Sample results confirm recoverable gold from TGME TSF
Released
Released
Announcement PDF
30 July 2024
ASX ANNOUNCEMENT
(ASX: TGM)
METALLURGICAL TEST RESULTS CONFIRM THAT GOLD IS
RECOVERABLE FROM THE TGME TAILINGS STORAGE FACILITY AND
ROCK DUMPS (174,000 OZ AU)
Highlights from the Metallurgical Test Work completed by MAK Analytical:
Composite samples were collected for metallurgical test work. These samples obtained
from the main tailings dam were collected from drill samples and additional samples were
collected from historic surface rock dumps via trenching.
Table 1 Highlights the best laboratory results for the composite samples.
Sample No.
Type
Head Grade
Gold Recovery %
Gold (g/t)
TGME A
Tailings Dam Material
1.24 g/t
58.95%
Beta and Peach Tree
Surface Rock Dump
0.94 g/t
95.43%
Vaalhoek 1
Surface Rock Dump
1.19 g/t
95.46%
Note:
•
•
•
•
•
•
TGME A sample: material from the main tailings dam
Top 9 metres of the Main Tailings Dam contains a high grade gold zone (Figure 3)
The Beta and Peach Tree samples are from surface rock dumps from the historical
mining of the Beta mine, which is over 60% of the current mine schedule.
Beta Mine gold recovery in the Feasibility Study is set at 88%, results show a higher
average recovery of 95%.
Vaalhoek 1 samples – collected from the Vaalhoek mine area. Vaalhoek resource
currently does not form part of the LOM schedule.
174,000 oz of gold sit on the surface at the TGME Mine site area.
Theta Gold Mines Limited ABN 30 131 758 177
Suite 80, Level 35 (Servcorp), International Tower One, 100 Barangaroo Avenue, Sydney NSW 2000
Tel: +61 2 8046 7584 Email: info@thetagoldmines.com
www.thetagoldmines.com
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX:TGM) is pleased to announce the results
of its metallurgical test work completed at MAK Analytical Laboratories (Appendix A contains the
details of the metallurgical test work). The laboratory test results achieved were in line with our
expectations and further confirming the flowsheet development work undertaken in the feasibility
phase (2022). The combined total surface sources (tailings dams and rock dumps) around the TGME
Plant contain 174,000 oz gold (See JORC Table in Appendix B).
Figure 1: Location Map TGME
The samples were collected during the confirmatory drilling and sampling program completed by SGS
(South Africa) Pty Ltd (“SGS”) in March 20241 in conjunction with Power China representatives. The
drill results for the TGME Main Tailings Storage Facility (“Main TSF”) have confirmed that the tailings
dams contain gold at the expected grades (See Table 2) (ASX Release May 2024)2.
Table 2 below shows the summary of the drill results for the TGME Main Tailings dam, where the
Company is considering early processing through Theta’s new gold plant to provide early cashflow
while the underground Beta mine is being developed. Appendix A has a detailed set of drill results and
sampling methodology.
1
ASX Release dated 27 March 2024 titled, “Drilling and Sampling on the TGME Tailings Dams”.
2
ASX Release dated 7 May 2024 titled, “Drilling Results from TGME Confirm High Grade Resources”.
SGS South Africa (Pty) (Assay Laboratory) Ltd, engaged by TGM’s preferred Engineering Procurement
and Construction (“EPC”) partner Yellow River Co., Pty (“YRC”) (a subsidiary of Power Construction
Corporation of China (“PowerChina”)) to complete a drilling and sampling program at various tailing
dams around the TGME plant. The drill locations of the Main TSF are indicated in Figure 2 below.
Table 2: Summary of the gold assays for TGME Main Tailings Dam drill results
Figure 2 – Drill hole location map of the holes drilled by the SGS team at the TGME Main TSF
The program is now complete with a total of 407 meters drilled over the TGME Main, Blyde and Glynns
Lydenburg TSFs with 117 meters drilled into the TGME Main TSF. Together with Power China, the
immediate focus understanding the gold recovery of the TGME Main TSF to allow mill feed at the start
of the project (see Appendix A). Metallurgical test work is now completed, allowing the Company the
possibility of adding surface sources (tailings and historic rock dumps) to its early production schedule
and thereby generating early cash flow ahead of the planned underground development.
Figure 3: Shows Main Tailings Dam cross section showing the distribution of gold values. Note the
higher grades occur in the upper 9 metres.
