Quarterly Activities and Cash Flow Report 30 June 2020
Released
Released
Announcement PDF
31 July 2020
ASX ANNOUNCEMENT
QUARTERLY REPORT 1 APRIL TO 30 JUNE 2020
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM, TGMO | OTCQB: TGMGF) is
pleased to report on its activities for the period from 1 April 2020 to 30 June 2020.
The Company has made good progress in bringing the Theta Project towards production. The incountry team is operational and currently busy planning geotechnical work programs, progressing
the tender process for the plant build, finalizing permit documents and planning trial mining box
cuts towards the end of the year. Over the next two quarters the Company expects to derisk
phase 1 of the Theta Open Pit Starter Project.
HIGHLIGHTS
Optimisation Study of Theta Open Pit Starter Project completed, showing significantly
improved economics
Digmin selected as Preferred Mining Contractor
Oversubscribed Share Placement raised A$4.0M
OTC Listing – DTC Eligibility Approved - Exposure to US Market
The Mayor and over 5,000 local residents signed a petition in support of Theta Gold’s open
pit and underground gold mining operations
Delineation the company strategy - 5 year Plan to bring 4 gold mines on stream targeting a
sustainable production profile of >160,000oz per annum
Figure 1: 5 Year Plan and target Production profile
SUMMARY OF JUNE QUARTER 2020
The Company is pleased with the continued strong project development progress including
completion of an optimisation study on the Theta Open Pit Starter Project, nomination of Digmin
Group (“Digmin”) as the preferred mining contractor and gaining access to US investment markets
through DTC eligibility. The pre construction tender process is ongoing for the 600,000tpa
process plant. The Company has updated the environmental authorisation documentation to
reflect the optimized study for Department of Mineral Resources and Energy (DMRE) assessment.
Optimised Theta Open Pit Starter Project
During the quarter, the Company released the results of an optimisation study for the Theta Open
Pit Starter Project (ASX announcement 24 April 2020). The study incorporates a new optimised
mine schedule that includes the mining of several old mine waste rock dumps and allows for an
increase in the production rate from 500ktpa to 600ktpa. The recently acquired 2.5 MW ball mill,
which has a capacity of up to 1.2Mtpa, was also incorporated into the study. This ball mill will
provide the flexibility to expand as the project grows.
The result of the study is a significant improvement over the May 2019 Feasibility Study (“May
’19 FS”) and adds 40,000 oz of gold to the life of mine plan. The table below sets out the
comparison of the May ’19 FS to the Optimised Study at various gold price scenarios. Salient
details between the Optimised Study run at US$1,500/oz vs the May ’19 FS base case at
US$1,257/oz include:
1.
2.
3.
4.
The IRR nearly doubling from 65% to 123%;
Mine life increases from 5 years to over 6.5 years;
EBITDA increases by US$50 million over the LoM to US$150 million; and
NPV5 increases by US$35 million to US$85 million.
Optimised Study compared May ‘19 FS
Real Discount Rate
Unit
Lower Case
US$1 369/
oz
NPV @ 5%
Internal Rate of Return (IRR)
Total ounces in Mine plan (Annexure A)
Total Oz Recovered
Average Payback Period (From Start of
Production)
Total Capital Requirement
All In Sustaining Cost (AISC)
Return on investment
EBITDA over LOM
Gold Price
Exchange Rate
USDm
%
oz
oz
61
92.7%
259 607
234 063
Base
Case
US$1 500/
oz
85
123.0%
259 607
234 063
Stretch
Case
US$1 600/
oz
104
157.2%
259 607
234 063
Month
9
8
6
14
USDm
USD/oz
USDm
USDm
USD/oz
ZAR/USD
31.4
911
206%
108.5
1 369
14.64
31.4
855
350%
150.2
1 500
16.00
31.4
822
476%
181.4
1 600
17.00
34.3
760
182%
99.6
1 257
14.01
May ’19 FS
US$1 257/
oz
50
65.1%
219 425
200 905
2
Preferred Mine Contractor
After a comprehensive tendering process, Digmin has been selected. The Digmin Group has a
solid track record providing contract mining services throughout Africa and also provides bulk
earthworks, roads and civils, mine infrastructure development as well as surface and
underground drilling services. Digmin is a proven contract miner currently engaged in a number
of gold, copper, niobium and coal projects across the African continent. To date, the group has
completed over US$2 billion worth of civil and mining works in South Africa alone. Further
information is available at www.digmingroup.com.
