Quarterly Activities Report
Released
Released
Announcement PDF
31 October 2021
ASX ANNOUNCEMENT
QUARTERLY REPORT
1 July to 30 September 2021
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM | OTC: TGMGF) is pleased to report
on its activities for the period from 1 July to 30 September 2021.
HIGHLIGHTS
DURING THE QUARTER – Q1 FY 2022
•
Extensive underground sampling program underway
•
Data acquired is to be applied to Definitive Feasibility Study (DFS) which is progressing to plan
•
On 7 September Minxcon was appointed as the Mine design engineer for the TGME
underground project with expected DFS completion for Beta, Frankfort, CDM and Rietfontein
by the First quarter of 2022
Figure 1: Frankfort underground trial mining drilling
Theta Gold Mines Limited ABN 30 131 758 177
Suite 80, Level 35 (Servcorp), International Tower One, 100 Barangaroo Avenue, Sydney NSW 2000
Tel: +61 2 8046 7584 Email: info@thetagoldmines.com
www.thetagoldmines.com
POST QUARTER – OCTOBER 2021
•
Trial mining commences at Frankfort Gold Mine
•
Minister of Forestry, Fisheries and the Environment has declared a forest nature reserve over,
amongst other properties, a portion of Theta’s MR83 mining right areas.
SUMMARY
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM |OTC: TGMGF) is pleased to confirm
that trial mining is now advancing at the Frankfort underground gold mine, with the results from this
program being instrumental for determining and optimising the selected mining and blasting method. The
results of this programme will be used to finalise the Underground Definitive Feasibility Study (DFS). The
DFS which includes the first three mines (Frankfurt, CDM and Beta) the company aims to put into
production, is expected to be completed in Q1 2022. Theta expects to make updates on progress prior to
completion.
The Frankfort Mine site, where trial mining is now underway, is located approximately 30km north of the
closed TGME gold plant. Modern underground mining methods and technologies will be used to enable
refinement of the long-hole open stoping mining methods. The initial drill holes are being drilled with a
Boart Longyear S36 Drill. A reputable explosives supplier is participating in the trials of pumpable emulsion
explosives. The trial mining data, including drill hole size, drill pattern, and explosive charge rate will inform
the DFS and provide proof of concept. The trial mining at Frankfort mine is also representative of the same
mining method to be applied at Beta and CDM mines.
Extensive underground sampling is also underway to assess the Beta South Mine ore body and other
potential zones of mineralisation. These results will be instrumental in Theta upgrading its Mineral
Resource Estimate (MRE).
Figure 2: Frankfort underground drill rig being installed
2
The on-site focus will be on mine pre-development and resource upgrading work that is expected to be
completed within the next 6 months. The availability of additional funding will enable the progress of
phase 1 underground project that includes Beta, CDM, Frankfort and Rietfontein Mines. Minxcon has been
appointed as the Mine design engineer for the phase 1 underground project with a DFS for these three
mines expected to be completed by Q1 2022. The inclusion of the Rietfontein Mine into the DFS will give
this mine its first Mine Reserve and lead to an updated Resource Statement.
COMMENT
Theta Chairman Mr Bill Guy stated: “Commencing trial mining is a critical milestone for Theta and is
instrumental in the development of a sustainable and profitable underground mining operation for which
we are permitted at the Frankfort Mine. Importantly, results from the trial mining program will clearly
demonstrate that the narrow gold reef system that was previously mined by hand in the early 20th century
can now be mined cost effectively using modern mining techniques. Having experienced local people and
modern machinery at work in the underground section of this project is a rewarding development for
Theta’s team and we are confident it will add significant value for our shareholders. We will share a
number of videos of the team in action via the Theta Twitter and website so that investors can follow
progress. The trial mining results are a key component of the underground DFS which is advancing to plan.
As well, the extensive underground sampling program that is underway is expected to deliver an increase
in the size and quality of our mineral resource estimate.”
OPERATIONS
Trial Mining
In September 2021, the Board authorised management to commence trial mining at Frankfort. In order
to commence with the trial mining programme, the closed Frankfort Gold mine was selected as it has the
necessary permits in place and offers easy access to the reef through an extensive network of
underground tunnels and developments adits. The upfront site work required for mining, such as making
safe and installing necessary stope support and lighting was completed timeously and has resulted in trail
mining commencing.
