement PDF
16 May 2019
ASX ANNOUNCEMENT
THETA GOLD INCREASES MINERAL RESOURCE TO OVER 6MOZ
30% INCREASE IN OPEN CUT RESOURCES
Theta Gold Mines Limited (“Theta Gold” or “Company” (ASX: TGM, TGMO) is pleased to announce an increase in
the global Mineral Resource (JORC 2012) to over 6 M oz Au (44.8 Mt @ 4.18 g/t Au) (Table 1).
The global Mineral Resource includes Theta Gold’s core project, the Theta Project, located next to the historical
gold mining town of Pilgrim’s Rest, in Mpumalanga Province, some 370km east of Johannesburg.
In addition to growing the global Mineral Resource, Theta Gold has also delivered the Company’s maiden Ore
Reserve following the last quarter’s successful drill campaigns.
Over the past 16 months, Theta Gold has focused on a strategy to convert a very large Mineral Resource into an
increased Ore Reserve. Today’s announcement highlights the Company’s potential to deliver reserve conversions
from its existing extensive resource base cost effectively and in a more immediate time frame, relative to other
early stage gold explorers.
As an example, drilling during this period was aimed at building Indicated Mineral Resources for the Theta Project
on Mining Right (“MR”) 83 to produce the company’s maiden Ore Reserve, and achieved this objective. MR83
hosts Columbia Hill and a portion of the Theta Hill deposit, which extends southwards across into the adjacent
MR341 (Figure 1).
Significantly, it is only a part of the Company’s overall holdings across the province. The Company aims to build a
solid production platform from Theta Project based primarily around shallow, open‐cut resource. Over 43
historical mines and prospect areas remain to be accessed and explored.
Highlights
New JORC 2012 global Mineral Resource of 6 Moz Au (44.8 Mt @ 4.18g/t Au, 26% Measured and
Indicated, 74% Inferred)
Including:
o 4.5 M oz Underground (26.3 Mt @ 5.4 g/t Au (Measured, Indicated, and Inferred)
o 1.3 M oz Open pit resources (13.08 Mt @3.12 g/t Au) (Indicated & Inferred) including:
870 Koz Theta Project (10.1 Mt @ 2.7g/t Au) (Indicated & Inferred; 0‐130m depth)
205 Koz (2.31 Mt @ 2.76 g/t Au at a 0.4 g/t Au cut‐off) Maiden Probable Ore Reserve
estimate (Theta Project maiden mining reserve)
(Refer Tables 1, 2 & 3)
Theta Project Summary
The Theta Project (open cut) Mineral Resource inventory now sits at 870 Koz (10.1 Mt @ 2.7g/t Au), and
represents an increase of 270 Koz of gold from the 26 September 2018 release on the ASX (0.6 M oz contained in
4.48 Mt @ 4.14 g/t Au).
1
The recently added Mineral Resources include Iota, a section of Columbia Hill, and the two previously
undiscovered low grade 1.0‐1.2m thick mineralized zones termed the Shale and Bevetts Reefs (Table 3). Both
Shale and Bevetts Reef average about 1.1 g/t Au, and added 82 Koz Au to the Theta Project. The lower grade
reefs lower the overall resource grade but increase the gold content of Theta Project.
Drilling at Theta Hill for Ore Reserves for this update has only included MR83, which is fully permitted for
underground mining but requires extra permitting for open pit development. The Theta Project drill program was
carried out over the last 16 months (Nov 2017), and in total some 18,857 m of drilling has been completed over
371 vertical drill holes from surface. MR83 hosts Columbia Hill and a third of the Theta Hill deposit, which extends
southwards across into the adjacent MR341 (Figure 1).
Chairman Bill Guy commented, “Theta Gold is fast‐tracking the Company’s very large Mineral Resource into an
increased Ore Reserve. The historical mining techniques of the mineral field in which we operate has meant the
Company has traditionally carried a large percentage of its Mineral Resources in Inferred categories. We have
shown in a very short period of time that we have the capacity to deliver an initial Ore Reserve and extra ounces
into the Theta Project (Open Cut). The results have been as planned and we are very excited about the potential
to follow‐up these results with future reserve conversions.”
