Presentation to Africa Down Under Conference 2019
Released
Released
Announcement PDF
THETA GOLD MINES LTD
6 Moz Resource & near term potential
gold production profile
Investor Presentation 4-6 September 2019 - Perth
Forward looking and cautionary statements
This announcement or presentation may refer to the intention of Theta Gold Mines regarding estimates or future events which could be considered forward looking statements. Forward looking
statements are typically preceded by words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”, “Predicted”, “Estimated” or similar expressions.
Forward looking statements, opinions and estimates included in this announcement are based on assumptions and contingencies which are subject to change without notice, and may be influenced by
such factors as funding availability, market‐related forces (commodity prices, exchange rates, stock market indices and the like) and political or economic events (including government or community
issues, global or systemic events). Forward looking statements are provided as a general reflection of the intention of the Company as at the date of release of the document, however are subject to
change without notice, and at any time. Future events are subject to risks and uncertainties, and as such results, performance and achievements may in fact differ from those referred to in this
announcement. Mining, by its nature, and related activities including mineral exploration, are subject to a large number of variables and risks, many of which cannot be adequately addressed, or be
expected to be assessed, in this document. Work contained within or referenced in this report may contain incorrect statements, errors, miscalculations, omissions and other mistakes. For this reason,
any conclusions, inferences, judgments, opinions, recommendations or other interpretations either contained in this announcement, or referencing this announcement, cannot be relied upon. There can
be no assurance that future results or events will be consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for making the forward looking statements
contained in this document, with respect to any production targets, resource statements or financial estimates, however further work to define Mineral Resources or Reserves, technical studies including
feasibilities, and related investigations are required prior to commencement of mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the sufficiency or
completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to support the estimation of Ore Reserves. There is no assurance that the intended development
referred to will proceed as described, and will rely on access to future funding to implement. Theta Gold Mines believes it has reasonable grounds the results of the Feasibility Study. At this stage there is
no guarantee that funding will be available, and investors are to be aware of any potential dilution of existing issued capital. The production targets and forward looking statements referred to are based
on information available to the Company at the time of release, and should not be solely relied upon by investors when making investment decisions. Theta Gold cautions that mining and exploration are
high risk, and subject to change based on new information or interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the results or production targets
contained in this release. Further evaluation is required prior to a decision to conduct mining being made. The estimated Mineral Resources quoted in this release have been prepared by Competent
Persons as required under the JORC Code (2012). Material assumptions and other important information are contained in this release.
NOTE BUSINESS ARRANGEMENT
Theta Gold Mines holds 100% issued capital of its South African subsidiary Stonewall Mining (Pty) Ltd (“Stonewall”). Stonewall holds a 74% shareholding in both Transvaal Gold Mining Estates Limited
(“TGME”) and Sabie Mines (Pty) Ltd (“Sabie Mines”). TGME holds the various exploration and mining permits. The balance of shareholding is held by Black Economic Empowerment (“BEE”) entities. The
South African Mining Charter requires a minimum of 26% meaningful economic participation by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines
is comprised of a combination of local community trusts, an employee trust and a strategic entrepreneurial partner.
2
ASX: TGM, TGMO
Disclaimer and Competent Person Statement
This announcement or presentation has been prepared by and issued by Theta Gold Mines Limited (ASX:TGM) to assist in informing interested parties about the Company and should not be considered
as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for
securities in the Company will be entered into on the basis of this announcement.
This announcement or presentation may contain forward looking statements. Whilst Theta Gold Mines has no reason to believe that any such statements and projections are either false, misleading or
incorrect, it does not warrant or guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice. This overview of Theta Gold Mines does not
purport to be all inclusive or to contain all information which its recipients may require in order to make an informed assessment of the Company’s prospects. Before making an investment decision, you
should consult your professional adviser, and perform your own analysis prior to making any investment decision. To the maximum extent permitted by law, the Company makes no representation and
gives no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors
in or omissions, from any information, statement or opinion contained in this announcement. This announcement contains information, ideas and analysis which are proprietary to Theta Gold.
Competent Persons Statement
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects, the information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. &
Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South African Council for Natural Scientific Professions and Mr Daan Van Heerden (B Eng
(Min.), MCom (Bus. Admin.), MMC, Pr.Eng. No. 20050318, FSAIMM, AMMSA), a director of Minxcon (Pty) Ltd and a member of the Engineering Council of South Africa respectively.
