TGME Gold Plant Construction Kicks Off - Contracts Locked In
Released
Released
Announcement PDF
15 September 2025
ASX ANNOUNCEMENT
(ASX:TGM)
TGME Gold Plant Construction Kicks Off - Key Contracts Locked In
Key Highlights
•
•
•
•
•
•
•
Construction Commenced: Bulk earthworks and civil site works have officially begun at the
TGME Gold Mine, Theta Gold’s 6Moz flagship project.
Experienced Partners Secured: Contracts executed with PICM and Mainpro for site works; RM
Process and Eco Elementum appointed as owners’ engineers.
Major Infrastructure Works Underway: Works include platforms, roads, water management
systems, retaining walls, dams, and gold processing plant civil foundations.
Local Jobs & Training: 70% of labour recruited locally, with training programs driving skills
development and regional economic uplift.
Funding Support: Secured investor support for near-term construction, enabling earth works
and civil works to progress with confidence that TGM has the necessary support.
Debt Syndication Progressing: Strong lender interest expected to firm into binding terms
following the release of the updated Feasibility Study due shortly.
Path to Production: Following earthworks and civil completion, Theta remains on track towards
initial commissioning of the gold plant by end of 2026.
Theta Gold Mines Limited (TGM) is pleased to announce the commencement of earthworks and civil
engineering activities at its flagship TGME Gold Mine Project in South Africa, marking a pivotal
milestone in the transition from development to construction. Bulk earthworks, integrated water
management, and other associated civil engineering activities are set to commence during September
2025.
Figure 1: Site visit with the execution team and contractors August 2025
1
TGM has taken another major step forward by locking in contracts with leading construction partners
PICM and Mainpro to deliver the critical earthworks and civil phase of the TGME Gold Mine Project.
These trusted partners have been selected to execute this essential phase of the project, bringing not
only a wealth of expertise but also a proven track record in large-scale infrastructure and resource
developments.
We are also proud to announce that RM Process and Eco Elementum, who designed the project's
processing plant, have been appointed under the FIDIC red book (standard form contracts for the design
and construction of buildings and engineering works) as the owners' engineers to oversee this phase of
the project. Their involvement will ensure that the highest standards of quality, safety, and innovation
are maintained.
Figure 2: Bulk Earthworks cut and fill requirements (Red area to be cut and Green to be filled)
Together, these appointments mark a pivotal milestone in transforming TGME into South Africa’s next
producing gold mine, underscoring TGM’s commitment to operational excellence, sustainability, and
stakeholder value creation.
The scope of works underway includes:
•
•
•
•
•
•
5 bulk earthworks platforms
721m of roads
1,355m of clean and dirty water channels
10,000m³ of concrete dams
135m³ CIL bund walls
5,540m³ plant civil works
2
These extensive cut-and-fill operations are strategically designed to optimise site conditions, laying the
foundation for advanced water management systems and civil infrastructure (see Figure 2). This phase
positions the project firmly on track for the next stage of development and ultimately, first gold
production.
The image below showcases the network design of integrated water management systems, featuring
robust dams, purpose-built channels for clean and dirty water, and advanced stormwater culverts, all
working in harmony to safeguard and optimise water resources. (see Figure 3)
Figure 3: Integrated Water Management Systems
Civil engineering works are set to commence in Q4 2025, forming the backbone of the project’s critical
path. These works lay the groundwork for the upcoming SMPP (Structural, Mechanical, Piping and
Platework) installations, making their timely delivery essential to keep the entire construction program
on schedule.
TGM is committed to driving local economic growth. Around 70% of our contractor workforce will be
recruited from neighbouring communities, creating jobs and ensuring our operations deliver tangible
local benefits.
Alongside job creation, we are investing in training and upskilling programs to equip local workers with
the skills needed to excel on site. This builds long-term employability, supports community
development, and strengthens the sustainability of the regional economy.
