Quarterly Activities and Cashflow Report 31 March 2019
Released
Released
Announcement PDF
30 April 2019
ASX ANNOUNCEMENT
Quarterly Report – 1 January to 31 March 2019
Theta Gold Mines Limited (“Theta Gold” and “Company”) (ASX: TGM) is pleased to report on its activities
for the three months ended 31 March 2019.
Drilling and feasibility work on the Theta Project continued during the quarter, with the Feasibility Study
scheduled for completion in Q2, 2019.
The Feasibility Study aims to define sufficient open‐cut reserves to justify a re‐start of mining and gold
production at Pilgrim’s Rest, which last produced gold in 2015.
KEY ACTIVITIES
Drilling continued during the quarter, with a focus on infill drilling and defining reserves as part
of the feasibility work. At Columbia Hill, follow‐up drilling confirmed more high‐grade shallow
gold intersections with the following highlights released (refer to ASX release 4 March 2019):
3m @ 5.05 g/t Au from 57m, incl 1m @ 10.40 g/t Au (RCBHI 48)
3m @ 7.24 g/t Au from 42m and 2m @ 13.52 g/t Au from 60m (RCBHI 82)
6m @ 2.11 g/t Au from 38m and 1m @ 10.40 g/t Au from 51m (RCBHI 63)
3m @ 4.82 g/t Au from 33m, incl 1m @ 12.60 g/t Au (RCBHI 64, Rho Reef)
Results from the RC program at Theta Hill, Columbia Hill and Scammels were released to the ASX
on 21 January, 2019. Highlights included:
11m @ 2.1 g/t Au from 8m in DG4RCWAD16 (incl 1m @ 9.5 g/t Au, Theta Hill)
1m @ 10.1 g/t Au from 18m in RCBHI44 (Columbia Hill)
1m @ 27.5 g/t Au from 8m in DG4RCWAD20 (Theta Hill)
Feasibility work including plant design, mine scheduling, resource/reserve modelling and
associated geological/engineering design continued during the quarter, and is nearing
completion.
Positive drilling results have continued to be received at Columbia Hill post the quarter end, with
recent results including 2m @ 18.2 g/t Au from 66m (RCBH I90), 2m @ 23.7 g/t Au from 75m
(RCBH I67) and 1m @ 23.3 g/t Au from 12m (RCBH I95) released to the ASX on 29 April 2019.
Chairman, Bill Guy commented: “Feasibility work continued during the quarter, with drilling at Theta Hill
and Columbia Hill continuing to demonstrate the potential for high grade, shallow gold to be
incorporated into reserves”.
“Work on the feasibility study is progressing well and results are expected Q2. The Board remains
focused on recommencement of gold mining at Pilgrim’s Rest which has potential to provide a platform
for the staged expansion of mining operations in the tenement area”.
Theta Gold Mines Limited ABN 30 131 758 177
Level 32, 101 Miller Street, North Sydney NSW 2060
Tel: +61 2 8912 2126 Email: info@thetagoldmines.com
www.thetagoldmines.com
FEASIBILITY STUDY UPDATE
The Feasibility Study (FS) is being prepared by South African geological/mining consultants Minxcon,
along with process/design engineers METS, conducted in accordance with the JORC (2012) Reporting
Code. The study includes part of Columbia Hill within Mining Right 83 (MR83) and the part of Theta Hill
within MR83.
MR83 is fully permitted for underground mining and requires an amendment process to be permitted
for open cut mining. Additional environmental studies are required to support the open pit permitting
process which is already underway.
The study is due for completion in Q2, 2019, with work undertaken during the quarter to define the
initial reserves and resources, development of the mining schedule and planned refurbishment of the
Carbon‐in‐Leach (CIL) plant to an initial 500ktpa capacity (the CIL plant is fully permitted, last operated
in 2015).
CORPORATE
Cash Position and Funding
As at 31 March 2019, the Group had US$113,000 in cash.
In November 2018, the Company entered into a subscription agreement with an investor to raise
A$4,500,000, of which A$2,000,000 was received on 30 January 2019.
