HIGHLIGHTS:
•
•
•
•
•
Rietfontein Mine PFS edging closer to completion, further test work is required to
confirm the processing recovery which has been conservatively assumed at 80%
Rietfontein PFS work provides adequate confidence to add to the TGME Underground
Project DFS which will run in parallel with processing test work
Rietfontein PFS confirmed the following production target at the assumed recovery
factor, subject to favourable processing test work results:
o 1,334 kt ore tonnes which consist of 479 kt tonnes Indicated Resources and 855 kt
tonnes Inferred Resources
o Average planned dilution was calculated over a 90 cm stope width where the dilution
considered an overbreak into waste of 10 cm on either side of the reef contact
o Delivered ore grade of approximately 6.82g/t
o 293 koz produced (including 107 koz delivered Indicated Resources and 186 koz
delivered Inferred Resources)
o LoM of approximately 7.6 years at 180ktpa production rate
Block models and mine scheduling has been completed utilising the proven shrinkage
mining method to mine the near vertical reef
Preliminary geotechnical, ventilation and engineering studies complete
Figure 1: Theta senior management team on site at Adit#3 – Rietfontein Mine (November 2021)
Theta Gold Mines Limited ABN 30 131 758 177
Suite 80, Level 35 (Servcorp), International Tower One, 100 Barangaroo Avenue, Sydney NSW 2000
Tel: +61 2 8046 7584 Email: info@thetagoldmines.com
www.thetagoldmines.com
Theta Gold Mines Limited (“Theta Gold” or the “Company”) (ASX: TGM| OTC: TGMGF) is pleased
to announce the extension of its Underground Prefeasibility Study (PFS). The Company added
Rietfontein Mine to the mine schedule of the PFS announced on 13 April 2021, which
incorporated the Beta, Frankfort, and CDM mines. Collectively referred to as the TGME
Underground (UG) Project.
Initial results from the Rietfontein PFS are positive and the Board has decided to accelerate the
study by including it in the Definitive Feasibility Study for the TGME Underground project, which
is also expected to be released Q2 2022.
The Rietfontein PFS requires validation from metallurgical testwork that is still in progress. Due
to the global backlog currently experienced in laboratories, the metallurgical results are expected
to be available in Q2 2022.
Figure 2: Adit entrances and surface footprint at Rietfontein Mine
2
Figure 3: Undergrund Samples taken at Rietfontein Mine
The company continues to honor its commitment to improving the project economics and
expansion of the production profile. The team initially delivered a Maiden Underground
Prefeasibility Study based on only 16% of the 4.5M oz Au underground gold resource and
incorporated only three mines out of a total of 43 historical mines across the project area. It also
only considered Measured and Indicated resources for initial inclusion in production and reserve
conversion. The inferred resources of these phase 1 mines, together with more than 40 historical
mine sites under management, are systematically studied and will be incorporated into future
production modeling. This was a very positive early step to developing the goldfield.
The initial study focused on the easy access of 684,000 oz Au in the Measured and Indicated
categories of the TGME Underground Resource for the Beta, Frankfort, and CDM areas. The team
achieved a conversion factor of 63% from resource to mining reserve in those areas. A further
3.5M oz Au of inferred resources is available to be upgraded to the Measured and Indicated
resource category, and a portion could potentially be converted into mining reserves.
After the conclusion of the initial PFS, Minxcon (Pty) Ltd (“Minxcon”) was retained to expand on
the PFS to understand the added value from the inclusion of Rietfontein to the overall
underground strategy. The study was completed in December 2021. No changes were made to
the three beforementioned operations. The economic input parameters were similarly left
unchanged from the previous 2021 study. No escalations were considered on costs as the
effective date was still in 2021. Rietfontein has been scheduled as the last of the four initial
operations and is planned to commence operations as Frankfort is depleted.
A conservative approach was applied to the study, as Rietfontein production was only
incorporated at the end of the life of the project, and throughput capacity remained unchanged.
Rietfontein mine, with a mine delivered grade of 6.82g/t is the highest grade of the four mines
incorporated in the project. As part of the Definitive Feasibility Study (DFS), the option of
incorporating Rietfontein production earlier, as well as expanding throughput capacity, is being
considered.
