Quarterly Activities & Cashflow Report - 30 June 2024
Released
Released
Announcement PDF
31 July 2024
ASX ANNOUNCEMENT
(ASX: TGM)
QUARTERLY REPORT
1 April 2024 to 30 June 2024
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM) is pleased to report on its activities
for the quarter ended 30 June 2024.
HIGHLIGHTS
DURING THE JUNE 2024 QUARTER:
•
•
•
•
•
Theta advances discussions and development plans with Power China subsidiary as the preferred
EPC partner to build Stage One of its TGME Gold Plant and TSF facilities 1
Execution Readiness – Theta’s team is currently preparing final execution documents for the TGME
Gold Plant build process
Drill results from the TGME main TSF confirm high grade resource2
Theta inked a US$10 million (A$15.2 million) via a two-tranche Placement3
Additional US$4 million (A$6.02 million) private equity placement completed 4
1
Refer to ASX Release dated 14 February 2024 titled, “Theta Gold selects PowerChina’s subsidiary as its preferred EPC Partner to
build its stage one TGME Gold Plant and TSF Facilities estimate at US$30 million”.
2 Refer to ASX Release dated 7 May 2024 titled, “Drilling results from TGME main TSF Confirms High Grade Resources”.
3 Refer to ASX Release dated 6 May 2024 titled, Theta Inks US10m Equity Funding Placement to Strengthen Balance Sheet and
Advance Plant & TSF Construction”.
4 Refer to ASX Release dated 26 June 2024 titled, Theta Completes a further US4m Private Placement to Complete the detailed
Engineering Design and Construction Tenders”.
1
OPERATIONS AND DEVELOPMENT UPDATE
Drilling and Sampling on the TGME Gold Mine Tailings Dam
The Company announced that the results of the confirmatory drilling program completed by SGS (South
Africa) Pty Ltd (“SGS”) in March 2024 have been received. The drill results for the TGME Main Tailings
Storage Facility (“Main TSF”) have confirmed the tailings dams contain gold at the expected grades (See
Table 1). Test results for metallurgical gold recovery were released on 30 July 20245.
Figure 1: Location Map - TSF
The combined tailings dams around the TGME Plant contain in total 141,000 oz gold (See JORC Table in
Appendix A).
Table 1 below is a summary of the drill results for the TGME Main TSF, where the Company is considering
early processing/production through Theta’s new gold plant to provide early cashflow for the Company
whilst development of the underground Beta Mine is underway. Appendix B has a detailed set of drill
results and methodology.
SGS South Africa (Pty) (Assay Laboratory) Ltd, engaged by TGM’s preferred Engineering Procurement and
Construction (“EPC”) partner Yellow River Co., Pty (“YRC”) (a subsidiary of Power Construction
Corporation of China (“Power China”) to complete a drilling and sampling program at various tailing dams
around the TGME plant. The drill locations of the Main TSF are indicated in Figure 2 below.
5 Refer to ASX released dated 30 July 2024 titled, “Metallurgical Test Results Confirm That Gold is Recoverable from the TGME
Tailings Storage Facility and Rock Dumps (174,000 OZ AU)”.
2
Table 1: Summary of TGME Main Tailings Dam drill results
Figure 2 – Drill hole location map of the holes drilled by SGS team at the TGME Main TSF
The program is now complete with a total of 407 meters drilled over the TGME Main, Blyde and Glynns
Lydenburg TSFs with 117 meters drilled into the TGME Main TSF. Together with Power China, the
immediate focus is on the TGME Main TSF (see Appendix B. Currently, various selected samples are being
metallurgically tested to allow the Company to decide the possibility of adding tailings recovery to its early
production schedule and generate early cash flow ahead of the planned underground development. Theta
Gold currently records 141,000 ounces of gold JORC Resources (see Appendix A) across numerous tailings
dams around the gold plant.
In total, 174,000 gold ounces sit on the surface, in tailings dams and surface rock dumps, surrounding the
TGME gold plant, including 140,600 ounces of Indicated Resources in various tailings dams (Refer to JORC
Table Appendix A).
3
Execution Readiness
The Theta team is currently preparing the final execution documentation for the TGME Gold Plant build
process. The purpose of this exercise is for the Company to be construction-ready once the go-ahead
decision is made by the Board.