Subsequent to the end of the quarter, the Company received A$500,000 under the subscription
agreement and the balance of A$2,000,000 is expected shortly. Pursuant to the subscription
agreement, the Company issued 5,555,555 shares to the investor at an issue price of A$0.09 per share
for the subscription of A$500,000 and the balance of A$2,000,000 will be issued at the 20 days VWAP
(Volume Weighted Average Price) immediately before the allotment of the shares.
The Company continues to proactively manage its cash flow requirements to ensure that funds are
available, including from capital raisings, as and when required.
Share Capital
The following options lapsed during the quarter –
(a)
1,000,000 unlisted options exercisable at $0.15 each lapsed on 3 January 2019;
(b)
2,000,000 unlisted options exercisable at $0.15 each lapsed on 22 March 2019.
Following the lapse of the above options, the capital structure of the Company is as follows –
Fully paid ordinary shares
(ASX: TGM)
Listed options exercisable at $0.30 each on or before 31 October 2020
(ASX: TGMO)
Unlisted options and performance rights
(details in Annexure A)
Number
356,696,568
31,429,663
33,743,304
Registered and Principal Offices
With effect from 1 February 2019, the Company’s registered and principal offices moved to –
Level 32
101 Miller Street
North Sydney NSW 2060
Australia
Telephone: + 61 2 8912 2126
2
Half Year Report
The Half Year Report for the six months ended 31 December 2018 was released on 14 March 2019. A
copy of the report is available at https://www.asx.com.au/asxpdf/20190314/pdf/443hdtxvd9wkg3.pdf.
TGME PROJECT (TGM‐ 74%)
Columbia Hill Reverse Circulation Drilling
The Company drilled 58 RC boreholes (3,554m) focused primarily on Columbia Hill, in the March quarter.
Reverse Circulation (“RC”) drilling was applied as a preferred evaluation method to establish reserves
due to difficult variably oxidised ground conditions which yielded very poor diamond core recoveries and
overall performance. The RC program was also much faster and cost effective than diamond drilling,
with all holes less than 100m in depth at Columbia Hill.
Positive assays from both Theta and Columbia Hill continued to be received during the quarter, with a
summary of results included in this quarterly report.
Figure 1 shows local setting of Columbia Hill, and Figures 2 & 3 the distribution of drilling for opencast
on MR83 as at the end of March 2019.
1km
Focus of Columbia Hill drilling pre‐ March 31, 2019
CIL Plant
N
0.8km
Old Waste Dump
Theta Hill (MR83)
Figure 1: View from Theta Hill of the Columbia Hill opencast drill target areas.
3
Figure 2: MR83 Locality of Opencast Targets and Drilling
Figure 3: Status of exploration drilling locations at Columbia Hill (31 March 2019)
4
Columbia Hill continues to demonstrate good potential as a satellite resource as demonstrated in the
following cross‐sections (Figures 4 and 5). The Company remains confident that economic resources can
be defined in this area, and looks forward to declaring a maiden resource and reserve for the deposit in
coming weeks.
