Quarterly Activities & Cashflow Report - 31 March 2025
Released
Released
Announcement PDF
30 April 2025
ASX ANNOUNCEMENT
(ASX: TGM)
QUARTERLY REPORT
1 January 2025 to 31 March 2025
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM) is pleased to report on its
activities for the quarter ended 31 March 2025.
HIGHLIGHTS
DURING THE MARCH 2025 QUARTER:
•
•
•
•
•
Theta continues to advance discussions with international debt funders to provide part of
the CAPEX requirements for the project, and is expected to make an announcement of
preferred debt advisors
Pre-development plant construction preparation works underway
Theta’s team have finalised the design for the processing plant for the TGME Gold Plant to
produce gold Dore on site
Theta’s team is examining the potential to add surface gold (174,000 oz) into the upfront
mine schedule with an updated Feasibility Study for Q2.
Long term sophisticated Hong Kong investors convert 30,000,000 unlisted options at 0.12
cents per options into 30,000,000 fully paid ordinary shares, raising US$2.3 million, (A$3.6
million) before costs1
Figure 1: Cleaning of old mill structures in preparation for drilling and blasting
1
Refer to ASX Release dated 28 March 2025 titled, “Allotment of Shares Upon Exercise of Options”.
1
PRE-DEVELOPMENT PLANT CONSTRUCTION WORKS
Based on the final design of the planned bulk earthworks for the Theta processing plant, the team is
currently relocating all material and equipment within the process plant footprint, including the
removal of old structures and buildings. The Company currently has a 50-ton crane on site and has
been dismantling the old plant tanks and removing the thickener.
The team contracted yellow equipment providers from the local community to assist in preparing the
salvage laydown areas. The salvage laydown area is located within the northeast corner of the
processing plant, adjacent to the planned run-of-mine ore storage pad.
Figure 2: Delivery of contracted Grader and Roller
The removal of old steel structures, roofing and mill civils will be removed during the following
weeks. The team plans on drilling and blasting the old mill civils and storing all the steel structures
in the salvage laydown area.
Figure 3: Removal of old mill sections
2
Figure 4: Salvage laydown area
Figure 5: Removal of old conveyor belt structure
Figure 6: Old mill civils to be removed
The pre-project execution work is planned to be completed by the end of May 2025. This work will
ensure that the plant footprint is prepared for the project's bulk earthworks to start without any
delays once the project is ready for execution.
3
OPERATIONS AND DEVELOPMENT UPDATE
In total, 174,000 gold ounces sit on the surface, in tailings dams and surface rock dumps,
surrounding the TGME gold plant, including 140,600 ounces of Indicated Resources in various
tailings dams (Refer to JORC Table Annexure A). Theta is working on adding the surface gold
resources into the mine schedule.
We completed the following tasks on-site as part of preparing to build the gold plant and
finalising the execution documentation.
Description
Completed
Plant Process Design Engineers Appointed – RM Process
✓
Tailings and Environmental Engineers Appointed – Eco Elementum
✓
Additional Metallurgical Test Work
✓
Updated Process Plant Flowsheet
✓
Final Process Plant and Engineering Design
✓
Process Plant footprint layouts and Civil works
✓
Draft schedules for the plant construction
✓
Draft schedule for the dewatering plant, water management and tailings
deposition
✓
Tender process and Requests for Quotes (RFQ)
✓
NDAs signed with all vetted possible Original Equipment Supplies (OEM’s)
✓
Long leading items identified completion
✓
Project Execution Plan completion
✓
Table 1: Provides a summary of the completed design and planning stages of the plant.
On finalising the geotechnical assessment, the plant’s footprint was designed, enabling bulk
earthworks and civil construction to commence once funding becomes available. The plant
design incorporates a 2-meter loss allowance beneath the raft foundations.
