Investor Presentation - August 2020
Released
Released
Announcement PDF
A Sustainable Gold Miner in the Making – over
6Moz Resources
Investor Presentation
Chairman – Bill Guy
August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
www.thetagoldmines.com
Disclaimer
Forward looking and cautionary statements
Disclaimer and Competent Persons Statement
This announcement or presentation may refer to the intention of Theta Gold Mines regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such as “Forecast”,
“Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”, “Predicted”, “Estimated” or similar expressions.
Forward looking statements, opinions and estimates included in this announcement are based on assumptions and contingencies
which are subject to change without notice, and may be influenced by such factors including but not limited to funding availability,
market-related forces (commodity prices, exchange rates, stock market indices and the like) and political, environmental or
economic events (including government or community issues, land owners, global or systemic events). Forward looking statements
are provided as a general reflection of the intention of the Company as at the date of release of the document, however are subject to
change without notice, and at any time. Future events are subject to risks and uncertainties, and as such results, performance and
achievements may in fact differ from those referred to in this announcement. Mining, by its nature, and related activities including
mineral exploration, are subject to a large number of variables and risks, many of which cannot be adequately addressed, or be
expected to be assessed, in this document. Work contained within or referenced in this report may contain incorrect statements,
errors, miscalculations, omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this announcement, cannot be relied
upon. There can be no assurance that future results or events will be consistent with any such opinions, forecasts or estimates. The
Company believes it has a reasonable basis for making the forward looking statements contained in this document, with respect to
any production targets, resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of mining. No liability is
accepted for any loss, cost or damage suffered or incurred by the reliance on the sufficiency or completeness of the information,
opinions or beliefs contained in this announcement.
DISCLAIMER
This announcement or presentation has been prepared by and issued by Theta Gold Mines Limited (ASX:TGM, TGMO |
OTCQB: TGMGF) to assist in informing interested parties about the Company and should not be considered as an offer
or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation
with respect to those securities. No agreement to subscribe for securities in the Company will be entered into on the basis
of this announcement.
This announcement or presentation may contain forward looking statements. Whilst Theta Gold Mines has no reason to
believe that any such statements and projections are either false, misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold Mines does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an investment
decision, you should consult your professional adviser, and perform your own analysis prior to making any investment
decision. To the maximum extent permitted by law, the Company makes no representation and gives no assurance,
guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity,
validity, accuracy, suitability or completeness of, or any errors in or omissions, from any information, statement or opinion
contained in this announcement. This announcement contains information, ideas and analysis which are proprietary to
Theta Gold.
COMPETENT PERSONS STATEMENT
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.),
Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South African Council for
Natural Scientific Professions and Mr Daan Van Heerden (B Eng (Min.), MCom (Bus. Admin.), MMC, Pr.Eng. No.
20050318, FSAIMM, AMMSA), a director of Minxcon (Pty) Ltd and a member of the Engineering Council of South Africa
respectively.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to support the estimation of
Ore Reserves. There is no assurance that the intended development referred to will proceed as described, and will rely on access to
future funding to implement. Theta Gold Mines believes it has reasonable grounds the results of the Feasibility Study. At this stage
there is no guarantee that funding will be available, and investors are to be aware of any potential dilution of existing issued capital.
The production targets and forward looking statements referred to are based on information available to the Company at the time of
release, and should not be solely relied upon by investors when making investment decisions. Theta Gold cautions that mining and
exploration are high risk, and subject to change based on new information or interpretation, commodity prices or foreign exchange
rates. Actual results may differ materially from the results or production targets contained in this release. Further evaluation is
required prior to a decision to conduct mining being made. The estimated Mineral Resources quoted in this release have been
prepared by Competent Persons as required under the JORC Code (2012). Material assumptions and other important information
are contained in this release.
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” and “Positive Feasibility Study for Theta
Project” dated 16 May 2019 and “Optimised Mine Schedule for Theta Open Pit Starter Project Delivers Significant
Improvements” dated 20 April 2020 were released to the Australian Securities Exchange (ASX) on those dates. The
Company confirms that:
•
it is not aware of any new information or data that materially affects the information included in the ASX
announcements; and
•
all material assumptions and technical parameters underpinning the estimates in the ASX announcements continue
to apply and have not materially changed.
NOTE BUSINESS ARRANGEMENT
Theta Gold Mines holds 100% issued capital of its South African subsidiary Stonewall Mining (Pty) Ltd (“Stonewall”). Stonewall
holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty) Ltd (“Sabie Mines”).
