Quarterly Activities & Cashflow Report - 30 Sept'25
Released
Released
Announcement PDF
1
31 October 2025
ASX ANNOUNCEMENT AND MEDIA RELEASE
(ASX: TGM)
QUARTERLY REPORT
1 July 2025 to 30 September 2025
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM) is pleased to report on its activities
for the quarter ended 30 September 2025.
Key Highlights
During the September 2025 Quarter:
• Construction Kicks Off: Bulk earthworks and civil works officially underway at Theta’s 6Moz
Transvaal Gold Mining Estates (TGME) Gold Mine Project – a major step toward first gold.
• Capital Raise Secured: US$4 million1
(before costs) -Funds deployed to accelerate earthworks, water
management systems, and site civils.
• Board Strengthened: Strategic appointments and management changes to drive execution.
• Debt Funding Momentum: Debt syndication process with commercial co-lenders progressing to
cover construction CAPEX.
Post Quarter End Summary Update:
• Secured A$60.72
΄3
million, (US$39.9 million) in funding made up of equity and debt
• Share Purchase Plan (SPP) – opened on 24 October 2025
Figure 1: Site visit with the execution team and contractors August 2025
1 Ref to ASX Release dated 3 July 2025 titled, “TGM Approves TGM Gold Project Plus US$4 Million Placement”
2 Ref to ASX Release dated 7 October 2025 titled, “TGM secures total (A$51.4m) debt and equity to advance TGME Gold Mine Project”.
3 Ref to ASX Release dated 21 October 2025 titled, “Additional US$6m (A$9.3m) secured and conversion of convertible loans”
2
Construction and Development
Earthworks and Civils underway:
• Construction in Full Swing: Bulk earthworks and civil works have started at the TGME Gold Mine
Project – Theta’s 6Moz flagship gold project
• Experienced Partners Secured: PICM and Mainpro leading site works; RM Process and Eco
Elementum driving engineering oversight.
• Building Essential Infrastructure: Roads, platforms, dams, water systems, and foundations for
the gold plant are taking shape.
• Local Jobs Driving Growth: 70% of the workforce hired locally, backed by training programs to
boost skills and community benefits.
• Funding Support: Secured investor support for near-term construction, earthworks and civils
now moving ahead with confidence.
TGM has kicked off earthworks and civil engineering at its flagship TGME Gold Mine in South Africa—
marking the move from planning to building. Bulk earthworks, water management systems, and key civil
works are now underway, laying the foundation for critical infrastructure. This progress keeps the project
firmly on track for the next development phase and, ultimately, first gold production
Smart Water Management In Action: Our integrated system (refer Figure 2) design includes robust
dams, purpose-built clean and dirty water channels, and advanced stormwater culverts—all working
together to protect and optimise water resources.
Figure 2: Integrated Water Management Systems
Civil Works Commence Q4 2025—forming the backbone for the entire build (refer Figure 3). These
foundations pave the way for Structural, Mechanical, Piping and Platework SMPP) installations, keeping
the construction schedule tight and on track.
3
Backing Local Communities - Around 70% of our workforce comes from nearby towns—creating jobs
and delivering real benefits where they matter most. We’re also investing in training and upskilling
programs to build long-term careers, strengthen local economies, and ensure sustainable growth for
the region.
Figure 3: Civil Engineering Works
Figure 4: Induction training on site with new contract employees from the local community
4
Project Ready for Action: Our leadership team has sharpened the design and locked in execution plans.
The site is fully prepared to push into the next critical phase—confidently and with precision
Figure 5: Theta Gold Mines leadership and guest visit to the Frankfort Mine (Left 4: Chairman, Bill Guy; Right 4:
NED, Brett Tang; Right 2: COO, Jacques Du Triou; Right 1: ED, Richie Yang)
Operations and Development Update
174,000 ounces of Surface, Tailings and Rock Dumps - surrounding the TGME plant, including 140,600
ounces classified as Indicated Resources (refer to JORC Table, Annexure A). TGM is progressing plans to
integrate these surface resources into the mine schedule to optimise early production.
TGM completed the following tasks on-site as part of preparing to build the gold plant and finalising the
execution documentation.