Eco Elementum Engineering (“ECOE”) was appointed on 1 July 2024, as the design consultants
for the remining of the TSF and the design of a dewatering plant. The remining project is
structured in phases, with the initial phase covering the Concept and Pre-Feasibility Study
(“PFS”), followed by engineering/feed, procurement, dewatering detailed design and integration,
and construction.
The project began in July 2024, with dolomite studies and samples from the TSF processed by
MAK Analytical Services to mimic the final tailings product. These samples were handed to
suppliers of dry-stacking dewatering plants for testing and design purposes.
ECOE was appointed to conduct a PFS on the underground deposition of tailings from the TGME
process plant. The solution involves using underground voids around the Beta Mine for tailings
4
storage, which will also allow for the permanent closure of the old, mined areas, enabling
uninterrupted mining operations in other areas.
The PFS aims to develop a cost-effective tailings disposal solution by utilizing these underground
voids, with key objectives including:
•
•
•
Providing adequate capacity for tailings storage.
Ensuring ongoing mining operations by managing tailings effectively.
Facilitating the environmental rehabilitation of old mined areas.
A backfill plant will be constructed on the surface, and a conveyor or wet transfer system may be
implemented for efficient material handling. A dewatering step will be necessary to ensure
tailings are prepared with the correct moisture content for backfilling. The environmental
approval process for the backfill project is linked to the completion of the PFS.
Environmental, Social and Governance (“ESG”)
Figure 6: TGME Environmental Sustainability Strategy
An Ecological Compensation Programme - Implementation Agreement
An Independent Environmental Scientist has been requested to provide us with a proposal to
develop a guideline for the execution of the compensation programme that was developed in
2022. This plan will include recommendations on the Implementation Agreement.
Some key points to be addressed as part of the Ecological Program
•
Integrated rehab plan for upper catchments and coordination capacity
•
On Nature Reserves, control dense Invasive Alien Plant Species (“IAPS”) and revegetate
•
Install and maintain fire breaks
•
Biocontrol development and release programs
5
•
Erosion control measures
•
Measures to improve the hydrogeology of local catchment
Social and Labour Plan
To mine in South Africa, companies must develop a Social and Labour Plan (“SLP”). This integrated
process involves discussion with the community, local council, and the Department of Mines and
Energy.
The SLP focus on community needs and economic uplift for the host community. Table 2 below
shows the work in progress.
Task
Appointment of SLP Consultant
TGME provides background information
Kick-Off Meeting
Final Socio-Economic Study
Consultant Document Review
The consultant submits Legal Review
Workshop session
Compilation of Draft SLP document
Preparation for SLP Consultations
SLP Consultations
Project Priority Lists from Ward Councillors
Compilation of the Final SLP document
TGME Review SLP
Update of SLP based on TGME comments
Mine Manager review SLP
COO review SLP
Submit Final SLP to the Board for approval
Final approved SLP Document
Submit endorsement letters to the Municipality for signature
Present SLP during EIA phase if necessary
Submission of final EIA/EMPR Report, SLP and MWP to the DMRE
Due date
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
15 January – 31 January 2024
29 January – 02 February 2024
05 February – 09 February 2024
09 February 2024
07 February – 20 February 2024
21 February 2024
21 February 2024
22 February – 10 April 2024
22 February – 12 April 2024
18 - 20 April 2024
06 May 2024
22 April – 31 August 2024
02 September – 30 November 2024
2 – 6 December 2024
09 – 20 December 2024
07 – 10 January 2025
14 - 28 January 2025
03 February 2025
11 February 2025
08 May – 07 July 2025
17 July 2025
Table 2: Social and Labour Plan (SLP)
Permitting
Rietfontein Integrated Environmental Authorization
TGME submitted an integrated EA application to the DMRE on 10 October 2023 to authorize the
NEMA and NEMWA listed activities for the proposed Rietfontein project.
The scoping report was submitted for public review to all registered I&APs on 12 October 2023.