TGME holds the various exploration and mining permits. The balance of shareholding is held by Black Economic Empowerment
(“BEE”) entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation by the historically
disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is comprised of a combination of local
community trusts, an employee trust and a strategic entrepreneurial partner.
AUTHORISATION
This announcement was authorised for release by Mr Bill Guy, Chairman.
2
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
The System
South Africa – Home of Mineral
Wealth
v Over 2 Billion oz of gold produced
from Witwatersrand, approximately
40-50% of World’s gold production
combined.
Eastern Transvaal
Gold Fields
v Bushveld Complex is the largest
igneous intrusion on earth:
ü World’s most significant
producer of Platinum and
Palladium.
ü Bushveld Complex hosts
approximately
80%
of
World’s PGM-bearing ore
(Source: Minerals Council
South Africa)
Pilgrim’s Rest
Gold Field
Sabie Gold Field
v The mining industry exported R312
billion (~USD23 billion) worth of
commodities (Diamonds, coal, iron
ore, chrome base metals) (Source:
Minerals Council South Africa
2018)
3
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Theta Controls A Very Large Gold Field
6Moz+
Group JORC Resources
(44.8Mt @ 4.18g/t Au)
1.3 Moz open cut resources
(13.08Mt @ 3.12g/t Au).
4.5 Moz underground resources
(26.3Mt @ 5.4g/t Au).
Initial Ore Reserves declared for
the Theta Project Starter-pits
(within MR83 only) in May 2019:
205Koz (2.3Mt @ 2.76g/t Au).
GOLD+
THETA CONTROLS THE
EASTERN TRANSVAAL
GOLD FIELDS
(A very large yet almost unexplored gold province since
WWII)
6.7Moz+
Gold already produced
since 1870s.
The No.1 gold discovery in South
Africa before the Witwatersrand.
TGME (Theta’s 74% owned
subsidiary) is the very first gold
mining company registered in
South Africa in late 1800’s.
Over 43 historic mines to be
explored using modern day
exploration technology.
4
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Corporate Overview / Board of Directors
Bill Guy - Chairman
§
§
Ex-Jupiter Mines Ltd (ASX: JMS) Chief Exploration Manager. (Jupiter was/is controlled by London based Pallinghurst Group, Chairman Mr.
Brian Gilbertson was former Chairman/CEO BHP Billiton)
>25yrs exploration & resource development experience.
Company Snapshot
Finn Behnken - Non-Executive Director
§
§
§
Former CEO of Tshipi é Ntle Manganese Mining (Pty) Limited (currently 49% owned by Jupiter Mines Ltd),
A Mining Engineer and Investment Banker by profession,
Previously worked for Nedbank and currently with Auramet responsible for all African Continent gold purchases
Rob Thomson – Non-Executive Director
§
§
>35 years Mining Engineer,
Development/Operations as CEO/MD/Project Manager in 8 significant gold and base metal projects including CEO at
Climax’s Didipio, GM at Oxiana’s Sepon and Kingsgate’s Chatree gold/copper mines.
Richie Yang - Non-Executive Director
§
§
23.87m
Unlisted options and management
performance rights
Former fund manager at Tasman Funds with > 15 years of gold/base metal experience.
A significant investor in TGM - indirectly holds >7% equity.
~A$118m (~US$83m)
Simon Liu - Non-Executive Director
§
33.75m
Listed options (ASX: TGMO), expiration Oct
2020, A$ 0.30 exercise price
Former ED of Bligh Resources Ltd (ASX: BGH) recently taken-over by Saracens (ASX: SAR).
>15 years experience in mining financing & executive positions and currently MD of Vs Capital Group
Brett Tang - Non-Executive Director
§
§
~454.4m
Ordinary Shares
Dual-listed on ASX: TGM, TGMO |
OTCQB: TGMGF
Fund manager previously a co-founder of Hanhong PE Fund with significant exposure to gold and oil & gas projects globally.
Market Capitalisation
(30th July 2020, undiluted)
71.5%
Top 10 shareholding
10%
Directors & management
5
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
4 Mines Strategy to Monetize the initial 2.75Moz Au
• Approved TGME CIL Plant Footprint & TSF
• Initial 5 Years to ramp-up 4 mines: to start 4 high quality nearsurface mines (approx. 2.75Moz) >160Kozpa.