A current limitation to the Rietfontein study is that further metallurgical test work is required. A
sampling campaign is currently underway, from which more representable test work can be done
on the mine’s ore. For the PFS a metallurgical recovery factor of 80% was applied to Rietfontein,
despite much higher recoveries achieved historically. The proven results will therefore be
3
incorporated in the DFS, and it was decided not to declare a reserve for Rietfontein until further
test work is concluded.
Figure 4: Rietfontein Mine Stoping area in Life of Mine
Mineral Resources in initial Rietfontein Life of Mine Plan
Mineral Resource
Category
Indicated
Inferred
Total
Gold Grade
g/t
6.92
6.77
6.82
Diluted Tonnes
kt
479.25
854.90
1,334.15
Gold Content
kg
koz
3,316
5,785
9,101
106.62
185.98
292.60
The Geovia Stope Shape Optimiser (“MSO”) software tool which produces optimised stope shapes
for the mining method was used. MSO runs were performed at the cut-off grade of 160 cm.g/t.
The MSO results were used with the objective to determine the economically mineable stope
blocks which provide the highest value for the individual orebodies. A minimum stoping width of
90 cm has been selected for the Rietfontein mine. A cut-off of 160 cm.g/t was applied to the
mining model utilised in the Rietfontein Mine design and schedule, this resulted in the difference
between the Mineral Resources for the TGM Underground Operations as at 1 February 2021 for
Rietfontein and the Mineral Resources in Rietfontein’s current Life of Mine Plan.
Theta Gold continues to demonstrate excellent project economics for what it believes to be only
a small portion of the underground resource, the Company will continue to build up its Mining
Reserves during the next year by progressing Rietfontein and other mines through to DFS level.
The Company remains focused on its target of reaching 160koz/annum within five years from a
multi-mine development programme.
Chairman Mr Bill Guy stated, “The board is pleased with initial results from the Rietfontein PFS
and has decided to add Rietfontein to the TGME Underground Definitive Feasibility Study. It is
expected that the addition will increase the production profile and mine life, along with further
improving project economics.”
“Rietfontein high grade ore was successfully mined up to 1945 using the shrinkage stoping
method, producing 65koz of gold from 227k tons of ore, recovering more than 8g/t. This method
was also chosen for the PFS due to the proven methodology and relatively low ore dilution. The
Rietfontein development will take place within the existing historical footprint, with minimal new
surface disturbance.”
4
“All workstreams for the Rietfontein PFS were completed, except for the metallurgical test work,
due to backlogs currently experienced globally within labs. The Definitive Feasibility Study has
been running alongside the Rietfontein PFS and solid progress has been made by the team.”
This announcement was approved for release by the Company’s Board.
For more information please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8046 7584
billg@thetagoldmines.com
Investor Relations
Australia: Jane Morgan, Jane Morgan Management: +61 (0) 405 555 618,
jm@janemorganmanagement.com.au
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTCQB: TGMGF) is a gold development company that holds a range of
prospective gold assets in a world-renowned South African gold mining region. These assets include several
surface and near-surface high-grade gold projects which provide cost advantages relative to other gold
producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga
Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). Following small scale production from 2011 – 2015, the Company is currently
focussing on the construction of a new gold processing plant within its approved footprint at the TGME plant,
and for the processing of the Theta Open Pit oxide gold ore. Nearby surface and underground mines and
prospects are expected to be further evaluated in the future.
The Company aims to build a solid production platform to over 160kozpa based primarily around shallow, openpit or adit-entry shallow underground hard rock mining sources. Theta Gold has access to over 43 historical
mines and prospect areas that can be accessed and explored, with over 6.7Moz of historical production
recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“TGSA”). TGSA
holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty) Ltd
(“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”) entities. The
South African Mining Charter requires a minimum of 26% meaningful economic participation by the historically
disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is comprised of a
combination of local community trusts, an employee trust and a strategic entrepreneurial partner.
Competent Persons Statement
Ore Reserves
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information
and supporting documentation compiled by Mr Daniel van Heerden (B.Ing (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director
5
of Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg.
No. 37309).
Mr van Heerden has sufficient experience that is relevant to the style of mineralisation under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr van Heerden consents to the inclusion in the report
of the matters based on his information in the form and context in which it appears.
Mineral Resources
The information in this report relating to Mineral Resources is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc
Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the
South African Council for Natural Scientific Professions.
