ASX ANNOUNCEMENT AND MEDIA RELEASE
(ASX: TGM)
QUARTERLY REPORT
1 October 2025 to 31 December 2025
Theta Gold Mines Limited (‘Theta Gold’ or the ‘Company’) (ASX: TGM) is pleased to report on its
activities for the quarter ended 31 December 2025.
The December quarter marked a decisive step forward in transforming TGM into South Africa’s next
emerging gold producer. With construction momentum accelerating across the Transvaal Gold Mining
Estates (TGME) Gold Project, the Company enters 2026 with strengthened financial capacity, clear
operational visibility, and a fully aligned development pathway toward first gold production.
Highlights:
During the December 2025 Quarter:
• Construction advancing - with bulk earthworks, civil works, water systems, platforms and gold-room
foundations progressing on schedule.
• Gold plant build schedule - Plant commissioning on target end of Q4 2026.
• Secured A$60.71
΄2
million (US$39.9 million) - funding made up of equity and debt (before costs).
• Strong operational performance and quality assurance - with all engineering inspections and
concrete strength tests meeting project specification.
• Debt funding - Debt syndication process progressing with debt financiers to cover construction
capital costs. A non‑binding funding agreement for US$80m has been reached with Nebari Partners
LLC as part of a broader TGME Project debt tendering process.
• Long Lead equipment secured - Twin Titan GDM3065 Ball Mills currently being built at MechProTech
along with processing plant equipment items from Kemix (Pty) Ltd and MIP Industries (Pty) Ltd, both
are local manufacturers within 4 hours of the site. Further orders placed for agitators, electrowinning
circuit, thickeners and other plant equipment.
• Workforce growth and local impact - over 70% of non-specialist personnel sourced from nearby
communities and 500+ jobs expected at full production.
• Project remains on schedule and within budget - with clear visibility to first gold and continued
progress across all critical path activities.
Upcoming Conferences -TGM Executive Chairman, Bill Guy will be presenting at 121 Indaba mining
conference in Cape Town - 9/10 February.
Strategic procurement of cutting-edge dual-Titan GDM3065 – 900kW Ball Mill Circuit from MechProTech
(a leading South African engineering firm) executed with build underway. This high-impact order reflects
TGM’s commitment to world-class processing technology and sets the stage for rapid construction
progress.
1 Ref to ASX Release dated 7 October 2025 titled, “TGM secures total (A$51.4m) debt and equity to advance TGME Gold Mine Project”.
2 Ref to ASX Release dated 21 October 2025 titled, “Additional US$6m (A$9.3m) secured and conversion of convertible loans”.
2
Figure 1: Right to left, COO Jacques Du Triou with MechProTech representative to oversee progress of construction
of 2x Titan GDM3065 Ball Mills.
Strong momentum continues, with bulk earthworks and civil engineering packages advancing on
schedule and within budget. These works are critical path items and mark a major milestone toward
building the TGME Gold Plant.
Since project commencement, significant ground movement has been achieved across terraces 2, 3, and
4, with over 12,000 cubic meters of material relocated and positive engineering compaction results
delivered.
Bulk excavations for concrete retaining walls are complete, and all but one base has been cast, with
reinforcement of the final base underway. Project remains firmly on track for commissioning by Q4 2026.
Construction of the gold room platform is advancing (Figure 2), with backfilling and base construction
scheduled shortly. Work on bund wall extensions is progressing well; all bases are cast, five vertical
extensions completed, and the remainder due shortly. These efficiencies leveraged on existing
infrastructure and in-house resources, delivering significant cost savings without compromising quality.
Structural (12) concrete inspections have been completed, with all blinding, steel fixing, and pre-concrete
inspections passing the required checks. Concrete test cube results received from the laboratory confirm
that all samples have achieved target strength.
Every stage is subject to rigorous engineering sign-off and inspections by the engineering team, ensuring
world-class standards and operational integrity.
All personnel already mobilised to site and plans for 500+ jobs at full production, the TGME Gold Project
is driving local employment and economic uplift, supported by AI-driven training and a clear path to
production.
3
Figure 2: Civil works underway for Gold Room foundations.