Table 1: Columbia Hill (Q1 2019) Phase 2 RC drilling results > 1 g/t Au
(ASX release 4 March 2019)
BHID
RCBHI48
RCBHI48 incl
RCBHI48 incl
RCBHI48 incl
RCBHI48 incl
RCBHI61
RCBHI62
RCBHI63
RCBHI63
RCBHI63
RCBHI63 incl
RCBHI64
RCBHI64
RCBHI64
RCBHI64 Incl
RCBHI64
RCBHI66
RCBHI66
RCBHI66 incl
RCBHI68
RCBHI68 incl
RCBHI69
RCBHI69 incl
RCBHI70
RCBHI70
RCBHI70
RCBHI70 incl
RCBHI71
RCBHI71
RCBHI71 incl
RCBHI71
RCBHI74
RCBHI74 incl
RCBHI75
RCBHI75
RCBHI75 incl
RCBHI76
RCBHI76
RCBHI76 incl
RCBHI77
RCBHI78
RCBHI82
RCBHI82 incl
RCBHI82
RCBHI88
RCBHI88 incl
From
m
To
m
Width
m
Au g/t Au Comments
43.00
48.00
49.00
57.00
57.00
82.00
64.00
50.00
50.00
60.00
58.00
83.00
21.00
2.00
1.00
3.00
1.00
1.00
1.36
1.85
2.67
5.05
10.40
1.61
Bevetts/Rho
U Rho
U Rho
L Rho
L Rho
Rho
39.00
43.00
4.00
1.88
Bevetts
35.00
37.00
2.00
1.09
Bevetts
38.00
44.00
6.00
2.11
Bevetts
51.00
51.00
14.00
53.00
52.00
15.00
2.00
1.00
1.00
6.53
10.40
3.23
L Rho
L Rho
Bevetts
28.00
29.00
1.00
1.36
U rho
33.00
34.00
45.00
36.00
35.00
46.00
3.00
1.00
1.00
4.82
12.60
3.82
L Rho
L Rho
U Theta
19.00
20.00
1.00
1.01
Bevetts
25.00
27.00
43.00
43.00
61.00
66.00
42.00
29.00
28.00
48.00
44.00
68.00
68.00
43.00
4.00
1.00
5.00
1.00
7.00
2.00
1.00
1.72
4.56
1.06
2.11
1.82
3.61
3.36
Bevetts
Bevetts
L Rho
L Rho
L Rho
L Rho
Quartz in Shale
75.00
76.00
1.00
1.08
U Rho
78.00
80.00
66.00
85.00
84.00
68.00
7.00
4.00
2.00
2.75
4.00
1.77
L Rho
L Rho
Bevetts
83.00
85.00
96.00
91.00
89.00
97.00
8.00
4.00
1.00
1.63
2.69
1.35
U Rho
U Rho
L Rho
46.00
47.00
20.00
50.00
49.00
21.00
4.00
2.00
1.00
1.35
2.08
3.73
L Rho
L Rho
U Rho
23.00
23.00
20.00
28.00
24.00
21.00
5.00
1.00
1.00
1.64
4.19
1.10
L Rho
L Rho
Quartz in Shale
46.00
49.00
20.00
51.00
51.00
22.00
5.00
2.00
2.00
0.91
1.27
0.71
Rho
Rho
Rho
37.00
38.00
1.00
1.83
Rho
41.00
42.00
60.00
46.00
45.00
62.00
5.00
3.00
2.00
4.56
7.24
13.52
Rho
Rho
U Theta
16.00
21.00
25.00
23.00
9.00
2.00
1.07
2.77
L Rho
L Rho
5
Figure 4: Columbia Hill Cross Section of RC boreholes I63‐46‐9‐22B‐16 looking north
Figure 5: Columbia Hill (Iota Mine) Cross Section RCBHI41‐I18 looking north
6
Theta Hill
All remaining assays for the December 2018 drilling at Theta Hill were released during the quarter (Table
2, refer to ASX release dated 21 January 2019). No drilling was conducted at Theta Hill during the
quarter.
Gold mineralisation at Theta Hill has mostly developed on the bedding plane parallel thrusts hosting
Beta, Lower Theta and Upper Theta "flat reefs", as well as within the Bevetts thrust packages, and
quartz veining in the Pretoria shales which is controlled by the thrust related structures and splays. An
interpretation of this geology is shown below in Figure 6.
Figure 6: Theta Hill cross section looking north showing thick Bevetts / lense development
and Upper and Lower Theta mineralised zones
7
Table 2: Theta Hill ‐ intersections > 1 g/t Au (ASX release 21 January 2019)
8
WORK UNDERWAY OR COMPLETED POST QUARTER‐END
Work underway since March 31 has focused on finalising the geological modelling, including resource
and reserve estimation for inclusion in the Theta Feasibility Study.
Exploration drilling of new targets within MR83 and other areas is planned for the remainder of 2019,
along with plans for funding and development of the TGME project, initially focused on gold production
from open‐cut sources within MR83.
Additional assays were received in March and April, and were released to ASX on 29 April, 2019.
