Annual Report 2020
Released
Released
Announcement PDF
2020
ANNUAL REPORT
Contents
Chairman’s Letter ...................................................................................................
Environment, Social and Governance .................................................................
Community .............................................................................................................
Review of Operations .............................................................................................
Ore Reserve and Mineral Resource Statement ...................................................
Mining Rights and Applications for Mining Rights ..........................................
Corporate Governance Statement ........................................................................
Directors’ Report ....................................................................................................
Remuneration Report ............................................................................................
Directors’ Declaration ............................................................................................
Auditor Independence Declaration .....................................................................
Financial Statements ..............................................................................................
Independent Auditor’s Report ..............................................................................
Shareholders Information .....................................................................................
Directory .................................................................................................................
2
Theta Gold Mines Limited
3
4
8
12
24
28
31
39
49
56
58
60
100
106
110
Chairman’s Letter
Dear Fellow Shareholders
On behalf of the Board of Directors, I am pleased to present
the 2020 Annual Report for Theta Gold Mines Limited
(ASX: TGM, TGMO / OTCQB: TGMGF). In the last twelve
months the company has delivered a path to gold production,
a new optimised mine schedule for the Theta Starter Open
Pit Project, listing on OTC Markets in the United States and
increases in share value and market capitalisation.
The company has 6Moz of gold under management and
a near term production asset being the Theta Open Pit
Project. The new multiple-mines strategy delineated by the
board set a production goal of 160 kozpa within a five year
period, offering a clear growth profile in production and
share value.
On the ground, the operation team has delivered:A 2.4MW ball mill delivered to site;
Environmental studies have been completed for the
stage 1 Theta Starter Open Pit Project;
Preferred Mining contractor appointed and draft mining
contract completed;
New optimised mine schedule completed to take
advantage of a strong gold price;
Engineering and metallurgical studies completed.
Gold plant construction tender and construction
financing in progress.
The market capitalisation of the company exceeded A$100
million during the year, reflecting the strong project
economics of the starter Theta Project Feasibility Study.
There was a steady re-positioning of the company from
exploration to development as the company looks towards
the next major transition to gold producer.
The company has a five-year plan which targets four mine
developments, Theta Starter Open Pit Project (MR83),
Theta Open-pit Extension (MR341) and the Rietfontein
and Beta underground mines. This four-mine plan provides
the company with a clear growth strategy of a combined
open pits and underground resource of over 2.75Moz with
only the Theta starter-pit portion of this resource included
in the Optimised Study. All ore is planned to be processed
within the permitted TGME plant footprint area with the
new 600,000tpa CIL plant designed to be readily expandable
to cater for 1.2Mtpa of oxide ore with modest capital
expenditure.
The new Optimised Mine Schedule enhanced the project
metrics on the May 2019 Feasibility Study and added
further value to shareholders. The key projects metrics at
US$1,600/oz gold price shows an increase in production to
234,000 ounces of gold, extends the mine life to 6.5 years
for stage 1, low cost with AISC US$822 per ounce, Internal
Rate of Return (IRR) of over 157%, and the life of mine
EBITDA increased to over US$181 million. These numbers
demonstrate profitable mining is likely to be achievable
on other project areas across the whole 620km2 goldfield
currently under management.
Theta has significant advantages over its junior peers with
an ability to discover in-situ low-cost gold ounces (at less
than US$12 per Indicated Resource ounce discovery cost),
control of its own goldfield and a pipeline of projects which
can take Theta to a sustainable mid-tier producer. We
expect an exciting 2021 as we work towards bringing the
stage 1 Theta Starter Open Pit Project online. In parallel, the
company has begun preliminary work on the underground
mines as it looks at all opportunities to add value for the
shareholders.
We appreciate the continued support from our shareholders
over the last twelve months, and we welcome new
shareholders to the share register. The company looks
forward to continuing to deliver good news and positive
updates for shareholders in the new year.
Charles
(Bill) Guy
Chairman
Annual
Anual Report 2020
3
1
ENVIRONMENT,
SOCIAL & GOVERNANCE
A sustainable gold
miner in the making
4
Theta Gold Mines Limited
ENVIRONMENT
Theta Gold is fully committed to creating a sustainable mining business underpinned by a green mining strategy.
