Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM) is pleased to report on its activities
for the quarter ended 31 March 2024.
HIGHLIGHTS
DURING THE MARCH 2024 QUARTER:
•
•
•
•
Theta selects Power China subsidiary as the preferred EPC partner to build stage one of its TGME
Gold Plant and TSF facilities estimated at US$30 million1
Theta is now fully permitted after receiving final Environmental Authorisation (EA) for Mining
Right 83 from the Department of Forest Fishery and Environment (DFFE) of South Africa2
Commencement of drilling and sampling on the TGME Gold Mine Tailings Dam
The Company continues to progress the due diligence process for the A$110 million (US$70
million) non-binding Term Sheet (“TGME Stream”) signed with Sprott Streaming and Royalty
Corporation (“Sprott Streaming”)3
Figure 1 – Drilling by the SGS team being conducted on the main TGME DSF
1
Refer to ASX Release dated 14 February 2024 titled, “Theta Gold selects PowerChina’s subsidiary as its preferred EPC Partner to
build its stage one TGME Gold Plant and TSF Facilities estimate at US$30 million”.
2
Refer to ASX Release dated 14 March 2024 titled, “Theta now fully permitted with mining right secured”.
3 Refer to ASX Release dated 19 October 2022 titled, “Theta Gold Executes a A$110M (US$70M) Non-Binding Funding Term
Sheet with Sprott Streaming for its TGME Gold Project”.
1
OPERATIONS AND DEVELOPMENT UPDATE
Drilling and Sampling on the TGME Gold Mine Tailings Dam
The Company announced4 that the Power China team has been onsite drilling and collecting samples for
metallurgical test work. The test work will assist in refining plant design and evaluating the tailings at the
TGME mine site. The tailings dams contain 140,000 oz gold (Appendix A) and will be tested for
metallurgical gold recovery.
SGS South Africa (Pty) (Assay Laboratory) Ltd, engaged by TGM’s preferred Engineering Procurement and
Construction (“EPC”) partner Power China subsidiary, (Yellow River Co., Pty (“YRC”) to complete a drilling
and sampling program at various tailing dams around the Company’s TGME gold plant for metallurgical
test work.
The program is now complete with a total of 407 meters drilled, 273.5 meters drilled into the TGME main
and four (4) Blyde tailings and 133.5 meters into the Glynn’s tailings. All samples will be assayed in the
coming weeks with various selected samples to be metallurgically tested to allow for the Company to
decide the possibility of adding tailings recovery to its early production schedule and generate early
cashflow ahead of the planned underground development. Theta Gold currently records 141,000 ounces
of gold JORC Resources (see Appendix A) across multiple tailings dams around the gold plant.
In total, 174,000 gold ounces sit on the surface surrounding the TGME gold plant, including 140,000 ounces
indicated as a resource in various tailings dams (Refer to JORC Table Appendix A) around the TGME plant
area.
With gold prices remaining high, the economics of commencing early mining of the contained gold in the
TSF provides the company with the opportunity to bring forward gold production and early cashflow
potential.
Figure 2 – Drilling by SGS at the Blyde #2 tailing near the TGME plant.
4
Refer to ASX Release dated 27 March 2024 titled, “Drilling and sampling on the TGME Tailings Dams”.
2
Figure 3 – Drill samples being labelled by SGS at the Blyde #2 tailing near the TGME plant
Figure 4 – Drilled samples being indexed by the SGS team
Earlier in the year TGME selected EPC partner YRC (a controlled subsidiary of Power Construction
Corporation of China) has already conducted a sampling program to confirm the surface sources of gold
resources, grade and metallurgy to its satisfaction as part of the on-going due diligence5
5 Ref to ASX Release dated 14 February 2024, titled “Theta Gold Selects PowerChina Subsidiary as its preferred EPC Partners to
build its stage one TGME Gold Plant and TSF Facilities Estimated at US$30 Million”.
3
Figure 5 – Sampling at the main TGME DSF adjacent to the TGME Processing Plant completed by YRC’s team
Project Permits and Approvals Update
Theta now has all the required approvals for MR 83 to start mining:
•
•
•
•
•
•
•
•
Atmospheric Emissions Licence (Gold Plant)
Explosive licence for transport and usage
Forrest Licence (Frankfort area)
MR 83 Environmental Authorisation
Water Use Licence (for tailings, plant and mining)
Environmental Rehabilitation Guarantee in place for MR 83
Updated Social and Labour Plan for MR 83
Heritage Record of Decision
Environmental Authorisation (EA):
On 14 March 2024, the Company advised that its Mining Right (MR) 83 was now fully permitted for mining
after the Department of Forest Fishery and Environment (DFFE) confirmed the approval in writing of the
Department's decision to grant the integrated Environmental Authorisation over TGME Gold Mines MR
83 which includes the Beta Mine, CDM Mine, and Frankfort Mine, three of the four mines included in the
mining schedule of the Definitive Feasibility Study6.
The decision of the Department follows an objection lodged in September 2023 over MR 83 against its
environmental approvals as part of a 90-day public review period7 by one individual out of over 900 public
& private members. This objection was rejected by the Department of Forest Fishery and Environment
(“DFFE”) and all other related departments. The main condition imposed in lifting the objection was
quarterly borehole and downstream water testing.