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” and “Positive Feasibility Study for Theta Project” were dated 16 May 2019 and were released to the Australian Securities
Exchange (ASX) on that date. The Company confirms that :
o
it is not aware of any new information or data that materially affects the information included in the ASX announcements; and
o
all material assumptions and technical parameters underpinning the estimates in the ASX announcements continue to apply and have not materially changed.
3
ASX: TGM, TGMO
Corporate Overview
Theta Gold Mines Limited (ASX: TGM, TGMO)
ASX listed since 2012
Strong technical board with production & South
African track records
Ordinary shares
Directors and management hold 12% of shares
Recent $A8m private placement1 (shares voluntarily
escrowed)
High: 32c
30 August 2019:
Closing: 16.5c
low: 7c
3 years share price chart
Capital structure
~400 million
Listed Options (TGMO), Expiration Oct 2020, $0.30 exercise (m)
31.4
Unlisted Options and Performance Rights (m)
36.0
Market capitalisation (A$m) (undiluted)
~66.0
Cash (A$m)
$2.5
Share placement commitment1 (due by 30 Sep 2019) (A$m)
$4.0
Board of Directors
Bill Guy (Chairman)
Ex‐Jupiter Mines Ltd (ASX: JMS) Chief Exploration Manager, >25yrs exploration
& resource development experience. >17 years listed mining executive.
Rob Thomson
(Managing Director)
35+ years Mining Engineer. Development/Operations as CEO/MD/Project
Manager in 8 significant gold and base metal projects including GM at Oxiana’s
Sepon and Kingsgate’s Chatree gold/copper mines.
Finn Behnken (NED)
Former CEO of Tshipi é Ntle Manganese Mining (Pty) Limited (currently 49%
owned by Jupiter Mines Ltd). A Mining Engineer and Investment Banker by
profession. Finn previously worked for Nedbank and currently with Auramet.
Richie Yang (NED)
Former ED of Bligh Resources Ltd (ASX: BGH) recently taken‐over by Saracens
(ASX: SAR). A financier with >15 years mining financing & executive experience.
Brett Tang (NED)
Former fund manager at Tasman Funds with > 15 years of gold/base metal
experience. A significant investor in TGM indirectly holds >7% equity.
Simon Liu (NED)
Fund manager previously a co‐founder of Hanhong PE (Beijing based) with
significant exposure to gold and oil & gas projects globally.
1. Private share placement at $0.15ps with voluntary escrow until 31 December 2020 (ASX Release on 23 July 2019)
4
ASX: TGM, TGMO
Investment Overview:
Low CapEx, near term production
As an ASX‐listed junior, Theta Gold
Mines has one of the largest JORC 2012
resources and has the potential to
develop into a leading gold company.
Sustainable resources:
Gold 6 Moz ‐ 44.78 Mt @ 4.18g/t.
A massive under explored ground holding across the Sabie
Pilgrim’s Rest Goldfield.
Proven Drill‐to‐validate Model – inexpensive gold discovery.
Scalable ‐ Potential to bring multiple mines online, increase
the production profile.
Higher chance of success:
Strong directors and technical team‐ with South African track
record.
Fast track to profit from first start up mine planned at Theta
Hill ‐ shallow open‐cut mining:
Low CAPEX – Strong Feasibility Study economics.
Existing Mining Rights, permitted plant footprint,
permitted TSF, available water/power, accessible via
highway/roads, permitting of pit in progress.
5
ASX: TGM, TGMO
Corporate Structure
Incorporate in
Australia: ASX Parent
company
The Black Economic
Empowerment (“BEE”)
shareholding in general
comprise of:
Incorporated: 100%
SA wholly‐owned
subsidiary
Employees Trust
(Employee/labour
Incentives),
Incorporated: South
Africa
operational/asset
companies and Black
Empowerment Entity
holdings
Landholders,
Assets Level
BEE compliant
entrepreneurs
The BEE shareholding is not
a free‐carry interest, it is a
contributing equity
interest1.
