Quarterly Activities & Cashflow Reports - 31 December 2022
Released
Released
Announcement PDF
31 January 2023
ASX ANNOUNCEMENT
(ASX:TGM)
QUARTERLY REPORT
1 October 2022 to 31 December 2022
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM | OTC: TGMGF) is pleased to
report on its activities for the period from 1 October 2022 to 31 December 2022.
HIGHLIGHTS
DURING THE DECEMBER 2022 QUARTER:
Theta Gold signed a A$110m (US$70m) non-binding Term Sheet (“TGME Stream”) with
Sprott Streaming and Royalty Corporation (“Sprott”) for pre-development, development
capital and operating expenditure to bring the initial stage of TGME Gold Project (the
“Project”) into production and reach positive cash flow1.
o The TGME Stream covers 90% of TGME Gold Project’s first stage US$77m peak funding1
requirement.
o The funding provides further confidence for the Theta board to deliver its growth
strategy to achieve a 160,000 oz p.a production profile within five years with potential
to expand the mineral resource and incorporate up to 40 other mines near to the plant
site.
o The Stream funding is conditional on completion of due diligence, final definitive
documentation, cost to complete certificate and South African regulatory approvals.
• TGM raised A$1.7 million (before costs) through a Private Placement (“Placement”) from
existing and new institutional, professional and sophisticated investors on 27 October
20222.
• The Company also announced on 6 December 2022 following the completion of the
Placement that had also successfully completed a Share Purchase Plan (“SPP”) raising
A$597,000 on the same terms as the Placement.
• The Company also announced it had been awarded the first of the two water use licences
required for its TGME Underground Gold Mine project from the South African Department
of Water and Sanitation (DWS).
•
Refer to ASX release dated 19 October 2022 titled “Theta Gold Executes a A$110M (US$70M) Non-Binding Funding Term Sheet with Sprott
for its TGME Gold Project”
2
Refer to ASX release dated 27 October 2022 titled “Theta Gold raises funds to advance TGME Gold Project”
1
Theta Gold Mines Limited ABN 30 131 758 177
Suite 80, Level 35 (Servcorp), International Tower One, 100 Barangaroo Avenue, Sydney NSW 2000
Tel: +61 2 8046 7584 Email: info@thetagoldmines.com
www.thetagoldmines.com
o Receipt of this water licence means that the Frankfort Mine is now fully permitted and
the Company can commence commercial bulk sampling and trial mining.
• The Company announced that all resolutions were successfully passed at the 2022 Annual
General Meeting (AGM) which was held on Wednesday, 30 November 2022.
• On 27 July 20223, the TGME Underground Project definitive Feasibility Study (“FS”) was
released to ASX with an NPV10% of $A432 million at US$1,642 / oz gold price. Key features
of FS include:
o TGME Feasibility Study delivers 1.24Moz contained gold, underpinning an initial 12.9year mine life.
o Strong financial return (based on LOM Plan), including (at a gold price of A$2,189/oz,
with first production targeted for 20244, including:
• Undiscounted free cash flows of US$508m, (A$678m), pre-tax US$717, (A$956m);
• NPV (at a 10% discount rate) of US$219m (A$292m), pre-tax US$324m, (A$432m);
• Capital payback period of 31 months;
• Pre-tax IRR of 65%;
• Combined Underground Projects have an AISC of US$834/oz (A$1,112/oz);
• Peak Capital requirement is US$77m (A$103m), total LOM capital requirements
US$174m (A$232m).
o Table 1 demonstrates the key economics of the project based on various gold price
assumptions.
Table 1: Project Economics at Various Gold Prices – Base Case (AUD)
Project Economics at
gold price
NPV @ 10% (real) Pre-tax
NPV @ 10% (real) Posttax
IRR (%) Pre-tax
IRR (%) Post-tax
AISC
EBITDA annual average
EBIT annual average
Free Cash Flow (Pre-tax)
Free Cash Flow (Post-tax)
Development Capital –
Peak Funding
Capital Sustaining
Payback post-tax
Capital Efficiency (Pre-Tax
NPV/Dev Capital
Capital Efficiency (PostTax NPV/Dev Capital
NOTES:
1.
