Revised Feasibility Study Confirms A$1.4B Free Cash Flow
Released
Released
Announcement PDF
1
3 February 2026
ASX ANNOUNCEMENT AND MEDIA RELEASE
(ASX: TGM)
Revised TGME Feasibility Study Confirms A$1.4 Billion Free Cash Flow
from 6.1 Moz Gold Resource
Theta Gold Mines Limited (‘Theta Gold’ or the ‘Company’) (ASX: TGM) has delivered a major uplift in project
value with its Revised Feasibility Study for its TGME Gold Mine Project (‘Project’), confirming a 13.1-year Life
of Mine (LoM) and positioning it as a high-margin, long-life gold operation in one of the world’s premier gold
regions.
Table 1: Project Economics at Various Gold Prices – Base Case (AUD)
Project Economics at AU$
Gold Price
Unit
Forecast
(USD2,884 /
oz Avg)
USD
2,500/oz
USD
3,000/oz
USD
3,500/oz
USD
4,000/oz
USD
4,500/oz*
USD
5,000/oz
Gold Price AUD / oz1
AUD/oz 4,365 3784 4,541 5,298 6,055 6,812 7,568
NPV @ 10% (real) Pre-tax AUDm 991 758 1,070 1,382 1,695 2,008 2,321
NPV @ 10% (real) Post-tax AUDm 689 526 742 954 1,166 1,379 1,591
IRR (%) Pre-tax % 84% 69% 86% 102% 117% 131% 146%
IRR (%) Post-tax % 77% 63% 78% 92% 105% 118% 130%
AISC AUD/oz 1,787 1750 1,800 1,848 1,896 1,943 1,990
EBITDA annual average AUDm 163 131 175 219 263 307 351
EBIT annual average AUDm 148 116 160 204 248 292 336
Free Cash Flow (Post-tax) AUDm 1,413 1102 1,525 1,941 2,358 2,775 3,193
Development Capital – Peak
Funding
AUDm 116 131 116 116 116 116 116
Capital Sustaining AUDm 65 65 65 65 65 65 65
Payback post-tax Months 29 34 30 27 25 24 23
Capital Efficiency (Pre-Tax
NPV/Dev Capital
% 855% 580% 924% 1,194% 1,463% 1,734% 2,004%
Capital Efficiency (Post-Tax
NPV/Dev Capital
% 595% 403% 641% 824% 1,007% 1,190% 1,374%
* Note: at the time of release of this study, Spot Gold Price was trading in excess of USD4,500 / oz.
The Base Case Production Target and forecast financial information shown above and disclosed in this study are
based on Mineral Resources that include a proportion of Inferred Mineral Resources and the realisation of the
full potential of the Base Case as presented cannot be guaranteed. Inferred Mineral Resources are considered
too speculative geologically to have the economic considerations applied to them that would enable them to be
classified as Ore Reserves. There is no certainty that further exploration work or evaluation studies will result in
the conversion of Inferred Mineral Resources to Indicated or Measured Mineral Resources or Ore Reserves.
1
Exchange rate USD:AUD applied throughout this document is 0.6606.