Figure 3: Gold reefs being Mark up to for trail mining
3
Due to the long lead time for delivery of the Sandvik Longhole DL230L drill rig, the Company acquired a
modified S36 machine (see Figures 2 & 3). This machine will be able to drill the desired holes and, most
importantly, the acquisition prevented operational and potential delays to the DFS. Holes of varying
depths (up to 22 meters), and spacing of 0.6m, will be drilled to determine an effective drilling depth and
diameter. This will allow the Theta team to determine a drilling pattern and mining layout that gives
optimum fragmentation of the ore and allowing for effective use of explosives, support, labour, and other
consumables. The drilling rig is operated by trained and skilled operators.
Figure 4: Underground haul way clean up at Frankfort Mine
Several explosives suppliers provided proposals for the mining trial. Following an analysis of the
proposals, with particular regard to the compatibility of their explosives and accessories for the specifics
of the site, Enaexe (formerly SASOL explosives) were chosen as the preferred provider. Theta team’s
selection was primarily based on the availability of the products, the equipment that would be required
and the willingness of Enaexe to partner with Theta during the trial mining period.
Underground Sampling
Several investigations into the Beta South Mine have also been undertaken to determine the extent of
historical mining, as well as the condition of the underground working places. Pleasingly, the working
places are mostly accessible and well supported. Some areas, however, will need to be re-supported to
ensure safety. An extensive sampling exercise will be undertaken in the coming weeks to sample the
historic pre-developed underground workings. With more than 250 sampling points identified from the
historical mine plans, the sampling program will consist of a 12 meter spaced sampling grid, cut into the
rock with representative samples taken from the reef. The collected samples will be processed and
analysed at SGS laboratories.
4
Figure 5: Underground sampling crew reviewing mine plans for Beta South Mine Complex
Definitive Feasibility Update
The definitive feasibility study for the phase 1 underground project is progressing very well and is planned
for completion during Q1 2022. Results from the trial mining and further metallurgical test work will be
incorporated, as well as more accurate costs and detailed mine, ventilation, metallurgical plant, tailings
and surface infrastructure designs.
Concurrently, the Rietfontein mine pre-feasibility study is also making good progress. It is expected to add
to the company’s Reserve statement in the short term and will be progressed to a definitive level in early
2022. The current mine planning utilises a 2.1g/t cut-off grade (Figure 6).
Figure 6: Mine Planning – Rietfontein’s mining designs and layouts are currently being designed at a cutoff grade of 2.1g/t
Making Safe
A rock engineer was engaged to give input with regards to the support design and the integrity of the
existing support units in the underground workings and the main roadway into the Frankfort Mine.
Support units that were found to be damaged or structurally compromised are currently in the process of
being removed and replaced. Areas were identified in the main roadway, specifically at intersections
5
where the span was found to be excessive and would require additional support in the form of interlocking
packs. The support design recommended by the rock engineer will be used to support the area before the
commencement of rock drilling activities.
Figure 7: Team installing new supports and marking out Frankfort Mine in preparation for Trial mining
Environmental Social Governance (ESG)
The Theta Environmental Social Governance (ESG) program will be progressed with the continuation of
environmental studies and engineering designs as part of the Environmental Authorisation and Water Use
Licence Amendment Applications. The license to operate the project will be future strengthened with the
appointment of Kongiwe environmental engagement specialists to lead the stakeholder engagement
programme.
Environmental rehabilitation will continue with old mining footprint cleanups at the Beta North Mine and
the demolition of the old process plant. These environmental activities will be performed by using local
community enterprises.
Engineering work on the tailing dam extension and the final design will be completed by Q4 2021. This
engineering design will increase the tails capacity to 2.1 million tonnes, subject to final approval. The
tailings dam will have a life of mine of 9 years and support the current phase 1 underground project.