RM Process (Pty) Ltd, a South African-based process engineering company and Eco Elementum Ltd
(“EcoE”), a tailings and environmental engineering company, have been appointed to complete the final
designs for the plant, tailings, and water management. They assist Theta and Power China in compliance
with local regulations.
RM Process will also assist with the final designs of the TGME Gold Plant and will form part of the execution
team with Theta and Power China.
The Eco Elementum group of companies provides an array of independent, multidisciplinary, and
integrated environmental science, engineering, and construction services. Eco Elementum will assist with
the final designs of water management systems and assist the design team in environmental and legal
compliance with the Water Use Licence.
Work in Progress
•
Updated flow sheet
•
75% completion of the scope of works
•
Draft schedule completed for the final plant designs
•
Draft schedules completed for the plant construction
•
Draft schedule completed for the dewatering plant, water management and tailings deposition
•
69% completion of the tender process and RFQ
•
NDA’s out to all vetted possible OEMs
•
Team integration have started as of the first week of July 2024 (TGME, RM and EcoE)
•
Long leading items identified, at 71% completion
•
Project Execution Plan at 82% completion
•
Data sets at 72% completion
Engineering Drilling
As part of the water use licence conditions, Theta is required to drill geotechnical infill holes to ensure the
tailings and existing Plant footprint are not affected by dolomites (voids in the bedrock). The old gold plant
tailing has been in place for 40 years and was previously drilled.
The first holes were completed at an average hole depth of 35m, with samples collected for rock
classification and final designs.
4
Figure 3: Engineering drilling team onsite near tailings dam.
Environmental, Social and Governance (“ESG”)
Ecological Compensation Programme - Implementation Agreement
An Independent Environmental Scientist has been requested to provide us with a proposal to develop a
guideline for the execution of the compensation programme that was developed in 2022. This plan will
include recommendations on the Implementation Agreement.
Some key points to be addressed as part of the Ecological Program
•
Integrated rehab plan for upper catchments and coordination capacity
•
On Nature Reserves, control dense Invasive Alien Plant Species (“IAPS”) and revegetate
•
Install, and maintain fire breaks
•
Biocontrol development and release programs
•
Erosion control measures
•
Measure to improve hydrogeology of local catchment
Social and Labour Plan
To mine in South Africa, companies must develop a Social and Labour Plan (“SLP”). This integrated process
involves discussion with the community, local council, and Department of Mines and Energy.
The SLP focus on community needs and economic uplift for the host community. Table 2 below shows the
work in progress.
5
Task
Due date
Appointment of SLP Consultant
✓
15 January – 31 January 2024
TGME provides background information
✓
29 January – 02 February 2024
Kick-Off Meeting
✓
05 February – 09 February 2024
Final Socio-Economic Study
✓
09 February 2024
Consultant Document Review
✓
07 February – 20 February 2024
Consultant submit Legal Review
✓
21 February 2024
Workshop session
✓
21 February 2024
Compilation of Draft SLP document
✓
22 February – 10 April 2024
Preparation for SLP Consultations
✓
22 February – 12 April 2024
SLP Consultations
✓
18 - 20 April 2024
Project Priority Lists from Ward Councillors
Compilation of Final SLP document
06 May 2024
✓
22 April – 25 June 2024
TGME Review SLP
26 June – 12 July 2024
Submit endorsement letters to Municipality for signature
31 July 2024
Update of SLP based on TGME comments
15 – 31 July 2024
Board Approval - Final SLP
06 – 20 August 2024
Final SLP Document
21 August 2024
Submission of final SLP to the DMRE
13 September 2024
Permitting
Rietfontein Approval Project
The environmental authorisation application was submitted to the DMRE on 10 October 2023 and the final
scoping report was submitted on 20 November 2023. The DMRE accepted the Final Scoping Report on 5
April 2024 and TGME may now proceed to the EIA phase of the Environmental Authorisation (EA)
application process.
CORPORATE GOVERNANCE AND FUNDING UPDATE
Company raises up to US$14 million (A$21.22 million) via Equity Placements
Two-tranche Placement - US$10 million (A$15.2 million)
The Company announced on 6 May 2024 that it had received firm commitments to raise up to US$10
million (A$15.2 million) via a two-tranche Placement to an existing sophisticated and professional
institutional investor.