Description Completed
Plant Process Design Engineers Appointed – RM Process ✓
Tailings and Environmental Engineers Appointed – Eco Elementum ✓
Additional Metallurgical Test Work ✓
Updated Process Plant Flowsheet ✓
Final Process Plant and Engineering Design ✓
Process Plant footprint layouts and Civil works ✓
Draft schedules for the plant construction ✓
Draft schedule for the dewatering plant, water management and tailings deposition ✓
Tender process and Requests for Quotes (RFQ) ✓
NDAs signed with all vetted possible Original Equipment Supplies (OEM’s) ✓
Long leading items identified completion ✓
Project Execution Plan completion ✓
Table 1: Provides a summary of the completed design and planning stages of the plant.
5
Design Locked Down, Construction Ready: Geotechnical assessments are complete, and the plant
footprint is finalised—clearing the way for bulk earthworks and civil construction. The design includes a
2‑meter loss allowance beneath raft foundations for added stability.
Innovative Tailings/Dewatering Solutions: Eco Elementum Engineering (ECOE) is leading the TSF
remining and dewatering plant design, progressing through structured phases: Concept and design,
detailed engineering, procurement, integration, and ultimately, construction. ECOE is conducting a Study
on underground tailings deposition for the TGME plant. The plan uses existing voids around Beta Mine
for storage—closing old workings permanently while enabling uninterrupted mining in other areas.
The study is focused on delivering a cost‑effective underground tailings solution by using existing voids.
Key goals:
• Maximise Storage Capacity: Ensure sufficient space for tailings.
• Keep Mining Moving: Manage tailings efficiently to avoid production delays.
• Rehabilitate Old Workings: Permanently close mined areas and restore the environment.
Backfill Plan in Motion: A surface backfill plant is planned, supported by either a conveyor or wet
transfer system for efficient material handling. Tailings will be dewatered to achieve the correct
moisture content for backfilling. Environmental approvals for this project are tied to the completion of
the study.
Environmental, Social and Governance (“ESG”)
Figure 6: TGME Environmental Sustainability Strategy
Ecological Compensation Programme – TGM has engaged an independent environmental scientist to
develop clear guidelines for executing the 2022 compensation plan. This will include detailed
recommendations for the Implementation Agreement to ensure compliance and best-practice delivery.
6
Key points to be addressed as part of the Ecological Program
• Integrated rehabilitation plan for upper catchments.
• Control Invasive Alien Plant Species (IAPS) on nature reserves and restore vegetation.
• Install and maintain firebreaks for risk management.
• Develop and release biocontrol programs.
• Implement erosion control measures.
• Improve hydrogeology across local catchments.
Social and Labour Plan - To mine in South Africa, companies must develop a Social and Labour Plan
(“SLP”). This process involves close engagement with local communities, municipal authorities, and the
Department of Mineral Resources and Energy to align on social development and economic uplift
initiatives.
The SLP focus on community needs and economic uplift for the host community. Table 2 below shows
the work in progress.
Task Due date
Appointment of SLP Consultant ✓ 15 January – 31 January 2024
TGME provides background information ✓ 29 January – 02 February 2024
Kick-Off Meeting ✓ 05 February – 09 February 2024
Final Socio-Economic Study ✓ 09 February 2024
Consultant Document Review ✓ 07 February – 20 February 2024
The consultant submits Legal Review ✓ 21 February 2024
Workshop session ✓ 21 February 2024
Compilation of Draft SLP document ✓ 22 February – 10 April 2024
Preparation for SLP Consultations ✓ 22 February – 12 April 2024
SLP Consultations ✓ 18 - 20 April 2024
Project Priority Lists from Ward Councillors ✓ 06 May 2024
Compilation of the Final SLP document ✓ 22 April – 31 August 2024
TGME Review SLP ✓ 02 September – 30 November 2024
Update of SLP based on TGME comments ✓ 2 – 6 December 2024
Mine Manager review SLP ✓ 09 – 20 December 2024
COO review SLP ✓ 07 – 10 January 2025
Submit Final SLP to the Board for approval ✓ 14 - 28 January 2025
Final approved SLP Document ✓ 03 February 2025
Submit endorsement letters to the Municipality for
signature
✓
11 February 2025
Present SLP during EIA phase if necessary ✓ 08 May – 07 July 2025
Submission of final EIA/EMPR Report, SLP and MWP to the
DMRE
✓ 17 July 2025
Table 2: Social and Labour Plan (SLP)
7
Permitting Secured - TGM has locked in a 13‑year renewal of Mining Right 83 (MR83) through to 2038—
a critical approval covering Beta, CDM, and Frankfort mines, which make up over 75% of the current
Feasibility Study schedule. This renewal clears a key condition for project financing and marks a major
step toward full execution. Notably, TGM has held this strategic ground for more than 130 years.
