Quarterly Activities & Cashflow Report - 30 September 2024
Released
Released
Announcement PDF
31 October 2024
ASX ANNOUNCEMENT
(ASX: TGM)
QUARTERLY REPORT
1 July 2024 to 30 September 2024
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM) is pleased to report on its
activities for the quarter ended 30 September 2024.
HIGHLIGHTS
DURING THE SEPTEMBER 2024 QUARTER:
•
•
•
•
•
•
•
Metallurgical test results confirmed recoverable gold from TGME Tailings Storage Facility 1
Theta continues discussions and development plans with Power China subsidiary as the
preferred EPC partner to build Stage One of its TGME Gold Plant and TSF facilities 2
Theta is also in advanced discussions with other international debt funders to provide part
of the CAPEX requirements for the project
Theta’s team is currently preparing design plans for the processing plant for the TGME Gold
Plant to produce gold dore on site
Completion of Tranche 1 US$6 million (A$8.99 million) of two-tranche Placement3
Additional US$2 million (A$3 million) private equity placement completed 4
Full redemption of A$6 million Bond and interest to 2Invest AG
1
Refer to ASX Release dated 30 July 2024 titled, “Metallurgical test results confirm that gold is recoverable from the TGME
Tailings Storage Facility and Rock Dumps (174,000 Oz AU)”.
2
Refer to ASX Release dated 14 February 2024 titled, “Theta Gold selects PowerChina’s subsidiary as its preferred EPC Partner to
build its stage one TGME Gold Plant and TSF Facilities estimate at US$30 million”.
3 Refer to ASX Release dated 6 May 2024 titled, Theta Inks US$10m Equity Funding Placement to Strengthen Balance Sheet and
Advance Plant & TSF Construction”.
4 Refer to ASX Release dated 16 September 2024 titled, “US$8 million Private Placement and Full Redemption of AU$6 million
Secured Bonds”
1
OPERATIONS AND DEVELOPMENT UPDATE
Drilling and Sampling on the TGME Gold Mine Tailings Dam
The Company announced that the results of the confirmatory drilling program completed by SGS
(South Africa) Pty Ltd (“SGS”) in March 2024 have been received. The drill results for the TGME
Main Tailings Storage Facility (“Main TSF”) have confirmed the tailings dams contain gold at the
expected grades (See Table 1). Test results for metallurgical gold recovery were released on 30
July 20245.
Highlights from the Metallurgical Test Work completed by MAK Analytical are as follows:
Composite samples were collected for metallurgical test work. These samples obtained from the
main tailings dam were collected from drill samples and additional samples were collected from
historic surface rock dumps via trenching.
Table 1 Highlights the best laboratory results for the composite samples.
Sample No.
Type
Head Grade
Gold Recovery %
Gold (g/t)
TGME A
Tailings Dam Material
1.24 g/t
58.95%
Beta and Peach Tree
Surface Rock Dump
0.94 g/t
95.43%
Vaalhoek 1
Surface Rock Dump
1.19 g/t
95.46%
Note:
•
•
•
•
•
•
TGME A sample: material from the main tailings dam
Top 9 metres of the Main Tailings Dam contains a high grade gold zone (Figure 3)
The Beta and Peach Tree samples are from surface rock dumps from the historical mining
of the Beta mine, which is over 60% of the current mine schedule.
Beta Mine gold recovery in the Feasibility Study is set at 88%, results show a higher
average recovery of 95%.
Vaalhoek 1 samples – collected from the Vaalhoek mine area. Vaalhoek resource
currently does not form part of the LOM schedule.
174,000 oz of gold sit on the surface at the TGME Mine site area.
5 Refer to ASX released dated 30 July 2024 titled, “Metallurgical Test Results Confirm That Gold is Recoverable from the TGME
Tailings Storage Facility and Rock Dumps (174,000 OZ AU)”.
2
Figure 1: Location Map - TSF
The combined tailings dams around the TGME Plant contain in total 141,000 oz gold (See JORC
Table in Appendix A).
Table 2 below is a summary of the drill results for the TGME Main TSF, where the Company is
considering early processing/production through Theta’s new gold plant to provide early
cashflow for the Company whilst development of the underground Beta Mine is underway.
Appendix B has a detailed set of drill results and methodology.