The original report titled “Theta Gold increases Mineral Resource to over 6Moz” was dated 16 May
2019 and was released to the Australian Securities Exchange (ASX) on that date. The Company confirms
that –
•
•
it is not aware of any new information or data that materially affects the information included in
the ASX announcement; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcement continue to apply and have not materially changed.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe
for or purchase any securities in the Company or as an inducement to make an offer or invitation with
respect to those securities. No agreement to subscribe for securities in the Company will be entered into
on the basis of this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe
that any such statements and projections are either false, misleading or incorrect, it does not warrant or
guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax
or other advice. This overview of Theta Gold does not purport to be all inclusive or to contain all
information which its recipients may require in order to make an informed assessment of the Company’s
prospects. Before making an investment decision, you should consult your professional adviser, and
perform your own analysis prior to making any investment decision. To the maximum extent permitted by
law, the Company makes no representation and gives no assurance, guarantee or warranty, express or
implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy,
suitability or completeness of, or any errors in or omissions, from any information, statement or opinion
contained in this announcement. This announcement contains information, ideas and analysis which are
proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which
could be considered forward looking statements. Forward looking statements are typically preceded by
words such as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”,
“Anticipates”, “Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and
estimates included in this announcement are based on assumptions and contingencies which are subject
to change without notice, and may be influenced by such factors as funding availability, market-related
forces (commodity prices, exchange rates, stock market indices and the like) and political or economic
events (including government or community issues, global or systemic events). Forward looking
6
statements are provided as a general reflection of the intention of the Company as at the date of release
of the document, however are subject to change without notice, and at any time. Future events are subject
to risks and uncertainties, and as such results, performance and achievements may in fact differ from those
referred to in this announcement. Mining, by its nature, and related activities including mineral
exploration, are subject to a large number of variables and risks, many of which cannot be adequately
addressed, or be expected to be assessed, in this document. Work contained within or referenced in this
report may contain incorrect statements, errors, miscalculations, omissions and other mistakes. For this
reason, any conclusions, inferences, judgments, opinions, recommendations or other interpretations
either contained in this announcement, or referencing this announcement, cannot be relied upon. There
can be no assurance that future results or events will be consistent with any such opinions, forecasts or
estimates. The Company believes it has a reasonable basis for making the forward looking statements
contained in this document, with respect to any production targets, resource statements or financial
estimates, however further work to define Mineral Resources or Reserves, technical studies including
feasibilities, and related investigations are required prior to commencement of mining. No liability is
accepted for any loss, cost or damage suffered or incurred by the reliance on the sufficiency or
completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments
to support the estimation of Ore Reserves. There is no assurance that the intended development referred
to will proceed as described, and will rely on access to future funding to implement. Theta Gold Mines
believes it has reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee
that funding will be available, and investors are to be aware of any potential dilution of existing issued
capital. The production targets and forward looking statements referred to are based on information
available to the Company at the time of release, and should not be solely relied upon by investors when
making investment decisions. Theta Gold cautions that mining and exploration are high risk, and subject
to change based on new information or interpretation, commodity prices or foreign exchange rates.
Actual results may differ materially from the results or production targets contained in this release.
Further evaluation is required prior to a decision to conduct mining being made. The estimated Mineral
Resources quoted in this release have been prepared by Competent Persons as required under the JORC
Code (2012). Material assumptions and other important information are contained in this release.