The selection of Digmin will allow Theta to rapidly mobilise trial mining operations. These
operations are expected to commence once final permitting has been achieved (environmental
authorisation for open pit mining on Theta Gold’s existing underground mining right). This
authorization is expected to be received in the near term in Q4 2020.
Post final permitting, a trial mining phase is planned for the end of 2020 (permit dependent),
where two box cuts will be mined in the future Iota and Browns Hill pits, during which final mining
equipment and grade control practices will be selected. Following the trial mining phase, it is
anticipated that Digmin will also do some of the bulk earthworks and civils as part of the project
infrastructure establishment.
Digmin have also agreed to partner with Theta Gold to facilitate local employment and social
upliftment programs in the small Pilgrim’s Rest community. Residents have been eagerly awaiting
this progress towards an official start of construction and mining in the area.
Figure 2: TGME and Digmin Directors at Barlows-Caterpillar Equipment Johannesburg
3
Figure 3: Digmin contract mining at New Luika Gold Mine, Tanzania
MINING RIGHT 83 (MR83) ENVIRONMENTAL AUTHORISATIONS
As part of the approval process for a mining right, the Mineral and Petroleum Resources
Development Act, No. 28 of 2002 and in terms of the One Environmental System, an application
for, and approval of, Environmental Authorisation is required. This EA comprises a complete
Environmental Management Programme Report (“EMPR”), incorporating an Environmental
Impact Assessment (“EIA”) and Environmental Management Programme (“EMP”), which must be
submitted and approved. The general process is described below.
Figure 4: Simplified Environmental Authorisations Process and Timeline
4
The Theta Project is situated on MR83 and has some additional resources in the adjacent MR341
to the south. MR83 is an approved and executed mining right and has an approved
Environmental Authorisation for underground mining activities, as well as approval for
processing of ore and deposition of residues onto an existing tailings dam.
In order to bring in open cut mining approvals, the Company is required to gain an approved
amendment to MR83 and complete an EIA process. The Company has updated the
environmental authorisation documentation to reflect the optimized study for Department of
Mineral Resources and Energy (DMRE) assessment.
LOCAL COMMUNITY SUPPORT FOR COMPANY
Five Thousand three hundred and thirty-four Local Residents signed a petition of support for
Theta Gold’s open pit and underground gold mining operations
Theta Gold thanks the Local Mayor and the local residents of Pilgrim’s Rest for their letters of
support for mining operations. The 5,334 local residents signed a petition of support, to support
Theta Gold in re-establishing mining operation (Open pit & underground) in the local region. The
petition was welcomed by the community as a strong voice of support in the regional effort to
boost the local economy which suffers from high levels of unemployment, well above the national
average.
The Mayor’s Letter and the petition will be presented to member of government formally at a
later date. Importantly this fulfils the “Equator Principle” requirement of full and informed
consent of local people. The local population is small, being a rural community, but has been
exposed to mining for 150 years as part of the local heritage.
TGME underground operations and gold processing only ceased in 2015. The community and
local businesses have been partnering with TGME and other historical mining companies around
Pilgrim’s Rest for more than a century. The local township of Schoonplaas attached to Pilgrim’s
Rest was originally built to provide accommodation for the local mining industry as was much of
Pilgrim’s Rest.
The Company continues to be actively involved in various Pilgrim’s Rest social projects including
Local School Support, Cooking and Heating Fuel for Community, School Infrastructure Repairs
and the Sabie Feeding Scheme.
TGME has been working with the local Primary School Headmaster in Pilgrim’s Rest and teachers
to support the school for more than 5 years. In addition to TGME paying for three teachers, an
administration person and all printing needs, the company has also embarked on other activities
to assist this school with the following:
Assisting with school water issues. The company is working with the school to ensure
there is a permanent water supply
Company engineering group is assisting with maintenance of school facilities
Providing extra educational toys and learning equipment
5
Figure 5: Company Staff (in red) and TGME CEO George Jenkins (grey shirt) at the local school
CORPORATE
Cash Position and Funding
As at 30 June 2020, the Group had US$148,000 in cash.
Subsequent to the end of the quarter, the Company raised A$4,000,100 (before costs) from a
share placement of 16,667,084 fully paid ordinary shares at an issue price of $0.24 per share.
The share placement was partly settled on 27 July 2020 with the issue of 12,500,417 shares for
total subscription money of A$3,000,100. The balance of the placement is expected to be settled
in August 2020.