2.
•
Unit
AUDm
Forecast
USD1,500/ USD1,600/ USD1,800/ USD2,000/ USD2,200/
(USD1,642/
oz
oz
oz
oz
oz
oz Avg)
432
339
405
536
669
802
AUDm
292
232
274
359
447
533
%
%
AUD/oz
AUDm
AUDm
AUDm
AUDm
65%
57%
1,112
92
80
956
678
57%
50%
1,096
77
66
768
550
64%
56%
1,107
87
76
897
638
77%
67%
1,129
107
96
1,158
814
90%
78%
1,149
128
116
1,421
996
102%
87%
1,167
148
136
1,686
1,175
AUDm
102
102
102
102
102
102
AUDm
Months
49
31
49
33
49
31
49
28
49
25
49
24
%
422%
332%
395%
524%
653%
783%
%
285%
226%
268%
351%
437%
521%
Converted to AUD from USD using AUD:USD exchange rate of 1.333.
Due to rounding, numbers presented throughout this document may not add up precisely to the totals, provided and percentages
may not precisely reflect the absolute figures.
Front-End Engineering Design (“FEED”) of the TGME gold plant was completed, forming an
important input towards the finalisation of the FS of the TGME underground project5.
3
Refer to ASX release dated 27 July 2022 titled “Theta’s TGME Project FS confirms NPV10% of A$432 Million at
US$1,642 / Oz Gold Price”.
4
5
First gold production will be subject to financing and permitting approvals.
Refer to ASX release dated 20 June 2022 titled “TGME Gold Project Update”.
2
•
The Final Environmental Impact Assessment Report and Environmental Management
Programme (“EIA/EMPr”) were submitted to the Department of Mineral Resources and
Energy (“DMRE”) and the final technical documents for the integrated Water Use License
(“WUL”) application to the Department of Water and Sanitation (“DWS”) for final decision.
OPERATIONS AND DEVELOPMENT UPDATE
Water Use Licence Granted for the Frankfort Mine
Theta Gold announced on 2 November 20226 it had been awarded a Water Use Licence (WUL) by the South
African Department of Water and Sanitation (DWS). This is the first of the two water use licences required for
its TGME Underground Gold Mine and means that the Frankfort Mine is now fully permitted.
The new Greater TGME Integrated Water Use License was issued in accordance with Chapter 4 of the National
Water Act, 1998 (Act 36 of 1998) for a period of 12 years. The WUL forms an integral part of TGME Underground
Project since it authorises all current water use activities within Mining Right (MR) 83 area.
The approval of the WUL is a result of a comprehensive environmental specialist studies conducted with
detailed engineering designs that satisfy the extensive regulatory requirements relating to water and waste
management in South Africa.
The DWS informed all interested and affected parties of the issuing of this license. No public participation
process is required for this license however any interested and effected parties may still appeal the licence.
The Company did, however, in the interest of transparency sent out a notification to inform all of our
stakeholders that the license was issued. No appeals were lodged during the review period and the licence was
granted. Our stakeholder engagement forum will going forward be kept updated in terms of compliance
monitoring of the license.
Now with the granting of this WUL, Theta Gold has now secured all of the regulatory licences required for the
Frankfort Mine and can commence commercial bulk sampling and trial mining.
Project Permits and Approvals
In light of its latest round of successful license applications, the Company continues to advance the long-term
environmental approvals process for MR83 following the release of its definitive Feasibility Study7 earlier this
year (refer ASX Announcement 27 July 2022).
6
7
ASX Release dated 2 November 2022 titled “ Water Use Licence Granted for Frankfort Mine”.
ASX release dated 27 July 2022 titled “Theta Gold's TGME Project DFS confirms NPV10% of AUD432 Million”.
3
Environmental Approvals for MINING RIGHT (MR) 83 – Progress Table
Forestry permit applications with the DFFE for the continuation of mining remain in progress 8 (refer ASX
Announcement 18 July 2022)
The Company looks forward to providing further updates on its regulatory pathway in Q1 2023, as it remains
on track to obtain full regulatory approval for the project in the March quarter of 2023.