The Company advised that Tranche 1 of the Placement to the cornerstone institutional investor, Hong
Kong Ruihua Investment Management Limited and its associate companies including Hong Kong Ruihua
Green Development Limited (together ‘Ruihua’), did not settle on 5 June 2024 but is now in the advanced
stages of PRC Overseas Direct Investment (“ODI”) approval process6.
The Company is pleased to advise these regulatory approvals have progressed and now anticipates
completion of Tranche 1 shortly.
6
Refer to ASX release dated 11 June 2024 titled, “Equity Funding Placement Update”.
6
Ruihua has re-confirmed its commitment to the Placement of US$10.0 million (AU$15.2 million) (before
costs). The Company will provide a further update to Shareholders once all Tranche 1 proceeds have been
received and New TGM shares and attaching Options can be issued.
Details of the time and venue for the General Meeting to consider the shareholder approvals required for
the grant of options under Tranche 2 of the Placement will be provided in a notice of meeting to be
despatched to shareholders shortly after completion of Tranche 1 of the Placement.
The exact number of new TGM Shares and attaching Options will be subject to the conversion rate applied
(USD:AUD) at the time funds are received by the Company under Tranches 1 and 2.
Additional US$4 Million Equity Raised
Theta announced on 26 May 20247 it had received firm commitments from existing and new sophisticated
and wholesale investors to raise a further US$4.0 million (AU$6.02 8 million) (before costs) via Share
Subscription Application(s) in a private placement, (June 2024 Placement), on the same terms as the
previously announced Two-Tranche US$10 million Placement announced on 6 May 2024.
Additional proceeds raised in the June 2024 Placement will result in the Company issuing a further
46,276,1139 million new fully paid TGM Ordinary Shares at the issue price of A$0.1310 (13 cents) per share
along with approximately 23,138,057 new attaching Options to be issued on a one (1) free Option for
every two (2) New TGM Shares issued in the June 2024 Placement.
Each Option will have an exercise price equal to an 8% discount to the 15-day VWAP to the last closing
price at the time of exercise (but no less than $0.13 cents), and an expiry date 2 years from the date of
issue. Options issued under the Placement will not be quoted.
New TGM Shares along with attaching Options in the June 2024 Placement will only be issued subject to
the Company obtaining the necessary Shareholder approvals, which are to be sought at a General
Meeting11.
Details of the time and venue for the General Meeting will be provided in a notice of meeting to be
dispatched to shareholders shortly.
The exact number of new TGM Shares and attaching Options will be subject to the conversion rate applied
(USD:AUD) at the time funds are received by the Company. All funds have now been received by the
Company.
Subsequent announcements relating to the completion of the June 2024 Placement along with
completion of Tranche 1 and Tranche 2 relating to the Two-Tranche Placement announced in May 2024
will be provided by the Company respectively.
Issue of Unlisted Options to 2Invest AG
The following unlisted options were issued to long-term investor, 2Invest AG as consideration for the
extension of time to pay interest owing on the Bond.
7 Ref to ASX release dated 26 June 2024 titled, “Theta Completes a Further US4m Private Placement to Complete the Detailed
Engineering Design and Construction Tenders”.
8 The conversion price of (USD:AUD) was based on the closing spot price(s) published by the RBA.
9 The exact number of new TGM shares and attaching Options to be issued in the June 2024 Placement will be dependent on the
conversion rate on the day the US$ funds are received and converted to AU$ by the Company.
10 The issue price per share of $0.13 is a 12.3% discount to the 15-day VWAP of $0.1482.
11 Pursuant to the Share Subscription Application(s), the Company is required to hold a General Meeting of Shareholders within 3
months of completing the Share Subscription Applications(s) and any securities requiring approval to be passed by a majority of
shareholders under an ordinary resolution.
7
•
•
•
1,000,000 unlisted options, expiry date 29 September 2024, exercise price $0.175
1,000,000 unlisted options, expiry date 28 October 2024, exercise price $0.15
1,000,000 unlisted options, expiry date 30 November 2024, exercise price $0.145
EPC Contracts and Debt Funding Discussions Advance
The Company continues to advance planning and discussions with Power China towards completing the
detailed engineering for the TGME Gold Plant, construction tenders, finalise the previously announced
planned EPC contract for the plant and TSF build and completing debt funding packages.
Cash Position and Subsequent Funding
As of 30 June 2024, the Group had US$2,545,000 in cash.