2
FS BASE CASE HIGHLIGHTS:
Key operational results of the Revised Feasibility Study (FS):
Production Start: Q1 2027 (TGME Gold Plant currently under construction)
Head Grade LoM: 4.96g/t Base Case
Base Case - Production: 871 Koz 4.28 g/t recovered grade (86.2% recovery)
Base Case - Production: 1.06 Moz @ 4.40 g/t mined grade
Production Ramp-up: Peak Production over 115 koz
Ore Reserve Plan: 514 koz @ 4.11 g/t recovered grade (85.2% recovery)
Gold plant: Plant construction underway
Infrastructure: Existing surface/underground works, permitting in place
Robust Base Case Financials: (Gold price (avg) US$2,884/oz, (A$4,3652
/oz)) (Update 7 October 2025)
Free Cashflow: US$0.9 billion, (A$1.4 billion)
Post-tax NPV10%: (at a 10% discount rate) of US$455 m, (A$689 m)
Revenue: US$2.5 billion, (A$3.8 billion)
Post-tax IRR: 77%
Life of Mine (LOM): 13.1 years
All in sustaining cost: US$1,181/oz, (A$1,787/oz)
Project payback: 29 months (from start of mining)
Peak funding: US$77 m, (A$116 m)
Table 2: Comparison of Base Case Financial Metrics – Feasibility Studies 2022 vs 2026
Project Economics at Gold Price US$
(Base Case)
Unit FS - Jul’ 223
FS - *Feb’ 26 % or Absolute
Life of Mine years 12.9 13.1 flat
Revenue USDbn 1.75 2.49 42%
Gold Price USD/oz 1,642 2,884 +1,242/oz
NPV @ 10% (real) Pre-tax USDm 324 654 102%
NPV @ 10% (real) Post-tax USDm 219 455 108%
IRR (%) Pre-tax % 65% 84% 29%
IRR (%) Post-tax % 57% 77% 35%
All In Sustaining Cost (AISC) USD/oz 834 1,181 42%
EBITDA (LoM) USDm 891 1,508 69%
EBITDA annual average USDm 69 115 67%
Free Cash Flow (Post-tax) USDm 508 933 84%
Development Capital – Peak Funding USDm 77 77 flat
Capital Sustaining USDm 37 44 7
Payback Post-tax Months 31 28 flat
Due to rounding, numbers presented throughout this document may not add up precisely to the totals provided and percentages may not precisely
reflect the absolute figures.
* - Mine Plan revised
Cost Control/Value Focus:
TGM continues to deliver strong project execution and disciplined cost management. The TGME Project’s post-
tax value has surged to US$455 million—an impressive US$236 million uplift over the 2022 FS—driven largely
by higher gold prices. This pricing strength has unlocked the ability to profitably mine lower-grade ore. The
project is gold price sensitive offering strong leverage as clearly demonstrated in tables 1 and 2 above.
2 Exchange rate USD:AUD applied throughout this document is 0.6606.
3 Ref to ASX Release dated 27 July 2022 titled, “Theta Gold’s TGME Project DFS confirms NPV of AUD432 Million”.
Key Assumptions: Long term average spot gold price of US$2,884 applied in Base Case scenario over LOM / AISC estimation of US$1,181/oz at +/- 15%
level of accuracy.
3
Importantly, while higher gold prices have led to increased royalties, they’ve also contributed positively to
project economics. Around 18% of the AISC increase (US$62/oz of the total US$347/oz) is influenced by gold
price impacts—underscoring the strong value capture for shareholders.
Project Summary:
The TGME Gold project, located in the Mpumalanga province of South Africa, is shown below.
Figure 1: Regional Geological Setting
Independent Mining Engineers, Minxcon Pty Ltd (Minxcon) completed a revised Feasibility Study (FS) to restart
the historical TGME Underground Gold Mine Project in South Africa. As the original authors of the 2022 FS,
Minxcon bring deep familiarity with the asset. The revised FS reflects a conservative base case gold price of
US$2,884/oz — despite spot prices now exceeding US$4,500/oz — and unlocks significantly enhanced
economics.
Two mine scheduling strategies have been investigated, namely:
• Base Case: LOM Plan includes a Production Target of 1.01 Moz targeting Measured, Indicated and Inferred
Mineral Resources; and
• Ore Reserve Plan: LOM Plan includes a Production Target of 604 koz targeting Measured and Indicated
Mineral Resources only.
The FS completed only includes the first of four mines out of a historical 43 mines that the company will look
to bring online, including:
• Beta;
• Frankfort;
• Clewer-Dukes Hill-Morgenzon (“CDM”); and
• Rietfontein.