•
Stage 1 Theta
Starter-pits
(Feasibility Study
completed to
recover 234Koz Au
surface ore)
>40kozpa
Multi-million dollars of infrastructure - capital savings
Stage 2 Theta
Extension Pits
(Reserve Definition
Drilling planned
targeting further
500Koz Au surface
ore)
Stage 3 Rietfontein
Shallow
Underground
- 780Koz @ 8.5g/t Au
JORC Resources
- Scoping Study
completed
Stage 4 Beta Shallow
Underground
1.1Moz @ 6g/t Au
JORC Resources
(Scoping Study
completed)
>80kozpa
>120kozpa
>160kozpa
6
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
4 Mines Strategy to Monetize the initial 2.75Moz Au
Stage 1: Theta Project
Starter Pits (MR83)
•
•
•
Recover 234.06Koz Au over
6.5 years (600Ktpa production)
At US$1600/oz Au price the
Starter-pits expected to deliver
>US$180m EBITDA with AISC
US$822/oz
Peak Funding Requirement
USD$26.7m
62,000 Hectare
tenements
Stage 2: Theta Southern
Extension Pits (MR341)
•
Pilgrim’s Rest
Gold Field
•
•
CIL Plant
•
Currently approximately 500Koz
open-pit resources to be converted
into Ore Reserves through in-fill
drilling
Indicated Resources drilling cost
expected to be ~US$12/oz
Shared infrastructure with Theta
Project Starter-pits (MR83)
Low CapEx expected due to limited
spending required on plant expansion
Stage 4: Beta shallow
underground mine (MR83)
Stage 3: Rietfontein shallow
underground mine (MR358/10161)
• 1.1Moz @ 6g/t JORC
Resources
• Scoping Study completed May
2017 (to be updated)
• Production targeting >40Kozpa
• Shared infrastructure with Theta
starter pits (<1km from existing
plant)
• 780Koz @ 8.5g/t JORC Resources
•
•
•
Sabie Gold
Field
•
Scoping Study completed May 2017
(further study planned in 2020)
Production targeting >40Kozpa
Underground access in progress
preparing for drilling/sampling (since Jan
2020)
Processing via existing TGME plant site
7
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Theta Project Starter-pits (MR83) Optimised Feasibility Study
Stage 1 Theta Starter-pits:
v Annual production planned for 600Ktpa, mine life of 6.5 years to recover a total of 234Koz gold
v Recently purchased a 1.2Mtpa Ball Mill – easy to double up production for Stage 2 pit extensions.
v Low CapEx and very high margin operations.
v Current gold price environment will substantially enhance project economics.
Real Discount Rate
NPV @ 5%
Unit
US$1369/oz Case
US$1500/oz Case
US$1600/oz Case
USDm
61
85
104
Internal Rate of Return (IRR)
%
92.7%
123.0%
157.2%
Total ounces in Mine plan
oz
259,607
259,607
259,607
Total Oz Recovered
oz
234,063
234,063
234,063
Average Payback Period (From Start of Production)
Month
9
8
6
Peak Funding Requirement
USDm
28
26.7
25.1
All-in-Sustaining Cost (AISC)
USD/oz
911
855
822
Return on investment
USDm
206%
350%
476%
EBITDA over LOM (Undiscounted)
USDm
108.5
150.2
181.4
Gold Price
USD/oz
1,369
1,500
1,600
Exchange Rate
ZAR/USD
14.64
16.00
17.00
8
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
5,000
5.00
4,500
4.50
4,000
4.00
3,500
3.50
3,000
3.00
2,500
2.50
2,000
2.00
1,500
1.50
1,000
1.00
500
0.50
-
Grade (g/t)
Recovered Oz
Theta Project Starter-pits (MR83) Optimised
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85
Months
Recovered Gold
Grade to Plant
Recovered Grade
Monthly Capital Schedule
v Total Capital Cost US$31.4m
v Low upfront capital required: peak funding
US$26.7m (at 16 ZAR/USD exchange rate)
Optimised Study Monthly Gold Production (oz)
v First 2 years of ore grade to plant over 2.5 g/t
v Only 9 months from start construction to first gold pour.