Furthermore, as announced previously on 25 March 2021, the Company entered into an At-The-Market
Subscription Deed (“ATM”) with Acuity Capital. The ATM was renewed on 31 July 2023 and extended for
a further 3 years to 31 July 2026 and may provide the Company with additional standby equity capital of
up to A$15,000,000 (US$9,958,500) available under the facility. There are no requirements on the
Company to utilise the ATM and the Company may terminate the ATM at any time, without cost or penalty.
As security for the ATM, the Company has issued 24 million TGM collateral shares to be held by Acuity
Capital on 25 March 2021. As of the date of this report, this facility remains available and undrawn.
In accordance with ASX Listing Rules 5.3.1 and 5.3.2, the Company provides the following summary of
expenditures incurred during the Quarter:
Mining exploration costs (including exploration labour)
Mining Production and Development Costs (including trial mining)
Licence to Operate Costs
Total
US
US
US
US
$ 426,618
$ 25,772
$ 50,057
$ 502,447
The Company’s Quarterly Appendix 5B reported US$210,000 in payments to related parties and their
associates as noted in the Appendix 5B this payment was for directors' fees and consulting fees (including
payments relating to current and prior quarters).
Capital Structure
The current capital structure of the Company at 30 June 2024 is as follows:
Fully paid ordinary shares (ASX: TGM | OTC: TGMGF)
Unlisted options, performance rights, and bonds (see “Annexure C”)
Number
711,539,838
82,010,000
The market capitalisation of TGM was A$107 million 12 (US$71m) as at 30 June 2024.
This announcement was authorised for release by the Board of Directors.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
12 Calculated as 711,539,838 fully-paid ordinary shares on issue at the closing price of AU$0.15 cents per share as at 30 June
2024 converted at the RBA exchange rate of AUD:USD of 0.6624.
8
Theta Gold Mines' Interactive Investor Hub
The Company encourages shareholders to please join the Theta Investor Hub which allows you to ask
questions directly to the Company, view video’s and keep up to date on progress of the TGME Gold Project
at http://investors.thetagoldmines.com.
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
9
Competent Persons Statement
MINERAL RESOURCES
Mr. Uwe Engelmann confirms that he is the Competent Person for the TGM Mineral Resources as
reported on TGM’s Mineral Resources which is extracted from TGM’s ASX announcement dated 8 April
2021(Initial Maiden Underground Mining Reserve) available to view at www.asx.com.au and was
prepared in accordance with the guidelines of the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012). Mr. Engelmann has
read and understood the requirements of the JORC Code (2012).
Mr. Engelmann is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to the style of mineralisation and type of deposit described in this report
and to the activity for which he is accepting responsibility. Mr. Engelmann (BSc (Zoo. & Bot.), BSc Hons
(Geol.), Pr.Sci.Nat. No. 400058/08, FGSSA), is a director of Minxcon (Pty) Ltd and a member of the South
African Council for Natural Scientific Professions. Mr. Engelmann is a full-time employee of Minxcon
(Pty Ltd and has reviewed this report and consents to the inclusion of the matters based on his
supporting information in the form and context in which it appears.
METALLURGICAL RESULTS
Mr. Rogan Roulstone confirms that he is the Competent Person in terms of Mineral Resources and Ore
Reserves (JORC Code, 2012). Mr. Roulstone has read and understood the requirements of the JORC
Code (2012).
Mr. Roulstone is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to gold extraction and in particular gold extraction from a refractory ore
body. Mr Roulstone is a Chemical Engineering (NHD) that graduated in 1993 and is member of the
SAIMM (705817). Mr Roulstone is the managing director of RM process and has over nine years’
experience on the TGME process plant design.
The information in this announcement that relates to TGM’s Mineral Resources is extracted from TGM’s
ASX announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available to view
at www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code (2012). TGM
confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical
parameters underpinning the Mineral Resources estimates in the relevant market announcement
continue to apply and have not materially changed other than as disclosed in TGM’s ASX announcement
dated 25 October 2021 regarding the TGME Project Permitting Update. TGM confirms that the form
and content in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
ORE RESERVES
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information
and supporting documentation compiled by Mr. Daniel van Heerden (B.Eng (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director
of Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg.
No. 37309).