Theta Gold through its controlled operating entities are creating regional Environmental Development Trusts within the
group’s existing local company equity structure. Funds are to be budgeted towards certain environmental offsets, alien
invasive plants removals, establishment of nature reserves and targeted environmental study programs.
The Company continues to conduct environmental monitoring and reporting as well as external audits required by its
mining right conditions and environmental authorisations. The Company has built functional working relationships in an
effort to support its environmental licencing strategy as the Company grows its proposed mining footprint.
Environmental Team Water Sampling
In light of the prevalence of alien invasive plants, fire is a key hazard and is well managed by Theta Gold in collaboration
with neighbouring forestry stakeholders and the local fire protection agency.
Invasive Alien Plants
Fire Protection
Annual Report 2020
5
HEALTH AND SAFETY
A sustainable value-based health and safety culture is core to Theta Gold. We recognise the importance of maintaining both
a strategic operational and tactical focus on health and safety to ensure that we do not harm our people and the community
in which we work. Operational health and safety leadership is recognised as an integral component to embedding our
desired culture. We are committed to continual improvement in relation to the management of our health and safety and its
performance. Theta Gold has developed and implemented a mandatory code of practice for the prevention, mitigation and
management of COVID-19 outbreak in accordance with regulatory guidelines and had zero positive cases on the minesite.
COVID-19
The Company’s onsite team in South Africa continued to operate notwithstanding lockdown measures due to COVID-19.
Under section 213 of the Labour Relations Act. 1995, mining operations in South Africa are deemed an essential service.
However, the Company has encountered delays in its dealings with government departments, in particular in connection
with the permitting amendment to MR83.
COVID-19 staff training
6
Theta Gold Mines Limited
TRANSFORMATION
Theta Gold is committed to transformation in the South
African mining industry and achieving the targets
contemplated in the Mining Charter 2018, with regards
to historically disadvantaged ownership participation,
employment equity, preferential procurement, skills
development, and local economic development.
Theta Gold has ensured that 26% of project ownership
is held by its local labour force, host communities and
strategic black entrepreneur partners, and its structure has
been designed for broad based economic participation,
with benefits intended to flow to poverty alleviation, small
local businesses and environmental enhancement projects.
Theta Gold further believes that this structure achieves the
regional impact contemplated in the spirit of the regulation
in terms of local development projects, employment, mining
participation and shareholder participation.
The management organisational design is currently under
review to ensure that we have the appropriate structure to
deliver on the Company’ strategic objectives. The objectives
of the optimised structure will be to align roles with levels of
work and ensure that we have the right people, in the right
roles, doing the right work, at the right time.
The Company seeks to maintain and improve its senior
management female and historically disadvantaged
participation in line with Mining Charter 2018 requirements.
GOVERNANCE
Conducting ethical business is core to the Theta Gold culture.
Beginning with the Board, significant effort is invested into
instilling a culture of high ethical standards throughout the
organisation. The Board adopted an updated Corporate
Governance Charter on 23 September 2020, including
its Ethics Policy, Diversity Policy, Continuous Disclosure
Policy, Anti-Bribery and Anti-Corruption Policy and
Whistleblower Policy. The Board has established processes
to review all corporate board charter documents annually.
Managing Risk
The Company, through its normal business management
and the development of its strategy, is exposed to different
types of risks that could adversely affect the Company’s
financial position, prospects or reputation.
Theta Gold is setting up a risk register which ranks all
risks across the business on likelihood and severity of
consequences across several categories including Financial,
People, Sustainability, Compliance and Reputation. For
each risk the relevant controls are documented and an
assessment of the controls to mitigate the risk is undertaken.
As part of the risk management system, the risk register,
controls, and effectiveness of the controls will be evaluated
annually.
The highest ranked residual business risks are continually
monitored by the Audit and Risk Committee. The Board
is also kept up-to-date on emerging risks and common
risks impacting the resources industry, such as the recently
declared COVID-19 pandemic.
Annual Report 2020
7
2
COMMUNITY
8
Theta Gold Mines Limited
The communities in which the Company operates are supportive of mining in general; the associated employment and
flow-on economic benefits that are likely to flow to local and regional businesses and the general uplifting of the area.
Similarly, the Company is committed to community upliftment and regional growth through effective partnerships with all
local stakeholders in the regions where it operates.