7
APPENDIX A
Phase 1 UG Project Mine Plans
8
9
APPENDIX B
JORC Global Mineral Resources
Mineral Resources for the TGM Underground Operations as at 1 February 2021
Mineral
Mine
Resource
Classific Frankfort
Measured
ation
Total
Measured
Reef
Bevetts
Frankfort
Bevetts
CDM
Rho
Beta
Beta
Indicated
Rietfontein
Rietfontein
Vaalhoek
Vaalhoek
Olifantsgera
Olifantsger
amte
aamte
Total Indicated
Total Measured & Indicated
Mineral
Resource
Classific
ation
UG Mine
Frankfort
CDM
Beta
Rietfontein
Olifantsgera
amte
Inferred
Vaalhoek
Vaalhoek
Glynns
Lydenburg
Ponieskrant
z*
Frankfort
Theta*
Nestor*
Total Inferred
Notes:-
Reef
Bevetts
Rho
Beta
Rietfontein
Olifantsger
aamte
Vaalhoek
Thelma
Leaders
Glynns
Portuguese
Theta
Sandstone
Ree
f
g/t
Gra
7.13
de
7.13
7.86
13.1
9
21.6
6
14.5
7
13.9
0
16.9
7
16.2
6
15.9
3
Ree
f
g/t
Gra
7.41
de
10.0
6
16.5
1
14.0
6
18.3
3
16.2
8
12.1
8
15.8
7
13.2
6
7.22
5.54
14.6
8
Sto
pe
g/t
Gra
5.37
de
5.37
5.13
3.80
6.58
8.20
6.34
4.62
6.21
6.20
Ree
f
cm
Wid
73
th
73
58
23
23
52
36
25
36
38
Sto
pe
cm
wid
103
th
103
96
90
90
92
90
90
91
91
Sto
pe
g/t
Gra
4.27
de
3.02
Ree
f
cm
Wid
48
th
24
25
57
23
22
96
25
22
34
41
31
Sto
pe
cm
wid
93
th
90
90
94
90
90
123
90
90
90
90
91
5.43
8.52
4.68
4.77
9.47
5.19
3.99
3.24
2.92
5.22
Conte
nt
cm.g/t
520
520
452
307
499
755
499
416
591
600
Conte
nt
cm.g/t
356
244
414
803
422
361
1166
397
287
244
225
458
Reef
Tonn
Mt
es
0.06
9
0.06
9
0.24
3
0.25
8
0.71
6
0.51
7
0.06
4
0.02
6
1.82
4
1.89
3
Reef
Tonn
Mt
es
0.34
3
0.54
4
1.10
7
1.19
0
0.05
9
0.87
3
0.02
3
3.21
8
0.06
4
0.09
9
0.10
1
7.62
2
Stop
e
Mt
Tonn
0.09
es 1
0.09
1
0.37
3
0.89
5
2.35
7
0.91
9
0.14
0
0.09
1
4.77
4
4.86
5
Stop
e
Mt
Tonn
0.59
es 6
1.81
1
3.36
7
1.96
2
0.24
8
2.98
0
0.03
0
9.83
3
0.21
3
0.22
0
0.19
3
21.4
52
Au Content
kg
koz
15.7
489
15.7
61.5
1,912
109.
3,401
4
498.
15,506
5
242.
7,534
2
28.5
887
13.6
422
953.
29,661
7
969.
30,150
4
Au Content
kg
koz
81.8
2,543
175.
5,472
9
587.
18,285
9
537.
16,721
6
37.3
1,162
456.
14,209
8
9.1
284
1
51,078
642.
27.3
2
849
23.0
714
18.1
562 3597
111,88
597.
0
0
1.
Mineral Resource cut-off of 160 cm.g/t applied.
2.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
3.
4.
Gold price used for the cut-off calculations is USD1,500/oz.
cm.g/t and g/t figures will not back calculate due to variable densities in reef and waste rock.
5.
Mineral Resources are stated as inclusive of Ore Reserves.
6.
Mineral Resources are reported as total Mineral Resources and are not attributed.
10
APPENDIX C
JORC Mineral Resources for the Total Theta Project (as at February 2021)
Resource
Classification
Indicated
Open Pit Mine
Reef
Inferred
Content
Reef
Tonnes
g/t
1.02
cm
200
cmgt
204
Mt
0.397
Au Content
Kg
404
koz
13.0
Shale
Theta & Browns Hill
Theta & Browns Hill
Bevett's
Upper Theta
1.08
223
241
0.856
925
29.7
2.41
100
241
0.651
1 571
50.5
Theta & Browns Hill
Lower Theta
3.79
100
379
0.839
3 178
102.2
Theta & Browns Hill
Beta
2.51
100
251
0.373
938
30.1
Columbia Hill
Bevett's
2.98
114
340
0.108
323
10.4
Columbia Hill
Upper Rho
2.33
402
937
0.897
2 090
67.2
Columbia Hill
Lower Rho
2.51
520
1306
0.981
2 464
79.2
Columbia Hill
Upper Theta
1.06
114
121
0.163
173
5.6
2.29
258
591
5.267
12 066
387.9
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Au Content
cm
215
cmgt
240
Mt
0.600
Open Pit Mine
Reef
Theta & Browns Hill
Shale
g/t
1.12
Theta & Browns Hill
Theta & Browns Hill
Bevett's
1.17
217
254
Upper Theta
1.86
100
186
Theta & Browns Hill
Lower Theta
8.06
100
Theta & Browns Hill
Beta
2.17
Columbia Hill
Upper Rho
Total Inferred
Resource
Classification
Reef
Width
Theta & Browns Hill
Total Indicated
Resource
Classification
Reef
Grade
Open Pit Mine
Reef
Kg
668
koz
21.5
0.451
528
17.0
0.948
1 762
56.6
806
1.384
11 153
358.6
100
217
0.778
1 686
54.2
5.12
134
687
0.131
673
21.6
3.84
129
497
4.292
16 470
529.5
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Au Content
cm
258
cmgt
591
Mt
5.3
Kg
12 066
koz
387.9
Indicated
Total Theta Project
All
g/t
2.29
Inferred
Total Theta Project
All
3.84
129
497
4.3
16 470
529.5
2.99
200
598
9.6
28 535
917.4
Total Indicated and Inferred
Notes:
1.