Corporate Governance and Funding Update
TGME Project Financing Update during the quarter ended 30 September 2025
Private Placement Completed for US$4 Million
On 3 July 2025 the Company announced it had completed a raise of US$4 million (~A$6.2 million) (before
costs) through a private placement to Hong Kong Ruihua Green Development Limited. The Company
issued 47,337,2784
new fully paid Ordinary Shares, (Placement Shares) in TGM at the issue price of $0.135
(13 cents) per share along with 23,668,639 new unlisted options, (Placement Options) on a one (1) free
option for every two (2) new Shares issued in the Placement.
Each Placement Option will have an exercise price equal to an 8% discount to the 15-day VWAP to the
last closing price at the time of exercise (but no less than $0.13 cents), and expiry date 2 years from the
date of issue. Options issued under the Placement will not be quoted.
The Company will use placement funds to:
• Kick off bulk earthworks and complete plant site terraces
• Progress civil engineering works and construction
• Purchase Geosynthetic Stabilenka – a geotextile used for reinforcement
• Finalise water management systems; and
• Support working capital needs
Commercial Bank Syndication Underway
TGM is now moving to secure commercial co-lenders, supported by the appointment of specialist South
African firm, Moore Debt Advisory. This syndication process is now live with the distribution of an
Information Memorandum to potential co-lenders. The company expects will update the market as
events dictate.
Funding Update Post Quarter End
Three - Tranche Placement and Private Placements:
In October 2025, the Company announced it had received equity and debt commitments funding
totalling A$60.7 million, (US$39.9 million), excluding the SPP amount.
Summary of that funding is as follows:
• On 7 October 2025 the Company announced it has received funding commitments by way of
equity and debt for up to A$51.4 million, (US$33.9 million) made up of an equity component of
A$36.3 million, (US$23.9 million) and a debt component of A$15.2 million, (US$10 million); and
4
The exact number of new shares is calculated after conversion of USD to AUD at a rate of 0.65 and applying the
per share issue price of $0.13 cents.
5
Shares issue price of $0.13 cents is a 7.3% discount to the 15-day VWAP calculated days prior to the release of
this capital raise and a 3.8% discount to the last closing price on Friday, 27 June 2025.
8
• On 21 October 2025 the Company announced it had received a further equity commitment of
A$9.3 million, (US$6 million).
Share Purchase Plan – Opening of SPP
On 24 October 2025, the Company announced the Share Purchase Plan (SPP) had opened to raise up to
a further A$2 million, (US$1.5 million) to eligible shareholders on the record as at 6 October 2025,
(Record Date). Eligible Shareholders are invited to participate in the SPP by subscribing for SPP Shares
(SPP Shares) at $0.21 (21 cents) per share up to a maximum of A$30,000. The company will receive
applications up to 17 November 2025, unless otherwise extended by the Company.
In addition, SPP participants will receive 1 free attaching option (SPP Option) for every 2.38 SPP shares
subscribed for in the SPP. The SPP Options will have an exercise price of A$0.32 (32 cents) and expiry
date that is 18 months from date of grant. The Company has advised that it intends to apply for quotation
of the SPP Options.