OTC Markets – DTC Eligibility Application
The Company’s shares are dual listed on the ASX and the OTCQB market in the United States
(ASX: TGM, TGMO | OTCQB: TGMGF), with the primary listing being on the Australian Securities
Exchange.
As announced on 20 July 2020, the Company has received approval for its shares listed on the
OTCQB market to be eligible for electronic clearing and settlement through The Depository Trust
Company (“DTC”) in the United States.
DTC is a subsidiary of The Depository Trust & Clearing Corporation, part of the US Federal Reserve
System that manages the electronic clearing and settlement of publicly traded companies. DTC
eligibility is expected to simplify the process of trading and enhance liquidity of the Company's
shares on the OTCQB by greatly broadening the pool of brokerage firms that will allow their
6
clients to trade the stock. Online brokers such as Ameritrade, Fidelity Investments, Charles
Schwab, Tradestation and Etrade all offer OTCQB trades.
Three advantages of trading TGMGF stock are:
1. Trades and settlements in US Dollars (USD);
2. Trading in the North American timezone; and
3. TGMGF is the same class of Ordinary Shares to ASX traded stock (ASX: TGM), not a
synthetic. The shares are simply registered in two different Registries.
Relocation of Registered and Principal Offices
With effect from 1 July 2020, the Company offices are located at –
Suite 80, Level 35 (Servcorp)
International Tower One
100 Barangaroo Avenue
Sydney NSW 2000
Telephone: 61 (02) 8046 7584
Managing Director Stepping Down
As announced on 11 May 2020, the Managing Director, Mr Robert Thomson, will step down from
executive duties with effect from 5 August 2020. Mr Thomson will remain on the Board as a nonexecutive director.
The Company’s project activities in South Africa continue uninterrupted under TGME CEO, Mr
George Jenkins, based at the minesite.
Capital Structure
The following are movements in the capital structure since the end of the previous quarter and
up to the date of this report –
a)
b)
c)
d)
e)
f)
4,650,000 fully paid ordinary shares were issued on 29 April 2020 at $0.20 each;
2,325,000 listed options (ASX: TGMO) exercisable at $0.30 each on or before 31 October
2020 were issued on 29 April 2020;
2,325,000 unlisted options exercisable at $0.40 each on or before 27 April 2022 were
issued on 29 April 2020;
258,948 fully paid ordinary shares were issued on 10 July 2020 at $0.19 each following
the exercise of options expiring on 13 August 2020;
12,500,417 fully paid ordinary shares were issued on 27 July 2020 at $0.24 each;
400,000 unlisted options exercisable at $0.35 and $0.40 each have lapsed.
The current capital structure of the Company is as follows –
Fully paid ordinary shares (ASX: TGM | OTCQB: TGMGF)
Listed options exercisable at $0.30 each on or before 31 October
2020 (ASX: TGMO)
Unlisted options and performance rights (Refer Appendix A)
Number
454,415,950
33,754,663
27,870,265
7
This announcement was authorised for release by the Board of Directors.
For more information please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
United States - Michael Porter, Porter, LeVay & Rose Inc: +1 212 564 4700,
theta@plrinvest.com
8
Annexure A
Mineral Resource - Theta Project MR 83
Mineral Resource
Category in LoM
Plan
Indicated
Inferred
Subtotal
Indicated
Inferred
Subtotal
Indicated
Inferred
Subtotal
Indicated
Inferred
Subtotal
Total Indicated
Total Inferred
Total
Grade
Pit
g/t
2.30
2.03
2.23
2.38
5.53
2.53
1.60
1.32
1.48
1.49
1.49
2.21
1.81
2.09
Browns Hill
Iota section of
Columbia Hill
Theta Hill
Dumps
Reef
Tonnes
kt
489
181
670
1 696
83
1 778
557
438
995
418
418
2 741
1 119
3 861
Au Content
kg
1 124
368
1 492
4 033
457
4 490
891
579
1 470
622
622
6 049
2 026
8 075
oz
36 135
11 831
47 967
129 673
14 694
144 367
28 662
18 604
47 266
20 007
20 007
194 470
65 137
259 607
Notes:
1.
2.
3.
4.
5.
6.
7.