Mr Van Heerden has sufficient experience that is relevant to the style of mineralisation under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
JORC Code (2012). Mr van Heerden consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this announcement that relates to TGM’s Ore Reserves is extracted from TGM’s ASX
announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available to view at
www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code (2012). TGM
10
confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical
parameters underpinning the Ore Reserve estimates in the relevant market announcement continue
to apply and have not materially changed other than as disclosed in TGM’s ASX announcement dated
25 October 2021 regarding the TGME Project Permitting Update. TGM confirms that the form and
content in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
11
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM ) is a gold development company that holds a range of prospective
gold assets in a world-renowned South African gold mining region. These assets include several surface
and near-surface high-grade gold projects which provide cost advantages relative to other gold producers
in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit
(Capital City of Mpumalanga Province).
Following small scale production from 2011 – 2015, the Company is currently focussing on the construction
and financing of a new gold processing plant within its approved footprint at the TGME plant. The
company has completed a FS in July 2022 for the first four mines Beta, CDM, Frankfort and Rietfontein
(TGME Underground Project). The Base Case LOM plan will comprise a 12.9-year mining operation starting
in 2023 and delivering production of 1.24 million ounces of contained gold.
The estimated development capital or peak funding requirement is USD77 million (AUD102 million), with
the Project forecast to generate a pre-tax NPV10% of USD324 million (AUD432 million) and pre-tax Internal
Rate of Return (IRR) of 65% at the forecast gold price of averaging USD1,642/oz over the LOM. The
Company aims to build a solid production platform to over next 5 years to 160kozpa based primarily
around shallow, open-pit or adit-entry shallow underground hard rock mining sources. Theta Gold has
access to over 43 historical mines and prospect areas that can be accessed and explored, with over 6.7Moz
of historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“TGSA”).
TGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines
(Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”)
entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation
by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie
Mines is comprised of a combination of local community trusts, an employee trust and a strategic
entrepreneurial partner.
12
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe for
or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to
those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of
this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe that
any such statements and projections are either false, misleading or incorrect, it does not warrant or guarantee
such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to
making any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or
any errors in or omissions, from any information, statement or opinion contained in this announcement. This
announcement contains information, ideas and analysis which are proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such
as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
and may be influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection
of the intention of the Company as at the date of release of the document, however are subject to change
without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables and risks,
many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for
making the forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to
support the estimation of Ore Reserves. There is no assurance that the intended development referred to will
proceed as described, and will rely on access to future funding to implement. Theta Gold believes it has
reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee that funding will be
available, and investors are to be aware of any potential dilution of existing issued capital. The production
targets and forward looking statements referred to are based on information available to the Company at the
time of release, and should not be solely relied upon by investors when making investment decisions. Theta
Gold cautions that mining and exploration are high risk, and subject to change based on new information or
interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the
results or production targets contained in this release. Further evaluation is required prior to a decision to
conduct mining being made. The estimated Mineral Resources quoted in this release have been prepared by
13
Competent Persons as required under the JORC Code (2012). Material assumptions and other important
information are contained in this release.
The Company confirms that all material assumptions underpinning the production target, or the forecast
financial information derived from the production target continue to apply and have not materially changed
from that released in the definitive Feasibility Study released to ASX on 27 July 2022.
14
ANNEXURE A
Mineral Resource and Mining Reserves
Combined Mineral Resource as at 1 February 2021
Combined Mineral Resource
Resource
Classification
Measured
Type of Operation
Tonnage
Gold Grade
Mt
g/t
Underground
Open pit
Tailings
Total Measured
Indicated
Underground
Open Pit
Tailings
Total Indicated
Inferred
Underground
Open pit
Tailings
Rock Dump
Total Inferred
Grand Total
Notes:
1.
2.
3.
4.
5.
6.
Gold Content
Kg
koz
0.091
5.37
489
15.7
0.091
4.774
8.109
5.244
18.128
21.452
4.907
0.023
0.885
27.267
45.485
5.37
6.21
2.14
0.83
2.84
5.22
5.11
0.57
1.20
5.06
4.17
489
29 661
17 364
4 373
51 398
111 880
25 057
13
1 059
138 009
189 896
15.7
953.7
558.2
140.6
1652.5
3597.0
805.6
0.4
34.0
4 437.0
6 105.2
Columns may not add up due to rounding.
Gold price used for the cut-off calculations is USD1,500/oz.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and