Theta Gold Chairman Mr Bill Guy stated: “The Company has now completed the Metallurgical test
work, drilling of tailings dams and sampling of the rock dumps, confirming grades and gold recoveries.
“Theta Gold currently records 174,000 ounces of gold JORC Resources (see Appendix B) across
numerous tailings, dams, and dumps around the gold plant. The company will now carefully examine
the possibility of bringing forward gold production ahead of its planned underground operations by
including high-grade zones from our surface sources”.
[ENDS]
This announcement was approved for release by Theta Gold Mines Limited’s Board.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8046 7584
E: billg@thetagoldmines.com
Investor Relations
Australia: Ben Jarvis, Six Degrees Investor Relations: +61 (0) 413 150 448
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
Interactive Investor Hub: http://investors.thetagoldmines.com
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTCQB: TGMGF) is a gold development company that holds a
range of prospective gold assets in a world-renowned South African gold mining region. These assets
include several surface and near-surface high-grade gold projects which provide cost advantages
relative to other gold producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit
(Capital City of Mpumalanga Province).
Following small scale production from 2011 – 2015, the Company is currently focusing on the
construction and financing of a new gold processing plant within its approved footprint at the TGME
plant.
The company has completed a FS in July 2022 for the first four mines Beta, CDM, Frankfort and
Rietfontein (TGME Underground Project). The Base Case LOM plan will comprise a 12.9-year mining
operation starting in 2023 and delivering production of 1.24 million ounces of contained gold.
The estimated development capital or peak funding requirement is USD77 million (AUD102 million),
with the Project forecast to generate a pre-tax NPV10% of USD324 million (AUD432 million) and pretax Internal Rate of Return (IRR) of 65% at the forecast gold price of averaging USD1,642/oz over the
LOM. The Company aims to build a solid production platform to over next 5 years to 160kozpa based
primarily around shallow, open-pit or adit-entry shallow underground hard rock mining sources. Theta
Gold has access to over 43 historical mines and prospect areas that can be accessed and explored, with
over 6.7Moz of historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“TGSA”).
TGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie
Mines (Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment
(“BEE”) entities. The South African Mining Charter requires a minimum of 26% meaningful economic
participation by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in
TGME and Sabie Mines is comprised of a combination of local community trusts, an employee trust
and a strategic entrepreneurial partner.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in
informing interested parties about the Company and should not be considered as an offer or invitation
to subscribe for or purchase any securities in the Company or as an inducement to make an offer or
invitation with respect to those securities. No agreement to subscribe for securities in the Company
will be entered into on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to
believe that any such statements and projections are either false, misleading or incorrect, it does not
warrant or guarantee such statements. Nothing contained in this announcement constitutes
investment, legal, tax or other advice. This overview of Theta Gold does not purport to be all inclusive
or to contain all information which its recipients may require in order to make an informed assessment
of the Company’s prospects. Before making an investment decision, you should consult your
professional adviser, and perform your own analysis prior to making any investment decision. To the
maximum extent permitted by law, the Company makes no representation and gives no assurance,
guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for,
the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omissions, from
any information, statement or opinion contained in this announcement. This announcement contains
information, ideas and analysis which are proprietary to Theta Gold.
The Company confirms that all material assumptions underpinning the production target, or the
forecast financial information derived from the production target continue to apply and have not
materially changed from those previously released to ASX in a Feasibility Study dated 27 July 2022.
COMPETENT PERSON’S STATEMENTS
MINERAL RESOURCES
Mr. Uwe Engelmann confirms that he is the Competent Person for the TGM Mineral Resources as
reported on TGM’s Mineral Resources which is extracted from TGM’s ASX announcement dated 8 April
2021(Initial Maiden Underground Mining Reserve) available to view at www.asx.com.au and was
prepared in accordance with the guidelines of the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012). Mr. Engelmann has
read and understood the requirements of the JORC Code (2012).
Mr. Engelmann is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to the style of mineralisation and type of deposit described in this report
and to the activity for which he is accepting responsibility. Mr. Engelmann (BSc (Zoo. & Bot.), BSc Hons
(Geol.), Pr.Sci.Nat. No. 400058/08, FGSSA), is a director of Minxcon (Pty) Ltd and a member of the
South African Council for Natural Scientific Professions. Mr. Engelmann is a full-time employee of
Minxcon (Pty Ltd and has reviewed this report and consents to the inclusion of the matters based on
his supporting information in the form and context in which it appears.