CORPORATE / GOVERNANCE UPDATE
A$110m (US$70m) non-binding Term Sheet with Sprott Streaming and Royalty Corporation
•
•
•
•
•
•
•
8
9
Theta Gold Mines announced on 19 October 20229 it has entered into a non-binding Streaming Term Sheet
(“Term Sheet”) with Sprott Resource Streaming and Royalty Corporation (“Sprott”) under which Sprott is
to advance US$70 million (~A$110 million) cash in return for a gold stream on Theta’s TGME Gold Project
(the “Project”).
The Project is expected to deliver to Sprott up to 100,000 ounces of gold over its Life-of-Mine (“LOM”), for
which Sprott will pay 10% of the gold price per ounce delivered under the stream.
Theta has the option to buy-back 50% of the stream based on a pre-agreed price, following which Theta
will deliver 2% of the ongoing gold production.
Prior to initial gold delivery, Theta will pay in cash or scrip (at 10% discount to 5 days volume-weightedaverage-price (“VWAP”)) on a semi-annual basis, 9.5% per annum interest to Sprott for the funds
advanced.
Under the Term Sheet, conditions precedent to closing include the completion of technical, legal, and
environmental and social due diligence, the receipt and review of the project’s final development budget
and schedule, the completion of definitive documentation, and the receipt of applicable environmental
permits, operating licences and regulatory approvals.
Closing is scheduled by the first quarter of 2023 and the funds will be applied towards the construction of
the TGME Gold Project, located in the Eastern Transvaal Goldfields in the Mpumalanga Province, South
Africa.
A due diligence team involving externally appointed consultants by Sprott already began working since
November, upon a satisfactory conclusion, a Binding Gold Stream Agreement between Sprott and Theta
Gold shall be finalised, executed and announced to the market in detail.
ASX release date 18 July 2022 titled “Permitting Update TGME Underground Gold Project”
ASX Release dated 19 October 2022 titled “Theta Gold Executes A$110m Term Sheet with Sprott”
4
Completion of Capital Raise via a Private Placement and Share Purchase Plan
On 27 October 202210, TGM announced it had completed a capital raise of up to A$1.7 million (before costs)
through a private placement from a majority of existing institutional, professional and sophisticated investors.
The Company issued 24,025,716 new TGM Ordinary Shares at the issue price of A$0.07 cents per share, using
the Company’s existing placement capacity pursuant to Listing Rule 7.1.
Following the successful completion of the Private Placement, the Company announced it would allow existing
Shareholders the opportunity to participant on the same terms as the Placement via a Share Purchase Plan
(SPP) which raised $572,000 and issued 8,171,405 new TGM Ordinary Shares at A$0.07 as announced to ASX
on 6 December 202211.
Use of funds raised from the share placement and SPP as follows:
a) Project expenditure including pre-liminary development and planning activities for the TGME
Underground Gold Mine Project;
b) Progress towards completion of permitting approvals for the project, and
c) General working capital and corporate overheads.
Cash Position and Subsequent Funding
As at 31 December 2022, the Group had US$577,000 in cash.
As announced on 25 March 2021, the Company entered into an At-The-Market Subscription Deed (“ATM”)
with Acuity Capital. The ATM provides the Company with up to AU$15 million of standby equity capital with
the expiry of the ATM being 31 July 2023. There are no requirements on the Company to utilise the ATM and
the Company may terminate the ATM at any time, without cost or penalty. As security for the ATM, the
Company has issued 24 million Theta Gold shares to be held by Acuity Capital. As of the date of this report, this
position remains unchanged.
In accordance with ASX Listing Rules 5.3.1 and 5.3.2, the Company provides the following summary of
expenditure incurred during the Quarter:
Mining exploration costs (incl exploration labour)
Mining Production and Development Costs (incl trial mining)
Licence to Operate Costs
Total
US $320,795
US $24,476
US $16,124
US $361,395
The Company’s Quarterly Appendix 5B reported US$89,704 payments to related parties and their associates;
as noted on the Appendix 5B this payment was for directors fees and consulting fees (includes payments
relating to current and prior quarters).