In connection with the Company’s recent stakeholders engagement in the environmental authorisation amendment process
for Mining Right 83 (“MR83”), over 5,000 local residents signed a petition in support of Theta Gold re-establishing mining
operation (open pit and underground).
Snapshot of section of a >5000 signature local
petition letter in support of Theta Gold’s mining
right amendment application.
As part of the Company’s commitment to its Corporate
Social Responsibility, the Company currently runs the
following projects for the benefit of the local community:
1. Employment of teachers at the primary and high schools
in Pilgrim’s Rest
2. Provision of water to the local community
3. Heating and cooking fuel provision to the local
community
4. School Feeding Scheme
5. Small, Medium and Micro-sized Enterprises (SMMEs)
development
It is a priority of the Company to effectively engage with the community and manage expectations and relations with respect
to all activities the Company is, or will be, engaged including construction, development, transport, potential environmental
impacts (noise, dust etc) and other factors associated with mining operations.
Annual Report 2020
9
Company Staff at the local school
Theta greatly values the youth of South Africa and supports
two local schools sponsoring three teachers, feeding
programs, photo copiers, school supplies and building
maintenance. The staff interacts with the schools and
support the local education.
Local Newspaper covering Theta’s community
involvements before Christmas 2019
10
Theta Gold Mines Limited
The Company has recognised that given the high
unemployment rate in the area that there were members
of the community that were finding it particularly difficult
to make ends meet. Through its community liaison officer
and the local councillor, the Company identified numerous
members of the community that were particularly in need
and provided them with food packs for the Christmas 2019
season.
During the year, Theta Gold also assisted the Mpumalanga
Department of Public Works, Road and Transport by
donating various gardening tools used to prepare the local
townships for the busy Christmas tourist season.
During COVID-19 the company flew 10,000
medical grade masks to site for distribution to
staff and local residents. Masks also donated to
local hospital and medical centres.
Annual Report 2020
11
3
REVIEW OF OPERATIONS
12
Theta Gold Mines Limited
OVERVIEW
Theta Gold Mines Limited (“Company” or “Theta Gold”)
is a gold exploration and development company, that holds
a range of prospective gold assets in a world-renowned
South African gold mining region. The Company’s shares
are dual-listed on the Australian Securities Exchange (ASX:
TGM, TGMO) and the OTC Markets in the United States
(OTCQB: TGMGF) with DTC Eligibility.
The Company’s initial open-pit project, the Theta Starter
Open Pit Project (“Stage One Theta Project”), is located
next to the historical gold mining town of Pilgrim’s
Rest, in Mpumalanga Province, some 370km northeast
of Johannesburg by road or 95km north of Nelspruit
(Provincial capital city). The Company is currently
focussing on the construction of a new gold processing
plant within its approved footprint at the TGME plant
(Figure 1), for processing of the open-pit oxide gold ore,
initially from the Theta Starter Open Pit Project. Nearby
surface and underground mines and prospects are expected
to be evaluated with a view to building a solid production
platform to over 160,000oz per annum primarily from
open-pits or shallow adit-entry underground resources.
South Africa is the home of gold having produce more
than 40+% of worlds gold. The company believes that our
tenement pack, has one the best regional geological settings
for gold mineralisation given that the prospects are located
on the eastern side of Bushveld complex, one of the world’s
largest and metal rich complexes on earth (Figure 2).
While the prospects are not located in the geology of the
Bushveld Complex it is strongly believed that the igneous
nature of this complex is the direct source of the Company’s
mineralised assets.
Figure 1: Existing TGME Permitted Gold Plant Footprint
Annual Report 2020
13
Figure 2: Location of Theta Project
14
Theta Gold Mines Limited
THETA STARTER
OPEN PIT PROJECT
HIGHLIGHTS
Project
Stage One Theta Project feasibility study optimised, with
significantly improved economics of 234,063oz gold
production over 6.5 years mine life
2.5MW used ball mill acquired in preparation for
Theta Project development, capable of processing up to
1.2Mtpa and caters for future expansion
Amended Permitting for open-pit mining pending approval
Preferred mining contractor selected
Strong community support of Theta Gold’s mining
operations
Exploration
Regional geological study completed with CSA
Global, define a new Mineral Systems Model.