Mr Guy added, “The drill program at the Theta Project increased the Indicated resources to 358 Koz of contained
gold, inclusive of the discovery of two Reefs (Shale & Bevetts).”
“Theta Gold Mines is pleased to be breathing life into this large goldfield, delivering reserves and making new
discoveries. Following this success, the exploration team is now planning the next phase of our drilling program,
which we look forward to announcing to shareholders shortly. “
Summary
Figure 1: Current Drill Hole location Plan with Future Drilling
2
Table 1: Combined Mineral Resources as at 1 May 2019
Mt
Gold
Grade
g/t
Kg
0.091
5.37
489
koz
15.7
0.091
5.37
489
15.7
Underground
4.774
6.21
29,661
953.7
Open Pit
7.161
2.11
15,091
485.2
Tailings
5.244
0.83
4,373
140.6
17.179
2.86
49,126
1,579.4
Underground
21.452
5.22
111,880
3,597.0
Open Pit
5.922
4.35
25,730
827.3
Tailings
0.023
0.57
13
0.40
Rock Dump
0.121
1.64
199
6.40
Total Inferred
27.518
5.01
137,823
4,431.0
Grand Total
44.788
4.18
187,438
6,026.2
Mineral
Resource
Classification
Measured
Type of Operation
Underground
Total Measured
Indicated
Total Indicated
Inferred
Tonnage
Gold Content
Notes:
1. Columns may not add up due to rounding.
2. Gold price used for the cut‐off calculations is USD1,500/oz.
3. UG Mineral Resources are reported at a cut‐off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock
dumps at 0.35 g/t.
4. Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
5. Mineral Resources are stated as inclusive of Ore Reserves.
6. Mineral Resources are reported as total Mineral Resources and are not attributed.
Table 2: Theta Project Ore Reserves for MR83 Only, 1 May 2019
Grade
g/t
3.24
Reef Tonnes
kt
564
kg
1,826
oz
58,699
2.54
1,253
3,189
102,513
2.76
493
1,362
43,798
Total
2.76
The Ore Reserves exclude Inferred Mineral Resources.
2,310
6,377
205,010
Mineral Resource
Category in LoM Plan
Probable
Probable
Probable
Pit
Browns Hill
Iota (Columbia
Hill)
Theta Hill
Notes:
1. Totals in the Ore Reserve may not add‐up due to rounding.
2. Mineral Resources are for MR83 only and excludes MR341.
3. No Inferred Mineral Resources are included in the Ore Reserve.
3
Au Content
Table 3: Total Theta Project ‐ Mineral Resources, 1 May 2019
Mineral
Resource
Classification
Open Pit Mine
Indicated
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Columbia Hill
Columbia Hill
Columbia Hill
Columbia Hill
Reef
Grade
g/t
Reef
Width
cm
cm.g/t
Reef
Tonnes
Mt
Shale
1.02
200
204
Bevetts
1.10
221
Upper Theta
2.41
Lower Theta
Reef
Open Pit Mine
Inferred
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Theta Hill &
Browns Hill
Columbia Hill
Au Content
Kg
koz
0.439
402
12.9
244
0.891
886
28.5
100
241
0.724
1,568
50.4
3.70
100
370
0.888
2,956
95.0
Beta
2.49
100
249
0.383
859
27.6
Bevetts
Upper Rho
Lower Rho
Upper Theta
2.89
2.43
2.51
1.08
2.14
114
393
550
114
246
330
956
1381
123
526
0.105
0.808
0.815
0.158
5.211
303
1,965
2,047
171
11,157
9.7
63.2
65.8
5.5
358.7
Reef
Grade
g/t
Reef
Width
cm
Shale
1.11
Bevetts
Total Indicated
Mineral
Resource
Classification
Content
cm.g/t
Reef
Tonnes
Mt
216
240
1.07
213
Upper Theta
1.86
Lower Theta
Reef
Content
Au Content
Kg
koz
0.703
666
21.4
227
0.648
589
19.0
100
186
1.071
1,692
54.4
8.11
100
811
1.643
11,329
364.3
Beta
2.23
100
223
0.748
1,417
45.6
Upper Rho
Total Inferred
5.13
3.30
106
132
544
434
0.099
4.912
507
16,202
16.3
520.9
Mineral
Resource
Classification
Reef
Grade
g/t
Reef
Width
cm
All
2.14
All
Open Pit Mine
Total Theta
Project
Total Theta
Inferred
Project
Total Indicated and Inferred
Indicated
Reef
cm.g/t
Reef
Tonnes
Mt
246
526
3.30
132
2.70
190
Content
Au Content
Kg
koz
5.2
11,157
358.7
435
4.9
16,202
520.9
514
10.1
27,359
879.6
Notes:
1.
