Investor Presentation - November 2019
Released
Released
Announcement PDF
THETA GOLD MINES LIMITED
Investor Presentation
6 Moz Resource (4.18 g/t AU) – Low Capex Open Pit Operation (Initial startup pits ~200Koz gold production over 5 years)
November 2019
ASX: TGM, TGMO
OTCQB: TGMGF
Disclaimer
Forward looking and cautionary statements
This announcement or presentation may refer to the intention of Theta Gold Mines regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such as “Forecast”,
“Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”, “Predicted”, “Estimated” or similar expressions.
Forward looking statements, opinions and estimates included in this announcement are based on assumptions and contingencies
which are subject to change without notice, and may be influenced by such factors as funding availability, market-related forces
(commodity prices, exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection of the intention of the
Company as at the date of release of the document, however are subject to change without notice, and at any time. Future events
are subject to risks and uncertainties, and as such results, performance and achievements may in fact differ from those referred to in
this announcement. Mining, by its nature, and related activities including mineral exploration, are subject to a large number of
variables and risks, many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations, omissions and other mistakes.
For this reason, any conclusions, inferences, judgments, opinions, recommendations or other interpretations either contained in this
announcement, or referencing this announcement, cannot be relied upon. There can be no assurance that future results or events
will be consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for making the
forward looking statements contained in this document, with respect to any production targets, resource statements or financial
estimates, however further work to define Mineral Resources or Reserves, technical studies including feasibilities, and related
investigations are required prior to commencement of mining. No liability is accepted for any loss, cost or damage suffered or
incurred by the reliance on the sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to support the estimation of
Ore Reserves. There is no assurance that the intended development referred to will proceed as described, and will rely on access to
future funding to implement. Theta Gold Mines believes it has reasonable grounds the results of the Feasibility Study. At this stage
there is no guarantee that funding will be available, and investors are to be aware of any potential dilution of existing issued capital.
The production targets and forward looking statements referred to are based on information available to the Company at the time of
release, and should not be solely relied upon by investors when making investment decisions. Theta Gold cautions that mining and
exploration are high risk, and subject to change based on new information or interpretation, commodity prices or foreign exchange
rates. Actual results may differ materially from the results or production targets contained in this release. Further evaluation is
required prior to a decision to conduct mining being made. The estimated Mineral Resources quoted in this release have been
prepared by Competent Persons as required under the JORC Code (2012). Material assumptions and other important information
are contained in this release.
NOTE BUSINESS ARRANGEMENT
Theta Gold Mines holds 100% issued capital of its South African subsidiary Stonewall Mining (Pty) Ltd (“Stonewall”). Stonewall
holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty) Ltd (“Sabie Mines”).
TGME holds the various exploration and mining permits. The balance of shareholding is held by Black Economic Empowerment
(“BEE”) entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation by the historically
disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is comprised of a combination of local
community trusts, an employee trust and a strategic entrepreneurial partner.
Disclaimer and Competent Persons Statement
DISCLAIMER
This announcement or presentation has been prepared by and issued by Theta Gold Mines Limited (ASX:TGM, TGM |
OTCQB: TGMGF) to assist in informing interested parties about the Company and should not be considered as an offer
or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation
with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis
of this announcement.
This announcement or presentation may contain forward looking statements. Whilst Theta Gold Mines has no reason to
believe that any such statements and projections are either false, misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold Mines does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an investment
decision, you should consult your professional adviser, and perform your own analysis prior to making any investment
decision. To the maximum extent permitted by law, the Company makes no representation and gives no assurance,
guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity,
validity, accuracy, suitability or completeness of, or any errors in or omissions, from any information, statement or opinion
contained in this announcement. This announcement contains information, ideas and analysis which are proprietary to
Theta Gold.
COMPETENT PERSONS STATEMENT
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.),
Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South African Council for
Natural Scientific Professions and Mr Daan Van Heerden (B Eng (Min.), MCom (Bus. Admin.), MMC, Pr.Eng. No.
20050318, FSAIMM, AMMSA), a director of Minxcon (Pty) Ltd and a member of the Engineering Council of South Africa
respectively.