9
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Stage 1 & 2 (Open-pits), and 4 (UG) - 3D Visual
Ore bodies
Bird-eye view: South to North
Green: M/I
Blue: Inf
1km
Beta UG
MR83
Theta Open-pits
Underground view
v Theta Starter Open-pits Project sits within
MR83
o Current completed FS includes
three pits: Columbia Hill (Iota) +
Theta Hill North + Browns Hill North
MR341
MR83
Green: M/I
Blue: Inf
v Theta Open-pits Southern Extension sits
within MR341
o Formed by Theta Hill South and
Browns Hill South
MR341
v Combined Theta Resources 879.6Koz @
2.70g/t (I/Inf)
Bird-eye view: South to North
10
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Stage 3 Rietfontein Underground Mine 3D Visual
v Rietfontein underground Mineral Resource - 2.88 Mt at 8.42g/t Au (for 780Koz)1, 31% indicated
v Rietfontein located 40km from processing plant
v Orebody Open at depth and along strike for major exploration upside
v Underground access into Level 4 began February 2020, planning for resource sampling/drilling initiate targeting for initial
reserve for initial mine planning
Rietfontein Level 3 Adit #3
11
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Value Creation and Growth Trajectory Targets
$$$$$
Stages 3 & 4:
Rietfontein + Beta
Undergrounds
$$$$
$$$
Stage 1 & 2:
Theta Openpits
Additional
Open-pit
operations
Glynn’s (1.6Moz
@ 4g/t) and the
rest of 6Moz +
future resource
discoveries
$$
>50kozpa
>160kozpa
Continuous Growth & Expansion
12
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Mature And Developed Gold Market
IMPORT/ EXPORT
UNFINISHED GOLD/
DORE BAR
RSA RESERVE BANK
(REGULATES GOLD
PREMITS PRECIOUS
METALS
PRICES, TRADING
AND TAXATION)
REGULATOR; RSA
Largest refinery in Africa.
Registered under the London
Bullion Market Association who
sets the refining standards.
MINING OPERATIONS
RECYCLED GOLD
Used by many South African gold
operations including Harmony,
Sibanye-Stillwater,
AngloGold
Ashanti, Gold Fields and DRD
Gold.
HEDGING/
ARTISANAL/SECTOR
SALES
RAND REFINED
FINISHED GOLD
SOUTH AFRICAN
BULLION BANK
Rand Refinery also markets and
sells the finished gold, and has
custody of gold for South African
bullion banks.
Provides a variety of ancillary
services, including:
§ 24-hour turnaround of
assaying, payment in USD
and/or Rand,
§ state-of-the-art vaulting, and
§ international logistics
services.
OPEN MARKET
(JEWELLERY,
TECHNOLOGY, HEDGING,
ETF, BAR & COIN)
13
Sources: Minerals Council South Africa, South African Revenue Service, Department of Mineral Resources and Energy, US Geological Survey.
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Corporate Structure
26%
Other
Shareholders
100%
74%
Theta Gold Mines
Limited
(ASX:TGM,TGMO
OTCQB:TGMGF)
100%
Transvaal Gold
Mining Estates
Ltd (TGME Est.
1895)
100%
Theta Gold
SA (Pty) Ltd
CIL Plant & Infrastructure
9 Mining Rights (>620sqkm)
74%
Sabie Mines
(Pty) Ltd
Other
Shareholders
100%
Operating company for
tenements surrounding Sabie
26%
Australia
South Africa
Other Shareholders general comprise of:
§ Employees Trust (Employee/labour Incentives),
§ Environmental Sustainability Trust (to be established),
§ Local Landholders,
§ Local entrepreneurs.
The Other Shareholders’ 26% equity interest are not a free-carry interest, it is a contributing equity interest (more details can be read from the
14
Company’s 2018 or 2019 Annual Reports).
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Resources Tables
Combined Mineral Resources as at 16 May 2019
Notes:
Tonnage
Gold
Grade
Mt
g/t
Kg
0.091
5.37
489
koz
15.7
0.091
5.37
489
15.7
Underground
4.774
6.21
29,661
953.7
Open Pit
7.161
2.11
15,091
485.2
Tailings
5.244
0.83
4,373
140.6
17.179
2.86
49,126
1,579.4
Underground
21.452
5.22
111,880
3,597.0
Open pit
5.922
4.35
25,730
827.3
Tailings
0.023
0.57
13
0.40
Rock Dump
0.121
1.64
199
6.40
Total Inferred
27.518
5.01
137,823
4,431.0
Grand Total
44.788
4.18
187,438
6,026.2
Mineral Resource
Classification
Measured
Type of Operation
Underground
Total Measured
Indicated
Total Indicated
Inferred
Gold Content
•
Columns may not add up due to
rounding.
