Quarterly Activities and Cashflow Report 31 December 2019
Released
Released
Announcement PDF
31 January 2020
ASX ANNOUNCEMENT
QUARTERLY REPORT 1 OCTOBER TO 31 DECEMBER 2019
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM, TGMO | OTCQB: TGMGF) is
pleased to report on its activities for the period from 1 October to 31 December 2019.
The Company had another strong quarter in bringing the Theta Project closer towards
production as well as strengthening its social license in the area. Various permitting activities
continue to progress as the Company works towards becoming a gold producer.
Highlights
The 2.5 MW ball mill purchased in October 2019 has been removed from the site at
Rustenburg in preparation for relocation to TGME site in Q1 of 2020
The 2.5 MW mill ball mill has been incorporated into the updated Plant Design
Plant Design Optimization Studies have been completed with a 20% increase in
production capacity to 600,000 tpa (ASX release 28 January 2020)
Capital costs for the 600,000 tpa process plant remains within 1% of the Feasibility
Study (500,000 tpa)
Tender documents have been prepared for the Engineering, Procurement,
Construction (EPC)/Lump Sum Turnkey (LSTK) plant construction
Mining contractor discussions have commenced and an initial draft contract has been
prepared
Company commences detailed design to upgrade the existing power line into the
Project
Company continues to progress Social License aspects of project
Corporate Activities
Theta Gold has been officially dual listed on the US OTCQB market from 7 November
2019, code: TGMGF
B.Riley FBR Inc appointed as Principal American Liaison (PAL) Sponsor and market‐
maker
Porter, LeVay & Rose Inc. appointed as Investor Relations consultant for North
America
AGM held 18 November 2019 with all resolutions passed unanimously
Investor presentation and Conferences in North America and Europe
Summary
The Company has made further advancement of its assets, including the Theta Project, as it
continues to work towards becoming a gold producer and as part of its strategy to produce
more than 100koz per annum.
The Company continues to support the local community and has been involved in several town
clean up initiatives, provided some sporting equipment to the local community and also
provided some food packages to those in need within the community (Figure1).
The Company secured a 2.5 MW ball mill as a key long‐lead piece of plant (ASX Release 2
October 2019) and has completed the removal of the mill and associated equipment in
preparation for relocation to the TGME plant site in Q1 of 2020. The 2.5 MW mill is seen as a
key milestone in the Company’s development of its “Starter Theta Open Pit Project”.
Plant Design Optimization Study resulted in a 20% increase in throughput to 600ktpa from the
original 500ktpa capacity in the Feasibility Study (ASX release 16 May 2019). The recently
purchased 2.5 MW ball mill was incorporated into the Plant Design Optimization Study. The
20% increase in the new plant design can be achieved with less than 1% change to the original
Feasibility Study Process Plant Capex of 24.85 M USD (ASX release 28 January 2020).
A contracting company have been engaged to finalise design of the incoming power system into
the existing Pilgrims Rest sub‐station located 2 kms from the TGME site to allow for the
increased power draw requirements for the new Theta Project Plant. There is an existing power
line and TGME has maintained connectivity to the grid for the existing plant. The electrical
connectivity design allows for the potential connection of backup generators.
Environmental Impact Study for Mining Right 83 (The amendment for MR83 from underground
to open pit (“Starter Theta Open Pit Project”) will be submitted in February 2020 for approval by
the Department of Mineral Resources and Energy (DMRE). A decision is expected from DMRE in
mid Q2 2020.
2
Figure 1: Theta Community Engagement ‐ GPS NEWSPAPER EXTRACT
Theta Project
The Company has continued to progress the development of the project and the following key
elements have been completed:
Purchase of 2.5 MW Ball Mill (long lead item)
Removal of Ball Mill, ready for transport to TGME site in early 2020
Plant Design Optimisation Study (2.5 MW Mill included into design)
Development of updated mining and plant construction tender documents
Draft mining contract based on a detailed tender document at 600 ktpa
3
Plant Design Optimisation Study
Following the release of the Theta Project Feasibility Study, the Company continued to
investigate the potential for increased throughput opportunities. The throughput constraint for
the project remains the annual deposition rate and total capacity on the existing permitted
tailings dam. Further work by the tailings engineers (Tailex) has unlocked an additional 100 kt
per annum of deposition rate, now 600 ktpa, however the overall tailings capacity of the
existing dam remains unchanged at 2.5 Mt.
The company engaged METS (Part of the UMS Group) who completed the original plant design
and costing as part of the Theta Project Feasibility Study, to complete an optimized plant design
at the increased throughput (Figure 2 and Table 1). The results of this study saw the delivery of
updated capital costs that has remained within 1 % of those presented in the Theta Project
Feasibility Study.