6
Figure 8: First aid support and training
Additional personnel that will be utilised for the duration of the trial mining were sourced from the
community in Pilgrim’s Rest. Over and above the mandatory medical screening, individuals were required
to provide proof of vaccination for Covid-19. The individuals were then put through the mine’s
recruitment process which includes initial training covering the Company’s policies, the Mine Health and
Safety Act and its requirements, basic strata control and general hygiene and environmental training.
Figure 9: Workers at the TGME plant & mines receiving Covid-19 vaccinations
7
In support of the Government’s COVID-19 vaccination roll-out, the Company arranged for employees to
receive vaccination at the mine (see Figure 9). The employees embraced this initiative with 99% of all
employees now vaccinated.
Figure 10 Underground Mining Team
Permitting Update.
It has come to Theta’s attention via the SA Government Gazette that the Minister of Forestry, Fisheries
and the Environment (“DFFE”) has declared a forest nature reserve over, amongst other areas, part of
Portion 3 of the farm Morgenzon 525KT and Portion 1 and a part of the remaining extent of the farm
Peach Tree 544KT. As a result, approximately 607 hectares of some 62,000 hectares in tenement areas
held by Theta are potentially affected, comprising close to 20% of the potential resource base and the
first phase of underground mining (refer to Annexure D).
As a result, a permit is require for continuation of mining. The company will now apply for a state forest
permit, including proposed conditions for continued mining.
The proposed conditions (subject to Ministerial approval) will likely relate to localised rehabilitation of
historic surface disturbance, alien invasive plant, riparian zone, erosion and sediment and firebelt
management; and be aimed at rehabilitating the ecological and hydrological functioning of the upper
portions of the Blyde River catchment and replenishing the licenced abstraction volume. Mining
8
Figure 11– New power line installation across the Northern section of our Mining Rights (Close to
Vaalhoek and Frankfort Mines.) The powerline will add to the required capacity for the new gold plant
and extends from north to south over 20 km within the current Mining Rights area.
CORPORATE
Cash Position and Funding
As at 30 September 2021, the Group had US$5.376M in cash.
During the Quarter, the Company completed a funding package of AUD 10.37 million, cornerstoned by
2Invest AG from Germany. The fund raising initiative comprised the following elements:
9
•
•
Frankfurt listed investment company 2Invest AG invested A$6 million in a Secured Bond issue by
Theta Gold to fund pre-development working capital, and
2Invest AG also cornerstoned, along with various Australian and overseas high net worth
investors, an A$4.5 million equity raise (A$3 million in direct placement and up to A$1.23 million
in a Shareholder Purchase Plan).
The fund raising initiative has been completed, all funds received and all bonds, shares and options have
been issued. An EGM was held in August 2021 to facilitate the fund raising initiative and all resolutions
were overwhelmingly supported. Additionally, the Company ratified a number of historic equity issues,
freeing up its 15% placement capacity.
Executive Changes
Mr Rob Thompson resigned from the Board on 13 August 2021.
On 1 July 2021, the Company appointed Mr Heath Roberts as Company Secretary and Mr Phillip Rankin
as Acting Chief Financial Officer.
Mr Roberts, a solicitor based in Sydney, Australia has acted as Company Secretary and/or Director of ASX
listed entities for over 25 years.
Mr Rankin, also Sydney based, is a practising accountant with extensive experience as CFO in mining and
mining-services operations. He was CFO of an ASX-listed gold miner and has held directorships in other
ASX listed entities.
Capital Structure
The current capital structure of the Company is as follows –
Fully paid ordinary shares (ASX: TGM | OTC: TGMGF)
Unlisted options and performance rights (see “Annexure C”)
Number
516,860,904
65,523,077
This announcement was authorised for release by the Board of Directors.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
Competent Persons Statement
10
Mineral Resources and Ore Reserves
The information in this report relating to mineral resources and ore reserves is based on, and fairly
reflects, the information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. &
Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a
member of the South African Council for Natural Scientific Professions and Mr Daniel van Heerden
(B.Ing (Mining M.Com (Business Management), member of Engineering Council of South Africa (Pr.Eng.
Reg. No. 20050318)), a director of Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining
and Metallurgy (FSAIMM Reg. No. 37309).