Highlights from the recent drilling at Columbia Hill included:
1m @ 9.7 g/t Au from 51m (RCBH I93)
2m @ 18.2 g/t Au from 66m (RCBH I90)
2m @ 5.9 g/t Au from 58m, incl 1m @ 10.7 g/t Au (RCBH I83)
3m @ 5.3 g/t Au from 87m, incl 1m @ 11.6 g/t Au from 87m (RCBH I73)
1m @ 7.0 g/t Au from 24m and 3m @ 5.2 g/t Au from 45m, incl 1m @ 10.7 g/t Au (RCBH I81)
6m @ 3.8 g/t Au from 12m, incl 1m @ 16.7 g/t Au from 13m, 2m @ 2.4 g/t Au from 58m and
1m @ 23.0 g/t Au from 68m (RCBH I91)
1m @ 8.4 g/t Au from 55m and 3m @ 16.04 g/t Au from 75m incl 2m @ 23.70 g/t Au (RCBH
I67)
2m @ 12.5 g/t Au from 12m incl 1m @ 23.3 g/t Au from 12m (RCBH I95)
The Columbia Hill drilling demonstrates that the resource is still open to the west. The old workings on
the western side (Figure 6) remain untested, offering potential to further extend the current conceptual
pit shell. Drilling recently ceased, to enable completion of the Feasibility Study.
The target mineralisation zones embrace the Bevetts thrust and Lense style reefs plus the underlying
Rho Reef (Figures 5 and 7). Bevetts thrust often causes structural thickening of gold reefs.
Combined with the Lense style and Rho Reef intersections all above 100m, below surface preliminary
open pit shells (Figure 6) have been tested on the deposit, and Columbia Hill will now be included in the
Theta Feasibility Study with maiden resources/reserves due to be published shortly.
Figure 7: Columbia Hill (Iota section) mineralised zones with current pit shell,
western extension still to be drilled
9
Columbia Hill is similar to Theta Hill in mineralisation and geometry, with a thrusted “lense” package
located around the Bevetts unconformity, and a flat to shallowly dipping Rho reef system in the Malami
dolomite footwall. At Columbia Hill, the Rho Reef mineralisation is hosted in bedding plane shears with
the gold associated with quartz and oxidised sulphides.
The drilling to date is supportive of the interpretation of four (4) zones of mineralisation, being –
1.
2.
3.
4.
Quartz in Shales
Bevetts thrust and lense deposits
Upper and Lower Rho flat reef horizons
An undiscovered “Upper Theta” equivalent Reef below the Rho horizon.
The geometry of the reefs continues to be modelled, and brings a significant exploration potential into
play going westwards. Current Rho Reef intersections continue to support a split (Upper and Lower
Rho) reef. Effectively the Rho Reef bedding plane shear locates on 2 “bounding” structures, leading to
drill intercepts collectively being up to 6m wide (e.g. RCBH I90 Figure 8). Lense style mineralisation was
intersected in RCBH I91, and substantiates the multiple mineral zone potential of Columbia Hill.