2.
3.
4.
5.
Theta Project (Theta Hill, Browns Hill and Iota) cut‐off is 0.35 g/t;
The gold price used for the cut‐off calculations is USD 1,500 / oz;
Geological losses applied are 10% for inferred and 5% for Indicated and Measured;
Theta Hill and Browns Hill ‐ Upper Theta Reef, Lower Theta Reef and Beta Reef are diluted grades over 100cm;
Historical mine voids have been depleted from the Mineral Resource;
4
6.
7.
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion
thereof will be converted to Ore Reserves;
Mineral Resources fall within the mining right MR83 and MR341.
For more information please visit www.thetagoldmines.com or contact:
General Enquiries
Rob Thomson, Managing Director
Theta Gold Mines Limited
M: +61 409 843 963
robt@thetagoldmines.com
or
Investor Enquiries
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8912 2126
billg@thetagoldmines.com
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM) is a gold development company that holds a range of prospective gold
assets in a world‐renowned South African gold mining region. These assets include several surface and near‐
surface high‐grade gold projects which provide cost advantages relative to other gold producers in the region.
Theta Gold Mines core project is TGME, located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km east of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). Following small scale production from 2011 – 2015, the Company is currently focussing
on the planned refurbishment of the existing CIL plant and nearby mines/prospects with the intention of
resuming gold production and is considering open pit mining where it has identified mineral resources amenable
to open pit production. The Company is presently concluding a detailed feasibility study and is also in the process
of seeking approvals for open pit mining on the existing mining licences held.
The Company aims to build a solid production platform to over 100kozpa based primarily around shallow, open‐
cut or adit‐entry hard rock mining sources. Theta Gold Mines has access to over 43 historical mines and prospect
areas that can be accessed and explored, with over 6.7Moz of historical production recorded.
5
Competent Persons Statement
Mineral Resources
The information in this report relating to Mineral Resources is based on, and fairly reflects, the information and supporting
documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a
director of Minxcon (Pty) Ltd and a member of the South African Council for Natural Scientific Professions.
Mr Engelmann has sufficient experience that is relevant to the style of mineralisation under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee
(JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Engelmann consents
to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Ore Reserves
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information and supporting
documentation compiled by Mr Daniel van Heerden (B Eng (Min.), MCom (Bus. Admin.), MMC, Pr.Eng. No. 20050318,
FSAIMM, AMMSA), a director of Minxcon (Pty) Ltd and a member of the Engineering Council of South Africa.