•
Gold price used for the cut-off
calculations is USD1,500/oz.
•
UG Mineral Resources are
reported at a cut-off of 160
cm.g/t, open pit at 0.5 g/t and
0.35 g/t, tailings and rock
dumps at 0.35 g/t.
•
Fault losses of 5% for
Measured and Indicated, 10%
for Inferred Mineral Resources.
•
Mineral Resources are stated
as inclusive of Ore Reserves.
•
Mineral Resources are reported
as total Mineral Resources and
are not attributed.
15
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Resources Tables
Total Theta Project - Mineral Resources, 16 May 2019
Mineral Resource
Classification
Open Pit Mine
Indicated
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Columbia Hill
Columbia Hill
Columbia Hill
Columbia Hill
Reef
Shale
Bevetts
Upper Theta
Lower Theta
Beta
Bevetts
Upper Rho
Lower Rho
Upper Theta
Total Indicated
Mineral Resource
Classification
Open Pit Mine
Reef
Inferred
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Theta & Browns Hill
Columbia Hill
Shale
Bevetts
Upper Theta
Lower Theta
Beta
Upper Rho
Open Pit Mine
Reef
Total Inferred
Mineral Resource
Classification
Indicated
Total Theta Project
Inferred
Total Theta Project
Total Indicated and Inferred
All
All
Reef
Grade
g/t
1.02
1.10
2.41
3.70
2.49
2.89
2.43
2.51
1.08
2.14
Reef
Grade
g/t
1.11
1.07
1.86
8.11
2.23
5.13
3.30
Reef
Grade
g/t
2.14
3.30
2.70
Reef Width
Content
cm
200
221
100
100
100
114
393
550
114
246
cmgt
204
244
241
370
249
330
956
1381
123
526
Reef Width
Content
cm
216
213
100
100
100
106
132
cmgt
240
227
186
811
223
544
434
Reef Width
Content
cm
246
132
190
cmgt
526
435
514
Reef
Tonnes
Mt
0.439
0.891
0.724
0.888
0.383
0.105
0.808
0.815
0.158
5.211
Reef
Tonnes
Mt
0.703
0.648
1.071
1.643
0.748
0.099
4.912
Reef
Tonnes
Mt
5.2
4.9
10.1
Notes:
Au Content
Kg
402
886
1,568
2,956
859
303
1,965
2,047
171
11,157
koz
12.9
28.5
50.4
95.0
27.6
9.7
63.2
65.8
5.5
358.7
•
Theta Project (Theta Hill,
Browns Hill and Iota) cut-off is
0.35 g/t.
•
The gold price used for the cutoff calculations is USD 1,500 /
oz.
•
Geological losses applied are
10% for inferred and 5% for
Indicated and Measured.
•
Theta Hill and Browns Hill Upper Theta Reef, Lower Theta
Reef and Beta Reef are diluted
grades over 100cm.
•
Historical mine voids have been
depleted from the Mineral
Resource.
•
The inferred Mineral Resources
have a high degree of
uncertainty and it should not be
assumed that all or a portion
thereof will be converted to Ore
Reserves.
•
Mineral Resources fall within
the mining right MR83 and
MR341.
Au Content
Kg
666
589
1,692
11,329
1,417
507
16,202
koz
21.4
19.0
54.4
364.3
45.6
16.3
520.9
Au Content
Kg
11,157
16,202
27,359
koz
358.7
520.9
879.6
16
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Resources Tables
Theta Project Ore Reserves for MR83 only, 16 May 2019 (The Ore Reserves exclude Inferred Mineral Resources).
Mineral Resource
Category in LoM Plan
Probable
Probable
Probable
Total
Pit
Browns Hill
Iota
Theta Hill
Grade
Reef Tonnes
g/t
3.24
2.54
2.76
2.76
kt
564
1,253
493
2,310
Au Content
kg
1,826
3,189
1,362
6,377
oz
58,699
102,513
43,798
205,010
Notes:
•
Totals in the Ore Reserve may
not add-up due to rounding.
•
Mineral Resources are for
MR83 only and excludes
MR341.
•
No Inferred Mineral Resources
are included in the Ore
Reserve.