Figure 8: Columbia Hill Cross Section of RC boreholes I63‐46‐9‐22B‐16 looking north
10
Table 3: Columbia Hill Q1 2019 final Phase 2 RC drilling results > 1 g/t Au
(ASX Release 29 April 2019)
BHID
RCBHI93
RCBHI90
From
m
To
m
Width
m
Au g/t
Au Comments
RCBHI42
51.00
66.00
66.00
57.00
52.00
72.00
69.00
64.00
1.00
6.00
2.00
7.00
9.73
7.60
18.20
1.80
L Rho
Rho
U Rho
Bevetts
RCBHI42 incl
RCBHI42 incl
57.00
63.00
60.00
64.00
3.00
1.00
1.51
5.73
Bevetts
Bevetts
RCBHI93B
RCBHI93B
RCBHI86
RCBHI86
RCBHI86
RCBHI89B
RCBHI72
CHRC11
RCBHI83
RCBHI83
4.00
57.00
10.00
50.00
54.00
45.00
81.00
36.00
51.00
58.00
59.00
57.00
87.00
87.00
26.00
38.00
47.00
61.00
24.00
28.00
45.00
46.00
85.00
82.00
12.00
13.00
41.00
58.00
68.00
95.00
33.00
39.00
52.00
74.00
80.00
55.00
75.00
77.00
90.00
6.00
12.00
12.00
28.00
28.00
5.00
58.00
11.00
51.00
55.00
46.00
82.00
38.00
52.00
60.00
60.00
58.00
90.00
88.00
29.00
39.00
50.00
62.00
25.00
29.00
50.00
47.00
86.00
83.00
18.00
14.00
42.00
60.00
69.00
96.00
34.00
40.00
53.00
75.00
81.00
56.00
77.00
78.00
93.00
7.00
14.00
13.00
31.00
29.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
1.00
1.00
3.00
1.00
3.00
1.00
3.00
1.00
1.00
1.00
5.00
1.00
1.00
1.00
6.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
3.00
1.00
2.00
1.00
3.00
1.00
1.09
1.24
3.26
3.42
1.13
3.54
2.62
1.42
1.02
5.85
10.70
3.01
5.30
11.60
2.80
2.78
3.36
1.67
6.97
2.10
3.18
10.70
1.08
1.31
3.79
16.70
1.00
2.44
23.00
4.14
3.65
1.19
1.82
1.83
1.30
8.36
23.70
23.70
1.47
6.72
12.54
23.30
1.93
4.81
Pyrox Sill
Bevetts
Pyrox Sill
U Rho
L Rho
Bevetts
U Rho
Rho
U Rho
L Rho
L Rho
U Rho
Bevetts
Bevetts
Bevetts
Bevetts
U Rho
L Rho
Bevetts
Bevetts
Rho
Rho
L Rho
U Theta?
Quartz in Shale
Quartz in Shale
Bevetts
Bevetts
Rho
U Theta
Quartz in Shale
Bevetts
Bevetts Lense
U Rho
L Rho
Pyrox Sill
Bevetts Lense
RCBHI90 incl
RCBHI83 (incl)
RCBHI87
RCBHI73
RCBHI73 incl
RCBHI80
RCBHI52
RCBHI84
RCBHI84
RCBHI81
RCBHI81
RCBHI81
RCBHI81 (incl)
RCBHI85
RCBHI94
RCBHI91
RCBHI91 (incl)
RCBHI91
RCBHI91
RCBHI91
RCBHI91
RCBHI92
RCBHI92
RCBHI92
RCBHI92
RCBHI92
RCBHI67
RCBHI67
RCBHI67
RCBHI67
RCBHI95
RCBHI95
RCBHI95 incl
RCBHI95
RCBHI95 incl
Rho
Quartz in Shale
Quartz in Shale
Quartz in Shale
Bevetts
Bevetts
For more information please visit www.thetagoldmines.com or contact:
General Enquiries
Rob Thomson, Managing Director
Theta Gold Mines Limited
M: +61 409 843 963
robt@thetagoldmines.com
or
Investor Enquiries
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8912 2126
billg@thetagoldmines.com
11
Competent Person Statement
The information in this report relating to drilling results is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Phil Bentley (MSc (Geol), MSc (MinEx),
Pr.Sci.Nat. No. 400208/05, FGSSA), a consultant to the Company and a member of the South African
Council for Natural Scientific Professions.
The original reports titled “High Grade Gold Assays at Theta Hill”, “High Grade Gold Assays at
Columbia Hill” and “More High Grade Gold Assays at Columbia Hill” were dated 21 January 2019, 4
March 2019 and 29 April 2019 respectively and were released to the Australian Securities Exchange
(ASX) on those dates. The Company confirms that –
it is not aware of any new information or data that materially affects the information included in
the ASX announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcements continue to apply and have not materially changed.
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM) is a gold development company that holds a range of prospective
gold assets in a world‐renowned South African gold mining region. These assets include several surface
and near‐surface high‐grade gold projects which provide cost advantages relative to other gold
producers in the region.