Figure 3: Removing old engineering structures
4
Figure 4: Retaining wall foundation steelworks
Corporate Governance and Funding Update
TGME Project Financing Update during the quarter ended 31 December 2025
Three Tranche Placement and Private Placements:
During the quarter, the Company announced it had received equity and debt commitments funding
totalling A$60.7 million, (US$39.9 million).
Summary of that funding is as follows:
• On 7 October 2025 the Company announced it has received funding commitments by way of
equity and debt for up to A$51.4 million, (US$33.9 million) made up of an equity component of
A$36.3 million, (US$23.9 million) and a debt component of A$15.2 million, (US$10 million); and
• On 21 October 2025 the Company announced it had received a further equity commitment of
A$9.3 million, (US$6 million) to two new Cornerstone Investors.
Share Purchase Plan (SPP)
On 19 November 20253
, the Company announced the completion of Share Purchase Plan (SPP) which
raised $120,000 (before costs) through the issue of 571,425 new fully paid ordinary shares (SPP Shares).
In addition, SPP participants will receive 1 free attaching option (SPP Option) for every 2.38 SPP shares
subscribed for in the SPP. As a result, the Company issued SPP Options will have an exercise price of
A$0.32 (32 cents) and expiry date that is 18 months from date of grant. The Company has advised that it
intends to apply for quotation of the SPP Options.
3 Ref to ASX Release dated 19 November 2025, titled “Completion of Share Purchase Plan and Options Offer”.
5
The Company will use placement funds from the equity raised to:
• Progress bulk earthworks and complete plant site terraces
• Progress civil engineering works and construction
• Purchase Geosynthetic Stabilenka – a geotextile used for reinforcement
• Finalise water management systems; and
• Support working capital needs
Commercial Lender’s Syndication Underway
TGM has engaged specialist advisors to support the process of securing the remaining project‑level
funding required to complete plant construction. As part of this broader engagement, on 16 December
2025 the Company announced that it had entered into a non‑binding term sheet (“Term Sheet”) with
Nebari Partners, LLC or its affiliates (“Nebari” or the “Lender”) for a proposed US$80 million (~A$120
million) senior secured loan facility (the “Proposed Facility”) to support the development and
commissioning of the TGME Gold Mine Project.
Upon closing of the facility agreement, TGM will be fully-funded which will allow the Company to
complete the construction and commissioning phase of the TGME Gold Processing Plant. The Proposed
Facility provides flexibility in amount and timing of funding drawdowns, with Tranche 1 of US$45 million
expected to be available early 2026 with the option to draw down Tranche 2 of up to US$35 million at
the request of the Borrower as early as 3 months after closing, subject to achieving certain conditions
precedent and milestones.
Key Indicative Terms of the Proposed Facility
• Tranche 1: US$45 million, (A$68 million) to be funded at closing;
• Tranche 2: up to US$35 million, (A$52 million) (at Borrower’s discretion) available after 3 and up
to 24 months of closing, subject to satisfaction of agreed conditions precedent and operational
milestones;
• Term: five (5) years (60 months) from draw-down;
• Interest: 3-month SOFR (subject to a 3.75% floor) plus 10.0% per annum.);
• Arrangement fee: 1.25% is payable;
• Interest roll-up: 12 months interest capitalisation from the date of Tranche 1 payout;
• Amortisation: No amortisation for the first 18 months from the Closing Date, after which
straight-line amortisation shall be payable for each calendar month at a fixed monthly amount
equal to 1.5% of the original principal amount;
• Original Issue Discount (“OID”): 3.0% on each tranche;
• Security: first-ranking security interest over substantially all assets of the Company and its
subsidiaries; all subsidiaries will provide guarantees;
• Warrants: warrants to subscribe for ordinary shares in Theta Gold equal to 27% of the funded
amount, exercisable at a 40% premium to the 20-day VWAP at signing or announcement (as
applicable), expiring 48 months after each funding tranche.
6
Conditions Precedent
Funding under the Proposed Facility will be subject to customary conditions precedent, including:
• Completion and satisfactory outcome of due diligence by Nebari;
• Approval by Nebari’s investment committee;
• Execution of binding loan, guarantee and security documentation;
• Receipt of all required regulatory, board and shareholder approvals;
• Completion of Tranche Two and Three Cornerstone Investor Subscription Agreements as
previously announced on 7 and 21 October 20254
΄5
and already approved by shareholders at
the 2025 AGM for the remaining balance of US$13 million in equity funding prior to closing.