Metallurgical testwork:
Mr. Rogan Roulstone confirms that he is the Competent Person in terms of Mineral Resources and
Ore Reserves (JORC Code, 2012). Mr. Roulstone has read and understood the requirements of the
JORC Code (2012).
Mr. Roulstone is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to gold extraction and in particular gold extraction from a refractory ore
body. Mr Roulstone is a Chemical Engineering (NHD) that graduated in 1993 and is member of the
SAIMM (705817). Mr Roulstone is the managing director of RM process and has over nine years’
experience on the TGME process plant design.
The information in this announcement that relates to TGM’s Mineral Resources is extracted from
TGM’s ASX announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available
to view at www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code
(2012). TGM confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcement and that all material assumptions and
technical parameters underpinning the Mineral Resources estimates in the relevant market
announcement continue to apply and have not materially changed other than as disclosed in TGM’s
ASX announcement dated 25 October 2021 regarding the TGME Project Permitting Update. TGM
confirms that the form and content in which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
ORE RESERVES
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information
and supporting documentation compiled by Mr. Daniel van Heerden (B.Eng (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director
of Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM
Reg. No. 37309).
Mr Van Heerden has sufficient experience that is relevant to the style of mineralisation under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
JORC Code (2012). Mr van Heerden consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.
The information in this announcement that relates to TGM’s Ore Reserves is extracted from TGM’s
ASX announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available to view
at www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code (2012).
TGM confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcement and that all material assumptions and
technical parameters underpinning the Ore Reserve estimates in the relevant market announcement
continue to apply and have not materially changed other than as disclosed in TGM’s ASX
announcement dated 25 October 2021 regarding the TGME Project Permitting Update. TGM confirms
that the form and content in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
FORWARD-LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold Mines regarding estimates or future
events which could be considered forward looking statements. Forward looking statements are
typically preceded by words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”,
“Conceptual”, “Believes”, “Anticipates”, “Predicted”, “Estimated” or similar expressions. Forward
looking statements, opinions and estimates included in this announcement are based on assumptions
and contingencies which are subject to change without notice, and may be influenced by such factors
including but not limited to funding availability, market-related forces (commodity prices, exchange
rates, stock market indices and the like) and political, environmental or economic events (including
government or community issues, land owners, global or systemic events). Forward looking
statements are provided as a general reflection of the intention of the Company as at the date of
release of the document, however, are subject to change without notice, and at any time. Future
events are subject to risks and uncertainties, and as such results, performance and achievements may
in fact differ from those referred to in this announcement. Mining, by its nature, and related activities
including mineral exploration, are subject to a large number of variables and risks, many of which
cannot be adequately addressed, or be expected to be assessed, in this document. Work contained
within or referenced in this report may contain incorrect statements, errors, miscalculations, omissions
and other mistakes.
For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable
basis for making the forward looking statements contained in this document, with respect to any
production targets, resource statements or financial estimates, however further work to define
Mineral Resources or Reserves, technical studies including feasibilities, and related investigations are
required prior to commencement of mining. No liability is accepted for any loss, cost or damage
suffered or incurred by the reliance on the sufficiency or completeness of the information, opinions or
beliefs contained in this announcement.
Theta Gold undertakes no obligation to update publicly or release any revisions to these forwardlooking statements to reflect events or circumstances after today’s date or to reflect the occurrence
of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly,
you should not place undue reliance on any forward-looking statement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments
to support the estimation of Ore Reserves. There is no assurance that the intended development
referred to will proceed as described and will rely on access to future funding to implement.
Theta Gold Mines believes it has reasonable grounds the results of the Feasibility Study. At this stage
there is no guarantee that funding will be available, and investors are to be aware of any potential
dilution of existing issued capital. The production targets and forward-looking statements referred to
are based on information available to the Company at the time of release and should not be solely
relied upon by investors when making investment decisions. Theta Gold cautions that mining and
exploration are high risk, and subject to change based on new information or interpretation,
commodity prices or foreign exchange rates. Actual results may differ materially from the results or
production targets contained in this release. Further evaluation is required prior to a decision to
conduct mining being made. The estimated Mineral Resources quoted in this release have been
prepared by Competent Persons as required under the JORC Code (2012). Material assumptions and
other important information are contained in this release.