Timetable for Share Purchase Plan
Indicative Timetable*
Record date for eligibility to participate in SPP 7:00pm (Sydney time) on
Monday, 6 October 2025
Announcement & Company resumes trading on ASX Tuesday, 7 October 2025
Settlement of Placement and Tranche One of private Cornerstone
Investment Monday, 13 October 2025
Alotment and issue of shares under the Placement and Tranche One
of the Cornerstone Investment Tuesday, 14 October 2025
Lodgement of Options Prospectus with ASIC and ASX (for offer of
Placement Options and SPP Options)
Lodgement of SPP Offer Booklet with ASX (for offer of SPP Shares)
Despatch of Options Prospectus and SPP Offer Booklet
Opening Date for offer of Placement Options, SPP Shares and SPP
Options
Friday, 24 October 2025
Despatch of NOM for Shareholder approval Wednesday, 29 October 2025
Options Prospectus close date
SPP offer close date
5.00pm (Sydney time),
Monday, 17 November 2025
Announcement of results of Options Prospectus offer and SPP offer Monday, 24 November 2025
Allotment of SPP Shares Monday, 24 November 2025
Shareholder meeting Friday, 28 November 2025
Issue of Tranche Three Shares, Tranche Three Options, Director
Shares, Director Options, Placement Options and SPP Options
(assuming approved by shareholders)
Monday, 1 December 2025
Cash Position
As of 30 September 2025, the Group had US $3.4 (A$5.1) million in cash.
In accordance with ASX Listing Rules 5.3.1 and 5.3.2, the Company provides the following summary of
expenditures incurred during the Quarter:
Mining exploration costs (including exploration labour) US $ -
Mining Production and Development Costs US $ 594,802
Licence to Operate Costs US $ 119,312
Total US $ 714,114
9
The Company’s Quarterly Appendix 5B reported US$111,000 in payments to related parties and their
associates, as noted in the Appendix 5B this payment was for directors' fees and consulting fees.
Capital Structure
The current capital structure of the Company at 30 September 2025 is as follows:
Number
Fully paid ordinary shares (ASX: TGM) 939,724,135
Unlisted options and performance rights (see “Annexure C”) 104,213,033
The estimated market capitalisation of TGM was A$244 million6
(US$161 million) as at 30 September
2025.
This announcement was authorised for release by the Board of Directors.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
Investor Relations
We’re committed to keeping you informed and involved. Download the Engage IR App today and join the
conversation.
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
6 Calculated as 939,724,135 fully-paid ordinary shares on issue at the closing price of AU$0.26 cents per share as at 30 September 2025
converted at the RBA exchange rate of AUD:USD of 0.6602.
10
Competent Persons Statement
MINERAL RESOURCES
Mr. Uwe Engelmann confirms that he is the Competent Person for the TGM Mineral
Resources as reported on TGM’s Mineral Resources which is extracted from TGM’s ASX
announcement dated 8 April 2021(Initial Maiden Underground Mining Reserve) available to
view at www.asx.com.au and was prepared in accordance with the guidelines of the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC Code, 2012). Mr. Engelmann has read and understood the requirements
of the JORC Code (2012).
Mr. Engelmann is a Competent Person as defined by the JORC Code, 2012, having more than
five years’ experience that is relevant to the style of mineralisation and type of deposit
described in this report and to the activity for which he is accepting responsibility. Mr.
Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.), Pr.Sci.Nat. No. 400058/08, FGSSA), is a
director of Minxcon (Pty) Ltd and a member of the South African Council for Natural Scientific
Professions. Mr. Engelmann is a full-time employee of Minxcon (Pty Ltd and has reviewed
this report and consents to the inclusion of the matters based on his supporting information
in the form and context in which it appears.
METALLURGICAL RESULTS
Mr. RoganRoulstone confirms that he is the Competent Person in terms of Mineral Resources
and Ore Reserves (JORC Code, 2012). Mr. Roulstone has read and understood the
requirements of the JORC Code (2012).
Mr. Roulstone is a Competent Person as defined by the JORC Code, 2012, having more than
five years’ experience that is relevant to gold extraction and in particular gold extraction from
a refractory ore body. Mr Roulstone is a Chemical Engineering (NHD) that graduated in 1993
and is member of the SAIMM (705817). Mr Roulstone is the managing director of RM process
and has over nine years’ experience on the TGME process plant design.