4
The process plant sits at the heart of Pilgrim’s Rest, a region steeped in gold mining history and home to a
skilled local workforce, just 370 km northeast of Johannesburg. Centrally located, the plant is only 2.5 km
from Pilgrim’s Rest township, with Beta Mine just 1.3 km to the west, Frankfort and CDM 24 km and 6.3 km
north, and Rietfontein 21 km south-southeast—ensuring efficient ore delivery from all key deposits.
Key Project Components:
• The Mineral Resource4
in the Base Case LoM Plan of 1,010 koz of gold now includes an additional 58koz
(109koz available) of surface ore from historic rock dumps and MR83 tailings storage facility (TFS) which
was previously never recognised in the mining plan and provides early cashflow opportunities.
• Phase 1 launches with four mines—Beta, Frankfort, CDM, and Rietfontein—leveraging the skilled mining
workforce of Pilgrim’s Rest and Sabie, 370 km northeast of Johannesburg.
• Over 43 historical mines underpin a long-term growth pipeline, with 3.6 Moz of Inferred Resources available
for future development—none included in the current Base Case.
• Execution-ready: Front-End Engineering Design (FEED) is complete, supporting modular expansion. The
plant build will use modular, plug-and-play equipment, significantly reducing construction risk and enabling
faster, more reliable commissioning.
• Site works underway: Old plant decommissioned; contracts for earthworks, civils, roads, and water
management signed in September 2025.
• Multi-phase ramp-up: Production will build to 45 ktpm across underground operations, following the FS
Base Case plan (Measured, Indicated, and Inferred Resources).
Beta Mine leads off: Mining starts with 18 months of pre-development at Beta before stoping begins.
• Phase 1 entails the initial 13.1-year Base Case LOM plan at the processing rate of 540 ktpa with key physical
parameters including;
o Gold ore production build up to 45 ktpm, for the first 18 months will be from the initial 109K oz of
surface ore contained in historical rock dumps and tailings to provide early cashflow while
underground mine development is completed;
o First underground gold within 18 months of development from Beta Mine;
o Free-milling stand-alone processing plant, with doré produced on site to produce 90 – 120Koz p.a.
@ 4.28 g/t recovered gold – at 86.2% gold recovery rate;
o First gold production is scheduled for Q1, 20275
;
o Gold plant expected to produce over 80koz/pa by the third year of production;
o Recommission of existing on-site Tailings Storage Facility (TSF);
o Base Case LOM plan outlines a recovery of 871 Koz gold from 1.01 Moz mined;
o Over 3 Moz of Inferred Mineral Resources available for future development are not included in the
Base Case LOM plan.
Key Economic Results of FS:
Under average gold prices of US$2,884 / oz (A$4,3656
/ oz), the Base Case scenario of FS demonstrates strong
financial returns7
(based on LOM plan), including:
o Undiscounted free cash flows of US$0.9 billion (A$1.4 billion), pre-tax US$1.3 billion (A$2.0 billion);
o NPV (at a 10% discount rate) of US$455 million (A$689 million), pre-tax US$654 million (A$991
million);
4 Including Inferred Resources.
5 First gold produced timing will be subject to securing funding and obtaining all necessary regulatory permitting approvals.
6 Exchange rate USD:AUD applied throughout this document 0.6606.
7 Financial returns applying the ‘Base Case’ scenario statistics.
5
o Capital payback period of 29 months;
o Post-tax IRR of 77%; pre-tax IRR of 84%
o Combined Underground Projects have an AISC of US$1,181/oz (A$1,787/oz); and
o Peak Capital requirement is US$77 million (A$116 million)8
, total initial capital US$102 million
(A$154 million)9
.