Metallurgical results
The information in this report relating to exploration results is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Phil Bentley (MSc (Geol), MSc (MinEx),
Pr.Sci.Nat. No. 400208/05, FGSSA), a consultant to the Company and a member of the South African
Council for Natural Scientific Professions.
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” dated 16 May 2019,
“Optimised Mine Schedule for Theta Open Pit Starter Project Delivers Significant Improvements” dated
20 April 2020, “Excellent Bulk Metallurgical Results Provides Confidence For Underground PFS” and
“Initial Maiden Underground Mining Reserve 419,000 oz Gold” dated 8 April 2021 were released to the
Australian Securities Exchange (ASX) on those dates. The Company confirms that:
•
•
it is not aware of any new information or data that materially affects the information included in
the ASX announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcements continue to apply and have not materially changed.
11
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTC: TGMGF) is a gold mining development company that holds a
range of prospective gold assets in a world-renowned South African gold mining region. These assets
include several surface and near-surface high-grade gold projects which provide cost advantages relative
to other gold producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit
(Capital City of Mpumalanga Province). Following small scale production from 2011 – 2015, the Company
is currently focussing on the construction of a new gold processing plant within its approved footprint at
the TGME plant, and for the processing of the Theta Open Pit oxide gold ore. Nearby surface and
underground mines and prospects are being evaluated.
The Company aims to build a solid production platform to over 160 kozpa based primarily around shallow,
open-cut or adit-entry hard rock mining sources. Theta Gold has access to over 43 historical mines and
prospect areas that can be accessed and explored, with over 6.7Moz of historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“SGSA”).
SGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines
(Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”)
entities. The BEE shareholding in TGME and Sabie Mines is comprised of a combination of local community
trusts, an employee trust and a strategic entrepreneurial partner.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe
for or purchase any securities in the Company or as an inducement to make an offer or invitation with
respect to those securities. No agreement to subscribe for securities in the Company will be entered into
on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe
that any such statements and projections are either false, misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax
or other advice. This overview of Theta Gold does not purport to be all inclusive or to contain all
information which its recipients may require in order to make an informed assessment of the Company’s
prospects. Before making an investment decision, you should consult your professional adviser, and
perform your own analysis prior to making any investment decision. To the maximum extent permitted by
law, the Company makes no representation and gives no assurance, guarantee or warranty, express or
implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy,
suitability or completeness of, or any errors in or omissions, from any information, statement or opinion
contained in this announcement. This announcement contains information, ideas and analysis which are
proprietary to Theta Gold.
12
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which
could be considered forward looking statements. Forward looking statements are typically preceded by
words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”,
“Anticipates”, “Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and
estimates included in this announcement are based on assumptions and contingencies which are subject
to change without notice, and may be influenced by such factors as funding availability, market-related
forces (commodity prices, exchange rates, stock market indices and the like) and political or economic
events (including government or community issues, global or systemic events). Forward looking
statements are provided as a general reflection of the intention of the Company as at the date of release
of the document, however are subject to change without notice, and at any time. Future events are subject
to risks and uncertainties, and as such results, performance and achievements may in fact differ from those
referred to in this announcement. Mining, by its nature, and related activities including mineral
exploration, are subject to a large number of variables and risks, many of which cannot be adequately
addressed, or be expected to be assessed, in this document. Work contained within or referenced in this
report may contain incorrect statements, errors, miscalculations, omissions and other mistakes. For this
reason, any conclusions, inferences, judgments, opinions, recommendations or other interpretations
either contained in this announcement, or referencing this announcement, cannot be relied upon. There
can be no assurance that future results or events will be consistent with any such opinions, forecasts or
estimates. The Company believes it has a reasonable basis for making the forward looking statements
contained in this document, with respect to any production targets, resource statements or financial
estimates, however further work to define Mineral Resources or Reserves, technical studies including
feasibilities, and related investigations are required prior to commencement of mining. No liability is
accepted for any loss, cost or damage suffered or incurred by the reliance on the sufficiency or
completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments
to support the estimation of Ore Reserves. There is no assurance that the intended development referred
to will proceed as described, and will rely on access to future funding to implement. Theta Gold believes
it has reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee that
funding will be available, and investors are to be aware of any potential dilution of existing issued capital.