Theta Gold Mines core project is TGME, located next to the historical gold mining town of Pilgrim’s Rest,
in Mpumalanga Province, some 370km east of Johannesburg by road or 95km north of Nelspruit (Capital
City of Mpumalanga Province). Following small scale production from 2011 – 2015, the Company is
currently focussing on the planned refurbishment of the existing CIL plant and nearby mines/prospects
with the intention of resuming gold production and is considering open pit mining where it has
identified mineral resources amenable to open pit production. The Company is presently concluding a
detailed feasibility study and is also in the process of seeking approvals for open pit mining on the
existing mining licences held.
The Company aims to build a solid production platform to over 100kozpa based primarily around
shallow, open‐cut or adit‐entry hard rock mining sources. Theta Gold Mines has access to over 43
historical mines and prospect areas that can be accessed and explored, with over 6.7Moz of historical
production recorded.
12
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
+Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16
Name of entity
THETA GOLD MINES LIMITED
ABN
Quarter ended (“current quarter”)
30 131 758 177
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
31 March 2019
Current quarter
US$’000
Year to date
(9 months)
US$’000
(861)
(2,540)
(d) staff costs
(135)
(390)
(e) administration and corporate costs
(486)
(1,361)
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
3
5
1.5
Interest and other costs of finance paid
-
(43)
1.6
Income taxes paid
1.7
Research and development refunds
1.8
Other
1.9
Net cash from / (used in) operating
activities
(1,479)
(4,329)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(3)
(4)
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
+ See chapter 19 for defined terms
1 September 2016
Page 1
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Consolidated statement of cash flows
2.2
Current quarter
US$’000
Year to date
(9 months)
US$’000
Proceeds from the disposal of:
(a) property, plant and equipment
-
79
(3)
75
1,491
4,743
(52)
(114)
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of
shares, convertible notes or options
3.5
Proceeds from borrowings
-
180
3.6
Repayment of borrowings
(107)
(638)
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
1,332
4,171
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
263
196
(1,479)
(4,329)
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(3)
75
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
1,332
4,171
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
113
113
+ See chapter 19 for defined terms
1 September 2016
Page 2
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
5.
Reconciliation of cash and cash
equivalents
Current quarter
US$’000
Previous quarter
US$’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
113
262
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
113
262
6.
Payments to directors of the entity and their associates
Current quarter
US$'000
6.1
Aggregate amount of payments to these parties included in item 1.2
186
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Payments for consulting fees, salaries and office rent at commercial rate.
Current quarter
US$'000
7.
Payments to related entities of the entity and their
associates
7.1
Aggregate amount of payments to these parties included in item 1.2
7.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
7.3
Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
+ See chapter 19 for defined terms
1 September 2016
Page 3
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
US$’000
Amount drawn at
quarter end
US$’000
2,942
2,942
8.1
Loan facilities
8.2
Credit standby arrangements
8.3
Other (please specify)
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
Details of the loan facilities are set out in Note 16 of the Company’s Financial Report for the year
ended 30 June 2018.
US$’000
9.
Estimated cash outflows for next quarter
9.1
Exploration and evaluation
9.2
Development
-
9.3
Production
-
9.4
Staff costs
200
9.5
Administration and corporate costs
700
9.6
Other (loan repayment and legacy creditors)
300
9.7
Total estimated cash outflows
10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
Tenement
reference
and location
Nature of interest
Interest at
beginning
of quarter
Interest
at end of
quarter
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
EL8540
(Lucky Draw)
Beneficial holder
100%
-
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
+ See chapter 19 for defined terms
1 September 2016
1,000
2,200
Page 4
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Sign here:
............................................................
(Director/Company secretary)
Print name:
Chin Haw Lim
Date: 30/04/2019
Notes
1.
The quarterly report provides a basis for informing the market how the entity’s activities have
been financed for the past quarter and the effect on its cash position. An entity that wishes to
disclose additional information is encouraged to do so, in a note or notes included in or attached
to this report.
2.
If this quarterly report has been prepared in accordance with Australian Accounting Standards,
the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral
Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report
has been prepared in accordance with other accounting standards agreed by ASX pursuant to
Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows
from investing activities, depending on the accounting policy of the entity.