Cautionary Statement for the LOM Base Case – The Base Case is presented as potential upside to the
Project. However, the Base Case is supported by a significant portion of Inferred Mineral Resources.
Inferred Mineral Resources inherently have a lower level of confidence and although it would be
reasonable to expect that the majority of Inferred Mineral Resources would upgrade to Indicated
Mineral Resources with continued exploration, it should not be assumed that such upgrading will
occur. The realisation of the full potential of the Base Case as presented thus cannot be guaranteed.
APPENDIX A
DETAILED METHODOLOGY AND GOLD RECOVERY RESULTS
Table 1 below shows the laboratory results for the four composite samples.
Sample No.
Type
Head Grade g/t
Gold Recovery %
Tailings Dam Material
1.24 g/t
58.95%
Beta and Peach Tree Surface Rock Sump
0.94 g/t
95.43%
Vaalhoek 1
Surface Rock Sump
1.19 g/t
95.46%
Vaalhoek 2
Surface Rock Sump
1.05 g/t
61.42%
TGME A
Gold Recovery method
The feed to the process plant can be categorized into two primary types, namely oxidized ore body
and an ore body containing carbonaceous and sulphide material. Within the definition of the
aforementioned description the samples can then be categorized as follows:
•
•
Sample categorized as oxidized ore (Free milling)
o Beta and Peachtree
o Vaalhoek 1
o Vaalhoek 2
Samples categorized as sulphide ore
o TGME A- Current tailings storage facility
The laboratory method of the treating the samples followed the process developed during the
feasibility phase, which is as follows:
The net result of this testwork is defined in Table 1.
Oxidized ore (Beta and Peachtree, Vaalhoek 1&2):
The test results achieved are based on the green lines above and can be broadly described as follows:
•
•
•
•
•
•
ROM ore received and subjected to a three (3) stage crushing circuit,
Post the crushing circuit the ore is finely ground to a product size of 80% pass 75 micron,
The resulting slurry post milling in then thickened to 50% solids,
The slurry is then subjected to a 24h CIL leach,
Detoxification of residual cyanide follows the CIL process,
Thickening of final tails is then performed.
Of interest to note is that the gold extraction reaction was complete within 4 hours.
The sulphide ore (TGME A):
The test results flow sheet description can briefly described as follows:
•
•
•
•
•
•
•
•
•
Attrition via a ball mill
Thicken the resulting slurry to 30% solids,
Float the carbonaceous material and treat this via a high carbon activity CIL 24 hour bottle roll
The tailings resulting from carbon floatation is the conditioned and the sulphide material is floated,
The concentrate post flotation is then subject to fine grinding with a resulting product of 80% passing
38 micron,
The tails from the sulphide floatation and the finely ground sulphide concentrate is then subjected to
a high shear reactor with direct oxygen (laboratory used peroxide) injection into a high circulating
volume shear reactor.
Post the oxidation process the resulting slurry is adjusted for pH control,
Post pH adjustment a 24-hour CIL leach is performed on the resulting slurry,
Detoxification of residual cyanide is performed on the material post leaching,
•
Thickening of final tails is the final step.
The results illustrate and confirm the process and technology selection in the feasibility phase.
Sampling Collection Method for the Surface Rock Dumps
The surface rock dump sampling programme was aimed at confirming the historical grades utilised
in the inferred Mineral Resource practically and cost-effectively. The sampling exercise was not
aimed at producing a compliant indicated Mineral Resource but rather at confirming the grades.
The sampling programme was aimed at gathering as many individual samples as practically possible
to produce enough samples to obtain a fair spread across the surface rock dumps. These samples
were then averaged to get a representative grade of the material.
The sampling programme was designed to test the surface spread as well as the depth profile. This
was achieved by conducting a surface sampling grid across the rock dump as well as taking samples
along two traverses (length and width) to sample the depth profile.
The traverse sampling pits were excavated by Excavator and TLB, to depths up to 4.5 meters and
were executed at regular 15 m intervals along the traverses for both the width and length of the
rock dump site, as depicted in Figure 1.
Vaalhoek Rock Dump
Peach Tree Rho Rock Dump
Figure 1 - Traverse sampling pits
Sampling was conducted at uniform 1.5 m intervals down these sample sections (pits), with
extracted samples subsequently transferred onto a conveyor belt next to the pit for further
processing.