The Company will continue to provide updates with regards to due diligence progress or terms with
debt funders.
Cash Position
As of 31 December 2025, the Group had US$12.5 (A$19) million in cash.
In accordance with ASX Listing Rules 5.3.1 and 5.3.2, the Company provides the following summary of
expenditures incurred during the Quarter:
Mining exploration costs (including exploration labour) US $ -
Mining Production and Development Costs US $ 7,150,000
Licence to Operate Costs US $ 98,000
Total US $ 7,248,000
The Company’s Quarterly Appendix 5B reported US$119,000 in payments to related parties and their
associates, as noted in the Appendix 5B this payment was for directors' fees and consulting fees.
Capital Structure
The current capital structure of the Company at 31 December 2025 is as follows:
Number
Fully paid ordinary shares (ASX: TGM) 1,046,552,399
Listed /Unlisted options and performance rights (see “Annexure C”) 225,162,680
The estimated market capitalisation of TGM was A$183 million6
(US$123 million) as at 31 December
2025.
[ENDS]
This announcement was approved for release by Theta Gold Mines Limited’s Board.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8046 7584 E: billg@thetagoldmines.com
4 Ref to ASX Release dated 7 October 2025, titled “TGM Secures A$51M Debt & Equity Funding for TGME Gold Mine”.
5 Ref to ASX Release dated 21 October 2025, titled “Additional US$6M Secured and Conversion of Convertible Loans”.
6 Calculated as 1,046,552,399 fully-paid ordinary shares on issue at the closing price of AU$0.175 cents per share as at 31 December 2025
converted at the RBA exchange rate of AUD:USD of 0.6693.
7
Investor Relations and Media Communications
We’re committed to keeping you informed and involved. Sign up for the Engage IR App and
Investor Hub today and join the conversation.
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
8
Competent Persons Statement
MINERAL RESOURCES
Mr. Uwe Engelmann confirms that he is the Competent Person for the TGM Mineral Resources as
reported on TGM’s Mineral Resources which is extracted from TGM’s ASX announcement dated 8 April
2021(Initial Maiden Underground Mining Reserve) available to view at www.asx.com.au and was
prepared in accordance with the guidelines of the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012). Mr. Engelmann has read
and understood the requirements of the JORC Code (2012).
Mr. Engelmann is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to the style of mineralisation and type of deposit described in this report and
to the activity for which he is accepting responsibility. Mr. Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.),
Pr.Sci.Nat. No. 400058/08, FGSSA), is a director of Minxcon (Pty) Ltd and a member of the South African
Council for Natural Scientific Professions. Mr. Engelmann is a full-time employee of Minxcon (Pty Ltd and
has reviewed this report and consents to the inclusion of the matters based on his supporting information
in the form and context in which it appears.
METALLURGICAL RESULTS
Mr. Rogan Roulstone confirms that he is the Competent Person in terms of Mineral Resources and Ore
Reserves (JORC Code, 2012). Mr. Roulstone has read and understood the requirements of the JORC Code
(2012).
Mr. Roulstone is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to gold extraction and in particular gold extraction from a refractory ore body.
Mr Roulstone is a Chemical Engineering (NHD) that graduated in 1993 and is member of the SAIMM
(705817). Mr Roulstone is the managing director of RM process and has over nine years’ experience on
the TGME process plant design.
The information in this announcement that relates to TGM’s Mineral Resources is extracted from TGM’s
ASX announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available to view at
www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code (2012). TGM
confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical
parameters underpinning the Mineral Resources estimates in the relevant market announcement
continue to apply and have not materially changed other than as disclosed in TGM’s ASX announcement
dated 25 October 2021 regarding the TGME Project Permitting Update. TGM confirms that the form and
content in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
ORE RESERVES
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information
and supporting documentation compiled by Mr. Daniel van Heerden (B.Eng (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director
of Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg.
No. 37309).