SGS South Africa (Pty) (Assay Laboratory) Ltd, engaged by TGM’s preferred Engineering
Procurement and Construction (“EPC”) partner Yellow River Co., Pty (“YRC”) (a subsidiary of
Power Construction Corporation of China (“Power China”) to complete a drilling and sampling
program at various tailing dams around the TGME plant. The drill locations of the Main TSF are
indicated in Figure 2 below.
3
Table 2: Summary of TGME Main Tailings Dam drill results
Figure 2 – Drill hole location map of the holes drilled by SGS team at the TGME Main TSF
The program is now complete with a total of 407 meters drilled over the TGME Main, Blyde and
Glynns Lydenburg TSFs with 117 meters drilled into the TGME Main TSF. Together with Power
China, the immediate focus is on the TGME Main TSF (see Appendix B. Currently, various selected
samples are being metallurgically tested to allow the Company to decide the possibility of adding
tailings recovery to its early production schedule and generate early cash flow ahead of the
planned underground development. Theta Gold currently records 141,000 ounces of gold JORC
Resources (see Appendix A) across numerous tailings dams around the gold plant.
In total, 174,000 gold ounces sit on the surface, in tailings dams and surface rock dumps,
surrounding the TGME gold plant, including 140,600 ounces of Indicated Resources in various
tailings dams (Refer to JORC Table Appendix A).
4
Figure 3: Shows Main Tailings Dam cross section showing the distribution of gold values. Note the higher
grades occur in the upper 9 metres.
Planning and Design of Plant
The Theta team is currently preparing the design plans and documentation for the TGME Gold
Plant build process. The purpose of this exercise is for the Company to be construction-ready
once the go-ahead decision is made by the Board.
RM Process (Pty) Ltd, a South African-based process engineering company and Eco Elementum
Ltd (“EcoE”), a tailings and environmental engineering company, have been appointed to
complete the final designs for the plant, tailings, and water management. These companies assist
Theta and Power China in compliance with local regulations.
RM Process will also assist with the final designs of the TGME Gold Plant and will form part of the
execution team with Theta and Power China.
The Eco Elementum group of companies provides an array of independent, multidisciplinary, and
integrated environmental science, engineering, and construction services. Eco Elementum will
assist with the final designs of water management systems and assist the design team in
environmental and legal compliance with the Water Use Licence.
Work in Progress:
•
Updated flow sheet
•
75% completion of the scope of works
•
Draft schedule completed for the final plant designs
•
Draft schedules completed for the plant construction
•
Draft schedule completed for the dewatering plant, water management and tailings
deposition
•
69% completion of the tender process and RFQ
•
NDA’s out to all vetted possible OEMs
•
Team integration have started as of the first week of July 2024 (TGME, RM and EcoE)
•
Long leading items identified, at 71% completion
•
Project Execution Plan at 82% completion
5
•
Data sets at 72% completion
Engineering Drilling
As part of the water use licence conditions, Theta is required to drill geotechnical infill holes to
ensure the tailings and existing Plant footprint are not affected by dolomites (voids in the
bedrock). The old gold plant tailing has been in place for 40 years and was previously drilled.
The first holes were completed at an average hole depth of 35m, with samples collected for rock
classification and final designs.
Environmental, Social and Governance (“ESG”)
Ecological Compensation Programme - Implementation Agreement
An Independent Environmental Scientist has been requested to provide us with a proposal to
develop a guideline for the execution of the compensation programme that was developed in
2022. This plan will include recommendations on the Implementation Agreement.
Some key points to be addressed as part of the Ecological Program
•
Integrated rehab plan for upper catchments and coordination capacity
•
On Nature Reserves, control dense Invasive Alien Plant Species (“IAPS”) and revegetate
•
Install, and maintain fire breaks
•
Biocontrol development and release programs
•
Erosion control measures
•
Measure to improve hydrogeology of local catchment
Social and Labour Plan
To mine in South Africa, companies must develop a Social and Labour Plan (“SLP”). This integrated
process involves discussion with the community, local council, and Department of Mines and
Energy.
The SLP focus on community needs and economic uplift for the host community. Table 3 below
shows the work in progress.