The Mineral Systems Model will be used to define
future drilling targets, potentially adding more ounces to
the existing JORC Resource of over 6.0Moz Au (44.8Mt
@ 4.18g/t Au) including open-pit resources of 1.3Moz
(13.08Mt @ 3.12g/t Au)
Optimised Study
The Company completed an optimised study for the Stage
One Theta Project during the year. The study incorporates
a new optimised mine schedule that include the mining
of several old mine waste rock dumps and allows for an
increase in the production rate from 500ktpa to 600ktpa.
The 2.5MW ball mill acquired in October 2019, which has
a capacity of up to 1.2Mtpa, was also incorporated into the
study. This ball mill will provide the flexibility for future
project expansion.
The result of the study indicates the potential to improve the
May 2019 Feasibility Study, by potentially adding 40,000oz
of gold to the life of mine plan and extending the mine
life to 6.5 years. The table below sets out the results of the
Optimised Study at various gold price scenarios. This life
of mine plan includes 65 000oz contained within Inferred
resources.
Corporate
Theta Gold dual listed on Unites States OTC Markets
(OTCQB: TGMGF), with eligibility for electronic
trading (DTC Eligible)
US$6.1 million capital raised
Real Discount Rate
Unit
US$1369/oz
Case
US$1500/oz
Case
US$1600/oz
Case
NPV @ 5%
USDm
61
85
104
Internal Rate of Return (IRR)
%
92.7%
123.0%
157.2%
Total ounces in Mine plan
oz
259 607
259 607
259 607
Total Oz Recovered
oz
234 063
234 063
234 063
Average Payback Period (From Start of Production)
Month
9
8
6
Total Capital Requirement
USDm
31.4
31.4
31.4
All In Sustaining Cost (AISC)
USD/oz
911
855
822
Return on investment
USDm
206%
350%
476%
EBITDA over LOM
USDm
108.5
150.2
181.4
Gold Price
USD/oz
1 369
1 500
1 600
Exchange Rate
ZAR/USD
14.64
16.00
17.00
Table 1: Optimised Feasibility Study April 2020
Annual Report 2020
15
The economics for the Theta Starter Open Pit Project
benefits from the open-pit mining potential of the geology,
near surface shallow flat laying horizontal reef systems, high
grade oxide ore, host rock sediments and close proximity
of the operations to the existing approved metallurgical
process plant. The reef systems, which consists of up to 4
opencut mineable reefs, are flat dipping between 2-7 degrees
horizontal and the high grade gold reefs are oxidised which
leads to high recoveries. In addition, the host sediments
are generally extremely fractured leading to reduced rock
strength and reduced mining costs.
Ball Mill
Shortly after the completion of the May 2019 Feasibility
Study on the Stage One Theta Project, the ball mill was
identified as a long lead item that could potentially delay
the project delivery. The Company has managed to secure
a secondhand mill in excellent condition, and with an
inventory of vital spare parts. The purchase also provides
certainty of grinding capability for the mine and, being
larger than initially planned for in the feasibility study,
allows for future throughput increases.
Figure 3: 2.5MW Ball Mill
The ball mill was last operated by Glencore at its Rustenburg
ferrochrome operation. The Original Equipment
Manufacturer (OEM) Thyssen Krupps was engaged to
complete the removal of the mill and associated equipment
and to transport it to the TGME site together with the
associated spares.
Upside Potential
The Stage One Theta Project open-pits resource included
in the feasibility mine plan to date represents only 57% of
the current Theta Open-pits Indicated Resources of 880Koz
(10.1Mt @ 2.7g/t Au). Considerable potential exists to
extend the project life.
Thyssen Krupps also completed a thorough inspection of
the mill, associated equipment and spares and confirmed
that everything was in excellent condition and any minor
refurbishment or repairs could be carried out on site. Some
workshop repairs are required to the gearboxes and motors
before installation with a total of three motors and two
gearboxes available for use. The girth gear and pinion for
the mill is still in good condition with minimal wear.
The Ore Reserve estimated for the Stage One Theta Project
occur in the Iota section of Columbia Hill and an estimated
35% portion of the Theta Hill and Browns Hill deposits
within an area bounded by Mining Right 83 (“MR83”). The
remainder of the Theta Hill and Browns Hill deposits extend
to the south and into Mining Right 341 (“MR341”).