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” and “Positive Feasibility Study for Theta
Project” were dated 16 May 2019 and were released to the Australian Securities Exchange (ASX) on that date. The
Company confirms that:
•
it is not aware of any new information or data that materially affects the information included in the ASX
announcements; and
•
all material assumptions and technical parameters underpinning the estimates in the ASX announcements continue
to apply and have not materially changed.
2
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Company Overview
▪
▪
Theta boasts a 6.0Moz Au resource – 44.78Mt at 4.18g/t (1.3M oz open-cut and
4.5M oz underground).
Focused on the development of projects in the Sabie & Pilgrim’s Rest
goldfields – 370 km from Johannesburg SA.
Company Snapshot
~436.7m
Ordinary Shares (ASX listed).
Dual-listed on OTCQB: TGMGF since 7 Nov 19’.
31.4m
Listed options (TGMO), expiration Oct 2020, A$
0.30 exercise price.
29.0m
Significant exploration upside – large unexplored holding controlling >80%
▪ Sabie & Pilgrim’s Rest goldfields.
Unlisted options and management performance
rights.
~A$70.0m
Market capitalisation (undiluted).
70%
Top 10 shareholding.
▪
Proven drill-to-validate model (digitising >130 years of raw data) –
inexpensive and highly scalable gold resource .
10%
Director & management shareholding.
Share Price Performance
Strong project economics – completed starter pits feasibility study, low
▪ CAPEX, AISC ~US$764/oz
$0.17
$0.15
$0.13
$0.11
$0.09
Oct-19
Sep-19
Aug-19
Jul-19
Aug-19
Jun-19
Jun-19
Apr-19
May-19
Apr-19
Mar-19
Jan-19
Feb-19
Jan-19
$0.07
Dec-18
▪ Board/Management built 16 mining operations combined.
3
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
24 Month Recap
FY 2018
✓ Nov 2017 – Jan 2018 - Early drilling confirming high grade gold reefs at Theta
Hill and Columbia Hill, boosting confidence to exploration targets.
✓ Jan 2018 – Average metallurgical recoveries of 95.7% and 94.7% for Beta
and Lower Theta Reefs respectively.
H1
FY 2019
✓ Sept 2018 – Official announcement of Theta Hill Resources,
global resources increased to 5.8Moz.
✓ Oct 2018 - Positive Scoping Study completed for Theta Hill.
2.5MW Ball mill (photo taken at Rustenburg during
independent inspection by METS).
Mill
secured
for
A$550k
(<US$360k) excl. delivery.
H2
FY 2019
✓ May 2019 - Feasibility Study completed for Theta
Project Starter Pits (based on initial 205Koz
Reserves, 500Ktpa production profile); global
resources increase to 6Moz.
H1
FY 2020
✓ Oct 2019 - Secured ex-Glenore
2.5MW ball mill, capacity to process
1Mtpa ore (secures both Phases 1 & 2
open-cut oxide ore).
▪
Similar size ball mill (new) cost
>A$5.5m with up to 40 weeks
waiting period.
▪
Dismantling & moving in process,
expecting on-site by February
2020.
4
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Mining Rights and Resources
Group JORC Resources of 6Moz Au (44.8Mt @
4.18g/t Au):
Northern
tenements
▪ 1.3Moz open cut resources (13.08Mt @ 3.12g/t Au).
620 km2
tenements
▪ 4.5Moz underground resources (26.3Mt @ 5.4g/t Au).
▪ Initial Ore Reserves for Theta Project (part of MR83
only): 205Koz (2.3Mt @ 2.76g/t Au) (Only 16% of total
OC Resources).
Southern
tenements
▪ 9 Mining Rights (various undergoing granting process).
Northern tenements
Southern tenements
Open Cut
Theta
Project
Starter Pits
(MR83)
5
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Starter Pits Production Summary – @US$1257 gold price
Production summary over 57 months
Ore mined and head grade
Total material moved (effective strip ratio)
Total ounces recovered
LOM gold recovery assumption
Average annual production
2.5Mt @ 2.71g/t Au
36.2Mt (13.4x)
200,905 oz
91.6%
Processing 500Ktpa.