The cone and split sample procedure was used to obtain a manageable-sized sample, Refer to Figure
2. The cone and split sample technique serves as a methodical approach for partitioning large
sample material into representative subsamples. This methodology proves particularly advantageous
when dealing with substantial sample sizes requiring reduction for subsequent analytical, testing, or
storage purposes.
Figure 2 – Coning and Quartering of Samples
The cut samples were crushed at the on-site laboratory and subsequently screened to a 1 cm sieve
fraction. Following this initial process, the sample was subjected to two additional rounds of splitting
utilising a 2-way rotary splitter to generate two distinct samples designated for dispatch to Power
China and Ready Lead Laboratory, respectively. Refer to Figure 3. A total of 344 samples were
prepared, with 172 samples delivered to the offices of Power China and 172 samples delivered to
Ready Labs.
Figure 3 – On-site Laboratory prep work.
Sampling Collection Method for Main Tailings Dam
SGS South Africa (Pty) (Assay Laboratory) Ltd utilised a power auger drill rig. The portable rigs utilise a
rotating spiral encased in a stainless-steel core barrel. This method ensures that contamination of the
sample is minimised. Because the drilling is performed dry, under relatively stable conditions, no back
mixing of the samples or chemical alteration of the elements in the samples can occur. The auger is
advanced to refusal (“hard objects”) or until the soil is encountered, indicating that the base or natural
ground level below the tailings has been reached.
The rig utilises a 50 mm nominal bore drill rod producing approximately 2-3 kg of sample per meter
drilled. Samples were drawn in 1.5 m increments, which resulted in between 3 and 4.5 kg of sample
per increment. Final hole samples potentially had a smaller increment if they hit refusal before 1.5m
was completed.
All the samples collected were indexed on-site and divided into two equal samples by making use of a
two-way sample splitter. These samples were placed in labelled calico bags with one duplicate sample
delivered to Ready Leads Assay Testing Laboratory (“Ready Labs”) in South Africa and one sample
delivered to Power China for storage. Ready Labs is located at Cloverfield Ave & Outeniqua Road
Eastvale Springs Gauteng and is a SANAS-accredited testing Laboratory with certificate number T0689.
Ready Labs completed a 50-gram fire assay on the samples with internal QA&QC using AMIS0882-85
gold standards. Gold standards were also added by Power China to samples dispatched to Ready Labs.
The gold standard return assays within specification limits.
Currently, only samples at the Main Tailings Storage Facility were composited on the mine site and
dispatched to Super Labs and MAK Analytics for gold recovery test work. For the Main Tailings Storage
Facility, the composite head grades conformed to grade expectations.
The drill hole locations were collected by a hand handle sub 5m GPS unit and validated by spatial
reference to the TGME Main TSF landform features (See tables below). Drill hole depth was
determined by the depth of the tailing dam or drill refusal.
Table 3: Drill Hole Locations
Hole Number
Drill Hole Co-Ordinates
TGME 1
24 54.921S
030 44.369E
TGME 2
24 54.883S
030 44.432E
TGME 3
24 54.826S
030 44.518E
TGME 4
24 54.841S
030 44.400E
TGME 5
24 54.922S
030 44.423E
TGME 6
24 54.861S
030 44.431E
TGME 7
24 54.885S
030 44.307E
TGME 8
24 54.948S
030 44.371E
TGME 9
24 54.913S
030 44.312E
TGME 10
24 54.826S
030 44.441E
Note: Hole co-ordinates in WGS 84
SGS South Africa (Pty) (Assay Laboratory) completed the drill program under the supervision of the
TGME mine-site staff and Power China representatives. The drill program was designed by Minxcon.
The drilling results support the existing JORC-Indicated Mineral Resource for the TGME Main TSF.
These drill results were also validated by comparing the results to the 2015 drill program by Minxcon.