16
Theta Gold Mines Limited
Figure 4: Theta Open-pits Resource Footprint
Amended Permitting for Open-pit Mining Pending
The Stage One Theta Project is situated on MR83, additional
resources are in the adjacent MR341 to the south. MR83
is an approved and executed mining right and has an
approved Environmental Authorisation for underground
mining activities, as well as approval for processing of ore
and deposition of residues onto an existing tailings dam.
To conduct open pit mining, the Company has applied for
an amendment to MR83 (“Amended Permitting”). The
application, which includes completing an environmental
authorisation amendment process, has now been submitted
to the Department of Mineral Resources and Energy
(“DMRE”). A decision by DMRE is pending.
Preferred Mining Contractor
A key project development milestone for the Stage One
Theta Project has been achieved with the selection of an
experienced and respected mining contractor.
After a comprehensive tendering process, Digmin Group
(‘Digmin’) has been selected. The Digmin Group has a solid
track record providing contract mining services throughout
Africa and also provides bulk earthworks, roads and civils,
mine infrastructure development as well as surface and
underground drilling services. Digmin is a proven contract
miner currently engaged in a number of gold, copper,
niobium and coal projects across the African continent. The
group has completed over US$2 billion worth of civil and
mining works to-date in South Africa alone.
The selection of Digmin will allow the Company to rapidly
mobilise trial mining operations. These operations are
expected to commence once final permitting has been
achieved (environmental authorisation for open pit mining
on MR83).
Digmin have also agreed to partner with Theta Gold to
facilitate local employment and social upliftment programs
in the small Pilgrim’s Rest community
Figure 5: TGME and Digmin Directors at
Barlows-Caterpillar Equipment Johannesburg
Annual Report 2020
17
RIETFONTEIN AND
BETA MINES
The Rietfontein and Beta mines forms part of the
Company’s five year strategy and remain a primary focus
for the Company. Scoping studies were conducted in 2017
on the Rietfontein mine (standalone) and on the combined
Rietfontein/Beta mines, both confirming the potential
viability of development.
During the financial year, the Company began to evaluate
the potential development of these shallow high grade old
underground mines.
FIVE YEAR PLAN
Over the next five years, the Company aims to build a solid
production platform to over 160,000ozpa based primarily
around shallow, open-pits or adit-entry hard rock mining
sources.
The Company has completed engineering studies to
maximise use of the existing permitted plant footprint.
The new metallurgical plant layout position will create
the flexibility to materially increase the Company’s gold
production profile above. In addition to the Theta Openpits, ore from the Rietfontein and Beta underground mines
is planned to be trucked to the processing plant.
Figure 6: Five Year Plan and Target Production profile
18
Theta Gold Mines Limited
EXPLORATION
The Company has a significant tenement holding of 62,000
hectares (620km2) covered by mining rights and applications
for mining rights at various stages of being granted, with
access to over 43 historical mines and prospect areas that
can be accessed and explored.
During the year, the Company commissioned CSA Global
(an ERM group company) (released to ASX on 03/02/2020)
to develop a Mineral Systems Model (ore genesis and
structural geology model) (Figure 6) to support the
Company’s exploration efforts. The CSA Global Mineral
Systems Model interpreted that east-west structures (faults
and joints) provided fluid pathways for mineralising fluids
from the Bushveld Complex to the Eastern Transvaal Gold
Fields. Based on these new interpretations, the Company
is assessing the regional exploration potential of the wider
Eastern Transvaal Basin.
The tenements are situated approximately 40km from the
Bushveld Complex (largest layered mafic igneous intrusive
complex on Earth) is interpreted as the key driver and source
of the gold mineralisation at the East Transvaal Goldfield.
This is reflected in the size of the East Transvaal Goldfield,
the extensive nature of the reefs system and the distribution
of gold deposits. Examples such as Vaalhoek (3.5 KM strike)
and Rietfontein (over 3km of known mineralization) reflect
the nature of the goldfield as indicated by elements of the
Mineral Systems Model.
During the year post the CSA work on Mineral Systems
Model and Regional structural Interpretation the Company
initiated a regional reconnaissance fieldwork in January and
February 2020, (released to ASX on 16/03/2020) this led to
encouraging results from a number of prospects. The company
also completed ASTER interpretation using different band
ratios to highlight zone mineral alteration assembles that
have gold mineralisation potential. The ASTER highlighted
4 zones of mineral alteration that require further field work
(See Figures 9 & 10).