Delivering 40,176 oz pa over 57 months (initial
2 years at 45,525 ozpa)
Construction timeline
9 months
Mining costs (US$/t)
US$22.98/t
Processing costs
US$22.53/t
General and administrative
US$8.92/t
Total costs – AISC
US$764/oz
Post-tax cumulative undiscounted EBITDA (on US$1257
LoM gold price assumption)
US$100m
6
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Planned Expansion Initiatives Over the Near Term
Q1- Q2 2020: Mine & Plant EPC/LSTK Contractor Selection, Project Finance, Detailed Plant, Mine & Infra. Designs, DMER Approval for MR83.
Q2 - Q4 2020: Mine, Plant & Infrastructure Construction.
Q4 2020: Commencement of Mining Operations.
Plant Optimisation Strategy
▪
Phase 1 (Starter pits): 500,000tpa open-cut oxide CIL plant (Theta
Project FS Design May 2019).
▪
Phase 2: Permitted plant space to expand open-cut oxide CIL plant
to 1 Mtpa.
▪
Phase 3: Permitted Plant space available for underground ore
process circuit for further ~500ktpa.
▪
Significant tailings storage capacity expansion been evaluated
beyond existing approved 2.5mt.
YELLOW/ORANGE: FS Phase 1 – 500 ktpa, GREEN: Phase 2 Expansion to 1
Mtpa+,RED: Phase 3 Expansion to above ~1.5Mtpa or more.
7
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Theta Production Profiling
>50kozpa
>100kozpa
Q4 FY2020: Commencement of Mining Operations.
Theta Project
starter pits +
Columbia Hill
open-cut (MR83
only)
Theta
Expanded,
South Theta +
Columbia Hill
(MR83/341)
Open-cut
Stage 1 –
Feasibility
Study
May 2019
Additional OC
Resource from
rest of
MR83/341
>150kozpa
Vaalhoek opencut and
Rietfontein/Bet
a UG next
focus
Other OC +
high grade UG
mines
+Underground
✓ Average All-in-sustaining-cost (AISC): USD764/oz
✓ Production plan: Recover 205koz AU over initial 5 years.
✓ Mine and processing type: Open-cut using conventional milling with cyanide extraction
(Metallurgical test work indicated gold recoveries of about 92%).
✓ Low CapEx: USD34m
8
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Growth Catalysts
Re-rating milestones: Explorer → Developer → Producer
Mining Reserve growth: 1.3 Mt Inferred Open Pit Resource
ready for conversion.
Exploration upside: 620 km2 of virgin goldfield ready for its
first geophysical survey.
Very low gold discovery costs: Very cheap gold in a bull
market.
Less funding and operational risk: Low Capex project with
high profit margins
One of the largest resource bases for an ASX Junior
Explorer: 6.0 Moz Au
9
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Key Investment Highlights
▪
▪
▪
▪
▪
Favourable Geology and Mineralisation
Low All-in-sustaining-cost (AISC)
Low Capital Requirements
Highly Competent Board of Directors
Near Term Expansion Opportunity
10
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Favourable Geology and Mineralisation
2
✓ Favorable geological traits = lesser mining activities
and shorter lead times = smaller upfront costs.
1
Flat laying
horizontal reef
systems that
allows for low
cost terrace
mining.
✓ The near surface flat reefs allow for low-cost modified
terrace mining (less expensive than traditional mining as
waste is not hauled out of the pit).
✓ Mineralisation is mesothermal in style and is formed
as a stacked series of laterally continuous bedding that
parallels quartz/carbonate/sulphide reefs.
✓ Overall thicknesses varying from reef to reef, i.e,;
30cm at Beta, 1-1.4m at Vaalhoek and even greater
thickness at Theta and Columbia Hill.
✓ The contained gold has been found to occur as free
milling grains (recoverable via gravity) and conventional
cyanidation.
High grade oxide
ores which are easier
to mine, mill and
process due to the
breakdown of
sulphide mineral.
3
4
Theta sediments consist
mainly of shales,
siltstones, dolomites
that are generally softer
and easier to mine than
traditional igneous
rocks.
Extremely fractured
sediments, allowing
for higher
production rates.
11
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Low Capital Requirements
Total Capital Costs estimated for the Theta starter
project is ~US$34m(1) (~480mRand).