Description
Throughput (ktpa)
Capital Cost (ZAR M)
Capital Cost (USD M)
Exchange Rate (ZAR/USD)
Feasibility
Study
500
353
24.85
14.2
Optimisation
Study
600
362
24.98
14.5
Variance
+ 20 %
+ 2.5%
+ 0.6 %
‐ 2.1 %
Table 1: Comparison table of Feasibility Study 500 ktpa to Optimisation Study at 600 ktpa
The brief was to provide an updated and detailed capital schedule including plant operating
costs as well as a detailed tender document for a Lump Sum Turnkey (LSTK) Price for the
construction of the plant. In addition, certain sections of the plant have been designed to cater
for increased throughput to 1.2 Mtpa (see red blocks in Figure 2).
Figure 2: Theta Project Plant Process Flow Diagram
4
The design caters for potential future expansions of up to 1.2 Mtpa throughput of oxide
material. Expansion of the plant would require further studies to confirm project economics at
different production rates. The crushing section allows for simple expansion to 1.2 Mtpa of
milling capacity through the inclusion of a tertiary crusher which can be installed while the
plant continues to run and will then only require a short 48 hours shutdown to tie in. This
additional crusher will allow for a reduction in feed size to the mill which will then allow for the
2.5 MW mill to increase throughput to 1.2 Mtpa. The CIL and cyanide destruction sections will
simply be duplicated to allow for the increased throughput however the elution section, gold
room and reagents section are designed to cater for any future increases in throughput.
The new plant layout with CIL duplicated for future expansion is shown in Figure 3.
Figure 3: Optimised Plant Layout Showing CIL Duplication for Possible Expansion
Detailed tender documents for the construction of the mine and plant have also been drafted
that have sufficient detail to allow for an Engineering, Procurement, Construction (EPC)/Lump
Sum Turnkey (LSTK) basis tender.
As part of the optimization process, the company and consultants carefully considered the
battery limits for the delivery of the study to ensure that the designs captured any downstream
elements that could affect the design e.g. Plant design battery limit included the use of cyclones
on the dam and design catered for the required operating conditions of the cyclones. In
addition, any area where synergies or skills could be shared were also catered for e.g. the
transport of filtered tailings from the plant to the tailings dam which has been included into the
mining tender.
5
Ball Mill
Following the completion of an agreement to purchase a 2.5 MW mill (ASX release 2 October
2019), the Company commenced with the process of dismantling and removing the mill from its
current location at the Glencore Smelters site in Rustenburg.
The purchase of this mill is considered by management to be one of the critical pieces of plant
equipment for the proposed new gold processing plant. The purchase mitigates potential future
capital costs risks, but more importantly it mitigates construction time risks as this is
traditionally a long lead time piece of equipment.
In October 2019, the Company returned to the site with various engineers to commence with
the planning and detailed costing for the removal of the mill and relocation to TGME and in
November the Original Equipment Manufacturer (OEM), Thyssen Krupps, was engaged to
complete the dismantling and removal of the mill and associated equipment.
On 15 December 2019 the mill was finally removed from the structure (Figure 4) and placed in a
storage area (Figure 5) on site with the rest of the associated equipment for the mill and in
preparation for road transport in early 2020.
Figure 4: Mill Removal From Structure
Figure 5: Mill and Containers of Associated Equipment Ready for Transport
The transport of the mill and associated equipment from Rustenburg to the TGME Plant in
Pilgrims Rest is expected to occur in Q1 of 2020.
6
Mining Contract Development
During the Feasibility Study, the Company and Minxcon worked initially with 5 experienced
mining contractor groups and then later in the study selected three mining contract groups to
generate technical and cost information covering mining development and mine operations
contract costs. All contractors are South African based and experienced in‐country as well as
some working in neighboring countries. All contractors provided access to their key people and
the Company visited at least one of their operating sites as part of the evaluation process.
Minxcon compared and bench‐marked the contractor costs to internal estimates that had been
developed and costs applied in the Feasibility Study reflected mid‐point quoted from the three
contractor responses. The mid‐point costs reflected one particular contracting group and keen
to partner with the Company.
During the quarter the Company progressed discussions to develop the basis of a mining
contract based on a schedule of rates basis as well as lump sum quotes for mining development
activities. Mining development activities will include mobilisation, contractor facilities such as
work‐shops and various attendant construction activities related to the project such as roads,
establishing ROM (Run of Mine) stockpiles and setting up the mining pits for operations.