The information in this announcement that relates to TGM’s Mineral Resources is extracted
from TGM’s ASX announcement dated 8 April 2021 (Initial Maiden Underground Mining
Reserve) available to view at www.asx.com.au and was prepared in accordance with the
guidelines of the JORC Code (2012). TGM confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcement
and that all material assumptions and technical parameters underpinning the Mineral
Resources estimates in the relevant market announcement continue to apply and have not
materially changed other than as disclosed in TGM’s ASX announcement dated 25 October
2021 regarding the TGME Project Permitting Update. TGM confirms that the form and
content in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
ORE RESERVES
The information in this report relating to Ore Reserves is based on, and fairly reflects, the
information and supporting documentation compiled by Mr. Daniel van Heerden (B.Eng
(Mining M.Com (Business Management), member of Engineering Council of South Africa
(Pr.Eng. Reg. No. 20050318)), a director of Minxcon (Pty) Ltd and a fellow of the South African
Institute of Mining and Metallurgy (FSAIMM Reg. No. 37309).
Mr Van Heerden has sufficient experience that is relevant to the style of mineralisation under
consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the JORC Code (2012). Mr van Heerden consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
11
The information in this announcement that relates to TGM’s Ore Reserves is extracted from
TGM’s ASX announcement dated 8 April 2021 (Initial Maiden Underground Mining Reserve)
available to view at www.asx.com.au and was prepared in accordance with the guidelines
of the JORC Code (2012). TGM confirms that it is not aware of any new information or data
that materially affects the information included in the original market announcement and
that all material assumptions and technical parameters underpinning the Ore Reserve
estimates in the relevant market announcement continue to apply and have not materially
changed other than as disclosed in TGM’s ASX announcement dated 25 October 2021
regarding the TGME Project Permitting Update. TGM confirms that the form and content in
which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
12
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM) is a gold development company that holds a range of prospective
gold assets in a world-renowned South African gold mining region. These assets include several surface
and near-surface high-grade gold projects which provide cost advantages relative to other gold
producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit
(Capital City of Mpumalanga Province). Following small scale production from 2011 – 2015, the Company
is currently focussing on the construction and financing of a new gold processing plant within its
approved footprint at the TGME plant.
TGM holds 100% of Theta Gold SA (Pty) Ltd, which in turn owns 74% of TGME and Sabie Mines, meeting
Black Economic Empowerment (BEE) ownership standards as per South African Mining Charter
requirements.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe
for or purchase any securities in the Company or as an inducement to make an offer or invitation with
respect to those securities. No agreement to subscribe for securities in the Company will be entered into
on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe
that any such statements and projections are either false, misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax
or other advice. This overview of Theta Gold does not purport to be all inclusive or to contain all
information which its recipients may require in order to make an informed assessment of the Company’s
prospects. Before making an investment decision, you should consult your professional adviser, and
perform your own analysis prior to making any investment decision. To the maximum extent permitted
by law, the Company makes no representation and gives no assurance, guarantee or warranty, express
or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity,
accuracy, suitability or completeness of, or any errors in or omissions, from any information, statement
or opinion contained in this announcement. This announcement contains information, ideas and analysis
which are proprietary to Theta Gold.
13
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such
as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without
notice, and may be influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection
of the intention of the Company as at the date of release of the document, however are subject to change
without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables and
risks, many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for
making the forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to
support the estimation of Ore Reserves. There is no assurance that the intended development referred to will
proceed as described, and will rely on access to future funding to implement. Theta Gold believes it has
reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee that funding will be
available, and investors are to be aware of any potential dilution of existing issued capital. The production
targets and forward looking statements referred to are based on information available to the Company at the
time of release, and should not be solely relied upon by investors when making investment decisions. Theta
Gold cautions that mining and exploration are high risk, and subject to change based on new information or
interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the
results or production targets contained in this release. Further evaluation is required prior to a decision to
conduct mining being made. The estimated Mineral Resources quoted in this release have been prepared by
Competent Persons as required under the JORC Code (2012). Material assumptions and other important
information are contained in this release.