During the scoping phase public review period stakeholders were identified and scoping phase
meetings were conducted to ensure that all stakeholders understood the proposed project and
project related information. The scoping report was accepted by the DMRE on 4 April 2024 and
TGME continued with the EIA phase of the project.
As part of the EIA phase, the following detailed specialist studies were undertaken:
6
Figure 7: List of Rietfontein specialist studies
Figure 8: Stakeholder Engagement Meetings – Rietfontein Scoping phase
CORPORATE GOVERNANCE AND FUNDING UPDATE
Options Exercised
Allotment of 30,000,000 shares upon conversion of options:
The Company released to the ASX on 28 March 2025 a notice advising that long-term strategic
investors had exercised 30,000,000 unlisted options to raise the company US$2.3 million. The
Company issued 30,000,0002 new TGM Shares, at the issue price of $0.12 (12 cents) per share.
Debt Funding Discussions Advance
The Company continues to advance planning and discussions with debt providers to fund the
CAPEX requirements to build the TGME gold plant.
The Company is currently in discussions with several other international debt funding institutions
with regard to providing part of the CAPEX funding requirements for the project, and is expected
to be in a position to provide more details during the month of May.
2
Refer to ASX release dated 28 March 2025, “Application for quotation of securities”.
7
Cash Position
As of 31 March 2025, the Group had US $2.9 million in cash.
In accordance with ASX Listing Rules 5.3.1 and 5.3.2, the Company provides the following
summary of expenditures incurred during the Quarter:
Mining exploration costs (including exploration labour)
Mining Production and Development Costs (including trial mining)
Licence to Operate Costs
Total
US
US
US
US
$ 513,498
$ 20,014
$ 16,261
$ 549,773
The Company’s Quarterly Appendix 5B reported US$73,000 in payments to related parties and
their associates as noted in the Appendix 5B this payment was for directors' fees and consulting
fees (including payments relating to current and prior quarters).
Capital Structure
The current capital structure of the Company at 31 March 2025 is as follows:
Fully paid ordinary shares (ASX: TGM)
Unlisted options and performance rights (see “Annexure C”)
Number
879,428,626
103,054,394
The estimated market capitalisation of TGM was A$123 million 3 (US$77m) as at 31 March 2025.
This announcement was authorised for release by the Board of Directors.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
Theta Gold Mines' Interactive Investor Hub
The Company encourages shareholders to please join the Theta Investor Hub which allows you to ask
questions directly to the Company, view video’s and keep up to date on progress of the TGME Gold Project
at http://investors.thetagoldmines.com.
3 Calculated as 879,428,626 fully-paid ordinary shares on issue at the closing price of AU$0.14 cents per share as at 31 March
2025 converted at the RBA exchange rate of AUD:USD of 0.628.
8
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
Competent Persons Statement
MINERAL RESOURCES
Mr. Uwe Engelmann confirms that he is the Competent Person for the TGM Mineral Resources as
reported on TGM’s Mineral Resources which is extracted from TGM’s ASX announcement dated 8 April
2021(Initial Maiden Underground Mining Reserve) available to view at www.asx.com.au and was
prepared in accordance with the guidelines of the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012). Mr. Engelmann has
read and understood the requirements of the JORC Code (2012).
Mr. Engelmann is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to the style of mineralisation and type of deposit described in this report
and to the activity for which he is accepting responsibility. Mr. Engelmann (BSc (Zoo. & Bot.), BSc Hons
(Geol.), Pr.Sci.Nat. No. 400058/08, FGSSA), is a director of Minxcon (Pty) Ltd and a member of the South
African Council for Natural Scientific Professions. Mr. Engelmann is a full-time employee of Minxcon
(Pty Ltd and has reviewed this report and consents to the inclusion of the matters based on his
supporting information in the form and context in which it appears.
METALLURGICAL RESULTS
Mr. Rogan Roulstone confirms that he is the Competent Person in terms of Mineral Resources and Ore
Reserves (JORC Code, 2012). Mr. Roulstone has read and understood the requirements of the JORC
Code (2012).