Environmental control aspects such as dust‐suppression from mining operations and working
within the rules and regulations of South Africa and in particular the DMRE were emphasized as
a condition of any future work on site. Site visits to TGME were again undertaken and all
technical information was reviewed which resulted in a new set of cost information in a near
final form being generated.
Work continues in Q1 of 2020 to complete this process and the Company is confident that a
workable mining contract can be concluded with mining costs in line with the Feasibility Study.
Expansion of Power Grid Transformers
The Theta Project will require additional power draw capacity off the national power grid to
cater for the overall increase in power requirements for the new plant. The incoming powerline
from the main grid is large enough to accommodate this additional power draw however the
transformer yard that deals with the incoming 22 KV line is not large enough to cater for this
additional power draw for the new Theta Project processing plant.
The Company has engaged a local consultant and contract company that works with the
national power provider ESKOM, to investigate the options available to bring additional power
into the plant from the national grid supply. Initial work completed has indicated that there is
sufficient power available from the grid and the application process for this power has also
commenced.
The designs will be to install an overhead powerline from the switch at the transformer yard
and to a point near the plant. All step down and other activities will take place at this point and
remain within the Company’s control and this has been included in the optimised plant design.
Local Community Support for Company
The community and local businesses have been partnering with TGME and other historical
mining companies around Pilgrims Rest for more than a century. TGME underground
operations and gold processing only ceased in 2015 and the resulting loss of jobs and loss of
income to businesses has hurt the community.
7
The Company continues to receive support from the local community to restart mining and
processing operations. Several meetings having been held with the local Pilgrims Rest
community voicing its support for the Company to implement the Theta Project. The Company
continues to also actively engage with and support local businesses. This is recognized by the
local business owners and they have expressed their appreciation for Company support as well
as encouraging the Company to also restart operations.
Social Responsibility
The Company continues to be actively involved in various social projects including Local School
Support, School Infrastructure Repairs Cooking and Heating Fuel for Community, and the Sabie
Feeding Scheme.
The local caravan park in Pilgrims Rest has not been operational for several years and this was
once a vibrant and nationally‐renown part of the community and region attracting customers
from throughout South Africa. The Company, Department of Public Works as administrators
and the local community believe that reinvigorating this Caravan Park will be an integral part of
helping restore the town and creating jobs as part of the strong multiplier effect of mining
development. A lease agreement detailing plans for returning the Caravan Park to its former
prominence has been developed with local businesses and submitted to the Department of
Public Works for signature. In the meantime, the Company at its cost has installed security at
the Caravan Park and undertaken temporary repairs to maintain the integrity of the roofing and
structure to protect against damage from the wet season.
Local Education and School Support
Support for strengthening local education and training is a priority for the Company as the
Project moves into development. In the meantime, the Company supports local schools by
paying for three teachers and an administration person at the local schools. The school
teachers program has run over 5 years and is an important part of our community social
responsibilities.
The Company has been progressively working with the local high school repairing and painting
the buildings and facilities as well as donating equipment like photocopiers and computers. The
Company is also sponsoring one promising student from the Browns Hill Community to attend a
matriculation camp to ensure she obtains good grades.
Cooking and Heating Fuel for Community
The Company is currently busy with the eradication of alien trees around the Return Water
Dams. The trees are cut into sections and supplied to the surrounding communities for
firewood.
Sabie PRIDE Feeding Scheme
The Company provides about 120 meals to Sabie school children before school each day. This
scheme has been in operation for over a year and supports under privileged children.
TGME embarked on a pre‐Christmas drive to assist the local Pilgrims Rest community
TGME gave food package gifts to 100 of the poorest and elderly in the community during
December 2019
Sporting equipment was donated to the community to allow the children and other
community members to utilise the sporting facilities in the community. This sports
equipment will be in charge of a community member.
8
In December the mine organised a clean‐up of the Pilgrims town centre by TGME staff
together with 17 members of the local community casually employed. The clean‐up
covered parts of the town and about 800m of the entrance road to the local township of
Schoonplaas and included collecting litter, brush cutting and removal of foreign invader
plants. 20 litter garbage drums were placed in the Town Main street and in Schoonplaas
(Figure 6).
Figure 6: Pilgrims Rest Pre‐Christmas Town Clean up Drive
The Company has recognised that given the high unemployment rate in the area that there
were members of the community that were finding it particularly difficult to make ends meet.
The Company, through its community liaison officer and the local councillor, identified some
members of the community that were particularly needy and provided them with food packs for
the festive season (Figure 7).