▪ Independent consultant estimates;
▪ Minxcon (Pty) Ltd (“Minxcon”),
▪ METS (Pty) Ltd (“METS”) and
▪ Tailex Management Services (Pty) Ltd (“Tailex”).
▪ Total estimated construction time: 9 months
Tailing Storage Facility Capital Cost Estimates(5)
Item
Total Costs(1)
ZARm
USDm
TSF Vasin
13.7
1.0
Dry Stack Buttress
5.5
0.4
Storm Water Control
0.7
0.1
Buttress SIB Capital
10.1
0.7
Total
29.9
2.1
Mining Equipment And Infrastructure Capital Cost Estimates(3)
Item
Total Costs(2)
ZARm
USDm
Civil
30.9
2.2
Earthworks
32.3
2.3
Electrical
2.0
0.1
Instrumentation, IT & Comms
4.0
0.3
P&G's
2.5
0.2
Pumps And Piping
3.2
0.2
Steel And Plate Work
1.2
0.1
Structural
0.4
0.0
Tool And Equipment
14.5
1.0
Vehicles
4.2
0.3
EPCM
1.0
0.1
Water Management
4.4
0.3
Total
100.6
7.1
Processing Plant Capital Cost Estimates(4)
Item
Total Costs(1)
ZARm
USDm
Mechanical
114.3
8.1
Plate Work
13.9
1.0
(5)
Piping And Valves
17.7
1.3
Civil & Earthworks
31.5
2.2
Structural Steel
18.3
1.3
Electrical And
45.0
3.2
Instrumentation(6)
First Fill
3.6
0.3
Direct Capital Costs
244.3
17.2
Construction And Engineering
62.6
4.4
Total
306.9
21.6
Source: Company Reports and announcements.
(1)Figure includes USD2.9m contingency (2) ZAR/USD exchange rate of 14.19 used for conversion as at close 1 April 2019. Variance with previously reported figures may exist
due to rounding differences. (3) As estimated by Minxcon (Pty) Ltd. (4) As estimated by METS (pty) Ltd. (5) As estimated by Tailex Management Services (Pty) Ltd.
Investor Presentation - November 2019
12
ASX: TGM, TGMO | OTCQB: TGMGF
707
Harmony Central Plant Reclamation
764
Theta Project - BFS
865
826
Harmony Waste Rock Dumps
Bambani
866
Phoenix
980
894
Unisel
Moab Khotsong
1,041
Kusasalethu
1,110
1,070
Doornkop
Masimong
1,168
Kalgold
1227
1,191
Tshepong
Barberton
1,240
Target 1
1,313
Joel
1258
1,903
Ergo
Evander
✓ LOM AISC of US$764/oz (lower in first two years).
✓ Minimal drill/blast allowed.
✓ Simple crush/grind and standard CIL processing with high recovery (>91%).
✓ Operating cashflow to potential self-fund for multiple pit openings reflected by
an increase in AISC in years 3 and 4.
South African Gold Operators - AISC
(US$/Oz)
South Deep
Theta Starter pits – AISC (Feasibility study):
2,065
Low AISC
13
Refer to ASX Announcement on 15 May, 2019.
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Highly Competent Board of Directors
Bill Guy - Chairman
▪
▪
▪
Ex-Jupiter Mines Ltd (ASX: JMS) Chief Exploration Manager,
>25yrs exploration & resource development experience.
>17 years listed mining executive.
Rob Thomson - Managing Director
▪
▪
35+ years Mining Engineer,
Development/Operations as CEO/MD/Project Manager in 8 significant gold and base metal projects including
CEO at Climax’s Didipio, GM at Oxiana’s Sepon and Kingsgate’s Chatree gold/copper mines.
Finn Behnken - Non-Executive Director
▪
▪
▪
Former CEO of Tshipi é Ntle Manganese Mining (Pty) Limited (currently 49% owned by Jupiter Mines Ltd),
A Mining Engineer and Investment Banker by profession,
Previously worked for Nedbank and currently with Auramet responsible for all African Continent gold
purchases
Richie Yang - Non-Executive Director
▪
▪
Former ED of Bligh Resources Ltd (ASX: BGH) recently taken-over by Saracens (ASX: SAR).