Mr Van Heerden has sufficient experience that is relevant to the style of mineralisation under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves
Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Van
Heerden consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited (ASX:TGM) to assist in
informing interested parties about the Company and should not be considered as an offer or invitation to
subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with
respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the
basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold Mines has no reason to believe
that any such statements and projections are either false, misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax or other
advice. This overview of Theta Gold Mines does not purport to be all inclusive or to contain all information which
its recipients may require in order to make an informed assessment of the Company’s prospects. Before making
an investment decision, you should consult your professional adviser, and perform your own analysis prior to
making any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any
errors in or omissions, from any information, statement or opinion contained in this announcement. This
announcement contains information, ideas and analysis which are proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold Mines regarding estimates or future events which
could be considered forward looking statements. Forward looking statements are typically preceded by words
such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included in
this announcement are based on assumptions and contingencies which are subject to change without notice, and
may be influenced by such factors as funding availability, market‐related forces (commodity prices, exchange
rates, stock market indices and the like) and political or economic events (including government or community
issues, global or systemic events). Forward looking statements are provided as a general reflection of the
intention of the Company as at the date of release of the document, however are subject to change without
notice, and at any time. Future events are subject to risks and uncertainties, and as such results, performance and
6
achievements may in fact differ from those referred to in this announcement. Mining, by its nature, and related
activities including mineral exploration, are subject to a large number of variables and risks, many of which cannot
be adequately addressed, or be expected to be assessed, in this document. Work contained within or referenced
in this report may contain incorrect statements, errors, miscalculations, omissions and other mistakes. For this
reason, any conclusions, inferences, judgments, opinions, recommendations or other interpretations either
contained in this announcement, or referencing this announcement, cannot be relied upon. There can be no
assurance that future results or events will be consistent with any such opinions, forecasts or estimates. The
Company believes it has a reasonable basis for making the forward looking statements contained in this document,
with respect to any production targets, resource statements or financial estimates, however further work to define
Mineral Resources or Reserves, technical studies including feasibilities, and related investigations are required prior
to commencement of mining. No liability is accepted for any loss, cost or damage suffered or incurred by the
reliance on the sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to support
the estimation of Ore Reserves. There is no assurance that the intended development referred to will proceed as
described, and will rely on access to future funding to implement. Theta Gold Mines believes it has reasonable
grounds the results of the Feasibility Study. At this stage there is no guarantee that funding will be available, and
investors are to be aware of any potential dilution of existing issued capital. The production targets and forward
looking statements referred to are based on information available to the Company at the time of release, and
should not be solely relied upon by investors when making investment decisions. Theta Gold cautions that mining
and exploration are high risk, and subject to change based on new information or interpretation, commodity prices
or foreign exchange rates. Actual results may differ materially from the results or production targets contained in
this release. Further evaluation is required prior to a decision to conduct mining being made. The estimated
Mineral Resources quoted in this release have been prepared by Competent Persons as required under the JORC
Code (2012). Material assumptions and other important information are contained in this release.
Note Business Arrangement
Theta Gold Mines holds 100% issued capital of its South African subsidiary Stonewall Mining (Pty) Ltd (“Stonewall”).
Stonewall holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty)
Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”) entities. The
South African Mining Charter requires a minimum of 26% meaningful economic participation by the historically
disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is comprised of a
combination of local community trusts, an employee trust and a strategic entrepreneurial partner.