Capital Structure
The current capital structure of the Company at 31 December 2022 is as follows:
Fully paid ordinary shares (ASX: TGM | OTC: TGMGF)
Unlisted options, performance rights and bonds (see “Annexure C”)
10
11
Number
619,009,073
107,681,433
ASX release dated 27 October 2022 titled ”Funds Raised to Advance TGME Gold Project”
ASX release dated 6 December 2022 titled “ Share Purchase Plan Completion Notice”
5
The Company issued 32,197,121 new TGM Ordinary Shares during the quarter relating to the completion of a
private placement and SPP.
The market capitalisation of TGM was A$40 million 12 million (US$27.1m) as at 31 December 2022.
This announcement was authorised for release by the Board of Directors.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
Investor Relations
Australia: Ben Jarvis, Six Degrees Investor Relations: +61 (0) 431 271 538
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
Competent Persons Statement
Mineral Resources and Ore Reserves
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects,
the information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc
Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South
African Council for Natural Scientific Professions and Mr Daniel van Heerden (B.Ing (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director of
Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg. No.
37309).
Metallurgical results
The information in this report relating to exploration results is based on, and fairly reflects, the information
and supporting documentation compiled by Mr Phil Bentley (MSc (Geol), MSc (MinEx), Pr.Sci.Nat. No.
400208/05, FGSSA), a consultant to the Company and a member of the South African Council for Natural
Scientific Professions.
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” dated 16 May 2019,
“Optimised Mine Schedule for Theta Open Pit Starter Project Delivers Significant Improvements” dated 20
April 2020, “Excellent Bulk Metallurgical Results Provides Confidence For Underground PFS” and “Initial
Maiden Underground Mining Reserve 419,000 oz Gold” dated 8 April 2021 were released to the Australian
Securities Exchange (ASX) on those dates. The Company confirms that:
•
•
it is not aware of any new information or data that materially affects the information included in the
ASX announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcements continue to apply and have not materially changed.
12
Calculated as 619,009,0732 fully-paid ordinary shares on issue at the closing price of AU$0.065 cents per share
as at 30 December 2022 converted at the RBA exchange rate of AUD:USD of 0.6775.
6
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTC: TGMGF) is a gold mining development company that holds a range
of prospective gold assets in a world-renowned South African gold mining region. These assets include several
surface and near-surface high-grade gold projects which provide cost advantages relative to other gold
producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga
Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). The Company aims to build a solid production platform to over 160 kozpa based
primarily around shallow adit/stope-entry hard rock mining sources. Theta Gold has access to over 43 historical
mines and prospect areas that can be accessed and explored, with over 6.7Moz of historical production
recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“SGSA”). SGSA
holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty) Ltd
(“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”) entities. The BEE
shareholding in TGME and Sabie Mines is comprised of a combination of local community trusts, an employee
trust and a strategic entrepreneurial partner.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe for
or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to
those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of
this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe that
any such statements and projections are either false, misleading or incorrect, it does not warrant or guarantee
such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to
making any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or
any errors in or omissions, from any information, statement or opinion contained in this announcement. This
announcement contains information, ideas and analysis which are proprietary to Theta Gold.
7
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such
as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
and may be influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection
of the intention of the Company as at the date of release of the document, however are subject to change
without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables and risks,
many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for
making the forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to
support the estimation of Ore Reserves. There is no assurance that the intended development referred to will
proceed as described, and will rely on access to future funding to implement. Theta Gold believes it has
reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee that funding will be
available, and investors are to be aware of any potential dilution of existing issued capital. The production
targets and forward looking statements referred to are based on information available to the Company at the
time of release, and should not be solely relied upon by investors when making investment decisions. Theta
Gold cautions that mining and exploration are high risk, and subject to change based on new information or
interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the
results or production targets contained in this release. Further evaluation is required prior to a decision to
conduct mining being made. The estimated Mineral Resources quoted in this release have been prepared by
Competent Persons as required under the JORC Code (2012). Material assumptions and other important
information are contained in this release.
The Company confirms that all material assumptions underpinning the production target, or the forecast
financial information derived from the production target continue to apply and have not materially changed
from that released in the definitive Feasibility Study released to ASX on 27 July 2022.