>15 years experience in mining financing & executive positions and currently MD of Vs Capital (Sydney based
family office)
Brett Tang - Non-Executive Director
▪
▪
Former fund manager at Tasman Funds with > 15 years of gold/base metal experience.
A significant investor in TGM - indirectly holds >7% equity.
Simon Liu - Non-Executive Director
▪
Fund manager previously a co-founder of Hanhong PE (Beijing based) with significant exposure to gold and oil
& gas projects globally.
14
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Project Company Board of Directors
Transvaal Gold Mining Estates Ltd (TGME)
Bill Guy
Chairman
Chairman - Theta Board
(Ex-Jupiter Mines)
Rob Thomson
George Jenkins
Managing Director
CEO
Director
Director
Project Delivery
Permitting/Operations /Plant
Accounting/Finance
Director
Director - Theta Board
Extraction Metallurgist
Government & Community
Affairs
Accountant
Legal/Commercial
(Ex-Climax Resources)
(Ex-Vale operations)
Lawyer & Government
Consultant
(Ex-Kraft Foods RSA)
Terrence Mokale
(Ex-Glencore RSA)
Hanlie Grobler
Natasha ThomasKasangana
Lawyer
(Ex-Tshipi - Jupiter Mines)
15
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Near Term Expansion Opportunity - Reserves
✓ Low Indicated Resources discovery cost of US$12/oz.
✓ Only 16% of Theta’s open cut resource are included in
its feasibility mine plan to date – i.e. 57% of Theta’s
current open cut indicated resource.
MR83 – Current
Theta starter
pits
✓ Open cut resources have increased 30% since 2018 to
1.3moz – further potential for increase have been
defined.
✓ Additional Theta Hill & Columbia Hill (MR83/341
inclusive) reserve conversion opportunities:
▪ Currently 879.6 Koz @ 2.7g/t Indicated/Inferred
Resources.
▪ Only 35% of resources in MR83 included in
reserves.
▪ Columbia Hill Iota ore body open to the west, not yet
at resource status.
▪ Numerous other open cut targets to be drilled out.
MR341 –
Theta
expansion
opportunity
✓ Vaalhoek (MR10167) – 335koz OC Resource- drilling to
delineate maiden Indicated Resource & Reserve status.
✓ Medium term underground operations at:
▪ Rietfontein Mine,
▪ Beta Mine.
16
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Near Term Expansion Opportunity – Exploration Targets
Under Explored – No modern
geophysical surveys
▪
TGME Goldfield - metallogenic province
extends for approximately 140 km in a
north-north-easterly direction, over a width
of 30 km.
▪
Gold System -Epigenetic gold mineralisation
occurs within sedimentary host rocks of the
Transvaal Supergroup. (Protozoic in Age).
▪
Open pit exploration targets near term Theta extensions, Kameels, and Vaalhoek.
First Regional Geophysical Surveys
▪
Regional Geophysical Surveys – to define
structural and geological controls on the
Gold System.
▪
VTEM and Magnetics.
▪
Bushveld Complex, the largest igneous
intrusion in the world, is believed to be the
possible fluid source.
▪
Malmani Subgroup (Blue) – has potential for
shallow gold Discoveries.
Geophysical
Survey Phase 1
Geophysical
Survey Phase 2
(Note: Gold
Mineralisation
Originally
thought to be
Carlin System)
Malmani Subgroups
(Dolomites & sediments
potential for new gold
discoveries)
17
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Why South Africa?
▪
▪
▪
Control Over Entire Goldfield
Favourable Mining Jurisdiction
Mature And Developed Gold Market
18
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Control Over Entire Goldfield
Sabie-Pilgrim’s Rest Goldfields
(“TGME Goldfield”)
▪
▪
▪
▪
▪
Situated just outside of the Bushveld Complex
– the world’s largest igneous intrusion.
Predominantly owned by TGM subsidiary;
TGME, near surface - flat reef systems,
620sqkm land package.
Historic production: 1873–1940s, 1980s, 90s,
produced over 6.7Moz gold.
Located 370km NE from Johannesburg,
South Africa, just 4 hours drive by highway.
Theta aims to recommence production in late
2020.