1. BEE structure can be read from page17 of the Company’s Annual Report 2018 released on 1st October 2018.
6
ASX: TGM, TGMO
Project Company Board of Directors
Project company Board of Directors at our
subsidiary Transvaal Gold Mining Estates Ltd
(“TGME”)
Bill Guy
(Chairman duties)
(Chairman ‐ Theta
Board)
MD ‐ Rob Thomson
(Project Delivery)
(Director ‐ Theta
Board)
CEO ‐ George Jenkins
(Permitting /
Operations / Plant)
Extraction Metallurgist
(Ex‐Vale operations)
Director ‐ Terrence
Mokale
(Government &
Community Affairs)
Lawyer & Government
Consultant
7
Director ‐ Hanlie
Grobler
(Accounting/Finance)
Accountant
Director ‐ Natasha
Thomas‐Kasangana
(Legal / Commercial)
Lawyer
Ex‐Tshipi (Jupiter
Mines)
ASX: TGM, TGMO
South Africa – Three Major Goldfields
Sabie Pilgrim’s Rest Goldfields
(predominantly owned by Theta Gold
Mine subsidiary TGME, near surface ‐ flat
reef systems). Producing: 1873 – 1940[?],
1980s, 90s and should soon be producing
again.
TGME Gold Projects
Witwatersrand: 1886 – Current.
(surrounds Johannesburg, currently
mining up to 4km underground)
Barberton Goldfield: 1881 – Current.
(450km East of Johannesburg,
Greenstone belt, currently mining up to
2km underground, recently announced
discovery of opencut resources to be the
new focus, LSE: PAF, Market Cap:
£260m+)
Theta Gold Mine’s TGME Gold Projects is located 370km NE from Johannesburg, South Africa, just 4 hours drive by highway (average 100
– 130 km/hour speed limit). This prolific gold field has produced over 6.7Moz gold since 1880.
8
ASX: TGM, TGMO
Mining Rights and Resources
620sqkm tenements
Northern tenements
Open Cut Theta
Project (MR83)
Southern tenements
Group JORC Resources of 6Moz Au (44.8Mt @ 4.18g/t Au):
1.3Moz open cut resources (13.08Mt @ 3.12g/t Au)
4.5Moz underground resources (26.3Mt @ 5.4g/t Au)
Initial Ore Reserves for Theta Project (part of MR83 only): 205Koz (2.3Mt @ 2.76g/t Au) (Only 16% of total OC Resources)
9
ASX: TGM, TGMO
Geology – Two Gold Systems
Under Explored – No modern geophysical surveys
TGME Goldfield ‐ metallogenic province extends for
approximately 140 km in a north‐north‐easterly direction,
over a width of 30 km
.
Gold System One ‐Epigenetic gold mineralisation occurs
within sedimentary host rocks of the Transvaal Supergroup.
(Protozoic in Age)
Gold system One
21 High Grade gold reefs (Flat dipping 3‐70)
Gold system Two
Discovery – Two new low grade reefs
Bushveld Complex, the largest igneous intrusion in the
world, is believed to be the possible fluid source
Gold System Two – Archaean Mesothermal gold
mineralisation granite greenstone
10
ASX: TGM, TGMO
Emergence of an established mining jurisdiction
South Africa has produced more gold than any other country
Over two billion ounces produced from South African goldfields
New pro‐mining President elected in South Africa as head of the ANC
o
A former businessman
o
A former miner
o
A former labour union leader
A very committed Government – re‐formation (May 2019) of the
Department of Mineral Resources and Energy
Fraser Institute Ratings 2018
o
South Africa 43/83
o
NSW 42/83
Global manufacturers in
South Africa
o
o
o
Mercedes
BMW
Toyota
11
ASX: TGM, TGMO
Success Stories – South Africa
Pan African Resources Plc / gold producer (AIM/JSE. BMN,
£260m MC / eqv. ~A$490m)
170Kozpa gold producer (2019FY)
150km South of Theta’s project in the Barberton Greenstone Belts.