7
APPENDIX A
JORC Global Mineral Resources
Mineral Resources for Underground Operations as at 1 May 2019
Mineral Resource
Classification
Measured
Mine
Frankfort
Reef
Bevetts
Total Measured
Reef
Grade
Stope
Grade
Reef
Width
Stope
width
Content
Reef
Tonnes
Stope
Tonnes
g/t
g/t
cm
cm
cm.g/t
Mt
Mt
Kg
koz
7.13
5.37
73
103
520
0.069
0.091
489
15.7
7.13
5.37
73
103
520
0.069
0.091
489
15.7
Au Content
Frankfort
Bevetts
7.86
5.13
58
96
452
0.243
0.373
1,912
61.5
CDM
Rho
13.19
3.80
23
90
307
0.258
0.895
3,401
109.4
Beta
Beta
21.66
6.58
23
90
499
0.716
2.357
15,506
498.5
Rietfontein
Rietfontein
14.57
8.20
52
92
755
0.517
0.919
7,534
242.2
Vaalhoek
Vaalhoek
13.90
6.34
36
90
499
0.064
0.140
887
28.5
Olifantsgeraa
mte
Olifantsgeraa
mte
16.97
4.62
25
90
416
0.026
0.091
422
13.6
Total Indicated
16.26
6.21
36
91
591
1.824
4.774
29,661
953.7
Total Measured & Indicated
15.93
6.20
38
91
600
1.893
4.865
30,150
969.4
Reef
Grade
Stope
Grade
Reef
Width
Stope
width
Content
Reef
Tonnes
Stope
Tonnes
g/t
g/t
cm
cm
cm.g/t
Mt
Mt
Kg
koz
Indicated
Mineral Resource
Classification
Inferred
UG Mine
Reef
Au Content
Frankfort
Bevetts
7.41
4.27
48
93
356
0.343
0.596
2,543
81.8
CDM
Rho
10.06
3.02
24
90
244
0.544
1.811
5,472
175.9
Beta
Beta
16.51
5.43
25
90
414
1.107
3.367
18,285
587.9
Rietfontein
Rietfontein
14.06
8.52
57
94
803
1.190
1.962
16,721
537.6
Olifantsgeraa
mte
Olifantsgeraa
mte
18.33
4.68
23
90
422
0.059
0.248
1,162
37.3
Vaalhoek
Vaalhoek
16.28
4.77
22
90
361
0.873
2.980
14,209
456.8
Vaalhoek
Thelma
Leaders
12.18
9.47
96
123
1166
0.023
0.030
284
9.1
Glynns
Lydenburg
Glynns
15.87
5.19
25
90
397
3.218
9.833
51,078
1,642.2
Ponieskrantz*
Portuguese
13.26
3.99
22
90
287
0.064
0.213
849
27.3
Frankfort
Theta*
Theta
7.22
3.24
34
90
244
0.099
0.220
714
23.0
Nestor*
Sandstone
5.54
2.92
41
90
225
0.101
0.193
562
18.1
14.68
5.22
31
91
458
7.622
21.452
111,880
3,597.0
Total Inferred
Note: * Manual Mineral Resources
8
Mineral Resources for Open Pit Operations as at 1 May 2019
Mineral
Resource
Classification
Indicated
Open Pit Mine
Reef
Inferred
Total Inferred
Reef
Width
Content
Reef
Tonnes
g/t
cm
cm.g/t
Mt
Kg
koz
Au Content
Hermansburg
Elluvial
1.79
0
0
0.505
905
29.1
DG1
Elluvial
1.37
0
0
0.159
217
7.0
DG2
Elluvial
0.76
0
0
1.174
892
28.7
Vaalhoek
Vaalhoek
17.25
33
574
0.111
1920
61.7
Theta & Browns Hill
Shale
1.02
200
204
0.439
402
12.9
Theta & Browns Hill
Bevetts
1.10
221
244
0.891
886
28.5
Theta & Browns Hill
Upper Theta
2.41
100
241
0.724
1568
50.4
Theta & Browns Hill
Lower Theta
3.70
100
370
0.888
2956
95.0
Theta & Browns Hill
Beta
2.49
100
249
0.383
859
27.6
Columbia Hill
Bevetts
2.89
114
330
0.105
303
9.7
Columbia Hill
Upper Rho
2.43
393
956
0.808
1965
63.2
Columbia Hill
Lower Rho
2.51
550
1381
0.815
2047
65.8
Columbia Hill
Upper Theta
1.08
114
123
0.158
171
5.5
2.11
179
378
7.161
15,091
485.2
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Total Indicated
Mineral
Resource
Classification
Reef
Grade
Open Pit Mine
Reef
Au Content
g/t
cm
cm.g/t
Mt
Kg
koz
Elluvial
0.88
0
0
0.110
97
3.1
DG1
Elluvial
2.95
0
0
0.293
864
27.8