2.
3.
4.
5.
6.
7.
Theta Project (Theta Hill, Browns Hill and Iota) cut-off is 0.35 g/t;
The gold price used for the cut-off calculations is USD 1,500 / oz;
Geological losses applied are 10% for inferred and 5% for Indicated and Measured;
Theta Hill and Browns Hill - Upper Theta Reef, Lower Theta Reef and Beta Reef are diluted grades over
100cm;
Historical mine voids have been depleted from the Mineral Resource;
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or
a portion thereof will be converted to Ore Reserves;
Mineral Resources fall within the mining right 83MR and 341MR.
11
APPENDIX D
JORC Ore Reserves for the Underground Operations (as at February 2021)
Beta, Frankfort and CDM Only
Ore Reserve Estimate- Underground Operations
Ore Reserve
Classification
Grade
g/t
Proved
Probable
Total
Tonnes
kt
4.24
5.54
5.51
Au Content
kg
60
2,306
2,366
koz
254
12,774
13,028
8.2
410.7
418.8
Notes:
1.
2.
3.
4.
5.
An Ore Reserve cut-off of 170 cm.g/t has been applied for the Beta Mine.
An Ore Reserve cut-off of 150 cm.g/t has been applied for the Frankfort Mine.
An Ore Reserve cut-off of 121 cm.g/t has been applied for the CDM Mine.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Mineral Reserves and are not attributed.
APPENDIX E
JORC Ore Reserves for the Total Theta Project (as at February 2021)
Ore Reserve Estimate - Theta Project
Pit
Browns Hill
Iota
Theta Hill
Total
Ore Reserve
Classification
Probable
Probable
Probable
Grade
g/t
2.61
2.43
1.62
2.31
Tonnes
kt
279
1,490
395
2,164
Au Content
kg
728
3,628
640
4,996
koz
23.4
116.6
20.5
160.6
Notes:
1.
2.
3.
An Ore Reserve cut – off of 0.4 g/t was applied.
A gold price of USD 1,300 / oz was used for the cut - off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
12
APPENDIX F
JORC Checklist – Table 1 Assessment and Reporting Criteria
SECTION 1: SAMPLING TECHNIQUES AND DATA
Criteria
Explanation
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
Detail
Sampling types discussed in this section mainly pertain to historical data with the exception of the Theta Project subsequent to the 2017-2019
drilling campaign. Drilling data sampling types include diamond, reverse circulation (“RC”), percussion and auger drilling. Other sampling data
types include underground channel chip sampling (as individual sample section composite data points on plans or as development or stope
face composite stretch values), grab sampling as well as trench and sample pit sampling for bulk sampling for the purposes of size fraction
analysis.
The table below outlines the types of sampling data collected or utilised in the Mineral Resource or Exploration Target estimates for each of
the Project Areas.