3
Figure 4: Civil Engineering works
Figure 5: Induction training on site with new contract employees from the local community
In recent months, our site leadership team has refined the project design and strengthened our
commitment to excellence. The team is now fully prepared and equipped to advance the project into
its next critical phase with confidence and precision.
4
Figure 6: Theta Gold Mines leadership and guest visit to the Frankfort Mine (Left 4: Chairman, Bill Guy; Right 4: NED, Brett
Tang; Right 2: COO, Jacques Du Triou; Right 1: ED, Richie Yang)
Table 1: Timeline of Long Lead Items
2025
Activities
Sep
Oct
Nov
2026
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Onboarding & Mobilisation
EARTH WORKS
Site Establishment
Terrace 2
Terrace 3
Terrace 4
Terrace 1
Terrace 5 (PCD Area)
WATER MANAGEMENT
Roads
Dirty Water Channels
Clean Water Channels
Stormwater Culverts
Concrete PCD
PCD Emergency Spillway
Milling Circuit
CIVILS & CONSTRUCTION
Crushing and Screening Circuit
Acid Wash and Elution Circuit
Carbon Regeneration Circuit
CIL Tank and Bund Area
CIL Thickening
Electrowinning and Smelting
Tails Thickening and Pumping
Reagents, Floc and Lime Area
Process and Wash Water Area
Short form corporate biographies for both Eco Elementum and PICM can be located at the back of this
announcement.
5
Undertaking from Institutional Investors to Support Construction Payments
The Company has entered into a formal agreement with its long-term institutional investors, Golden
Asia Investment Group Limited (GAIG) and High Gift Investments Ltd (HGIL). Under this agreement, GAIG
and HGIL have committed to cover any upcoming payment obligations for earthworks, civil works and
water management projects, while the Company continues negotiations with lenders on the broader
funding package.
As reported on 30 June 2025 quarterly cashflow (announced 31 July 2025), the Company held
approximately US$5.6 million (A$8.4 million) in available cash. This provides the initial funding
requirements of the estimated US$10 million (A$15 million) necessary to complete the earthworks, civil
works, integrated water management systems and ball mill installation. These works are expected to
take up to approximately 11 months to complete, and the Company is well positioned to build on its
existing funding as it advances project development.
This guarantee of financial support for project activities allows TGM to execute contracts now with its
contractor, Pro Instrumentation Construction and Maintenance (Randfontein) Pty Ltd (PICM) with
confidence the Company has the necessary support as the Company advances funding solutions.
As compensation for the financial undertaking, the Company has agreed to grant a total of 30,000,000
unlisted options (Undertaking Options) to GAIG or HGIL in three equal tranches of 10,000,000, (each
tranche) in total or on a pro-rata basis at the discretion of investors, with an exercise price of:
•
•
•
$0.20 (20 cents) and expiry date of 18 months from issue;
$0.25 (25 cents) and expiry date of 18 months from issue; and
$0.30 (30 cents) and expiry date of 18 months from issue.
The Undertaking Options will require shareholder approval, which will be sought at an upcoming
General Meeting. The meeting notice will be sent to shareholders shortly.
Any shares issued upon the conversion of the options will rank equally with existing fully paid ordinary
shares in the Company. Key terms of Undertaking Options are summarised in Annexure A.
An Appendix 3B Proposed issue of securities will follow today’s announcement.
Commercial Debt Syndication Progressing
As previously announced on 30 June 20251, the Company has appointed specialist South African firm,
Moore Debt Advisory to run the TGME Project debt syndication process. This syndication process is live
with initial indications suggesting strong interest from commercial lenders. It is anticipated that interest
will be converted to more binding terms upon release of the updated TGME Project Feasibility Study
expected shortly.
Comments by the Executive Chairman, Bill Guy:
“The start of the earthworks and other long lead activities demonstrates our urgency and commitment
to becoming South Africa’s next gold producer. Once civil works and funding are complete, we will be
commissioning the plant by end of 2026 and processing ore in Q1 2027.
“With skilled local teams and experienced contractors, we are hitting key milestones on schedule.
“Our training programs will deliver long lasting economic opportunities and prosperity for local
communities and the region.