World’s very first Biox‐gold operation
Effective interest in its producing assets: 74%
Jupiter Mines Limited / manganese producer (ASX. JMS,
A$760m MC)
Largest recent ASX listing (April 2018) having raised A$240m (Lead
Manager: Hartleys)
Already paid out three dividends to date (2017FY 9%yield, 2018FY
11%yield and 2019FY 19%yield respectively)
Effective interest in its flagship Tshipi project: 49%
12
ASX: TGM, TGMO
Starter Project – Theta Project Feasibility Study
Average annual EBITDA (based on USD1257/oz gold price) over 5 years
approx. USD20 million (39% Margin)
Average All‐in Sustaining Cost over 5 years USD764/oz
Average LoM gold recovery/yield at 91.6%
Payback period 1.2 years
13
ASX: TGM, TGMO
Theta Project Feasibility – Low CapEx
Unlocking large 6Moz resource base: starting from open cut mining, then shallow underground
Open Cut Theta Project – startup Feasibility Study
Total gold recovered over 5 years 201Koz @ 40Kozpa
o Initial 2 years from Theta Hill (incl. Browns) recovers
~91.05Koz (recovered grade 2.81g/t Au) at 45.53Kozpa
BHID
Sample
No.
DDBH21
DDBH21
S0792
S0795
From
m
33.10
34.72
To
m
34.04
35.15
Width
m
0.94
0.43
Estimated Recovery Au_Final
g/t
37%
79%
134.00
9.15
Intersection
m
Au g/t
0.94
0.43
134.00
9.15
Average All‐in‐Sustaining Cost USD764/oz
9 month construction timeline & plant upgrade to 500ktpa
Post‐tax cumulative undiscounted cashflow of USD65.7m
o Cumulative undiscounted EBITDA over LoM USD99.6m
o 1.2 years payback period.
o Post‐tax NPV5% of USD49.6m and 65.1% IRR
USD29.2m Peak Funding (incl. new mill & elution circuit)
Broken and fracture ground – Reduces cost
14
ASX: TGM, TGMO
Theta Project Feasibility – All‐in‐sustaining cost
LOM AISC of US$764/oz (lower in
first two years)
Minimal drill/blast allowed
Simple crush/grind and standard CIL
processing with high recovery
(>91%)
Operating cashflow to potential self‐
fund for multiple pit openings
reflected by an increase in AISC in
years 3 and 4
1 Refer to ASX Announcement on 15 May, 2019
15
ASX: TGM, TGMO
Theta Project Feasibility – Cashflow
16
FS cashflow were based on USD1257/oz
gold price
Strong free cashflow generation post
construction, total US$65.7m over LOM
(post tax, costs)
Recent weakening of ZAR will lower USD
Capex and Opex. ZAR Gold is up 24% since
concluding the Feasibility Study improving
project economics
The Company aims to increase ore reserves
and obtain additional TSF to extend LoM
Pay back 1.2 years
LoM EBITDA ~USD100m
ASX: TGM, TGMO
Theta Project Feasibility – Mining Method
Modified terrace mining with partial waste‐backfill, low cost method due to relatively flat‐lying ore seams and favorable
topography
Simple and efficient method using bulldozers, excavators for ripping and loading both waste and ore
Short haulage (2‐3km by road) from existing CIL Plant at Pilgrim’s Rest
17
ASX: TGM, TGMO
Theta Project Feasibility – Production Summary
Production Summary over 57 months‐
Ore Mined & Head Grade
Total material moved
(effective strip ratio)
Total ounces recovered
LOM gold recovery assumption
Average annual production
2.52Mt @ 2.71g/t Au
36.2 Mt (13.4x)
200,904oz
91.6%
40,176 oz pa over 57 months
(initial 2 years at 45,525ozpa)
Mining Costs (US$/t)
USD 22.98/t
Processing costs
USD 22.53/t
General & Administrative
USD 8.92/t
Total costs ‐ AISC
USD 764/oz
Average Gold price used
18
USD 1257
ASX: TGM, TGMO
Growth Strategy – production ramp up
Other open-cut +
high grade UG
mines
Additional open-cut
resources from rest
of MR83/341
>100kozpa
Theta Hill +
Columbia Hill ore
(MR83 only)
Theta Expanded,
South Theta +
Columbia Hill
>50kozpa
Vaalhoek opencut and
Rietfontein/Beta
UG next focus
Theta Project
starter open-cut
Open-cut
Open-cut
Subject to exploration success and funding
19
+Underground
ASX: TGM, TGMO
Scalability – Gold plant expansion strategy