Theta Project (Theta Hill, Browns Hill and Iota) cut-off is 0.35 g/t;
The gold price used for the cut-off calculations is USD 1,500/oz;
Geological losses applied are 10% for inferred and 5% for Indicated and Measured;
Theta Hill and Browns Hill - Upper Theta Reef, Lower Theta Reef and Beta Reef are diluted grades over 100 cm;
Geological losses applied are, 10% for inferred and 5% for Indicated and Measured;
Historical mine voids have been depleted from the Mineral Resource;
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion
thereof will be converted to Ore Reserves;
8. Mineral Resource fall within the mining right 83MR and 341MR.
9. No Geological losses applied to dumps
10. The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion
thereof will be converted to Ore Reserves;
JORC Global Mineral Resources
Mineral Resources for Underground Operations as at 1 May 2019
Resource
Classification
Measured
Mine
Frankfort
Reef
Bevetts
Total Measured
Reef
Grade
Stope
Grade
Reef
Width
Stope
width
Content
Reef
Tonnes
Stope
Tonnes
g/t
g/t
cm
cm
cmgt
Mt
Mt
7.13
5.37
73
103
520
0.069
0.091
7.13
5.37
73
103
520
0.069
0.091
Au Content
Kg
koz
15.7
489
489
15.7
Frankfort
Bevetts
7.86
5.13
58
96
452
0.243
0.373
CDM
Rho
13.19
3.80
23
90
307
0.258
0.895
Beta
Beta
21.66
6.58
23
90
499
0.716
2.357
Rietfontein
Rietfontein
14.57
8.20
52
92
755
0.517
0.919
Vaalhoek
Vaalhoek
13.90
6.34
36
90
499
0.064
0.140
Olifantsgera
amte
Olifantsger
aamte
16.97
4.62
25
90
416
0.026
0.091
Total Indicated
16.26
6.21
36
91
591
1.824
4.774
29,661
953.7
Total Measured & Indicated
15.93
6.20
38
91
600
1.893
4.865
30,150
969.4
Indicated
1,912
3,401
15,506
7,534
61.5
109.4
498.5
242.2
28.5
887
13.6
422
9
Resource
Classification
Inferred
UG Mine
Reef
Reef
Grade
Stope
Grade
Reef
Width
Stope
width
Content
Reef
Tonnes
Stope
Tonnes
g/t
g/t
cm
cm
cmgt
Mt
Mt
Kg
koz
Au Content
Frankfort
Bevetts
7.41
4.27
48
93
356
0.343
0.596
2,543
81.8
CDM
Rho
10.06
3.02
24
90
244
0.544
1.811
5,472
175.9
Beta
Beta
16.51
5.43
25
90
414
1.107
3.367
18,285
587.9
Rietfontein
Rietfontein
14.06
8.52
57
94
803
1.190
1.962
16,721
537.6
Olifantsgera
amte
Olifantsger
aamte
18.33
4.68
23
90
422
0.059
0.248
1,162
37.3
Vaalhoek
Vaalhoek
16.28
4.77
22
90
361
0.873
2.980
14,209
456.8
Vaalhoek
Thelma
Leaders
12.18
9.47
96
123
1166
0.023
0.030
284
9.1
Glynns
15.87
5.19
25
90
397
3.218
9.833
51,078
1,642.2
Portuguese
13.26
3.99
22
90
287
0.064
0.213
849
27.3
Theta
7.22
3.24
34
90
244
0.099
0.220
714
23.0
Sandstone
5.54
2.92
41
90
225
0.101
0.193
562
18.1
14.68
5.22
31
91
458
7.622
21.452
111,880
3,597.0
Glynns
Lydenburg
Ponieskrantz
*
Frankfort
Theta*
Nestor*
Total Inferred
Note: * Manual Mineral Resources
Mineral Resources for Open Pit Operations as at 1May 2019
Resource
Classification
Reef
Grade
Reef
Width
Content
Reef
Tonnes
g/t
cm
cmgt
Mt
Kg
koz
Elluvial
1.79
0
0
0.505
905
29.1
DG1
Elluvial
1.37
0
0
0.159
217
7.0
DG2
Elluvial
0.76
0
0
1.174
892
28.7
Vaalhoek
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Vaalhoek
17.25
33
574
0.111
1920
61.7
1.02
200
204
0.439
402
12.9
1.10
221
244
0.891
886
28.5
Upper Theta
2.41
100
241
0.724
1568
50.4
Lower Theta
3.70
100
370
0.888
2956
95.0
Beta
2.49
100
249
0.383
859
27.6
Iota
Bevetts
2.89
114
330
0.105
303
9.7
Iota
Upper Rho
2.43
393
956
0.808
1965
63.2
Iota
Lower Rho
2.51
550
1381
0.815
2047
65.8
Iota
Upper Theta
1.08
114
123
0.158
171
5.5
2.11
179
378
7.161
15,091
485.2
Open Pit Mine
Hermansburg
Indicated
Total Indicated
Reef
Shale
Bevetts
Au Content
10
Resource
Classification
Open Pit Mine
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Au Content
g/t
cm
cmgt
Mt
Kg
koz
Elluvial
0.88
0
0
0.110
97
3.1
DG1
Elluvial
2.95
0
0
0.293
864
27.8
DG5
Elluvial
Vaalhoek
0.76
0
0
0.101
77
2.5
20.32
43
880
0.213
4,319
138.9
Vaalhoek
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Thelma Leaders