Task
Due date
Appointment of SLP Consultant
✓
15 January – 31 January 2024
TGME provides background information
✓
29 January – 02 February 2024
Kick-Off Meeting
✓
05 February – 09 February 2024
Final Socio-Economic Study
✓
09 February 2024
Consultant Document Review
✓
07 February – 20 February 2024
Consultant submit Legal Review
✓
21 February 2024
Workshop session
✓
21 February 2024
Compilation of Draft SLP document
✓
22 February – 10 April 2024
Preparation for SLP Consultations
✓
22 February – 12 April 2024
SLP Consultations
✓
18 - 20 April 2024
6
Task
Due date
Project Priority Lists from Ward Councillors
✓
06 May 2024
Compilation of Final SLP document
✓
22 April – 31 October 2024
TGME Review SLP
02 September – 31 October 2024
Update of SLP based on TGME comments
1 – 15 November 2024
Board Approval - Final SLP
19 – 26 November 2024
Submit endorsement letters to Municipality for signature
27 – 29 November 2024
Final SLP Document
30 November 2024
Present SLP during EIA phase if necessary
28 January – 31 March 2025
Submission of final EIA/EMPR Report, SLP and MWP to the
06 May 2025
DMRE
Table 3: Social and Labour Plan (SLP)
Permitting
Rietfontein Approval Project
The environmental authorisation application was submitted to the DMRE on 10 October 2023
and the final scoping report was submitted on 20 November 2023. The DMRE accepted the Final
Scoping Report on 5 April 2024 and TGME may now proceed to the EIA phase of the
Environmental Authorisation (EA) application process.
CORPORATE GOVERNANCE AND FUNDING UPDATE
Company raises up to US$16 million (~A$24 million) via Equity Placements
Two-tranche Placement - US$10 million (~A$15 million)
Tranche 1:
The Company announced on 6 May 2024 that it had received firm commitments to raise up to
US$10 million (A$15.2 million) via a two-tranche Placement to an existing sophisticated and
professional institutional investor.
The Company further announced on 16 September 2024 that Tranche 1, US$6 million (A$8.99
million) of the two-tranche Placement to the cornerstone institutional investor, Hong Kong
Ruihua Investment Management Limited (HRIM) and its associate companies including Hong
Kong Ruihua Green Development Limited (HRGD), was completed.6
Tranche 2:
As previously advised by the Company 7, HRIM remains committed to providing the remaining
balance of US$4 million (~AU$6 million) to complete Tranche 2 Placement of Shares and Options,
subject to receiving the necessary Shareholder approvals which were obtained at a General
Meeting held on 28 October 2024 and related Condition Precedents8.
6 Refer to ASX release dated 16 September 2024 titled, “US8 million Private Placement and Full Redemption of AU$6 million Secured Bonds”.
7 as per Reference 1.
8 ASX Announcements: “Theta Gold Mines Inks US$10m Equity Funding Placement” dated 6 May 2024 And “Equity Funding Placement Update”
dated 11 June 2024.
7
Tranche 2 Placement Options 9 will be issued on the same terms and pricing as those under
Tranche 1 Placement, on a one (1) free option for every two (2) new Shares issued under Tranche
2.
The exact number of new TGM shares and attaching options issued under Tranche 2 Placement
will be subject to the conversion rate applied (USD:AUD) at the time funds are received by the
Company.
Oversubscribed Private Placement for US$2 million:
The Company also advised on 2 October 2024 that it has received an additional US$2 million
(~AU$3 million) from institutional investors on the same terms as those offered in the twotranche Placement. The Company issued 22,475,136 10 new TGM Shares, at the issue price of
$0.1311 (13 cents) per share, along with approximately 11,237,568 attaching options following
completion of the Placement.
Additional US$4 Million Equity Raised
Theta announced on 26 May 2024 12 it had received firm commitments from existing and new
sophisticated and wholesale investors to raise a further US$4.0 million (AU$6.02 13 million)
(before costs) via Share Subscription Application(s) in a private placement, (June 2024
Placement), on the same terms as the previously announced Two-Tranche US$10 million
Placement announced on 6 May 2024.
Additional proceeds raised in the June 2024 Placement will result in the Company issuing a
further 46,276,11314 million new fully paid TGM Ordinary Shares at the issue price of A$0.13 15
(13 cents) per share along with approximately 23,138,057 new attaching Options to be issued on
a one (1) free Option for every two (2) New TGM Shares issued in the June 2024 Placement.
Each Option will have an exercise price equal to an 8% discount to the 15-day VWAP to the last
closing price at the time of exercise (but no less than $0.13 cents), and an expiry date 2 years
from the date of issue. Options issued under the Placement will not be quoted.
New TGM Shares along with attaching Options in the June 2024 Placement will be issued
following the Company obtaining the necessary Shareholder approvals at a General Meeting
which was held on 28 October 202416.