Figure 7: Handing out food packages to 100 jobless families in Pilgrims Rest local community
9
Sporting Community Support
The Company believes there is a strong link between supporting sports and the general welfare
of communities. Within the local community residential area, there is a tennis court with netball
and basketball nets as well as a soccer field. The community members however did not have
necessary sporting equipment to utilise these facilities and the Company has provided tennis
rackets and balls and soccer and netball to allow the local community children to make use of
the facilities over their holiday break (Figure 8). Members of the TGME team also provide
support to the local golf club.
Figure 8: TGME donates Sporting Equipment to Pilgrims Community
Environmental Impact Study for Mining Right 83 (MR83)
Environmental Impact Study (EIS) for Mining Right 83 (The amendment for MR83 from
underground to open pit) “Starter Theta Open pit Project” will be submitted in Q1 of 2020 for
approval by the Department of Mines Resources and Energy (DMRE). A decision is expected by
mid Q2 of 2020.
As part of the ongoing engagement with government agencies and stake holders the Final EIA
layout has made minor modifications to reduce mining impact on the local environment. The
company has a stated goal of being a “Sustainable Miner” and has therefore made these minor
concessions to enhance its on ground reputation with stakeholders. TGME has operated and
been part of community for close to 150 years, and from the very early 1900’s has acted as
custodian of land restricting hunting, logging, and illegal mining activities.
These modifications to the project are expected to have a modest effect on project economics
with the contained gold in the starter Theta Open Pit Project expected to remain unchanged
overall. The team is working on making adjustments to mine schedule to determine what
further work may be required.
10
The permitting process is ongoing until Department of Mines Resources Energy (DMRE) make
the final decision. In South Africa, active engagement is required with all stakeholders and the
company has gone above and beyond in its Public Participation Process to include as wide a
stakeholder community as possible. The DMRE will make an independent assessment based on
EIS content and stakeholder comments. The permitting risk of MR 83 is mitigated by the
Company having multiple mines sites. Permitting process is outlined in Figure 9.
Figure 9: General Approvals Process Description
(Note: Post DMRE Approval, there is a 20 working day appeal window to Interested and
affected parties)
The company has completed up to step 4 of the process and is currently finalising the
documents for submission to the DMRE in Q1 of 2020 for their decision.
Corporate
Cash Position and Funding
As at 31 December 2019, the Group had US$1,810,000 in cash.
Funding discussions are in progress to raise funds for the Theta Project pre‐development costs
and for exploration activities and general working capital.
OTC Markets Listing
The Company’s shares have been accepted for listing on the OTCQB market in the United States
and are now listed for trading under the code TGMGF.
11
The Company's primary listing continues to be the Australian Securities Exchange (“ASX”), with
the shares now dual‐listed on the OTCQB Market. Investors can find real‐time quotes and
market information on the OTC Markets website:
(www.otcmarkets.com/stock/TGMGF/overview ).
The Company is in the process of applying for Depository Trust Clearing (DTC) eligibility, which
essentially facilitates electronic trading of securities by individual investors that use self‐
managed online broking accounts (such as TD Ameritrade and E‐Trade), as opposed to trading
through full services brokers. Pending DTC eligibility, trading of the shares will be handled by
brokers who will act as market makers. In the interim OTCQB trading will be conducted through
B.Riley FBR Inc as market maker. A list of other brokers operating on the OTC Markets is
available from the following link: https://www.otcmarkets.com/otc‐link/broker‐dealer‐directory
The Board has actively promoted the Company through the quarter particularly in North
America. Theta Gold has appointed New York based Porter, LeVay & Rose Inc. as its investor
relations consultant in the US. Investors are welcome to contact the firm using the details
provided below.
Annual General Meeting
The 2019 Annual General Meeting was held on Monday 18 November 2019. All resolutions put
to shareholders at the annual general meeting were passed unanimously on a show of hands.
Capital Structure
The following are movements in the capital structure since the end of the previous quarter and
up to the date of this report –
a) A total of 12,589,091 unlisted options have expired;
b) 300,000 options were exercised on 14 January 2020 at $0.19 per share.
The current capital structure of the Company is as follows –
Fully paid ordinary shares (ASX: TGM | OTCQB: TGMGF)
Listed options exercisable at $0.30 each on or before 31 October
2020 (ASX: TGMO)
Unlisted options and performance rights (details in Appendix A)
Number
437,006,585
31,429,663
26,204,213
This announcement was authorised for release by the Board of Directors.