14.25
97
1,388
0.293
4,172
134.1
Shale
1.11
216
240
0.703
666
21.4
Bevetts
1.07
213
227
0.648
589
19.0
Upper Theta
1.86
100
186
1.071
1692
54.4
Lower Theta
8.11
100
811
1.643
11329
364.3
Beta
2.23
100
223
0.748
1417
45.6
Iota
Upper Rho
5.13
106
544
0.099
507
16.3
4.35
115
502
5.922
25,730
827.3
Hermansburg
Vaalhoek
Inferred
Reef
Total Inferred
Mineral Resources for Tailings Dams as at 1 May 2019
Resource
Classification
Indicated
Surface
Operation
Reef
Inferred
Gold
Grade
Mt
g/t
Kg
koz
Gold Content
Glynn’s
Lydenburg
Tailings
1.211
0.80
972
31.3
Blyde 1
Tailings
0.590
0.73
434
14.0
Blyde 2
Tailings
0.280
0.83
234
7.5
Blyde 3
Tailings
0.316
0.87
275
8.8
Blyde 4
Tailings
0.164
0.72
119
3.8
Blyde 5
Tailings
0.022
0.61
14
0.4
TGME Plant
Tailings
2.661
0.87
2,325
74.8
5.244
0.83
4,373
140.6
Tonnage
Gold
Grade
Mt
g/t
Kg
koz
0.023
0.57
13
0.4
0.023
0.57
13
0.4
Total Indicated
Resource
Classification
Tonnage
Surface
Operation
Blyde 3a
Reef
Tailings
Total Inferred
Gold Content
Mineral Resources for Rock Dumps as at 1 May 2019
Mineral
Resource
Category
Inferred
Total Inferred
Surface
Operation
Vaalhoek
Reef
Rock Dump
Tonnage
Gold
Grade
Mt
g/t
Kg
0.121
1.64
199
6.4
0.121
1.64
199
6.4
Gold Content
koz
Notes:
1.
Columns may not add up due to rounding.
2.
Gold price used for the cut-off calculations is USD1,500/oz.
3.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and
rock dumps at 0.35 g/t.
4.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
5.
Mineral Resources are stated as inclusive of Ore Reserves.
6.
Mineral Resources are reported as total Mineral Resources and are not attributed.
11
Competent Persons Statement
Mineral Resources (April 2020)
The information in this report relating to Mineral Resources (April 2020) is based on, and fairly reflect,
the information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.),
BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of
the South African Council for Natural Scientific Professions.
The original reports titled “Optimised Mine Schedule for Theta Open Pit Starter Project Delivers
Significant Improvements” was dated 20 April 2020 and was released to the Australian Securities
Exchange (ASX) on that date. The Company confirms that –
it is not aware of any new information or data that materially affects the information included in
the ASX announcement; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcement continue to apply and have not materially changed.
Mineral Resources (May 2019) and Ore Reserves
The information in this report relating to Mineral Resources (May 2019) is based on, and fairly reflects,
the information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.),
BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of
the South African Council for Natural Scientific Professions.
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information
and supporting documentation compiled by Mr Daniel van Heerden (B Eng (Min.), MCom (Bus. Admin.),
MMC, Pr.Eng. No. 20050318, FSAIMM, AMMSA), a director of Minxcon (Pty) Ltd and a member of the
Engineering Council of South Africa.
The original reports titled “Theta Gold increases Mineral Resource to over 6Moz” and “Positive
Feasibility Study for Theta Project” were dated 16 May 2019 and were released to the Australian
Securities Exchange (ASX) on that date. The Company confirms that –
it is not aware of any new information or data that materially affects the information included in
the ASX announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcements continue to apply and have not materially changed.
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTCQB: TGMGF) is a gold development company that
holds a range of prospective gold assets in a world-renowned South African gold mining region.