DG5
Elluvial
0.76
0
0
0.101
77
2.5
Vaalhoek
Vaalhoek
20.32
43
880
0.213
4,319
138.9
Vaalhoek
Thelma Leaders
14.25
97
1,388
0.293
4,172
134.1
Theta & Browns Hill
Shale
1.11
216
240
0.703
666
21.4
Theta & Browns Hill
Theta & Browns Hill
Bevetts
1.07
213
227
0.648
589
19.0
Upper Theta
1.86
100
186
1.071
1692
54.4
Theta & Browns Hill
Lower Theta
8.11
100
811
1.643
11329
364.3
Theta & Browns Hill
Beta
2.23
100
223
0.748
1417
45.6
Columbia Hill
Upper Rho
5.13
106
544
0.099
507
16.3
4.35
115
502
5.922
25,730
827.3
Hermansburg
9
Mineral Resources for Tailings Dams as at 1 May 2019
Mineral
Resource
Classification
Indicated
Surface Operation
Reef
Inferred
Gold Grade
Mt
g/t
Gold Content
Kg
koz
Glynn’s Lydenburg
Tailings
1.211
0.80
972
31.3
Blyde 1
Tailings
0.590
0.73
434
14.0
Blyde 2
Tailings
0.280
0.83
234
7.5
Blyde 3
Tailings
0.316
0.87
275
8.8
Blyde 4
Tailings
0.164
0.72
119
3.8
Blyde 5
Tailings
0.022
0.61
14
0.4
TGME Plant
Tailings
2.661
0.87
2,325
74.8
5.244
0.83
4,373
140.6
Tonnage
Gold Grade
Mt
g/t
Kg
Total Indicated
Mineral
Resource
Classification
Tonnage
Surface Operation
Blyde 3a
Reef
Tailings
Total Inferred
Gold Content
koz
0.023
0.57
13
0.4
0.023
0.57
13
0.4
Tonnage
Gold Grade
Mt
g/t
Kg
koz
0.121
1.64
199
6.4
0.121
1.64
199
6.4
Mineral Resources for Rock Dumps as at 1 May 2019
Mineral
Resource
Category
Surface Operation
Inferred
Vaalhoek
Total Inferred
Reef
Rock Dump
Gold Content
Notes:
1.
Columns may not add up due to rounding.
2.
Gold price used for the cut‐off calculations is USD1,500/oz.
3.
UG Mineral Resources are reported at a cut‐off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock
dumps at 0.35 g/t.
4.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
5.
Mineral Resources are stated as inclusive of Ore Reserves.
6.
Mineral Resources are reported as total Mineral Resources and are not attributed.
10
APPENDIX B
JORC Checklist – Table 1 Assessment and Reporting Criteria
Criteria
SECTION 1: SAMPLING TECHNIQUES AND DATA
Detail
Explanation
Nature and quality of
sampling (e.g. cut
channels, random
chips, or specific
specialised industry
standard
measurement tools
appropriate to the
minerals under
investigation, such as
down hole gamma
sondes, or handheld
XRF instruments, etc.).
These examples
should not be taken as
limiting the broad
meaning of sampling.
Sampling types discussed in this section mainly pertain to historical data with the exception of the Theta
Project subsequent to the 2017/2019 drilling campaign. Drilling data sampling types include diamond, reverse
circulation (“RC”), percussion and auger drilling. Other sampling data types include underground channel chip
sampling (as individual sample section composite data points on plans or as development or stope face
composite stretch values), grab sampling as well as trench and sample pit sampling for bulk sampling for the
purposes of size fraction analysis.
The table below outlines the types of sampling data collected or utilised in the Mineral Resource or Exploration
Target estimates for each of the Project Areas.