Table 3: Key Project Metrics
Description Units Base Case Reserve Plan
Project Start Date1
Qtr/Year Q4 2025 Q4 2025
Commercial Production Date Qtr/Year Q1 2027 Q1 2027
Life of mine years 13.1 8.8
Underground ore mined (LOM) Mt 4.69 2.71
Surface ore remined (LoM) Mt 1.65 1.19
Mined Grade g/t 4.96 4.82
Gold Mined (LOM) Moz 1.01 0.60
Production Rate kt/pa 540 540
Production Rate kt/pm 45 45
Gold recovered (average LOM) % 86.2 85.2
Gold recovered (LOM) Moz 0.87 0.51
Strong Upside options:
• Phase 2 unlocks scale: 7 mines, 90 ktpm processing, and up to 160 koz/year gold output within five
years .
• Growth runway secured: 40 nearby historical mines and defined exploration targets offer substantial
resource upside.
• Low-cost mining advantage: All current reserves and LOM material hosted in shallow orebodies
(<400m).
• Cost discipline embedded: Competitive pricing achieved through active tendering of mine services
across South Africa.
8 TGM is currently in discussion with debt financiers and has engaged an experienced debt advisors to assist in the negotiation of term-sheets for funding
of the Project. Further equity raises are also planned to fund working capital and part of the project capital if required, which may lead to dilution to
existing shareholders.
9 The FS demonstrates that post to Peak Funding, the balance of Total Capital requirement will be self-funded from project cashflow. The board may
however, consider external funding solutions such as via equity, debt, gold pre-sales, gold-streaming or a mixture of these methods.
Figure 2: Steel reinforcing installation and preparation for concrete placement
6
• Built for sustainability: ESG-focused design reduces energy use, broadens workforce diversity, and
attracts green-aligned suppliers.
Project Execution Strategy and Plan:
The project will ramp up in phases, targeting an initial Phase 1 Run-Of-Mine (RoM) output of 45 ktpm from
multiple underground mines. This staged approach is underpinned by the FS Base Case, leveraging Measured,
Indicated, and Inferred Resources to maximise early production and flexibility.
In order to achieve this, mining operations are planned to commence as follows:
• Beta Mine - Beta Mine will kick off with 18 months of pre-development, followed by stoping from month
19. In the Base Case, the mine is expected to deliver around 30 ktpm of stoping ore for 8.5 years, within
a total Life of Mine of 10.1 years.
• Rietfontein Mine - Rietfontein Mine will start mining in18 months after Beta, stoping after eight months
of pre-development. Stoping begins in month 27, with plans to produce 15 ktpm of ore.
• Frankfort and CDM Mines - Frankfort and CDM Mines will begin mining in months 104 and 90, with 16
and 19 months of pre-development planned, respectively. Frankfort is set to produce 15 ktpm, feeding
a DMS plant that delivers 9.5 ktpm. CDM will also produce 15 ktpm at steady state.
Mining of the historic rock dumps and TGM Plant TSF will begin in months 7 and 16, respectively, following the
start of operations. The Waste Rock Dump will be mined over 10 months at 45 ktpm, enabling a smooth ramp-
up of Beta’s operations. TSF material will feed the plant for 4 months during ramp-up and continue as needed,
with a total retreatment life of 79 months.
Figure 3: The Gold Room’s Foundations
7
Project Funding Update:
Commercial Debt Syndication Progressing
The Company has appointed, specialist debt advisors to run the TGME Project debt syndication process. This
syndication process is live with initial indications suggesting strong interest from commercial lenders.
The 2026 FS Base Case provides an estimated peak capex funding requirement of US$77 million, A$116 million
and the Company has demonstrated its ability to raise funding to meet this funding requirement through a
combination of equity and or debt.
On 15 September 202510
, the Company announced the execution of key contracts to kick start the construction
at the TGME Gold Mine including commencement of bulk earthworks, civils and infrastructure items including
platforms, roads, water management systems, retaining walls, dams and gold processing plant civil foundation.
A Private Placement of US$4 million, (A$6.2 million) along with secured investor support for near-term
construction has enabled earth works and civil works to progress.
Agreement provided by long-term institutional investors, ensures the Company has sufficient funding to
complete the initial long lead earthworks and civil construction items.