Table 4: Drill Results for the TGME Main TSF
Hole
number
TGME
Sample
End
Depth (m)
1
1.5
21/03 TGME 001 NO.1B DEPT. 1.5M 1
1.542
1
3
21/03 TGME 001 NO.1B DEPT. 3M 1
1.270
1
4.5
21/03 TGME 001 NO.1B DEPT. 4.5M 1
1.514
1
5
21/03 TGME 001 NO.1B DEPT. 5M 1
2.016
2
1.5
21/03 TGME 002 NO.1A DEPT. 1.5M 1
1.508
2
3
21/03 TGME 002 NO.1A DEPT. 3M 1
1.514
2
4.5
21/03 TGME 002 NO.1A DEPT. 4.5M 1
1.581
2
5
21/03 TGME 002 NO.1A DEPT.5M 1
1.667
3
1.5
21/03 TGME 003 NO.1B DEPT. 1.5M 1
1.474
Sample Name
Grade
(g/t)
3
3
21/03 TGME 003 NO.1B DEPT. 3M 1
1.660
3
4.5
21/03 TGME 003 NO.1B DEPT. 4.5M 1
1.905
3
6
21/03 TGME 003 NO.1B DEPT.6M 1
1.793
3
4.5
21/03 TGME 003 NO.1B DEPT.7.5M 1
0.870
3
9
21/03 TGME 003 NO.1B DEPT.9M 1
0.754
3
10.5
21/03 TGME 003 NO.1B DEPT.10.5M 1
0.996
3
12
21/03 TGME 003 NO.1B DEPT.12M 1
1.225
3
13.5
21/03 TGME 003 NO.1B DEPT.13.5M 1
1.071
3
15
21/03 TGME 003 NO.1B DEPT.15M 1
0.916
3
16.5
21/03 TGME 003 NO.1B DEPT.16.5M 1
1.107
3
18
21/03 TGME 003 NO.1B DEPT.18M 1
3.373
3
19.5
21/03 TGME 003 NO.1B DEPT.19.5M 1
0.876
4
1.5
21/03 TGME 004 NO.1B DEPT.1.5M 1
1.304
4
3
21/03 TGME 004 NO.1B DEPT.3M 1
1.825
4
4.5
21/03 TGME 004 NO.1B DEPT.4.5M 1
1.186
4
6
21/03 TGME 004 NO.1B DEPT.6M 1
0.794
4
7.5
21/03 TGME 004 NO.1B DEPT.7.5M 1
0.717
4
9
21/03 TGME 004 NO.1B DEPT.9M 1
0.870
4
10.5
21/03 TGME 004 NO.1B DEPT.10.5M 1
0.992
4
12
21/03 TGME 004 NO.1B DEPT.12M 1
0.916
4
13.5
21/03 TGME 004 NO.1B DEPT.13.5M 1
0.830
4
15
21/03 TGME 004 NO.1B DEPT.15M 1
0.119
4
16.5
21/03 TGME 004 NO.1B DEPT.16.5M 1
0.717
5
1.5
21/03 TGME 005 NO.1B DEPT. 1.5M 1
1.265
5
3
21/03 TGME 005 NO.1B DEPT. 3M 1
1.310
6
1.5
21/03 TGME 006 NO.1B DEPT.1.5M 1
2.351
6
3
21/03 TGME 006 NO.1B DEPT.3M 1
1.581
6
4.5
21/03 TGME 006 NO.1B DEPT.4.5M 1
0.952
6
6
21/03 TGME 006 NO.1A DEPT.6M 1
0.359
6
7.5
21/03 TGME 006 NO.1B DEPT.7.5M 1
0.474
6
9
21/03 TGME 006 NO.1B DEPT.9M 1
1.310
6
10.5
21/03 TGME 006 NO.1B DEPT.10.5M 1
0.988
7
1.5
22/03 TGME 007 NO.1B DEPT.1.5M 1
1.270
7
3
22/03 TGME 007 NO.1B DEPT.3M 1
1.315
7
4.5
22/03 TGME 007 NO.1B DEPT.4.5M 1
1.462
7
6
22/03 TGME 007 NO.1B DEPT.6M 1
0.356
7
7.5
22/03 TGME 007 NO.1B DEPT.7.5M 1
0.677
7
9
22/03 TGME 007 NO.1B DEPT.9M 1
0.593
7
10.5
22/03 TGME 007 NO.1B DEPT.10.5M 1
0.833
7
12
22/03 TGME 007 NO.1B DEPT.12M 1
0.830
7
13.5
22/03 TGME 007 NO.1B DEPT.13.5M 1
0.873
7
15
22/03 TGME 007 NO.1B DEPT.15M 1
0.717
7
16.5
22/03 TGME 007 NO.1B DEPT.16.5M 1
4.111
7
18
22/03 TGME 007 NO.1B DEPT.18M 1
0.711
7
19.5
22/03 TGME 007 NO.1B DEPT.19.5M 1
0.754
7
21
22/03 TGME