Project Area
Reef
Rietfontein
Rietfontein
Beta
Beta
Frankfort
Bevetts and Theta
Clewer, Dukes Hill & Morgenzon
Rho
Olifantsgeraamte
Olifantsgeraamte
Vaalhoek
Vaalhoek and Thelma
Leaders
Glynn’s Lydenburg
Glynn's
Theta Project (Theta Hill, Browns
Hills and Iota)
Columbia Hill
Hermansburg
DG1
DG2
Sampling
techniques
Beta, Shale, Lower
Theta, Upper Theta,
Lower Rho, Upper Rho
and Bevetts
Rho, Shale and Shale
Leaders
Eluvial
Eluvial
Eluvial
DG5
Eluvial
Glynn’s Lydenburg TSF
Blyde TSFs (1, 2, 3, 3a, 4, 5)
TGME Plant
Tailings
Tailings
Tailings
Vaalhoek
Rock Dump
a)
Sampling Data Types
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Stretch Values
Drillhole Data
Channel Chip Sample Data
Stretch Values
Drillhole Data
Trench Sampling Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
RC Drillhole Data
RC Drillhole Data
RC Drillhole Data
Grab Samples
RC Drillhole Data
Auger Drillhole Data
Auger Drillhole Data
Auger Drillhole Data
Bulk Sampling Data
Trench Sampling Data
Sampling Pit Data
Channel Chip Sampling Data:Historical (Pre-1946) chip sample values were captured in ‘pennyweight’ (dwt) units for gold content and
in inches for channel width. The quality of the chip samples could not be ascertained due to the historical
nature there-of; however, it should be noted chip sampling is a well-established sampling method in the
underground South African mining industry. The sampling activity on the mines was usually managed by
each mine’s survey department and were usually conducted to specific company-wide standards.
More recent chip sample values were captured as cm.g/t content values and channel widths were
recorded in centimetres as is the case at Frankfort while under ownership of Simmer & Jack Mines
Limited. During 2008, Minxcon audited the chip sampling procedure as employed by Simmer & Jack and
found the procedures employed to be of industry standard.
b)
Stretch Values:In some instances (such as at Vaalhoek and Glynn’s Lydenburg) in areas where original sample plans
were not available, stretch value plans recording a composite content and channel width value for a
stope length or development end were available and included in the database. The integrity of these
plans as a source of grade information has been proven in other areas on the same mines where both
chip sample plans and stretch value plans were available and were compared. It was found that the
correlation to old sampling has been representative of the stretch values in these areas.
c)
Drillhole Data:Historical (pre-2007/8) drillhole data (inclusive of diamond, RC, and auger) exists on many of the
operations. However very little backing data is available for many of these older holes and it must be
assumed that QAQC was not included in the process. Minxcon has however reviewed the general quality
of the survey data for these drillholes. For the most part, collar data has been found to agree well with
local topography and is considered to be acceptable for modelling purposes.
Downhole survey data with respect to diamond and RC drilling is also often absent from the older holes;
however, it should be noted that over 98% of these holes were seldom drilled to depths in excess of 150
m and were vertically collared. Only 1.40% of all the drillholes on all the properties were drilled as
inclined drillholes, thus it is Minxcon’s view that the holes and their relative reef intercept points would be
spatially acceptable for modelling purposes.
The historical drillhole data has no accompanying assay QAQC, however this fact is considered in
allocation of Mineral Resource classification during modelling.
11
Criteria
SECTION 1: SAMPLING TECHNIQUES AND DATA
Detail
Explanation
More recent drillhole data (inclusive of diamond, RC and auger) from 2008 onward is considered to be of
high quality as it was conducted to updated industry standards with the incorporation of drillhole collar
survey as well as assay QAQC where blanks and certified reference material were inserted for
monitoring purposes, with the inclusion of coarse duplicate samples. These later drilling programmes
were also either monitored, audited or managed by Minxcon personnel under Minxcon previous sister
company Agere Project Management (“Agere”).
Include
reference to
measures
taken to
ensure
sample
representivity
and the
appropriate
calibration of
any
measurement
tools or
systems
used.
d)
Trench, Sample Pit and Bulk Sampling (Vaalhoek Rock Dump):In order to evaluate the Vaalhoek Rock Dump, trenches and sample pits were dug. The trenches and pits
were surveyed by a Mine Surveyor and were sampled in sections down to a depth 1.2 m, each sample
representing a composite of 40 cm down the wall of the trench or pit. These sam