Equity Raising for US$30 Million, (A$46 Million)
The Company announced on 7 October 202511
that it had secured institutional and sophisticated investor
commitments of up to US$23.9 million, (A$36.3 million) through a Private Placement and investment from
Cornerstone Investors via a two - tranche Placement. Furthermore, on 21 October 202512
the Company
announced it had received a further commitment through a third tranche to Cornerstone Investors for an
additional US$6 million and completed a Share Purchase Plan to bring the total raised through the issue of
equity to approximately US$30 million.
Discretionary Debt Component for additional US$10 Million, (A$15 Million)
On 7 October 2025, the Company also announced that it had received a loan facility of up to US$10 million,
(A$15 million) from Cornerstone Investors to be available for drawn down at the sole discretion of the Company
from 1 April 2026.
Non-Binding Term-Sheet for US$80 Million, (A$120 Million)
On 16 December 202513
, the Company announced it had signed a non-binding funding agreement with Nebari
Partners, LLC. Subject to completion of due-diligence and execution of definitive documents, funding to be
made available to Theta Gold Mines Limited by way of two tranches, with tranche one: US$45 million, available
at closing and tranche two:US$35 million subject to meeting conditions precedent and operational milestones.
Figure 4: Arial photo of the existing Plant post decommissioning of old facilities.
10 Ref to ASX Release dated 15 September 2025 titled, “TGME Gold Plant Construction Kicks Off – Key Contracts Locked In”.
11 Ref to ASX Release date 7 October 2025 titled, “TGM Secures A$51.4M Debt & Equity Funding for TGME Mine”.
12 Ref to ASX Release date 21 October 2025 titled, “Additional US$6M Secured and Conversion of Convertible Loans”.
13 Ref to ASX Release dated 16 December 2025 titled, “TGM has entered into Non-Binding Funding Agreement for US$80m, (A$120M)”.
8
Table 4: Project Economics at Various Gold Prices – Base Case (USD)
Project Economics at US$
Gold Price
Unit
Forecast
(USD2,88414
/
oz Avg)
USD
2,500/o
z
USD
3,000/oz
USD
3,500/oz
USD
4,000/oz
USD
4,500/oz
USD
5,000/oz
NPV @ 10% (real) Pre-tax USDm 654 501 707 913 1,120 1,326 1,533
NPV @ 10% (real) Post-tax USDm 455 348 490 630 770 911 1,051
IRR (%) Pre-tax % 84% 69% 86% 102% 117% 131% 146%
IRR (%) Post-tax % 77% 63% 78% 92% 105% 118% 130%
AISC USD/oz 1,18115
1156 1,189 1,221 1,253 1,284 1,315
EBITDA annual average USDm 108 87 116 145 174 203 232
EBIT annual average USDm 98 77 106 135 164 193 222
Free Cash Flow (Post-tax) USDm 933 728 1,007 1,282 1,558 1,833 2,109
Development Capital –
Peak Funding
USDm 77 86 77 77 77 77 77
Capital Sustaining USDm 43 43 43 43 43 43 43
Payback post-tax Months 29 34 30 27 25 24 23
Capital Efficiency (Pre-Tax
NPV/Dev Capital
% 855% 580% 924% 1,194% 1,463% 1,734% 2,004%
Capital Efficiency (Post-Tax
NPV/Dev Capital
% 595% 403% 641% 824% 1,007% 1,190% 1,374%
The diluted Mineral Resources included in the combined LoM plan as a total of the Base Case, only targeting
Mineral Resources, are detailed in the following table below.