Figure 7: Mineral Systems Model
Annual Report 2020
19
Figure 8: Aster Satellite - Image Band Combination A (Priority)
Figure 9: Aster Satellite -Image Band Combination B (Priority)
20
Theta Gold Mines Limited
An initial fieldwork included rock chip sampling highlights
in Table 2 with assay result of 83.97 g/t Au collected at
Vaalhoek is over 60 km from Rietfontein samples (41.87 g/t
Au, 22.85 g/t Au) (Table 2). Both Vaalhoek and Rietfontein
have over 3 km of underground workings; both have a
vertical component to the gold mineralization, which has
been interpreted as a result of the NNE trending dykes
forming structural traps and causing gold deposition via
the disruption of migrating mineralizing fluids. The setting
for mineralization in both mines conform with the Mineral
Systems Model announced as part of an ASX release dated
3 February 2020 (Structural Traps). The 43 historical mines
under management can now be compared to the Mineral
Systems Model to assist with evaluation, classification and
exploration
Location
Sample No.
Au g/t
Comments
Vaalhoek reef Neck Section
VN002B
16.73
Flat reef Chysocolla
Vaalhoek reef Met Plant
VN002C
22.83
Met Plant Rock dump
Vaalhoek reef Neck Section
VN003A
11.1
Nothern rock dump
Vaalhoek Shaft Dump
VN004A
83.97
2 Shaft Rock Dump
Rietfontein Adit 3 rocks
R3D005
22.85
Vein material #3 Adit
Rietfontein Adit 3 rocks
R3D006
41.87
Vein material #3 Adit
Rietfontein Adit 13 Outcrop
R13002B
15.28
Oxidised outcrop vein
Elansdrift Workings
ELR001A
30.24
Reef material at surface
Elansdrift Workings
ELR001B
34.92
Reef material at surface
Table 2: Rock chip Assay Highlights(Two kilogram samples were dispatched to SGS Laboratories in Barberton SA. Analysis by standard 50 g aliquot
mixed acid dissolution Fire assay with AAS finish. Samples located using sub 5 m hand-held GPS unit)
Figure 10: Sampling at the old Frankfort Mine, Bevetts Reef, Beverly Hills area.
Grades up to 3.2 g/t Au recorded.
Annual Report 2020
21
FINANCIAL
The Company has a large mineral resource base and aims
to be able to convert it to mining reserves through further
exploration over time. Total mineral resources is estimated
at over 6.0Moz gold (43.74Mt @ 4.29g/t Au) across several
locations and projects, including open-pit resources of
1.3Moz (13.08Mt @ 3.12g/t Au).
An Ore Reserve and Mineral Resource Statement is set out
on pages 25 and 26.
Results
The Consolidated Entity made a loss after tax of US$5,490,000
(2019: US$5,172,000). Contributing to the loss was indirect
exploration costs written-off of US$841,000, finance costs of
US$710,000 and corporate and administration costs carried
by the Consolidated Entity in support of its exploration and
pre-development activities. The corporate costs include
a provision of US$621,000 for a tax penalty assessed by
the South African Revenue Service in connection with a
subsidiary’s income tax return for 2016 to 2018 (refer Note
13 of the financial statements). Based on professional advice
from its tax adviser, the Company is strongly objecting to
the tax penalty.
Further exploration expenditure was incurred on permitting
and pre-development activities associated with the Theta
Project. This further exploration expenditure, totaling
US$1,426,000, has been capitalized and disclosed in the
balance sheet.
Cashflow
Funding for the Company’s business activities is sourced
largely from equity markets. During the year, the company
raised a total of US$6,115,000 from share placements to
sophisticated investors. The funds were applied towards
pre-development and permitting activities for the Theta
Project and general exploration, acquisition of the used
ball mill, debt repayment and general administration and
corporate costs.
The Consolidated Entity continues to proactively manage its
cash flow requirements to ensure that funds are available,
including from capital raisings, as and when required to
meet its debts and commitments as they fall due.
Subsequent to balance date, the Company raised A$4,000,100
from a share placement of 16,667,084 fully paid ordinary
shares at an issue price of A$0.24 per share.
22
Theta Gold Mines Limited
CORPORATE
Dual Listing on OTC Markets
In November 2019, shares in the Company were admitted for
trading on the OTCQB market in the United States under the
code TGMGF. The Company’s primary listing
Share your feedback
Discover