The production targets and forward looking statements referred to are based on information available to
the Company at the time of release, and should not be solely relied upon by investors when making
investment decisions. Theta Gold cautions that mining and exploration are high risk, and subject to change
based on new information or interpretation, commodity prices or foreign exchange rates. Actual results
may differ materially from the results or production targets contained in this release. Further evaluation
is required prior to a decision to conduct mining being made. The estimated Mineral Resources quoted in
this release have been prepared by Competent Persons as required under the JORC Code (2012). Material
assumptions and other important information are contained in this release.
13
ANNEXURE A
Mineral Resource and Mining Reserves
Table 1: Combined Underground and Open Pit Ore Reserves as at 1 February 2021
Grade
g/t
Operation
Beta
Frankfort
CDM
Open Pit (MR83)
Total
Notes:
1.
Tonnes
kt
6.51
4.13
2.31
2.74
3.98
Au Content
kg
1,662
319
385
2,164
4,530
10,822
1,317
889
4,996
18,023
koz
347.94
42.33
28.58
160.61
579.46
The information pertaining to the Ore Reserve estimation is detailed in the notes of the Ore Reserve tabulation for the
individual operations.
Table 2: Combined Mineral Resource as at 1 February 2021
Combined Mineral Resource
Resource
Classification
Measured
Type of Operation
Tonnage
Gold Grade
Mt
g/t
Underground
Open pit
Tailings
Total Measured
Indicated
Underground
Open Pit
Tailings
Total Indicated
Inferred
Underground
Open pit
Tailings
Rock Dump
Total Inferred
Grand Total
Notes:
1.
2.
3.
4.
5.
6.
Gold Content
Kg
koz
0.091
5.37
489
15.7
0.091
4.774
8.109
5.244
18.128
21.452
4.907
0.023
0.885
27.267
45.485
5.37
6.21
2.14
0.83
2.84
5.22
5.11
0.57
1.20
5.06
4.17
489
29 661
17 364
4 373
51 398
111 880
25 057
13
1 059
138 009
189 896
15.7
953.7
558.2
140.6
1652.5
3597.0
805.6
0.4
34.0
4 437.0
6 105.2
Columns may not add up due to rounding.
Gold price used for the cut-off calculations is USD1,500/oz.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35
g/t.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
Mineral Resources are stated as inclusive of Ore Reserves.
Mineral Resources are reported as total Mineral Resources and are not attributed.
Table 3: Beta Underground Ore Reserve as at 1 February 2021
Ore Reserve Category
Probable
Total
Notes:
7.
8.
9.
Grade
g/t
Tonnes
kt
6.51
6.51
Au Content
kg
1,662
1,662
10,822
10,822
koz
347.94
347.94
An Ore Reserve cut-off of 170 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Mineral Reserves and are not attributed.
14
Table 4: Frankfort Underground Ore Reserve as at 1 February 2021
Grade
g/t
Ore Reserve Category
Proved
Probable
Total
Notes:
1.
2.
3.
Tonnes
kt
4.24
4.11
4.13
Au Content
kg
60
259
319
koz
8.16
34.16
42.33
254
1,063
1,317
An Ore Reserve cut-off of 150 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 5: CDM Underground Ore Reserve as at 1 February 2021
Grade
g/t
Ore Reserve Category
Probable
Total
Notes:
1.
2.
3.
Tonnes
kt
2.31
2.31
Au Content
kg
385
385
koz
28.58
28.58
889
889
An Ore Reserve cut-off of 121 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 6: Ore Reserves for the Open pit Operations as at 1 February 2021
Ore Reserve Category
in LoM Plan
Probable
Probable
Probable
Total
Notes:
1.
2.
3.
Grade
g/t
2.61
2.43
1.62
2.31
Pit
Browns Hill
Iota
Theta Hill
Reef Tonnes
kt
279
1,490
395
2,164
Au Content
kg
koz
728
23
3,628
117
640
21
4,996
161
An Ore Reserve cut – off of 0.4 g/t was applied.