8
ANNEXURE A
Mineral Resource and Mining Reserves
Table 1: Combined Underground and Open Pit Ore Reserves as at 1 February 2021
Grade
g/t
Operation
Beta
Frankfort
CDM
Open Pit (MR83)
Total
Notes:
1.
Tonnes
kt
6.51
4.13
2.31
2.74
3.98
Au Content
kg
1,662
319
385
2,164
4,530
10,822
1,317
889
4,996
18,023
koz
347.94
42.33
28.58
160.61
579.46
The information pertaining to the Ore Reserve estimation is detailed in the notes of the Ore Reserve tabulation for the
individual operations.
Table 2: Combined Mineral Resource as at 1 February 2021
Combined Mineral Resource
Resource
Classification
Measured
Type of Operation
Tonnage
Gold Grade
Mt
g/t
Underground
Open pit
Tailings
Total Measured
Indicated
Underground
Open Pit
Tailings
Total Indicated
Inferred
Underground
Open pit
Tailings
Rock Dump
Total Inferred
Grand Total
Notes:
1.
2.
3.
4.
5.
6.
Gold Content
Kg
koz
0.091
5.37
489
15.7
0.091
4.774
8.109
5.244
18.128
21.452
4.907
0.023
0.885
27.267
45.485
5.37
6.21
2.14
0.83
2.84
5.22
5.11
0.57
1.20
5.06
4.17
489
29 661
17 364
4 373
51 398
111 880
25 057
13
1 059
138 009
189 896
15.7
953.7
558.2
140.6
1652.5
3597.0
805.6
0.4
34.0
4 437.0
6 105.2
Columns may not add up due to rounding.
Gold price used for the cut-off calculations is USD1,500/oz.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35
g/t.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
Mineral Resources are stated as inclusive of Ore Reserves.
Mineral Resources are reported as total Mineral Resources and are not attributed.
Table 3: Beta Underground Ore Reserve as at 1 February 2021
Ore Reserve Category
Probable
Total
Notes:
7.
8.
9.
Grade
g/t
Tonnes
kt
6.51
6.51
Au Content
kg
1,662
1,662
10,822
10,822
koz
347.94
347.94
An Ore Reserve cut-off of 170 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Mineral Reserves and are not attributed.
9
Table 4: Frankfort Underground Ore Reserve as at 1 February 2021
Grade
g/t
Ore Reserve Category
Proved
Probable
Total
Notes:
1.
2.
3.
Tonnes
kt
4.24
4.11
4.13
Au Content
kg
60
259
319
koz
8.16
34.16
42.33
254
1,063
1,317
An Ore Reserve cut-off of 150 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 5: CDM Underground Ore Reserve as at 1 February 2021
Grade
g/t
Ore Reserve Category
Probable
Total
Notes:
1.
2.
3.
Tonnes
kt
2.31
2.31
Au Content
kg
385
385
koz
28.58
28.58
889
889
An Ore Reserve cut-off of 121 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 6: Ore Reserves for the Open pit Operations as at 1 February 2021
Ore Reserve Category
in LoM Plan
Probable
Probable
Probable
Total
Notes:
1.
2.
3.
Grade
g/t
2.61
2.43
1.62
2.31
Pit
Browns Hill
Iota
Theta Hill
Reef Tonnes
kt
279
1,490
395
2,164
Au Content
kg
koz
728
23
3,628
117
640
21
4,996
161
An Ore Reserve cut – off of 0.4 g/t was applied.