Optimisation of Phase 1 Plant – to support
scalability
Phase 1: 500,000tpa Open Cut Oxide CIL Plant
(Theta Project FS Design May 2019)
Phase 2: Permitted plant space to expand Open
Cut Oxide CIL Plant to 1 Mtpa
Phase 3: Permitted Plant space available for
Underground Ore process circuit for further
~500ktpa
Significant tailings storage capacity expansion been
evaluated beyond existing approved 2.5mt
Refer to ASX Release on 22 August 2019
YELLOW/ORANGE: FS Phase 1 – 500 ktpa, GREEN: Phase 2 Expansion to 1
Mtpa+,RED: Phase 3 Expansion to above ~1.5Mtpa or more
20
ASX: TGM, TGMO
Scalability – Theta Project open cut upside
Only 16.7% of Theta’s open‐cut resource are included in the Feasibility
mine plan to date and only 57% of Theta’s current Open‐cut Indicated
Resources
Open‐cut resources have increased by 30% since 2018 to 1.3Moz, further
potential for increases have been defined
Target to further increase the 870Koz at Theta Hill and drilling Vaalhoek
Numerous other targets yet to be drill‐tested
21
ASX: TGM, TGMO
Scalability – Near term resource development
Near term open cut expansion priorities
Additional Theta Hill & Columbia Hill
(MR83/341 inclusive)‐ reserve
conversions‐
o currently 879.6 Koz @ 2.7g/t
Indicated/Inferred Resources
o only 35% of resources in MR83
included in reserves
o Columbia Hill Iota ore body open to
the west, not yet at resource status
o Numerous other open cut targets to
be drilled out
Vaalhoek (MR10167) – 335koz OC
Resource‐ drilling to delineate maiden
Indicated Resource & Reserve status
Medium term underground:
o Rietfontein
22
ASX: TGM, TGMO
Scalability – Drill‐to‐validate exploration model
Drill‐to‐validate Model – Exploration cost 12 USD Indicated JORC Gold Ounce
1.
2.
3
3.
4.
Digitise 130 years of mining data – So far over 75,000 +underground samples and 1,281 drill holes in data base
Maps and underground plans scanned and georeferenced (face samples/stopes plans, geology, drill plans)
The captured assay points validated and checked for errors capturing the data
3D geological models were created in Datamine Studio 3™ and Datamine Studio RM™
Geological models and wireframes project to surface to generate drill targets
23
ASX: TGM, TGMO
Re‐rating Potential / Why buy TGM?
1. Transitioning from Explorer to Developer to
Producer “Status” A re‐rating of
resources/reserves in‐ground
Rand (ZAR) Gold Price also trading at all time high at
~ZAR23,351/Oz (as at 1 September 2019)
2. Low capital expenditure startup Less
funding & financial risk
3. High operating margin With a
combination of low OpEx and rising gold
price boosting profit potential
4. Very low discovery cost “Cheap Gold”
5. Led by a team of proven successful mine
builders/developers High chance of
success
24
ASX: TGM, TGMO
(Photos captured at 2018 South African National Gold Panning
Championships, held on TGME Mining Rights for last 21 years)
“Goodbye from South Africa”
Appendix A ‐ Resources
Combined Mineral Resources as at 16 May 2019
Mineral Resource
Classification
Measured
Total Measured
Indicated
Tonnage
Gold Grade
Underground
Mt
0.091
0.091
4.774
g/t
5.37
5.37
6.21
Kg
489
489
29,661
koz
15.7
15.7
953.7
Open Pit
Tailings
7.161
5.244
2.11
0.83
15,091
4,373
485.2
140.6
17.179
21.452
5.922
0.023
0.121
27.518
44.788
2.86
5.22
4.35
0.57
1.64
5.01
4.18
49,126
111,880
25,730
13
199
137,823
187,438
1,579.4
3,597.0
827.3
0.40
6.40
4,431.0
6,026.2
Type of Operation
Underground
Total Indicated
Inferred
Total Inferred
Grand Total
Underground
Open pit
Tailings
Rock Dump
26
Gold Content
Notes:
• Columns may not add up due to
rounding.
• Gold price used for the cut-off
calculations is USD1,500/oz.
• UG Mineral Resources are
reported at a cut-off of 160 cm.g/t,
open pit at 0.5 g/t and 0.35 g/t,
tailings and rock dumps at 0.35 g/t.