Mr. Roulstone is a Competent Person as defined by the JORC Code, 2012, having more than five years’
experience that is relevant to gold extraction and in particular gold extraction from a refractory ore
body. Mr Roulstone is a Chemical Engineering (NHD) that graduated in 1993 and is member of the
SAIMM (705817). Mr Roulstone is the managing director of RM process and has over nine years’
experience on the TGME process plant design.
The information in this announcement that relates to TGM’s Mineral Resources is extracted from TGM’s
ASX announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available to view
at www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code (2012). TGM
confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical
parameters underpinning the Mineral Resources estimates in the relevant market announcement
continue to apply and have not materially changed other than as disclosed in TGM’s ASX announcement
dated 25 October 2021 regarding the TGME Project Permitting Update. TGM confirms that the form
and content in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
9
ORE RESERVES
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information
and supporting documentation compiled by Mr. Daniel van Heerden (B.Eng (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director
of Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg.
No. 37309).
Mr Van Heerden has sufficient experience that is relevant to the style of mineralisation under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
JORC Code (2012). Mr van Heerden consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this announcement that relates to TGM’s Ore Reserves is extracted from TGM’s ASX
announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve) available to view at
www.asx.com.au and was prepared in accordance with the guidelines of the JORC Code (2012). TGM
confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical
parameters underpinning the Ore Reserve estimates in the relevant market announcement continue
to apply and have not materially changed other than as disclosed in TGM’s ASX announcement dated
25 October 2021 regarding the TGME Project Permitting Update. TGM confirms that the form and
content in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
10
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM ) is a gold development company that holds a range of prospective
gold assets in a world-renowned South African gold mining region. These assets include several surface
and near-surface high-grade gold projects which provide cost advantages relative to other gold producers
in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit
(Capital City of Mpumalanga Province).
Following small scale production from 2011 – 2015, the Company is currently focussing on the construction
and financing of a new gold processing plant within its approved footprint at the TGME plant. The
company has completed a FS in July 2022 for the first four mines Beta, CDM, Frankfort and Rietfontein
(TGME Underground Project). The Base Case LOM plan will comprise a 12.9-year mining operation starting
in 2023 and delivering production of 1.24 million ounces of contained gold.
The estimated development capital or peak funding requirement is USD77 million (AUD102 million), with
the Project forecast to generate a pre-tax NPV10% of USD324 million (AUD432 million) and pre-tax Internal
Rate of Return (IRR) of 65% at the forecast gold price of averaging USD1,642/oz over the LOM. The
Company aims to build a solid production platform to over next 5 years to 160kozpa based primarily
around shallow, open-pit or adit-entry shallow underground hard rock mining sources. Theta Gold has
access to over 43 historical mines and prospect areas that can be accessed and explored, with over 6.7Moz
of historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“TGSA”).
TGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines
(Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”)
entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation
by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie
Mines is comprised of a combination of local community trusts, an employee trust and a strategic
entrepreneurial partner.
11
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe for
or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to
those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of
this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe that
any such statements and projections are either false, misleading or incorrect, it does not warrant or guarantee
such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to
making any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or
any errors in or omissions, from any information, statement or opinion contained in this announcement. This
announcement contains information, ideas and analysis which are proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such
as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
and may be influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection
of the intention of the Company as at the date of release of the document, however are subject to change
without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables and risks,
many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for
making the forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to
support the estimation of Ore Reserves. There is no assurance that the intended development referred to will
proceed as described, and will rely on access to future funding to implement. Theta Gold believes it has
reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee that funding will be
available, and investors are to be aware of any potential dilution of existing issued capital. The production
targets and forward looking statements referred to are based on information available to the Company at the
time of release, and should not be solely relied upon by investors when making investment decisions. Theta
Gold cautions that mining and exploration are high risk, and subject to change based on new information or
interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the
results or production targets contained in this release. Further evaluation is required prior to a decision to
conduct mining being made. The estimated Mineral Resources quoted in this release have been prepared by
12
Competent Persons as required under the JORC Code (2012). Material assumptions and other important
information are contained in this release.