17
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Key Stock Exchange Releases over last 24 months
Key Project Progress
30 Jul 2020
20 Jul 2020
20 Apr 2020
23 Mar 2020
16 Mar 2020
03 Mar 2020
03 Feb.2020
28 Jan 2020
20 Oct 2019
22 Aug 2019
16 May 2019
16 May 2019
29 Apr 2019
04 Mar 2019
04 Mar 2019
21 Jan 2019
29 Nov 2018
15 Oct 2018
26 Sep 2018
28 Aug 2018
18 Jun 2018
22 May 2018
12 May 2018
Key Corporate Changes
Geotechnical Drilling and Geophysics for Starter Theta Pit
Theta Selects Digmin as Preferred Mining Contractor
Optimised Theta Project delivers additional 40k oz of gold
Ball Mill arrives at mine site
Regional exploration strategy
Theta project development update
Exploration-New gold mineralisation system model
Results of Independent Plant Design Optimisation Study
Theta buys ball mill for US$360k in preparation towards
construction
Optimised gold plant layout completed
Positive feasibility study for Theta project
Theta Gold increases mineral resource to over 6M oz
More high grade gold assays at Columbia Hill
Feasibility study update
High grade gold assays at Columbia Hill
High grade gold assays at Theta Hill
High grade shallow gold at Theta Hill and Columbia Hill
Positive Theta Hill open-cut gold mine scoping study
Theta Hill open cut grows to 5.8M oz resource
Theta Hill open cut drilling update and scoping study update
Resource drilling continues at Theta Hill
Exploration update
126g/t from drilling at Theta Hill
13 Jul 2020
11 Jul 2020
08 Nov 2019
19 Dec 2018
29 Oct 2018
Mines
29 Oct 2018
06 Sep 2018
OTC Listing – DTC Eligibility
Approved
Managing Director Step Down
Theta Gold Mines Lists on OTC
Markets
Appointment of Director-Finn
Behnken
Name change to Theta Gold
Limited
Notice of 10:1 consolidation
Bill Guy appointed as Chairman
Tickers:
TGM
TGMGF
18
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Theta’s Gold Peers
TSX:MAX / OTC: MDRPF - Midas Gold Corporation (Idaho, US)
v
v
v
v
v
Gold/Antimony/Silver project developer
Targeting 337Koz per annum to recover 4Moz Au Life of Mine
PFS indicated CapEx requirement >US$900m
Awaiting draft Environmental Impact Statement from US Government
Market Capitalization (July 30th 2020): ~CA$420m (~US$310m)
TSX: CDV / ASX: CDV – Cardinal Resources Limited (Ghana)
v
v
v
v
Feasibility Study indicated CapEx US$390m
Targeting 287Koz per annum to recover 4.2Moz Au Life of Mine
Under All-Cash-Takeover bidding war between Shandong Gold and Nord Gold
Market Capitalization (July 30th 2020): ~C$360m
NYSE: DRD / JSE: DRD – DRDGold Limited
v
v
v
v
Surface Tailings-only producer out of South Africa
2 operating centers
2020 Production Guidance: ~185Kozpa
Market Capitalization (July 30th 2020): ~US$1.45 Billion
Figure source: Midas Gold Investor Presentation July 28th 2020; Cardinal Resources Investor Presentation June 2020; DRDGold Investor Presentation June 2-4 2020
19
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
Why Invest in Theta?
Upcoming Milestones:
Why Invest in Theta Gold:
• Completion of tenders for
plant construction
• Discovery cost less than 0.7%
(US$12/oz) of current gold
price
• Final MR83 amendment
approval
• Complete Project Finance;
• Trial Mining
• Plant Construction
• Production costs (AISC) will
be less than half current gold
price
• Multi Million Ounce Goldfield
• Increase Reserve
1. Source: CSIRO “21 Century Gold Issue 17”
What is Theta Worth:
• Replacement Cost for
Resources (~US$45/oz1 ?)
• Replacement Cost for existing
infrastructure incl.
underground workings,
permitted plant & TSF,
power/water etc ($ ???)
• Controlling our own Gold
Field/System ($ ???)
20
Investor Presentation – August 2020
ASX: TGM, TGMO | OTCQB: TGMGF
THANK YOU
Tickers: TGM
Tickers: TGMGF
Bill Guy – CHAIRMAN
E: billg@thetagoldmines.com
Ben Jarvis – Six Degrees Media
E: ben.jarvis@sdir.com.au
Michael Porter – US Investor Relations
Porter, Levay & Rose
E: theta@plrinvest.com
www.thetagoldmines.com
21
Share your feedback
Discover