Mr Van Heerden has sufficient experience that is relevant to the style of mineralisation under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
JORC Code (2012). Mr van Heerden consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this announcement that relates to TGM’s Ore Reserves is extracted from TGM’s ASX
announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available to view at
www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code (2012). TGM
confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical
9
parameters underpinning the Ore Reserve estimates in the relevant market announcement continue to
apply and have not materially changed other than as disclosed in TGM’s ASX announcement dated 25
October 2021 regarding the TGME Project Permitting Update. TGM confirms that the form and content
in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement.
About Theta Gold Mines Limited
Theta Gold Mines Limited (ASX: TGM) is an advanced gold development company focused on unlocking
value from its extensive suite of projects in South Africa’s renowned Eastern Transvaal goldfields. The
Company’s flagship TGME Gold Project offers near surface and shallow underground ore bodies with
compelling cost advantages, with 6.1m Oz’s of gold Resource.
TGM’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga
Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). Following small scale production from 2011 – 2015, the Company is currently
focusing on the construction and financing of a new gold processing plant.
TGM holds 100% of Theta Gold SA (Pty) Ltd, which in turn owns 74% of TGME and Sabie Mines, meeting
Black Economic Empowerment (BEE) ownership standards as per South African Mining Charter
requirements.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe
for or purchase any securities in the Company or as an inducement to make an offer or invitation with
respect to those securities. No agreement to subscribe for securities in the Company will be entered into
on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe
that any such statements and projections are either false, misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax
or other advice. This overview of Theta Gold does not purport to be all inclusive or to contain all
information which its recipients may require in order to make an informed assessment of the Company’s
prospects. Before making an investment decision, you should consult your professional adviser, and
perform your own analysis prior to making any investment decision. To the maximum extent permitted
by law, the Company makes no representation and gives no assurance, guarantee or warranty, express
or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity,
accuracy, suitability or completeness of, or any errors in or omissions, from any information, statement
or opinion contained in this announcement. This announcement contains information, ideas and analysis
which are proprietary to Theta Gold.
10
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such
as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without
notice, and may be influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection
of the intention of the Company as at the date of release of the document, however are subject to change
without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables and
risks, many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for
making the forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to
support the estimation of Ore Reserves. There is no assurance that the intended development referred to will
proceed as described, and will rely on access to future funding to implement. Theta Gold believes it has
reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee that funding will be
available, and investors are to be aware of any potential dilution of existing issued capital. The production
targets and forward looking statements referred to are based on information available to the Company at the
time of release, and should not be solely relied upon by investors when making investment decisions. Theta
Gold cautions that mining and exploration are high risk, and subject to change based on new information or
interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the
results or production targets contained in this release. Further evaluation is required prior to a decision to
conduct mining being made. The estimated Mineral Resources quoted in this release have been prepared by
Competent Persons as required under the JORC Code (2012). Material assumptions and other important
information are contained in this release.
11
ANNEXURE A
Mineral Resource and Mining Reserves
Combined Mineral Resource as at 1 February 2021
Resource
Classification
Type of Operation
Combined Mineral Resource
Tonnage Gold Grade Gold Content
Mt g/t Kg koz
Measured
Underground 0.091 5.37 489 15.7
Open pit
Tailings
Total Measured 0.091 5.37 489 15.7
Indicated
Underground 4.774 6.21 29 661 953.7
Open Pit 8.109 2.14 17 364 558.2
Tailings 5.244 0.83 4 373 140.6
Total Indicated 18.128 2.84 51 398 1,652.5
Inferred
Underground 21.452 5.22 111 880 3597.0
Open pit 4.907 5.11 25 057 805.6
Tailings 0.023 0.57 13 0.4
Rock Dump 0.885 1.20 1 059 34.0
Total Inferred 27.267 5.06 138,009 4,437.0
Grand Total 45.485 4.17 189,896 6,105.2
Notes:
1. Columns may not add up due to rounding.
2. Gold price used for the cut-off calculations is USD1,500/oz.
3. UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35 g/t.
4. Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
5. Mineral Resources are stated as inclusive of Ore Reserves.
6. Mineral Resources are reported as total Mineral Resources and are not attributed.
Mineral Resources for the TGM Tailings Dams as at 1 February 2021
Mineral Resource
Classification
Surface
Operation
Reef
Tonnage Gold
Grade
Gold Content
Mt g/t kg koz
Indicated
Glynn’s Lydenburg Tailings 1.211 0.80 972 31.3
Blyde 1 Tailings 0.590 0.73 434 14.0
Blyde 2 Tailings 0.280 0.83 234 7.5
Blyde 3 Tailings 0.316 0.87 275 8.8
Blyde 4 Tailings 0.164 0.72 119 3.8
Blyde 5 Tailings 0.022 0.61 14 0.4
TGM Plant Tailings 2.661 0.87 2,325 74.8
Total Indicated 5.244 0.83 4,373 140.6
Mineral Resource
Classification
Surface
Operation
Reef
Tonnage Gold
Grade
Gold Content
Mt g/t kg koz
Inferred Blyde 3a Tailings 0.023 0.57 13 0.4
Total Inferred 0.023 0.57 13 0.4
Notes:-
1. Mineral Resource cut-off of 0.35 g/t applied.2.
2. TGM Plant tailings: 10% discount applied for volume uncertainty.
3. Gold price used for the cut-off calculations is USD1,500/oz.
4. Mineral Resources are stated as inclusive of Ore Reserves.
5. Mineral Resources are reported as total Mineral Resources and are not attributed.
12
Mineral Resources for the TGM Rock Dumps as at 1 February 2021
Mineral Resource
Classification
Surface Operation Reef
Tonnage Gold
Grade
Gold Content
Mt g/t kg koz
Inferred Vaalhoek Rock Dump 0.121 1.64 199 6.4
Inferred South East (DGs) Rock Dump 0.408 0.93 379 12.2
Inferred Peach Tree Rock Dump 0.092 1.23 114 3.7
Inferred Ponieskrantz Rock Dump 0.129 1.63 211 6.8
Inferred Dukes Clewer Rock Dump 0.134 1.16 156 5.0
Total Inferred 0.885 1.20 1,059 34.0
Notes:-
1. Mineral Resource cut-off of 0.35 g/t applied.
2. Gold price used for the cut-off calculations is USD1,500/oz.
3. Mineral Resources are stated as inclusive of Ore Reserves.
4. Mineral Resources are reported as total Mineral Resources and are not attributed.
Combined Underground and Open Pit Ore Reserves as at 1 February 2021
Operation
Grade Tonnes Au Content
g/t kt kg koz
Beta 6.51 1,662 10,822 347.94
Frankfort 4.13 319 1,317 42.33
CDM 2.31 385 889 28.58
Open Pit (MR83) 2.74 2,164 4,996 160.61
Total 3.98 4,530 18,023 579.46
Notes:
1. The information pertaining to the Ore Reserve estimation is detailed in the notes of the Ore Reserve tabulation for the individual
operations.
13
ANNEXURE B
Mining Rights and Applications for Mining Rights
MR No Description Farms Effective
Date
Expiry Date Remarks
Northern Tenements (MR 83, MR 340, MR 341, MR 10167)
MR 83
TGME
Underground
Mines
(including
Frankfort, Beta,
Theta, CDM)
Portions 1, 2, 3, 4, 5 and the Remaining
Extent of Frankfort 509KT, Krugers Hoop
527 KT, Portions 1, 2 and the Remaining
Extent of Morgenzon 525 KT, Peach Tree
544 KT, 18, 42, 43, 44 and Remaining
Extent of Ponieskrans 543 KT and Portion 1
and the Remaining Extent of Van der
Merwes Reef 526 KT
09-May-25 08-May-38
MR83, originally
granted on 16
October 2013, has
been renewed for a
further 13 years
MR 340 Hermansburg
Portion of the Remaining Extent of
Hermansburg 495KT
10-Jul-13 09-Jul-23
Granted
Renewal submitted
Refer Note 1