2Invest AG Secured Bonds Redemption:
Following the completion of the placements mentioned above, the Company announced on 16
September 2024 that it had fully redeemed the AU$6million Secured Bond17 and all outstanding
interest payments from long term investor and lender, 2Invest AG (“2Invest”).
9 Each Option will have an exercise price equal to an 8% discount to the 15-day VWAP to the last closing price at the time of exercise (but no less
than $0.13 cents), and an expiry date 2 years from the date of issue.
10 Number of new shares is calculated after conversion of USD to AUD at a rate of 0.6675 and applying the per share issue price of 1 3 cents.
11 Shares issued under the additional US$2 million Placement will be issued at a 17% discount to the 15-day VWAP.
12 Ref to ASX release dated 26 June 2024 titled, “Theta Completes a Further US4m Private Placement to Complete the Detailed Engineering
Design and Construction Tenders”.
13 The conversion price of (USD:AUD) was based on the closing spot price(s) published by the RBA.
14 The exact number of new TGM shares and attaching Options to be issued in the June 2024 Placement will be dependent on the conversion rate
on the day the US$ funds are received and converted to AU$ by the Company.
15 The issue price per share of $0.13 is a 12.3% discount to the 15-day VWAP of $0.1482.
16 Pursuant to the Share Subscription Application(s), the Company is required to hold a General Meeting of Shareholders within 3 months of
completing the Share Subscription Applications(s) and any securities requiring approval to be passed by a majority of shareholders under an
ordinary resolution.
17 ASX Announcements: “Funding Package to Accelerate TGME Project” dated 2 August 2021.
8
On 30 July 2021, the Company announced it had entered into an AU$6 million Secured Bonds
facility with 2Invest AG made up of fifteen (15) ‘bearer partial bonds’, each with a face value of
AU$400,000 and a maturity date of 31 January 2023, which was later extended by parties.
This full bond redemption frees up the project level security package, allowing it for potential
future project funding requirements.
Issue of Unlisted Options to 2Invest AG
The following unlisted options were issued to long-term investor, 2Invest AG as consideration for
the extension of time to pay interest owing on the Bond. No further unlisted options are required
to be issued following the full repayment of the Bond and all outstanding interest.
•
•
1,000,000 unlisted options, expiry date 30 December, exercise price $0.15
1,000,000 unlisted options, expiry date 28 January 2025, exercise price $0.135
EPC Contracts and Debt Funding Discussions Advance
The Company continues to advance planning and discussions with Power China towards
completing the detailed engineering for the TGME Gold Plant, construction tenders, finalise the
previously announced planned EPC contract for the plant and TSF build and completing debt
funding packages.
Cash Position
As of 30 September 2024, the Group had US$2.1 million in cash.
In accordance with ASX Listing Rules 5.3.1 and 5.3.2, the Company provides the following
summary of expenditures incurred during the Quarter:
Mining exploration costs (including exploration labour)
Mining Production and Development Costs (including trial mining)
Licence to Operate Costs
Total
US
US
US
US
$ 733,121
$ 17,027
$ 4,193
$ 754,341
The Company’s Quarterly Appendix 5B reported US$105,000 in payments to related parties and
their associates as noted in the Appendix 5B this payment was for directors' fees and consulting
fees (including payments relating to current and prior quarters).
Capital Structure
The current capital structure of the Company at 30 September 2024 is as follows:
Fully paid ordinary shares (ASX: TGM)
Unlisted options and performance rights (see “Annexure D”)
Number
780,677,376
101,678,769
The market capitalisation of TGM was A$133 million 18 (US$92m) as at 30 September 2024.
This announcement was authorised for release by the Board of Directors.
18 Calculated as 780,677,376 fully-paid ordinary shares on issue at the closing price of AU$0.17 cents per share as at 30
September 2024 converted at the RBA exchange rate of AUD:USD of 0.6932.
9
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
Theta Gold Mines' Interactive Investor Hub
The Company encourages shareholders to please join the Theta Investor Hub which allows you to ask
questions directly to the Company, view video’s and keep up to date on progress of the TGME Gold Project
at http://investors.thetagoldmines.com.