“We thank our long-term shareholders for their continued support as we move towards production.
“TGM remains on target to release an updated and optimised Feasibility Study shortly.”
1
Refer to ASX Release dated 30 June 2025 titled, “Board Approves TGME Gold Project + US$ 4 Million Private
Placement”.
6
Comments by the new Executive Director, Richie Yang:
“The year 2025 marks the 130th Anniversary for our project subsidiary Transvaal Gold Mining Estate
Limited, registered in May 1895, with over 6.7Moz of recorded gold production to date.
“Today, to be underpinned by a brand-new gold processing plant along with our committed initial Lifeof-Mine ESG program, we begin a new chapter for the town of Pilgrim’s Rest.
“A big ‘Thank You’ to our management team, our staff, our amazing ESG experts and our highly capable
and professional consultants for making this possible”.
[ENDS]
This announcement was approved for release by Theta Gold Mines Limited’s Board.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy (Chairman):
T: + 61 2 8046 7584
Richie Yang (Executive Director):
E: billg@thetagoldmines.com
E: richiey@thetagoldmines.com
Investor Relations
7
We’re committed to keeping you informed and involved. Download the Engage IR App today
and join the conversation.
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM) is an advanced gold development company focused on unlocking
value from its extensive suite of projects in South Africa’s renowned Eastern Transvaal goldfields. The
Company’s flagship TGME Gold Project offers near surface and shallow underground ore bodies with
compelling cost advantages.
TGM’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga
Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). Following small scale production from 2011 – 2015, the Company is currently
focusing on the construction and financing of a new gold processing plant.
TGM has completed a Feasibility Study (FS) released to ASX on 27 July 2022, for the first four mines Beta,
CDM, Frankfort and Rietfontein (TGME Underground Project). The Base Case LOM plan comprises a 12.9year mining operation starting in 2023 and delivering production of 1.24 million ounces of contained
gold. The estimated development capital1 or peak funding requirement is USD77 million (AUD102
million), with the Project forecast to generate a pre-tax NPV10% of USD324 million (AUD432 million) and
pre-tax Internal Rate of Return (IRR) of 65% at the forecast gold price of averaging USD1,642/oz over the
LOM. A revised FS 2025 is scheduled to be released shortly.
TGM aims to build a solid production platform to over next 5 years to 160kozpa based primarily around
shallow, open-pit or adit-entry shallow underground hard rock mining sources. Theta Gold has access to
over 43 historical mines and prospect areas that can be accessed and explored, with over 6.7Moz of
historical production recorded.
TGM holds 100% of Theta Gold SA (Pty) Ltd, which in turn owns 74% of TGME and Sabie Mines, meeting
Black Economic Empowerment (BEE) ownership standards as per South African Mining Charter
requirements.
8
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to
subscribe for or purchase any securities in the Company or as an inducement to make an offer or
invitation with respect to those securities. No agreement to subscribe for securities in the Company will
be entered into on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to
believe that any such statements and projections are either false, misleading or incorrect, it does not
warrant or guarantee such statements. Nothing contained in this announcement constitutes
investment, legal, tax or other advice. This overview of Theta Gold does not purport to be all inclusive
or to contain all information which its recipients may require in order to make an informed assessment
of the Company’s prospects. Before making an investment decision, you should consult your
professional adviser, and perform your own analysis prior to making any investment decision. To the
maximum extent permitted by law, the Company makes no representation and gives no assurance,
guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for,
the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omissions, from
any information, statement or opinion contained in this announcement. This announcement contains
information, ideas and analysis which are proprietary to Theta Gold.
The Company confirms that all material assumptions underpinning the production target, or the
forecast financial information derived from the production target continue to apply and have not
materially changed from those previously released to ASX in a Feasibility Study dated 27 July 2022.