+ See chapter 19 for defined terms
1 September 2016
Page 5
Annexure A
THETA GOLD MINES LIMITED
UNLISTED OPTIONS AND PERFORMANCE RIGHTS
Number
500,000
222,223
614,449
1,000,000
274,449
1,050,000
2,000,000
1,000,000
500,000
500,000
3,500,000
727,970
1,000,000
1,000,000
3,500,000
604,213
2,000,000
2,200,000
2,200,000
200,000
150,000
150,000
Performance Hurdle/Vesting Date
(if applicable)
Company achieving a market capitalisation of
greater than $25,000,000 for a period of 10
consecutive trading days
Recommencement of production, reopening of the
Group’s TGME Mine and refurbishment of the plant
Production from the Group’s operations reaching
40,000 tonnes per month yielding 2,000 ounces of
gold per month at a cost of less than USD750 per
ounce for a period of 3 consecutive months
20 day VWAP above $0.025. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
20 day VWAP above $0.030. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
20 day VWAP above $0.035. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
20 day VWAP above $0.030. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
20 day VWAP above $0.035. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
20 day VWAP above $0.040. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
Exercise
Price
Expiry Date
$0.25
$0.30
$0.30
$0.30
$0.30
$0.15
$0.20
$0.20
19 Jul 2019
15 Aug 2019
21 Aug 2019
22 Aug 2019
1 Sep 2019
12 Oct 2019
12 Oct 2019
12 Oct 2019
$0.20
12 Oct 2019
$0.40
12 Oct 2019
$0.40
$0.19
$0.25
$0.30
$0.20
$0.19
$0.30
12 Oct 2019
15 Jan 2020
18 Jan 2020
18 Jan 2020
30 Apr 2020
13 Aug 2020
19 Jul 2022
$0.35
19 July 2022
$0.40
19 July 2022
$0.30
19 July 2022
$0.35
19 July 2022
$0.40
19 July 2022
Number
1,500,000
1,000,000
1,000,000
1,000,000
2,000,000
250,000
350,000
350,000
350,000
375,000
175,000
500,000
33,743,304
Performance Hurdle/Vesting Date
(if applicable)
Achievement of Milestone 1. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
Achievement of Milestone 2. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
Achievement of Milestone 2. This performance
hurdle must be achieved on or before the date that
is three years from the date of issue of the Options.
Achievement of Milestone 3 and Pre‐Feasibility
Study IRR (pre‐tax) is greater than or equal to 40%.
This performance hurdle must be achieved on or
before the date that is three years from the date of
issue of the Options.
Obtaining sufficient capital expenditure financing
(debt and/or equity) to enable the group's mines
and facilities to be upgraded to the point where they
can profitably produce no less than 55,000 ounces of
gold or gold equivalent on an annualised basis.
Where the relevant capital expenditure financing is
obtained through debt financing, this milestone will
be deemed to have been achieved upon the first,
actual drawdown of the relevant loan. This
performance hurdle must be achieved on or before
the date that is three years from the date of issue of
the Options.
Obtaining sufficient capital expenditure financing
(debt and/or equity) to enable the group's mines
and facilities to be upgraded to the point where they
can profitably produce no less than 55,000 ounces of
gold or gold equivalent on an annualised basis.
Where the relevant capital expenditure financing is
obtained through debt financing, this milestone will
be deemed to have been achieved upon the first,
actual drawdown of the relevant loan. This
performance hurdle must be achieved on or before
the date that is three years from the date of issue of
the Options.
20 day VWAP above $0.025
20 day VWAP above $0.030
20 day VWAP above $0.035
Achievement of Milestone 3 and pre‐feasibility study
IRR (pre‐tax) is greater than or equal to 40%
Achievement of Milestone 3 and pre‐feasibility study
IRR (pre‐tax) is greater than or equal to 50%
Market capitalisation above $125,000,000 for a
consecutive 5 day period
Exercise
Price
$0.25
Expiry Date
19 July 2022
$0.25
19 July 2022
$0.30
19 July 2022
$0.30
19 July 2022
$0.25
19 July 2022
$0.30
19 July 2022
19 July 2022
19 July 2022
19 July 2022
19 July 2022
19 July 2022
19 July 2022
20 Day VWAP means the a
Share your feedback
Discover