A gold price of USD 1,300 / oz was used for the cut - off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 7: Total Theta Project - Mineral Resources, 1 February 2021
Resource
Classification
Indicated
Open Pit Mine
Reef
Inferred
Reef
Width
Content
Reef
Tonnes
g/t
1.02
cm
200
cmgt
204
Mt
0.397
Au Content
Kg
404
koz
13.0
Theta & Browns Hill
Shale
Theta & Browns Hill
Theta & Browns Hill
Bevett's
Upper Theta
1.08
223
241
0.856
925
29.7
2.41
100
241
0.651
1 571
50.5
Theta & Browns Hill
Lower Theta
3.79
100
379
0.839
3 178
102.2
Theta & Browns Hill
Beta
2.51
100
251
0.373
938
30.1
Columbia Hill
Bevett's
2.98
114
340
0.108
323
10.4
Columbia Hill
Upper Rho
2.33
402
937
0.897
2 090
67.2
Columbia Hill
Lower Rho
2.51
520
1306
0.981
2 464
79.2
Columbia Hill
Upper Theta
1.06
114
121
0.163
173
5.6
2.29
258
591
5.267
12 066
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Au Content
Theta & Browns Hill
Shale
g/t
1.12
cm
215
cmgt
240
Mt
0.600
Theta & Browns Hill
Theta & Browns Hill
Bevett's
1.17
217
254
Upper Theta
1.86
100
186
Total Indicated
Resource
Classification
Reef
Grade
Open Pit Mine
Reef
Kg
387.9
668
koz
21.5
0.451
528
17.0
0.948
1 762
56.6
10
Theta & Browns Hill
Lower Theta
8.06
100
806
1.384
11 153
358.6
Theta & Browns Hill
Beta
2.17
100
217
0.778
1 686
54.2
Columbia Hill
Upper Rho
5.12
134
687
0.131
673
21.6
3.84
129
497
4.292
16 470
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Au Content
cm
258
cmgt
591
Mt
5.3
Kg
12 066
koz
387.9
Total Inferred
Resource
Classification
Open Pit Mine
Reef
529.5
Indicated
Total Theta Project
All
g/t
2.29
Inferred
Total Theta Project
All
3.84
129
497
4.3
16 470
529.5
2.99
200
598
9.6
28 535
917.4
Total Indicated and Inferred
Notes:
1.
2.
3.
4.
5.
6.
7.
Theta Project (Theta Hill, Browns Hill and Iota) cut-off is 0.35 g/t;
The gold price used for the cut-off calculations is USD 1,500 / oz;
Geological losses applied are 10% for inferred and 5% for Indicated and Measured;
Theta Hill and Browns Hill - Upper Theta Reef, Lower Theta Reef and Beta Reef are diluted grades over 100cm;
Historical mine voids have been depleted from the Mineral Resource;
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion thereof will be
converted to Ore Reserves;
Mineral Resources fall within the mining right 83MR and 341MR.
11
ANNEXURE B
Mining Rights and Applications for Mining Rights
MR No
Description
Farms
Effective Date
Expiry Date
Remarks
16-Oct-13
15-Oct-23
Amendment
application
pending to
include open cut
mining
Refer Note 1
Refer Note 1
Granted
10-Jul-13
09-July-23
Granted
25-Sep-19
16-Feb-22
Granted
NORTHERN TENEMENTS (MR83, MR330, MR340, MR341, MR10167)
Portions 1, 2, 3, 4, 5 and the Remaining
Extent of Frankfort 509KT, Krugers
Hoop 527 KT, Portions 1, 2 and the
Remaining Extent of Morgenzon 525
KT, Peach Tree 544 KT, Portions 18, 42,
43, 44 and Remaining Extent of
Ponieskrans 543 KT and Portion 1 and
the Remaining Extent of Van der
Merwes Reef 526 KT
Portions 1, 2, 3 and the Remaining
Extent of Grootfonteinberg 561 KT and
Remaining Extent of Grootfontein 562
KT
Portion of the Remaining Extent of
Hermansburg 495 KT
MR 83
Greater TGME
MR 330
Beta ReDevelopment &
Grootfontein
Cluster
MR 340
Hermansburg
MR 341
PTD’s
Portions 1 and 2 and a Portion of the
Remainder Extent of Grootfontein
562KT
TGME
Desire 563KT, RE and Ptn 1, 2, 3, 12, 14,
15, 17, 18, 19, 20, 22 and 23 of
Doornhoek 545KT, RE and Ptn 1, 2 and
3 Rotunda Greek 510KT, Vaalhoek
474KT, Buffelsfontein 452KT, RE and
Ptn 1 of Willemsoord 476KT,
Sacramento 492KT, Granite Hill 477KT,
Blackhill 528KT, Manx 475KT, Klondyke
493KT, Hermansburg 495KT
MR 10167
Refer Note 1
Refer Note 1
Consolidation of
Prospe
Share your feedback
Discover