ABOUT ECO ELEMENTUM
Established in 2013, Eco Elementum (Pty) Ltd has become a trusted partner in delivering world-class
engineering solutions underscored by a strong commitment to environmental stewardship. With
offices in South Africa, the Democratic Republic of Congo, and Australia, and project experience in
over 25 countries, Eco Elementum combines global expertise with local insight across industries such
as mining, energy, water, infrastructure, transport, and industrial development.
At the heart of Eco Elementum is a multidisciplinary team of more than 85 professionals, including
civil, structural, geotechnical, mechanical, electrical, and process engineers, supported by scientists,
geohydrologists, project managers, and environmental specialists. This diverse expertise enables the
delivery of integrated, compliant, and future-ready designs that balance technical excellence with
sustainable practices.
Engineering Expertise
Eco Elementum’s engineering services encompass the entire project lifecycle, offering expertise in the
following areas:
•
Civil & Structural Engineering: Infrastructure development, bridges, roads, pavements,
concrete structures, and bulk earthworks.
•
Geotechnical & Dam Engineering: Site investigations, slope stability assessments, foundation
design, embankment dams, tailings storage facilities (TSFs), and mine waste management
facilities.
9
•
Mechanical & Electrical Engineering: Water and slurry transfer systems, dewatering systems,
underground backfill systems, water and wastewater treatment, dams and hydropower
facilities, control and instrumentation, and bulk materials handling.
•
Water & Environmental Engineering: Hydrological investigations, water
management, process engineering, closure planning, and site rehabilitation.
•
Project & Construction Management: EPCM (Engineering, Procurement, and Construction
Management), QA/QC supervision, contract administration, cost management, and project
integration.
resource
Eco Elementum’s engineers are professionally registered with ECSA, Engineers Australia, GCC, PMP, and
NHBRC, ensuring world-class standards across all disciplines. The company employs advanced software
and modeling tools to deliver reliable, efficient, and cost-effective solutions.
Integrated Advantage
By integrating engineering design with in-house environmental expertise, Eco Elementum ensures that
projects not only meet technical requirements but also adhere to regulatory frameworks, sustainability
targets, and ESG standards. This holistic approach reduces risk, streamlines approval processes, and
delivers outcomes that create long-term value for clients.
Recent Major Projects
EcoE has played a significant role in supporting operations across various tailings storage facilities for
Harmony Gold Mining Company Limited, delivering a comprehensive suite of services to their Mponeng,
Savuka, Kusasalethu, and Great Noligwa complexes. These services included acting as the Engineer of
Record for all mentioned tailings management operations. In addition, EcoE provided design and
construction support services for the Savuka TSF and the Mponeng TSF Lower Compartment, where the
company assisted with water and tailings transfer, conducted comprehensive water management
reviews and mass balances, and developed tailings storage facility design and life extension strategies.
Furthermore, EcoE has supported Ivanhoe Mines at one of their flagship projects, the Platreef Mine in
Limpopo. Platreef is poised to become one of the world’s largest undeveloped deposits of precious and
base metals, featuring a large, high-grade, polymetallic orebody comprising platinum-group metals,
nickel, copper, and gold within South Africa’s Bushveld Igneous Complex. For this project, EcoE was
responsible for pre-execution studies involving the Drystack Tailings Storage Facility, Dewatering Plant,
and TSF Bulk Material Handling System, and may soon commence with detailed design and project
execution phases.
ABOUT PICM
PICM is a leading provider of high-quality fabrication and civil construction services, with a proven track
record of delivering exceptional projects since 1980. In the past five years alone, PICM has completed
over 800 projects, ranging from earthworks and civil construction to structural steel, mechanical, and
piping supply and installation. The firm’s commitment to quality, safety, and client satisfaction has made
it a trusted partner in Africa's construction and infrastructure sectors.
Expertise
PICM specializes in a wide range of services, including:
•
Fabrication: Precision-engineered metal structures, custom designs, and industrial components
tailored to meet diverse client needs.
•
Civil Construction: Comprehensive solutions for infrastructure development, including roads,
bridges, commercial buildings, residential projects, and mining projects on surface and underground.