The Company confirms that all material assumptions underpinning the production target, or the forecast
financial information derived from the production target continue to apply and have not materially changed
from that released in the definitive Feasibility Study released to ASX on 27 July 2022.
13
ANNEXURE A
Mineral Resource and Mining Reserves
Combined Mineral Resource as at 1 February 2021
Combined Mineral Resource
Resource
Classification
Measured
Type of Operation
Tonnage
Gold Grade
Mt
g/t
Underground
Open pit
Tailings
Total Measured
Indicated
Underground
Open Pit
Tailings
Total Indicated
Inferred
Underground
Open pit
Tailings
Rock Dump
Total Inferred
Grand Total
Notes:
1.
2.
3.
4.
5.
6.
Gold Content
Kg
koz
0.091
5.37
489
15.7
0.091
4.774
8.109
5.244
18.128
21.452
4.907
0.023
0.885
27.267
45.485
5.37
6.21
2.14
0.83
2.84
5.22
5.11
0.57
1.20
5.06
4.17
489
29 661
17 364
4 373
51 398
111 880
25 057
13
1 059
138,009
189,896
15.7
953.7
558.2
140.6
1,652.5
3597.0
805.6
0.4
34.0
4,437.0
6,105.2
Columns may not add up due to rounding.
Gold price used for the cut-off calculations is USD1,500/oz.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35
g/t.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
Mineral Resources are stated as inclusive of Ore Reserves.
Mineral Resources are reported as total Mineral Resources and are not attributed.
Mineral Resources for the TGM Tailings Dams as at 1 February 2021
Mineral Resource
Classification
Surface Operation
Indicated
Glynn’s Lydenburg
Blyde 1
Blyde 2
Blyde 3
Blyde 4
Blyde 5
TGM Plant
Reef
Tailings
Tailings
Tailings
Tailings
Tailings
Tailings
Tailings
Total Indicated
Mineral Resource
Classification
Inferred
Total Inferred
Notes:1.
2.
3.
4.
5.
Surface Operation
Blyde 3a
Reef
Tailings
Tonnage
Mt
1.211
0.590
0.280
0.316
0.164
0.022
2.661
5.244
Gold
Grade
g/t
0.80
0.73
0.83
0.87
0.72
0.61
0.87
0.83
Gold Content
kg
koz
972
31.3
434
14.0
234
7.5
275
8.8
119
3.8
14
0.4
2,325
74.8
4,373
140.6
Tonnage
Mt
0.023
0.023
Gold
Grade
g/t
0.57
0.57
Gold Content
kg
koz
13
0.4
13
0.4
Mineral Resource cut-off of 0.35 g/t applied.
TGM Plant tailings: 10% discount applied for volume uncertainty.
Gold price used for the cut-off calculations is USD1,500/oz.
Mineral Resources are stated as inclusive of Ore Reserves.
Mineral Resources are reported as total Mineral Resources and are not attributed.
14
Mineral Resources for the TGM Rock Dumps as at 1 February 2021
Mineral Resource
Classification
Inferred
Inferred
Inferred
Inferred
Inferred
Total Inferred
Notes:1.
2.
3.
4.
Surface Operation
Vaalhoek
South East (DGs)
Peach Tree
Ponieskrantz
Dukes Clewer
Reef
Rock Dump
Rock Dump
Rock Dump
Rock Dump
Rock Dump
Tonnage
Mt
0.121
0.408
0.092
0.129
0.134
0.885
Gold
Grade
g/t
1.64
0.93
1.23
1.63
1.16
1.20
Gold Content
kg
koz
199
6.4
379
12.2
114
3.7
211
6.8
156
5.0
1,059
34.0
Mineral Resource cut-off of 0.35 g/t applied.