For more information please visit www.thetagoldmines.com or contact:
Project Enquiries
Rob Thomson, Managing Director
Theta Gold Mines Limited
M: +61 409 843 963
robt@thetagoldmines.com
or
Investor Enquiries
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8912 2126
billg@thetagoldmines.com
United States ‐ Michael Porter, Porter, LeVay & Rose Inc: +1 212 564 4700,
theta@plrinvest.com
12
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTCQB: TGMGF) is a gold development company that holds a range of
prospective gold assets in a world‐renowned South African gold mining region. These assets include several
surface and near‐surface high‐grade gold projects which provide cost advantages relative to other gold
producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga
Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). Following small scale production from 2011 – 2015, the Company is currently
focussing on the construction of a new gold processing plant within its approved footprint at the TGME plant,
and for the processing of the Theta Open Pit oxide gold ore. Nearby surface and underground mines and
prospects are expected to be further evaluated in the future.
The Company aims to build a solid production platform to over 100kozpa based primarily around shallow,
open‐cut or adit‐entry hard rock mining sources. Theta Gold has access to over 43 historical mines and
prospect areas that can be accessed and explored, with over 6.7Moz of historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Stonewall Mining (Pty) Ltd (“Stonewall”).
Stonewall holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines
(Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”)
entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation by
the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is
comprised of a combination of local community trusts, an employee trust and a strategic entrepreneurial
partner.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe
for or purchase any securities in the Company or as an inducement to make an offer or invitation with
respect to those securities. No agreement to subscribe for securities in the Company will be entered into
on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to
believe that any such statements and projections are either false, misleading or incorrect, it does not
warrant or guarantee such statements. Nothing contained in this announcement constitutes
investment, legal, tax or other advice. This overview of Theta Gold does not purport to be all inclusive or
to contain all information which its recipients may require in order to make an informed assessment of
the Company’s prospects. Before making an investment decision, you should consult your professional
adviser, and perform your own analysis prior to making any investment decision. To the maximum
extent permitted by law, the Company makes no representation and gives no assurance, guarantee or
warranty, express or implied, as to, and take no responsibility and assume no liability for, the
authenticity, validity, accuracy, suitability or completeness of, or any errors in or omissions, from any
information, statement or opinion contained in this announcement. This announcement contains
information, ideas and analysis which are proprietary to Theta Gold.
13
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which
could be considered forward looking statements. Forward looking statements are typically preceded by
words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”,
“Anticipates”, “Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and
estimates included in this announcement are based on assumptions and contingencies which are subject
to change without notice, and may be influenced by such factors as funding availability, market‐related
forces (commodity prices, exchange rates, stock market indices and the like) and political or economic
events (including government or community issues, global or systemic events). Forward looking
statements are provided as a general reflection of the intention of the Company as at the date of release
of the document, however are subject to change without notice, and at any time. Future events are
subject to risks and uncertainties, and as such results, performance and achievements may in fact differ
from those referred to in this announcement. Mining, by its nature, and related activities including
mineral exploration, are subject to a large number of variables and risks, many of which cannot be
adequately addressed, or be expected to be assessed, in this document. Work contained within or
referenced in this report may contain incorrect statements, errors, miscalculations, omissions and other
mistakes. For this reason, any conclusions, inferences, judgments, opinions, recommendations or other
interpretations either contained in this announcement, or referencing this announcement, cannot be
relied upon. There can be no assurance that future results or events will be consistent with any such
opinions, forecasts or estimates. The Company believes it has a reasonable basis for making the forward
looking statements contained in this document, with respect to any production targets, resource
statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement
of mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments
to support the estimation of Ore Reserves. There is no assurance that the intended development
referred to will proceed as described, and will rely on access to future funding to implement. Theta Gold
believes it has reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee
that funding will be available, and investors are to be aware of any potential dilution of existing issued
capital. The production targets and forward looking statements referred to are based on information
available to the Company at the time of release, and should not be solely relied upon by investors when
making investment decisions. Theta Gold cautions that mining and exploration are high risk, and subject
to change based on new information or interpretation, commodity prices or foreign exchange rates.
Actual results may differ materially from the results or production targets contained in this release.
Further evaluation is required prior to a decision to conduct mining being made. The estimated Mineral
Resources quoted in this release have been prepared by Competent Persons as required under the JORC
Code (2012). Material assumptions and other important information are contained in this release.
14
Annexure A
Theta Gold Mines Limited
Unlisted Options and Performance Rights
Number
OPTIONS
604,213
200,000
Performance Hurdle/Vesting Date
(if applicable)
20 day VWAP above $0.030. This performance
hurdle must be achieved on
Share your feedback
Discover