10
•
SMPP Services: We specialize in delivering comprehensive SMPP services tailored to meet the
unique needs of our clients in various industrial sectors, including mining, metals smelting, and mineral
processing. Our Structural, Mechanical, Piping and Platework expertise ensures that we provide highquality, efficient, and safe solutions for all your project requirements.
Clients
Pan Africa Resources - Mogale Tailing Retreatment Project.
Other existing clients including Sibanye Stillwater (Lonmin Platinum), Anglo American, and ABInBev SA
Breweries (SAB). Their past clients also include Harmony Gold, Impala Platinum, De Beers, Exxaro, and
Murray & Roberts.
11
Annexure A
THETA GOLD MINES LIMITED
UNDERTAKING OPTIONS TO
GOLDEN ASIA INVESTMENT GROUP LIMITED AND
HIGH GIFT INVESTMENTS LTD
EXPIRING 18 MONTHS FROM DATE OF ISSUE
(EXERCISE PRICES EQUAL TO $0.20, $0.25 AND $0.30)
The terms and conditions of the unlisted Options are as follows:
Entitlement
Each Option entitles the holder to subscribe for one Share upon exercise of the Option.
a) Exercise Price
Subject to paragraph (h) and (i), the amount payable upon exercise of each Tranche of Option
will be equal at $0.20, $0.25 and $0.30 (Exercise Price).
b) Expiry Date
Each Option will expire at 5:00 pm (Sydney Time) 18 months from the grant date (Expiry
Date). An Option not exercised before the Expiry Date will automatically lapse on the Expiry
Date.
c) Notice of Exercise
The Options may be exercised during the Exercise Period by notice in writing to the Company
(Notice of Exercise) and payment of the Exercise Price for each Option being exercised in
Australian currency by electronic funds transfer or other means of payment acceptable to the
Company.
d) Exercise Date
A Notice of Exercise is only effective on and from the later of the date of receipt of the Notice
of Exercise and the date of receipt of the payment of the Exercise Price for each Option being
exercised in cleared funds (Exercise Date).
e) Timing of issue of Shares on exercise
Within 5 Business Days after the Exercise Date, the Company will:
(i) issue the number of Shares required under these terms and conditions in respect of the
number of Options specified in the Notice of Exercise and for which cleared funds have been
received by the Company; and
(ii) if admitted to the official list of ASX at the time, apply for official quotation on ASX of
Shares issued pursuant to the exercise of the Options.
f) Shares issued on exercise
Shares issued on exercise of the Options rank equally with the then issued Shares of the
Company.
12
g) Bonus issues
If prior to an exercise of an Option, the Company makes an issue of Shares by way of
capitalisation of profits or out of its reserves (other than pursuant to a dividend reinvestment
plan), pursuant to an offer of such Shares to at least all the holders of Shares, then on exercise
of the Option, the number of Shares over which an Option is exercisable shall be increased by
the number of Shares which the holder of the Option would have received if the Option had
been exercised before the date on which entitlements to the issue were calculated.
h) Rights issue
If prior to an exercise of an Option, any offer or invitation is made by the Company to at least
all the holders of Shares resident in Australia for the subscription for cash with respect to
Shares, options or other securities of the Company on a pro rata basis relative to those holders'
Share holding at the time of the offer, the Exercise Price shall be adjusted as specified in the
Listing Rules in relation to pro-rata issues (except bonus issues).
i) Reorganisation of capital
If at any time the issued capital of the Company is subject to a reorganisation, all rights of an
Optionholder are to be changed in a manner consistent with the Corporations Act and the ASX
Listing Rules at the time of the reorganisation.
j) Participation in new issues
There are no participation rights or entitlements inherent in the Options and holders will not be
entitled to participate in new issues of capital offered to Shareholders during the currency of
the Options without exercising the Options.
k) Change in exercise price
Subject to paragraphs (h) and (i), an Option does not confer the right to a change in Exercise
Price or a change in the number of underlying securities over which the Option can be
exercised.
l) Transferability
The Options are fully transferable at the Option holder’s discretion.
13
Share your feedback
Discover