TGME Goldfield
Witwatersrand
▪
▪
1886 – Current. (surrounds Johannesburg,
currently mining up to 4km underground.
Having produced >50% of world’s gold by
tons).
Barbeton Goldfield
▪
▪
1881
–
Current.
(450km
East
of
Johannesburg, Greenstone belt, currently
mining up to 2km underground.
Recently announced discovery of open cut
resources to be the new focus, LSE: PAF,
Market Cap: £260m+).
19
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Favourable Mining Jurisdiction
✓ South Africa has produced more gold than any other
country with over two billion ounces produced from its
goldfields (> 50% of world’s gold production).
Fraser Institute Ratings 2018
(Investment Attractiveness Index)
✓ Abundant supply of skills and services at reasonable
costs with minimal need for foreign expat workforce.
Colorado (US)
35/83
NSW (Australia)
42/83
South Africa
43/83
Victoria (Australia)
54/83
Ecuador
56/83
Nova Scotia (Canada)
57/83
California (US)
61/83
Ghana
68/83
✓ Foreign investment was over US$7.1B in 2018 and is
climbing.
✓ Current president; Cyril Ramaphosa and the Minister of
Mines; Gwede Mantashe are active promoters of mining
ventures across the nation.
▪ Mining plays a big role at the provincial level,
offering
employment
to
the
provincial
economies.
▪ Recently estimated to employ over 450,000
South Africans and contribute over R350 billion
to the GDP (~7.3% of total GDP).
President Ramaphosa delivers the 2019 State of the Nation
address (source: Bloomberg).
Unit
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
USD
Million
7,160
7,654
8,680
9,433
8,783
8,353
7,895
5,003
3,662
5,797
6,884
Mining’s contribution to private
sector fixed investment
%
16
19
19
18
18
17
17
12
10
13
15
Mining’s contribution to Total investment
%
11
12
12
12
12
11
11
8
6
9
10
Direct contribution to fixed Investment
Sources: Minerals Council South Africa, South African Revenue Service, Department of Mineral Resources and Energy, US Geological Survey.
20
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Mature And Developed Gold Market
IMPORT/ EXPORT
PREMITS PRECIOUS
METALS
REGULATOR; RSA
UNFINISHED GOLD/
DORE BAR
RSA RESERVE BANK
(REGULATES GOLD
PRICES, TRADING
AND TAXATION)
Largest refinery in Africa.
Registered under the London
Bullion Market Association who
sets the refining standards.
MINING OPERATIONS
RECYCLED GOLD
HEDGING/
ARTISANAL/SECTOR
SALES
Used by many South African gold
operations including Harmony,
Sibanye-Stillwater,
AngloGold
Ashanti, Gold Fields and DRD
Gold.
RAND REFINED
FINISHED GOLD
SOUTH AFRICAN
BULLION BANK
OPEN MARKET
(JEWELLERY,
TECHNOLOGY, HEDGING,
ETF, BAR & COIN)
Rand Refinery also markets and
sells the finished gold, and has
custody of gold for South African
bullion banks.
Provides a variety of ancillary
services, including:
▪ 24-hour turnaround of
assaying, payment in USD
and/or Rand,
▪ state-of-the-art vaulting, and
▪ international logistics
services.
21
Sources: Minerals Council South Africa, South African Revenue Service, Department of Mineral Resources and Energy, US Geological Survey.
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Appendices
▪
▪
Corporate Structure
JORC Resource Summary
22
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Corporate Structure
The Black Economic Empowerment (“BEE”) shareholding in general comprise of:
▪ Employees Trust (Employee/labour Incentives),
▪ Landholders,
▪ Local entrepreneurs
The BEE shareholding is not a free-carry interest, it is a contributing equity interest (BEE structure can be read from page17 of the
Company’s Annual Report 2018 released on 1st October 2018).