Table 5: Base Case – Diluted Mineral Resource in Mine Plan
Mineral Resource
Classification
Tonnes Grade Au Content
kt g/t kg koz
Beta
Measured - - - -
Indicated 1,541 7.57 11,657 375
Inferred 1,044 5.53 5,773 186
Rietfontein
Measured - - - -
Indicated 500 7.99 3,998 129
Inferred 625 8.13 5,087 164
Frankfort
Measured 54 4.30 233 8
Indicated 251 3.93 984 32
Inferred 252 3.42 864 28
CDM
Measured - - - -
Indicated 278 2.52 700 23
Inferred 141 2.35 331 11
TGM Plant TSF
Measured - - - -
Indicated 1,210 0.97 1,171 38
Inferred - - - -
TGM Rock Dumps
Measured - - - -
Indicated - - - -
Inferred 443 1.45 643 21
Combined
Measured 54 4.30 233 8
Indicated 3,779 4.90 18,510 595
Inferred 2,506 5.07 12,699 408
Total 6,339 4.96 31,443 1,011
Notes:
1. A Mineral Resources inventory cut-off of 170 cm.g/t has been applied for the Beta Mine.
2. A Mineral Resources inventory cut-off of 150 cm.g/t has been applied for the Frankfort Mine.
3. A Mineral Resources inventory cut-off of 121 cm.g/t has been applied for the CDM Mine.
4. A Mineral Resources inventory cut-off of 160 cm.g/t has been applied for the Rietfontein Mine.
14 Commodity prices used in this study are currently below spot gold prices of >US$4,500/Oz at the time of this report.
15 All-in Sustaining Costs (AISC) of US$1,181/oz includes C1 Cash Costs plus sustaining capital, renewals and replacements, reclamation, off-mine
overheads and royalites.
9
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM) is pleased to deliver a revised FS for the
TGME Underground Gold Mine Project, delivering a 6.34 Mt resource @ 4.96 g/t Au for 1.01M oz of contained
gold.
Theta Gold Chairman, Mr. Bill Guy stated:
“The completion of this Revised Feasibility Study (FS) is a defining moment for Theta Gold. It confirms what we’ve
always believed – TGME is a world-class gold asset with the potential to deliver exceptional returns for
shareholders. The FS uses an average base gold price US$2,884 / oz AISC of US$1,181 /oz, displaying the financial
robustness of the project, which delivers shareholders free cash flow of over US$900m during the initial phase.
“This study validates a robust, scalable operation with a 13-year mine life, strong margins, and rapid payback.
With modular plant design, proven mining methods, and a skilled local workforce, we are execution ready – first
gold is targeted for Q1 2027. From there, the pathway to 160,000 ounces per year is clear as additional mines
come online
“TGME delivers strong leverage to gold prices, a low-cost mining advantage, and a pipeline of resources that
positions Theta Gold as a future mid-tier producer in one of the world’s premier gold districts. Phase 1 starts with
four mines, but the real upside lies ahead. Vaalhoek, Desire, Glynn’s and dozens of other historic mines give us a
clear pathway to scale production beyond 160,000 ounces annually.
“This is just the beginning of unlocking one of South Africa’s most prolific goldfields.”
[ENDS]
This announcement was approved for release by Theta Gold Mines Limited’s Board.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8046 7584 E: billg@thetagoldmines.com
Investor Relations and Media Communications
We’re committed to keeping you informed and involved. Sign up for the Engage IR App and Investor
Hub today and join the conversation.
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
10
About Theta Gold Mines Limited
Theta Gold Mines Limited (ASX: TGM) is an advanced gold development company focused on unlocking value
from its extensive suite of projects in South Africa’s renowned Eastern Transvaal goldfields. The Company’s
flagship TGME Gold Project offers near surface and shallow underground ore bodies with compelling cost
advantages, with 6.1m Oz’s of gold Resource.
TGM’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga Province,
some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of Mpumalanga
Province). Following small scale production from 2011 – 2015, the Company is currently focusing on the
construction and financing of a new gold processing plant.
TGM holds 100% of Theta Gold SA (Pty) Ltd, which in turn owns 74% of TGME and Sabie Mines, meeting Black
Economic Empowerment (BEE) ownership standards as per South African Mining Charter requirements.