Gold price used for the cut-off calculations is USD1,500/oz.
Mineral Resources are stated as inclusive of Ore Reserves.
Mineral Resources are reported as total Mineral Resources and are not attributed.
Combined Underground and Open Pit Ore Reserves as at 1 February 2021
Operation
Beta
Frankfort
CDM
Open Pit (MR83)
Total
Notes:
1.
Grade
g/t
Tonnes
kt
6.51
4.13
2.31
2.74
3.98
Au Content
kg
1,662
319
385
2,164
4,530
10,822
1,317
889
4,996
18,023
koz
347.94
42.33
28.58
160.61
579.46
The information pertaining to the Ore Reserve estimation is detailed in the notes of the Ore Reserve tabulation for the
individual operations.
15
ANNEXURE B
Mining Rights and Applications for Mining Rights
MR No
Description
Farms
Effective Date
Expiry Date
Remarks
16-Oct-13
15-Oct-23
Granted
Renewal pending
mining right,
therefore still in
force
Refer Note 1
Refer Note 1
Granted
NORTHERN TENEMENTS (MR83, MR330, MR340, MR341, MR10167)
MR 83
Greater TGME
MR 330
Beta ReDevelopment &
Grootfontein
Cluster
Portions 1, 2, 3, 4, 5 and the Remaining
Extent of Frankfort 509KT, Krugers
Hoop 527 KT, Portions 1, 2 and the
Remaining Extent of Morgenzon 525
KT, Peach Tree 544 KT, Portions 18, 42,
43, 44 and Remaining Extent of
Ponieskrans 543 KT and Portion 1 and
the Remaining Extent of Van der
Merwes Reef 526 KT
Portions 1, 2, 3 and the Remaining
Extent of Grootfonteinberg 561 KT and
Remaining Extent of Grootfontein 562
KT
MR 340
Hermansburg
Portion of the Remaining Extent of
Hermansburg 495 KT
10-Jul-13
09-July-23
Granted
Renewal pending
mining right,
therefore still in
force
MR 341
PTD’s
Portions 1 and 2 and a Portion of the
Remainder Extent of Grootfontein
562KT
25-Sep-19
16-Feb-22
Renewal
submitted
TGME
Desire 563KT, RE and Ptn 1, 2, 3, 12, 14,
15, 17, 18, 19, 20, 22 and 23 of
Doornhoek 545KT, RE and Ptn 1, 2 and
3 Rotunda Greek 510KT, Vaalhoek
474KT, Buffelsfontein 452KT, RE and
Ptn 1 of Willemsoord 476KT,
Sacramento 492KT, Granite Hill 477KT,
Blackhill 528KT, Manx 475KT, Klondyke
493KT, Hermansburg 495KT
MR 10167
Refer Note 1
Refer Note 1
Consolidation of
Prospecting
Rights 10255PR,
10404PR,
10254PR
Granted
SOUTHERN TENEMENTS (MR198, MR358, MR433, MR10161)
Elandsdrift
Heap Leach Pad
Portions 1 and 2 of Elandsdrift 220 JT
MR 358
Rietfontein
Portion of the Remaining Extent and
Portion 2 and 3 of the farm Spitskop
195 JT, Portion of Portion 16 of
Waterval 168 JT and Portion of the
Remaining Extent of Maliveld Vallei 192
JT
05-Jun-13
04-Jun-28
MR 433
Glynn's
Lydenburg
Portion 5 of Grootfontein 196 JT and
Remaining Extent of Olifantsgeraamte
198 JT
12-Nov-13
11-Nov-23
MR198
18-Mar-08
17-Mar-09
Renewal
submitted
Amendment
application
pending to
incorporate
portions of
Portions 1, 4 and
6 of the farm
Rietfontein 193 JT
Granted
Renewal pending
mining right,
therefore still in
force
Note 1:
The period of grant of the mining right