These assets include several surface and near-surface high-grade gold projects which provide
cost advantages relative to other gold producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of
Nelspruit (Capital City of Mpumalanga Province). Following small scale production from 2011 –
2015, the Company is currently focussing on the construction of a new gold processing plant
within its approved footprint at the TGME plant, and for the processing of the Theta Open Pit
oxide gold ore. Nearby surface and underground mines and prospects are being evaluated
12
The Company aims to build a solid production platform to over 160 kozpa based primarily around
shallow, open-cut or adit-entry hard rock mining sources. Theta Gold has access to over 43
historical mines and prospect areas that can be accessed and explored, with over 6.7Moz of
historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Stonewall Mining (Pty) Ltd
(“Stonewall”). Stonewall holds a 74% shareholding in both Transvaal Gold Mining Estates Limited
(“TGME”) and Sabie Mines (Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black
Economic Empowerment (“BEE”) entities. The South African Mining Charter requires a minimum
of 26% meaningful economic participation by the historically disadvantaged South Africans
(“HDSAs”). The BEE shareholding in TGME and Sabie Mines is comprised of a combination of local
community trusts, an employee trust and a strategic entrepreneurial partner.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in
informing interested parties about the Company and should not be considered as an offer or
invitation to subscribe for or purchase any securities in the Company or as an inducement to make
an offer or invitation with respect to those securities. No agreement to subscribe for securities in
the Company will be entered into on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason
to believe that any such statements and projections are either false, misleading or incorrect, it
does not warrant or guarantee such statements. Nothing contained in this announcement
constitutes investment, legal, tax or other advice. This overview of Theta Gold does not purport
to be all inclusive or to contain all information which its recipients may require in order to make
an informed assessment of the Company’s prospects. Before making an investment decision, you
should consult your professional adviser, and perform your own analysis prior to making any
investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take
no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or
completeness of, or any errors in or omissions, from any information, statement or opinion
contained in this announcement. This announcement contains information, ideas and analysis
which are proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events
which could be considered forward looking statements. Forward looking statements are typically
preceded by words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”,
13
“Conceptual”, “Believes”, “Anticipates”, “Predicted”, “Estimated” or similar expressions. Forward
looking statements, opinions and estimates included in this announcement are based on
assumptions and contingencies which are subject to change without notice, and may be
influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including
government or community issues, global or systemic events). Forward looking statements are
provided as a general reflection of the intention of the Company as at the date of release of the
document, however are subject to change without notice, and at any time. Future events are
subject to risks and uncertainties, and as such results, performance and achievements may in fact
differ from those referred to in this announcement. Mining, by its nature, and related activities
including mineral exploration, are subject to a large number of variables and risks, many of which
cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors,
miscalculations, omissions and other mistakes. For this reason, any conclusions, inferences,
judgments, opinions, recommendations or other interpretations either contained in this
announcement, or referencing this announcement, cannot be relied upon. There can be no
assurance that future results or events will be consistent with any such opinions, forecasts or
estimates. The Company believes it has a reasonable basis for making the forward looking
statements contained in this document, with respect to any production targets, resource
statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to
commencement of mining. No liability is accepted for any loss, cost or damage suffered or
incurred by the reliance on the sufficiency or completeness of the information, opinions or beliefs
contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic
assessments to support the estimation of Ore Reserves. There is no assurance that the intended
development referred to will proceed as described, and will rely on access to future funding to
implement. Theta Gold believes it has reasonable grounds the results of the Feasibility Study. At
this stage there is no guarantee that funding will be available, and investors are to be aware of
any potential dilution of existing issued capital. The production targets and forward looking
statements referred to are based on information available to the Company at the time of release,
and should not be solely relied upon by investors when making investment decisions. Theta Gold
cautions that mining and exploration are high risk, and subject to change based on new
information or interpretation, commodity prices or foreign exchange rates. Actual results may
differ materially from the results or production targets contained in this release. Further
evaluation is required prior to a decision to conduct mining being made. The estimated Mineral
Resources quoted in this release have been prepared by Competent Persons as required under
the JORC Code (2012). Material assumptions and other important information are contained in
this release.
14
Annexure A
Theta Gold Mines Limited
Unlisted Options and Performance Rights
Number
OPTIONS
345,265
2,325,000
2,670,265
Performance Hurdle/Vesting Date
(if applicable)
Exercise
Price
Expiry Date
$0.19
$0.40
13 Aug 2020
27 Apr 2022
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
TOTAL OPTIONS
PERFORMANCE RIGHTS
50,000
All systems, licences, insurances, regulatory and
statutory compliance in place to meet South Africa
Minin