• Fault losses of 5% for Measured
and Indicated, 10% for Inferred
Mineral Resources.
• Mineral Resources are stated as
inclusive of Ore Reserves.
• Mineral Resources are reported as
total Mineral Resources and are
not attributed.
ASX: TGM, TGMO
Appendix A ‐ Resources
Mineral
Resource
Classification
Indicated
Inferred
Reef
Width
Content
Reef
Tonnes
Au Content
Open Pit Mine
Reef
g/t
cm
cmgt
Mt
Kg
koz
Theta & Browns Hill
Shale
1.02
200
204
0.439
402
12.9
Theta & Browns Hill
Bevetts
1.10
221
244
0.891
886
28.5
Theta & Browns Hill
Upper Theta
2.41
100
241
0.724
1,568
50.4
Theta & Browns Hill
Lower Theta
3.70
100
370
0.888
2,956
95.0
Theta & Browns Hill
Beta
2.49
100
249
0.383
859
27.6
Columbia Hill
Columbia Hill
Columbia Hill
Columbia Hill
Bevetts
Upper Rho
Lower Rho
Upper Theta
2.89
2.43
2.51
1.08
114
393
550
114
330
956
1381
123
0.105
0.808
0.815
0.158
303
1,965
2,047
171
9.7
63.2
65.8
5.5
2.14
246
526
5.211
11,157
358.7
Total Indicated
Mineral
Resource
Classification
Reef
Grade
Open Pit Mine
Reef
Reef
Grade
g/t
Reef
Width
cm
Theta & Browns Hill
Shale
1.11
216
Theta & Browns Hill
Bevetts
1.07
213
cmgt
Reef
Tonnes
Mt
Kg
240
0.703
666
21.4
227
0.648
589
19.0
Content
Au Content
koz
Theta & Browns Hill
Upper Theta
1.86
100
186
1.071
1,692
54.4
Theta & Browns Hill
Lower Theta
8.11
100
811
1.643
11,329
364.3
Theta & Browns Hill
Beta
2.23
100
223
0.748
1,417
45.6
Columbia Hill
Upper Rho
5.13
106
544
0.099
507
16.3
3.30
132
434
4.912
16,202
520.9
Reef Width
Content
Total Inferred
Mineral Resource
Classification
Open Pit Mine
Reef
Reef
Grade
g/t
cm
Indicated
Total Theta Project
All
2.14
246
Inferred
Total Theta Project
All
3.30
2.70
Total Indicated and Inferred
cmgt
Reef
Tonnes
Mt
Kg
koz
526
5.2
11,157
358.7
132
435
4.9
16,202
520.9
190
514
10.1
27,359
879.6
27
Au Content
Total Theta Project ‐ Mineral Resources, 16 May
2019
NOTES
• Theta Project (Theta Hill, Browns Hill and Iota) cut-off is
0.35 g/t;
• The gold price used for the cut-off calculations is USD
1,500 / oz;
• Geological losses applied are 10% for inferred and 5%
for Indicated and Measured;
• Theta Hill and Browns Hill - Upper Theta Reef, Lower
Theta Reef and Beta Reef are diluted grades over
100cm;
• Historical mine voids have been depleted from the
Mineral Resource;
• The inferred Mineral Resources have a high degree of
uncertainty and it should not be assumed that all or a
portion thereof will be converted to Ore Reserves;
• Mineral Resources fall within the mining right MR83 and
MR341.
ASX: TGM, TGMO
Appendix A ‐ Resources
Theta Project Ore Reserves for MR83 only, 16 May 2019 (The Ore Reserves
exclude Inferred Mineral Resources)
Mineral Resource
Category in LoM
Plan
Probable
Pit
Browns Hill
Probable
Iota
Probable
Theta Hill
Total
g/t
3.24
Reef
Tonnes
kt
564
kg
1,826
oz
58,699
2.54
1,253
3,189
2.76
493
1,362
102,51
3
43,798
2.76
2,310
6,377
Grade
Au Content
28
Notes:
• Totals in the Ore Reserve may not add‐up due to
rounding.
• Mineral Resources are for MR83 only and excludes
MR341.
• No Inferred Mineral Resources are included in the Ore
Reserve.
205,01
0
ASX: TGM, TGMO
Share your feedback
Discover