TGME Black
Empowerment
Shareholders
26%
100%
CIL Plant & Infrastructure
TGME Ltd
74%
100%
>600km2 of MRs and
Exploration rights
100%
Operating company for
tenements surrounding Sabie
Theta Gold
Mines Ltd
(ASX:TGM,
OTCQB:TGMGF)
74%
Sabie Black
Empowerment
Shareholders
Australia
Sabie Mines
(Pty) Ltd
26%
South Africa
23
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Resources Tables
Combined Mineral Resources as at 16 May 2019
Notes:
Tonnage
Gold
Grade
Mt
g/t
Kg
0.091
5.37
489
koz
15.7
0.091
5.37
489
15.7
Underground
4.774
6.21
29,661
953.7
Open Pit
7.161
2.11
15,091
485.2
Tailings
5.244
0.83
4,373
140.6
17.179
2.86
49,126
1,579.4
Underground
21.452
5.22
111,880
3,597.0
Open pit
5.922
4.35
25,730
827.3
Tailings
0.023
0.57
13
0.40
Rock Dump
0.121
1.64
199
6.40
Total Inferred
27.518
5.01
137,823
4,431.0
Grand Total
44.788
4.18
187,438
6,026.2
Mineral Resource
Classification
Measured
Type of Operation
Underground
Total Measured
Indicated
Total Indicated
Inferred
Gold Content
•
Columns may not add up due to
rounding.
•
Gold price used for the cut-off
calculations is USD1,500/oz.
•
UG Mineral Resources are
reported at a cut-off of 160
cm.g/t, open pit at 0.5 g/t and
0.35 g/t, tailings and rock
dumps at 0.35 g/t.
•
Fault losses of 5% for
Measured and Indicated, 10%
for Inferred Mineral Resources.
•
Mineral Resources are stated
as inclusive of Ore Reserves.
•
Mineral Resources are reported
as total Mineral Resources and
are not attributed.
24
Investor Presentation - November 2019
ASX: TGM, TGMO | OTCQB: TGMGF
Resources Tables
Total Theta Project - Mineral Resources, 16 May 2019
Mineral Resource
Classification
Open Pit Mine
Indicated
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Columbia Hill
Columbia Hill
Columbia Hill
Columbia Hill
Reef
Shale
Bevetts
Upper Theta
Lower Theta
Beta
Bevetts
Upper Rho
Lower Rho
Upper Theta
Total Indicated
Mineral Resource
Classification
Open Pit Mine
Inferred
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Columbia Hill
Shale
Bevetts
Upper Theta
Lower Theta
Beta
Upper Rho
Open Pit Mine
Reef
Reef
Total Inferred
Mineral Resource
Classification
Indicated
Total Theta Project
Inferred
Total Theta Project
Total Indicated and Inferred
All
All
Notes:
Reef
Grade
g/t
1.02
1.10
2.41
3.70
2.49
2.89
2.43
2.51
1.08
2.14
Reef
Grade
g/t
1.11
1.07
1.86
8.11
2.23
5.13
3.30
Reef
Grade
g/t
2.14
3.30
2.70
Reef Width
Content
cm
200
221
100
100
100
114
393
550
114
246
cmgt
204
244
241
370
249
330
956
1381
123
526
Reef Width
Content
cm
216
213
100
100
100
106
132
cmgt
240
227
186
811
223
544
434
Reef Width
Content
cm
246
132
190
cmgt
526
435
514
Reef
Tonnes
Mt
0.439
0.891
0.724
0.888
0.383
0.105
0.808
0.815
0.158
5.211
Kg
402
886
1,568
2,956
859
303
1,965
2,047
171
11,157
Reef
Tonnes
Mt
0.703
0.648
1.071
1.643
0.748
0.099
4.912
Kg
666
589
1,692
11,329
1,417
507
16,202
Reef
Tonnes
Mt
5.2
4.9
10.1
Au Content
koz
12.9
28.5
50.4
95.0
27.6
9.7
63.2
65.8
5.5
358.7
•
Theta Project (Theta Hill,
Browns Hill and Iota) cut-off is
0.35 g/t.
•
The gold price used for the cutoff calculations is USD 1,500 /
oz.
•
Geological losses applied are
10% for inferred and 5% for
Indicated and Measured.
•
Theta Hill and Browns Hill Upper Theta Reef, Lower Theta
Reef and Beta Reef are diluted
grades over 100cm.
•
Historical mine voids have been
depleted from the Mineral
Resource.
•
The inferred Mineral Resources
have a high degree of
uncertainty and it should not be
assumed that all or a portion
Share your feedback
Discover