Project Area
Sampling
techniques
Reef
Rietfontein
Rietfontein
Beta
Beta
Frankfort
Bevetts and Theta
Clewer, Dukes Hill & Morgenzon
Rho
Olifantsgeraamte
Olifantsgeraamte
Vaalhoek
Vaalhoek and Thelma Leaders
Glynn’s Lydenburg
Glynn's
Theta Project (Theta Hill, Browns Hills and Iota
section of Columbia Hill)
Beta, Shale, Lower Theta, Upper Theta, Lower
Rho, Upper Rho and Bevetts
Columbia Hill (remaining)
Rho, Shale and Shale Leaders
Hermansburg
DG1
DG2
Eluvial
Eluvial
Eluvial
DG5
Eluvial
Glynn’s Lydenburg TSF
Tailings
Theta Gold Mines Limited ABN 30 131 758 177
Suite 80, Level 35 (Servcorp), International Tower One, 100 Barangaroo Avenue, Sydney NSW 2000
Tel: +61 2 8046 7584 Email: info@thetagoldmines.com
www.thetagoldmines.com
Sampling Data Types
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
Stretch Values
Drillhole Data
Channel Chip Sample Data
Stretch Values
Drillhole Data
Trench Sampling Data
Channel Chip Sample Data
Drillhole Data
Channel Chip Sample Data
RC Drillhole Data
RC Drillhole Data
RC Drillhole Data
Grab Samples
RC Drillhole Data
Auger Drillhole Data
SECTION 1: SAMPLING TECHNIQUES AND DATA
Criteria
Explanation
Detail
a)
Blyde TSFs (1, 2, 3, 3a, 4, 5)
TGM Plant
Tailings
Tailings
Vaalhoek, South East (DGs), Peach Tree,
Ponieskrantz, Dukes Clewer
Rock Dump
Auger Drillhole Data
Auger Drillhole Data
Bulk Sampling Data
Trench Sampling Data
Sampling Pit Data
Channel Chip Sampling Data:Historical (Pre-1946) chip sample values were captured in ‘pennyweight’ (dwt) units for gold content and in inches for channel width. The
quality of the chip samples could not be ascertained due to the historical nature there-of; however, it should be noted chip sampling is a
well-established sampling method in the underground South African mining industry. The sampling activity on the mines was usually
managed by each mine’s survey department and were usually conducted to specific company-wide standards.
More recent chip sample values were captured as cm.g/t content values and channel widths were recorded in centimetres as is the case
at Frankfort while under ownership of Simmer & Jack Mines Limited. During 2008, Minxcon audited the chip sampling procedure as
employed by Simmer & Jack and found the procedures employed to be of industry standard.
b)
Stretch Values:In some instances (such as at Vaalhoek and Glynn’s Lydenburg) in areas where original sample plans were not available, stretch value
plans recording a composite content and channel width value for a stope length or development end were available and included in the
database. The integrity of these plans as a source of grade information has been proven in other areas on the same mines where both
chip sample plans and stretch value plans were available and were compared. It was found that the correlation to old sampling has been
representative of the stretch values in these areas.
c)
Drillhole Data:Historical (pre-2007/8) drillhole data (inclusive of diamond, RC, and auger) exists on many of the operations. However very little backing
data is available for many of these older holes and it must be assumed that QAQC was not included in the process. Minxcon has
however reviewed the general quality of the survey data for these drillholes. For the most part, collar data has been found to agree well
with local topography and is considered to be acceptable for modelling purposes.
Downhole survey data with respect to diamond and RC drilling is also often absent from the older holes; however, it should be noted that
over 98% of these holes were seldom drilled to depths in excess of 150 m and were vertically collared. Only 1.40% of all the drillholes
on all the properties were drilled as inclined drillholes, thus it is Minxcon’s view that the holes and their relative reef intercept points
would be spatially acceptable for modelling purposes.
The historical drillhole data has no accompanying assay QAQC, however this fact is considered in allocation of Mineral Resource
classification during modelling.
More recent drillhole data (inclusive of diamond, RC and auger) from 2008 onward is considered to be of high quality as it was
conducted to updated industry standards with the incorporation of drillhole collar survey as well as assay QAQC where blanks and
certified reference material were inserted for monitoring purposes, with the inclusion of coarse duplicate samples. These later drilling
programmes were also either monitored, audited or managed by Minxcon personnel under Minxcon previous sister company Agere
Project Management (“Agere”).
14
SECTION 1: SAMPLING TECHNIQUES AND DATA
Criteria
Explanation
Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of any
measurement tools or systems
used.
Detail
d)
Trench, Sample Pit and Bulk Sampling (Vaalhoek Rock Dump):In order to evaluate the Vaalhoek Rock Dump, trenches and sample pits were dug. The trenches and pits were surve
Share your feedback
Discover