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
Competent Persons Statement
MINERAL RESOURCES
Mr. Uwe Engelmann confirms that he is the Competent Person for the TGM Mineral Resources as
reported on TGM’s Mineral Resources which is extracted from TGM’s ASX announcement dated 8 April
2021(Initial Maiden Underground Mining Reserve) available to view at www.asx.com.au and was
prepared in accordance with the guidelines of the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012). Mr. Engelmann has
read and understood the requirements of the JORC Code (2012).
Mr. Engelmann is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to the style of mineralisation and type of deposit described in this report
and to the activity for which he is accepting responsibility. Mr. Engelmann (BSc (Zoo. & Bot.), BSc Hons
(Geol.), Pr.Sci.Nat. No. 400058/08, FGSSA), is a director of Minxcon (Pty) Ltd and a member of the South
African Council for Natural Scientific Professions. Mr. Engelmann is a full-time employee of Minxcon
(Pty Ltd and has reviewed this report and consents to the inclusion of the matters based on his
supporting information in the form and context in which it appears.
10
METALLURGICAL RESULTS
Mr. Rogan Roulstone confirms that he is the Competent Person in terms of Mineral Resources and Ore
Reserves (JORC Code, 2012). Mr. Roulstone has read and understood the requirements of the JORC
Code (2012).
Mr. Roulstone is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to gold extraction and in particular gold extraction from a refractory ore
body. Mr Roulstone is a Chemical Engineering (NHD) that graduated in 1993 and is member of the
SAIMM (705817). Mr Roulstone is the managing director of RM process and has over nine years’
experience on the TGME process plant design.
The information in this announcement that relates to TGM’s Mineral Resources is extracted from TGM’s
ASX announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available to view
at www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code (2012). TGM
confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical
parameters underpinning the Mineral Resources estimates in the relevant market announcement
continue to apply and have not materially changed other than as disclosed in TGM’s ASX announcement
dated 25 October 2021 regarding the TGME Project Permitting Update. TGM confirms that the form
and content in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
ORE RESERVES
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information
and supporting documentation compiled by Mr. Daniel van Heerden (B.Eng (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director
of Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg.
No. 37309).
Mr Van Heerden has sufficient experience that is relevant to the style of mineralisation under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
JORC Code (2012). Mr van Heerden consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this announcement that relates to TGM’s Ore Reserves is extracted from TGM’s ASX
announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available to view at
www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code (2012). TGM
confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical
parameters underpinning the Ore Reserve estimates in the relevant market announcement continue
to apply and have not materially changed other than as disclosed in TGM’s ASX announcement dated
25 October 2021 regarding the TGME Project Permitting Update. TGM confirms that the form and
content in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
11
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM ) is a gold development company that holds a range of prospective
gold assets in a world-renowned South African gold mining region. These assets include several surface
and near-surface high-grade gold projects which provide cost advantages relative to other gold producers
in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit
(Capital City of Mpumalanga Province).
Following small scale production from 2011 – 2015, the Company is currently focussing on the construction
and financing of a new gold processing plant within its approved footprint at the TGME plant. The
company has completed a FS in July 2022 for the first four mines Beta, CDM, Frankfort and Rietfontein
(TGME Underground Project). The Base Case LOM plan will comprise a 12.9-year mining operation starting
in 2023 and delivering production of 1.24 million ounces of contained gold.
The estimated development capital or peak funding requirement is USD77 million (AUD102 million), with
the Project forecast to generate a pre-tax NPV10% of USD324 million (AUD432 million) and pre-tax Internal
Rate of Return (IRR) of 65% at the forecast gold price of averaging USD1,642/oz over the LOM. The
Company aims to build a solid production platform to over next 5 years to 160kozpa based primarily
around shallow, open-pit or adit-entry shallow underground hard rock mining sources. Theta Gold has
access to over 43 historical mines and prospect areas that can be accessed and explored, with over 6.7Moz
of historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“TGSA”).
TGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines
(Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”)
entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation
by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie
Mines is comprised of a combination of local community trusts, an employee trust and a strategic
entrepreneurial partner.
12
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe for
or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to
those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of
this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe that
any such statements and projections are either false, misleading or incorrect, it does not warrant or guarantee
such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to
making any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or
any errors in or omissions, from any information, statement or opinion contained in this announcement. This
announcement contains information, ideas and analysis which are proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such
as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
and may be influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection
of the intention of the Company as at the date of release of the document, however are subject to change
without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables and risks,
many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for
making the forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to
support the estimation of Ore Reserves. There is no assurance that the intended development referred to will
proceed as described, and will rely on