MR 341 PTD’s
Portions 1 and 2 and a Portion of the
Remaining Extent of Grootfontein 562KT
25-Sep-19 16-Feb-22
Granted
Renewal submitted
MR 10167 Pilgrims Rest
Desire 563 KT, Remaining Extent and
Portions 1, 2, 3, 12, 14, 15, 17, 18, 19,20, 22
and 23 of Doornhoek 545 KT, Remaining
Extent and Portion 1, 2 and 3 of Rotunda
Greek 510 KT, Vaalhoek 474 KT,
Buffelsfontein 452 KT, Remaining Extent
and Portion 1 of Willemsoord 476 KT,
Sacramento 492 KT, Granite Hill 477 KT,
Blackhill 528 KT, Manx 475 KT, Klondyke
493 KT and Hermansburg 495 KT
Refer Note 2 Refer Note 2
Consolidation of
Prospecting Rights
10255PR,
10404PR and
10254PR
Granted not yet
executed
Southern Tenements (MR 198, MR 358, MR 433, MR 10161)
MR 198 Elandsdrift Portions 1 and 2 of Elandsdrift 220JT 18-Mar-08 17-Mar-09
Granted
Renewal submitted
MR 358 Rietfontein
Portion of the Remaining Extent and Portion
2 and 3 of the farm Spitskop 195 JT, Portion
of Portion 16 of Waterval 168 JT and
Portion of the Remaining Extent of Maliveld
Vallei 192 JT
05-Jun-13 04-Jun-28
Section 102
amendment
application
pending to
incorporate
Portions 1, 4 and a
portion of portion
6 of the farm
Rietfontein 193 JT
MR 433 Glynns Lydenburg
Portion 5 of Grootfontein 196JT and
Remaining Extent of Olifantsgeraamte
198JT
12-Nov-13 11-Nov-23
Granted
Renewal submitted
MR 10161 Sabie
Spitzkop 195JT, Portions of the Remaining
Extent and Portion 1 of Hendriksdal 216JT,
Grootfontein 196JT, Waterval 168JT, Sheba
219JT, Vertroosting 218JT,
Olifantsgeraamte 198JT, Rietfontein 193JT
Refer Note 3 Refer Note 3
Consolidation of
Prospecting
Rights, 10005PR,
660PR, 10252PR
Granted not yet
executed
Note 1:
The period of grant of the mining right will be determined upon execution thereof. In the South African context, mining rights may
be granted for up to 30 years and are renewable thereafter.
14
ANNEXURE C
Listed / Unlisted Options and Performance Rights
Number Performance Hurdle/Vesting Date
(if applicable)
Exercise
Price
Expiry Date
OPTIONS
4,550,000
NA
$0.12 30 Sept
2027
900,000
NA
$0.17 30 Sept
2027
2,650,000
NA
$0.17 30 Sept
2027
300,000
NA
$0.25 20 Sept
2027
34,568,769 Exercise price an 8% discount to the 15 Day VWAP (no less
than $0.13)
$0.13 17 Sep
2026
11,237,568 Exercise price an 8% discount to the 15 Day VWAP (no less
than $0.13)
$0.13 2 Oct
2026
23,138,057 Exercise price an 8% discount to the 15 Day VWAP (no less
than $0.13)
$0.13 31 Oct
2026
23,668,639 Exercise price an 8% discount to the 15 Day VWAP (no less
than $0.13)
$0.13 03 July
2027
10,000,000
NA
$0.20 25 May
2027
10,000,000
NA
$0.25 25 May
2027
10,000,000
NA
$0.25 25 May
2027
3,000,000
NA
$0.12 30 Sept
2028
29,050,000
NA
$0.15 30 Sept
2028
3,550,000
NA
$0.17 30 Sept
2029
1,400,000
NA
$0.25 30 Sept
2029
24,249,647
TGMO – Listing Options
$0.32 01 Jun
2027
192,262,680 TOTAL OPTIONS
PERFORMANCE RIGHTS
700,000 12 months production (ounces) on schedule as per Theta
Project Optimised Feasibility Study or from underground mine
production, or the combination thereof, at AISC of US$855/oz
(+/- 10%)
Nil 30 Sep
2027
2,650,000 Consecutive 3 months >100k annualised ounces Nil 30 Sep
2027
3,800,000 Consecutive 3 months >150k annualised ounces Nil 30 Sep
2027
4,400,000 Completion of Funding Nil 30 Sept
2028
5,700,000 First Gold Pour Nil 30
Share your feedback
Discover