A gold price of USD 1,300 / oz was used for the cut - off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 7: Total Theta Project - Mineral Resources, 1 February 2021
Resource
Classification
Indicated
Open Pit Mine
Reef
Inferred
Reef
Width
Content
Reef
Tonnes
g/t
1.02
cm
200
cmgt
204
Mt
0.397
Au Content
Kg
404
koz
13.0
Theta & Browns Hill
Shale
Theta & Browns Hill
Theta & Browns Hill
Bevett's
Upper Theta
1.08
223
241
0.856
925
29.7
2.41
100
241
0.651
1 571
50.5
Theta & Browns Hill
Lower Theta
3.79
100
379
0.839
3 178
102.2
Theta & Browns Hill
Beta
2.51
100
251
0.373
938
30.1
Columbia Hill
Bevett's
2.98
114
340
0.108
323
10.4
Columbia Hill
Upper Rho
2.33
402
937
0.897
2 090
67.2
Columbia Hill
Lower Rho
2.51
520
1306
0.981
2 464
79.2
Columbia Hill
Upper Theta
1.06
114
121
0.163
173
5.6
2.29
258
591
5.267
12 066
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Au Content
Theta & Browns Hill
Shale
g/t
1.12
cm
215
cmgt
240
Mt
0.600
Theta & Browns Hill
Theta & Browns Hill
Bevett's
1.17
217
254
Upper Theta
1.86
100
186
Total Indicated
Resource
Classification
Reef
Grade
Open Pit Mine
Reef
Kg
387.9
668
koz
21.5
0.451
528
17.0
0.948
1 762
56.6
15
Theta & Browns Hill
Lower Theta
8.06
100
806
1.384
11 153
358.6
Theta & Browns Hill
Beta
2.17
100
217
0.778
1 686
54.2
Columbia Hill
Upper Rho
5.12
134
687
0.131
673
21.6
3.84
129
497
4.292
16 470
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Au Content
cm
258
cmgt
591
Mt
5.3
Kg
12 066
koz
387.9
Total Inferred
Resource
Classification
Open Pit Mine
Reef
529.5
Indicated
Total Theta Project
All
g/t
2.29
Inferred
Total Theta Project
All
3.84
129
497
4.3
16 470
529.5
2.99
200
598
9.6
28 535
917.4
Total Indicated and Inferred
Notes:
1.
2.
3.
4.
5.
6.
7.
Theta Project (Theta Hill, Browns Hill and Iota) cut-off is 0.35 g/t;
The gold price used for the cut-off calculations is USD 1,500 / oz;
Geological losses applied are 10% for inferred and 5% for Indicated and Measured;
Theta Hill and Browns Hill - Upper Theta Reef, Lower Theta Reef and Beta Reef are diluted grades over 100cm;
Historical mine voids have been depleted from the Mineral Resource;
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion thereof will be
converted to Ore Reserves;
Mineral Resources fall within the mining right 83MR and 341MR.
16
ANNEXURE B
Mining Rights and Applications for Mining Rights
MR No
Description
Farms
Effective Date
Expiry Date
Remarks
16-Oct-13
15-Oct-23
Amendment
application
pending to
include open cut
mining
Refer Note 1
Refer Note 1
Granted
10-Jul-13
09-July-23
Granted
25-Sep-19
16-Feb-22
Granted
NORTHERN TENEMENTS (MR83, MR330, MR340, MR341, MR10167)
Portions 1, 2, 3, 4, 5 and the Remaining
Extent of Frankfort 509KT, Krugers
Hoop 527 KT, Portions 1, 2 and the
Remaining Extent of Morgenzon 525
KT, Peach Tree 544 KT, Portions 18, 42,
43, 44 and Remaining Extent of
Ponieskrans 543 KT and Portion 1 and
the Remaining Extent of Van der
Merwes Reef 526 KT
Portions 1, 2, 3 and the Remaining
Extent of Grootfonteinberg 561 KT and
Remaining Extent of Grootfontein 562
KT
Portion of the Remaining Extent of
Hermansburg 495 KT
MR 83
Greater TGME
MR 330
Beta ReDevelopment &
Grootfontein
Cluster
MR 340
Hermansburg
MR 341
PTD’s
Portions 1 and
Share your feedback
Discover