14
ANNEXURE A
Mineral Resource and Mining Reserves
Combined Mineral Resource as at 1 February 2021
Resource
Classification
Type of Operation
Combined Mineral Resource
Tonnage Gold Grade Gold Content
Mt g/t Kg koz
Measured
Underground 0.091 5.37 489 15.7
Open pit
Tailings
Total Measured 0.091 5.37 489 15.7
Indicated
Underground 4.774 6.21 29 661 953.7
Open Pit 8.109 2.14 17 364 558.2
Tailings 5.244 0.83 4 373 140.6
Total Indicated 18.128 2.84 51 398 1,652.5
Inferred
Underground 21.452 5.22 111 880 3597.0
Open pit 4.907 5.11 25 057 805.6
Tailings 0.023 0.57 13 0.4
Rock Dump 0.885 1.20 1 059 34.0
Total Inferred 27.267 5.06 138,009 4,437.0
Grand Total 45.485 4.17 189,896 6,105.2
Notes:
1. Columns may not add up due to rounding.
2. Gold price used for the cut-off calculations is USD1,500/oz.
3. UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35
g/t.
4. Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
5. Mineral Resources are stated as inclusive of Ore Reserves.
6. Mineral Resources are reported as total Mineral Resources and are not attributed.
Mineral Resources for the TGM Tailings Dams as at 1 February 2021
Mineral Resource
Classification
Surface
Operation
Reef
Tonnage Gold
Grade
Gold Content
Mt g/t kg koz
Indicated
Glynn’s Lydenburg Tailings 1.211 0.80 972 31.3
Blyde 1 Tailings 0.590 0.73 434 14.0
Blyde 2 Tailings 0.280 0.83 234 7.5
Blyde 3 Tailings 0.316 0.87 275 8.8
Blyde 4 Tailings 0.164 0.72 119 3.8
Blyde 5 Tailings 0.022 0.61 14 0.4
TGM Plant Tailings 2.661 0.87 2,325 74.8
Total Indicated 5.244 0.83 4,373 140.6
Mineral Resource
Classification
Surface
Operation
Reef
Tonnage Gold
Grade
Gold Content
Mt g/t kg koz
Inferred Blyde 3a Tailings 0.023 0.57 13 0.4
Total Inferred 0.023 0.57 13 0.4
Notes:-
1. Mineral Resource cut-off of 0.35 g/t applied.
2. TGM Plant tailings: 10% discount applied for volume uncertainty.
3. Gold price used for the cut-off calculations is USD1,500/oz.
4. Mineral Resources are stated as inclusive of Ore Reserves.
5. Mineral Resources are reported as total Mineral Resources and are not attributed.
15
Mineral Resources for the TGM Rock Dumps as at 1 February 2021
Mineral Resource
Classification
Surface Operation Reef
Tonnage Gold
Grade
Gold Content
Mt g/t kg koz
Inferred Vaalhoek Rock Dump 0.121 1.64 199 6.4
Inferred South East (DGs) Rock Dump 0.408 0.93 379 12.2
Inferred Peach Tree Rock Dump 0.092 1.23 114 3.7
Inferred Ponieskrantz Rock Dump 0.129 1.63 211 6.8
Inferred Dukes Clewer Rock Dump 0.134 1.16 156 5.0
Total Inferred 0.885 1.20 1,059 34.0
Notes:-
1. Mineral Resource cut-off of 0.35 g/t applied.
2. Gold price used for the cut-off calculations is USD1,500/oz.
3. Mineral Resources are stated as inclusive of Ore Reserves.
4. Mineral Resources are reported as total Mineral Resources and are not attributed.
Combined Underground and Open Pit Ore Reserves as at 1 February 2021
Operation
Grade Tonnes Au Content
g/t kt kg koz
Beta 6.51 1,662 10,822 347.94
Frankfort 4.13 319 1,317 42.33
CDM 2.31 385 889 28.58
Open Pit (MR83) 2.74 2,164 4,996 160.61
Total 3.98 4,530 18,023 579.46
Notes:
1. The information pertaining to the Ore Reserve estimation is detailed in the notes of the Ore Reserve tabulation for the
individual operations.
16
Share your feedback
Discover