Competent Person’s Statements
MINERAL RESOURCES
Mr. Uwe Engelmann confirms that he is the Competent Person for the TGM Mineral Resources as reported on
TGM’s Mineral Resources which is extracted from TGM’s ASX announcement dated 8 April 2021 (Initial Maiden
Underground Mining Reserve) and 25 October 2021 (TGME Project Permitting Update) available to view at
www.asx.com.au and was prepared in accordance with the guidelines of the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012). Mr.
Engelmann has read and understood the requirements of the JORC Code (2012).
Mr. Engelmann is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to the style of mineralisation and type of deposit described in this report and to the
activity for which he is accepting responsibility. Mr. Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat.
No. 400058/08, MGSSA), is a director of Minxcon (Pty) Ltd and a member of the South African Council for
Natural Scientific Professions. Mr. Engelmann is a full-time employee of Minxcon (Pty) Ltd and has reviewed
this report and consents to the inclusion of the matters based on his supporting information in the form and
context in which it appears.
The information in this announcement that relates to TGM’s Mineral Resources is extracted from TGM’s ASX
announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) and 25 October 2021 (TGME
Project Permitting Update) available to view at www.asx.com.au, and was prepared in accordance with the
guidelines of the JORC Code (2012). TGM confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the Mineral Resources estimates in the relevant market
announcement continue to apply and have not materially changed. TGM confirms that the form and content in
which the Competent Person’s findings are presented have not been materially modified from the original
market announcement.
Theta Gold confirms that the form and context in which the Competent Persons findings are presented have
not been materially modified from the original release.
ORE RESERVES
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information and
supporting documentation compiled by Mr. Daniel van Heerden (B.Eng (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director of
Minxcon Pty Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg. No. 37309).
11
Mr van Heerden has sufficient experience that is relevant to the style of mineralisation under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the JORC Code (2012). Mr van
Heerden consents to the inclusion in the report of the matters based on his information in the form and context
in which it appears.
The information in this announcement that relates to TGM’s Ore Reserves is extracted from TGM’s ASX
announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) and 25 October 2021 (TGME
Project Permitting Update) and February 2026 (Revised TGME Feasibility Study) available to view at
www.asx.com.au, and was prepared in accordance with the guidelines of the JORC Code (2012). A detailed
summary of all material assumptions underpinning the Ore Reserve estimate pursuant to ASX Listing Rule 5.9
is provided in the revised Feasibility Study Summary (pages 14 to 59 of this release).
TGM confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters
underpinning the Ore Reserve estimates in the relevant market announcement continue to apply and have not
materially changed. TGM confirms that the form and content in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
Disclaimers
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe for or
purchase any securities in the Company or as an inducement to make an offer or invitation with respect to
those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of
this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe that
any such statements and projections are either false, misleading or incorrect, it does not warrant or guarantee
such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to
making any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or
any errors in or omissions, from any information, statement or opinion contained in this announcement. This
announcement contains information, ideas and analysis which are proprietary to Theta Gold.
Forward-Looking and Cautionary Statements
This announcement may refer to the intention of Theta Gold Mines regarding estimates or future events which
could be considered forward looking statements. Forward looking statements are typically preceded by words
such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
and may be influenced by such factors including but not limited to funding availability, market-related forces
(commodity prices, exchange rates, stock market indices and the like) and political, environmental or economic
events (including government or community issues, land owners, global or systemic events). Forward looking
statements are provided as a general reflection of the intention of the Company as at the date of release of the
document, however, are subject to change without notice, and at any time. Future events are subject to risks
and uncertainties, and as such results, performance and achievements may in fact differ from those referred to
in this announcement. Mining, by its nature, and related activities including mineral exploration, are subject to
a large number of variables and risks, many of which cannot be adequately addressed, or be expected to be
assessed, in this document. Work contained within or referenced in this report may contain incorrect
statements, errors, miscalculations, omissions and other mistakes. For this reason, any conclusions, inferences,
judgments, opinions, recommendations or other interpretations either contained i
Share your feedback