As a result of the granting of environmental approvals to date, the Company is in a position to commit to
the completion of a major condition precedent for potential project financing for its TGME Gold Mine
Project as previously stated by the Company. It is also able to advance the EPC contractor's progress to
the build stage for one of its gold plants.
6 Refer to ASX release 27 July 2022 “Theta Gold’s TGME Project DFS confirms NPV of AUD432 million”.
7 Refer to ASX release 11 September 2023 “ENVIRONMENTAL AUTHORISATION UPDATE FOR MR83”.
4
Updated Environmental Approvals for MINING RIGHT (MR) 83 – Progress Table
Environmental Approvals for Mining Right (MR) 83
Status
Submit application for EA
✓
Submit draft scoping report
✓
Specialists EIA Studies Completed
✓
DMRE acceptance of final Scoping report
✓
Draft EIA/EMPr submitted for public review
✓
Draft IWWMP submitted for public review
✓
Air Quality Emissions approval
✓
Water use approvals
✓
EIA approvals
✓
Stakeholder Management and Social Investment
The Company’s focus remains to work closely with our stakeholders and communities to strengthen the
existing relationships and, to establish a mutually beneficial relationship that is healthy and sustainable.
The TGME Stakeholder Forum continues to gain good momentum with open and honest communications
between all parties.
A thorough and robust broad-based community and stakeholder consultation process will be undertaken
as part of the development of the new Social Labour Plan (SLP). The purpose of this process is not only to
ensure legislative compliance but to establish and maintain sustainable partnerships with communities
and stakeholders, in line with the requirements of a transparent, inclusive, and equitable social license to
operate.
As part of our social investment, the company continues to support the local schools with teachers and
feeding programs. The local mine staff also assist with school maintenance.
Key Feasibility Study Highlights for TGME Gold Mine Project
On 27 July 20228, the TGME Underground Project Definitive Feasibility Study (“FS”) was released to ASX
with an NPV10% of $A432 million at US$1,642 / oz gold price. Key features of FS include:
•
•
TGME Feasibility Study delivers 1.24Moz contained gold, underpinning an initial 12.9-year mine life.
Strong financial return (based on LOM Plan), including (at a gold price of A$2,189/oz, with first
production targeted for 20249, including:
o Undiscounted free cash flows of US$508m, (A$678m), pre-tax US$717, (A$956m);
o NPV (at a 10% discount rate) of US$219m (A$292m), pre-tax US$324m, (A$432m);
o Capital payback period of 31 months;
o Pre-tax IRR of 65%;
o Combined Underground Projects have an AISC of US$834/oz (A$1,112/oz);
o Peak Capital requirement is US$77m (A$103m), total LOM capital requirements US$174m
(A$232m).
8 Refer to ASX release dated 27 July 2022 titled “Theta’s TGME Project FS confirms NPV10% of A$432 Million at US$1,642 / Oz
Gold Price”.
9 First gold production will be subject to securing financing, permitting and regulatory approvals.
5
o
Table 1 demonstrates the key economics of the project based on various gold price assumptions.
Table 1: Project Economics at Various Gold Prices – Base Case (AUD)
Project Economics at
gold price
NPV @ 10% (real) Pre-tax
NPV @ 10% (real) Posttax
IRR (%) Pre-tax
IRR (%) Post-tax
AISC
EBITDA annual average
EBIT annual average
Free Cash Flow (Pre-tax)
Free Cash Flow (Post-tax)
Development Capital –
Peak Funding
Capital Sustaining
Payback post-tax
Capital Efficiency (Pre-Tax
NPV/Dev Capital
Capital Efficiency (PostTax NPV/Dev Capital
NOTES:
1.
2.
Unit
AUDm
Forecast
USD1,500/ USD1,600/ USD1,800/ USD2,000/ USD2,200/
(USD1,642/
oz
oz
oz
oz
oz
oz Avg)
432
339
405
536
669
802
AUDm
292
232
274
359
447
533
%
%
AUD/oz
AUDm
AUDm
AUDm
AUDm
65%
57%
1,112
92
80
956
678
57%
50%
1,096
77
66
768
550
64%
56%
1,107
87
76
897
638
77%
67%
1,129
107
96
1,158
814
90%
78%
1,149
128
116
1,421
996
102%
87%
1,167
148
136
1,686
1,175
AUDm
102
102
102
102
102
102
AUDm
Months
49
31
49
33
49
31
49
28
49
25
49
24
%
422%
332%
395%
524%
653%
783%
%
285%
226%
268%
351%
437%
521%
Converted to AUD from USD using AUD:USD exchange rate of 1.333.
Due to rounding, numbers presented throughout this document may not add up precisely to the totals, provided and percentages
may not precisely reflect the absolute figures.
CORPORATE GOVERNANCE AND FUNDING UPDATE
Indaba 2024
The Companies Chairman, Mr Bill Guy presented at the 2024 Indaba, 121 Mining Investment Conference
held in Cape Town, South Africa on 5 and 6 February 2024. The Company received a great deal of interest
from potential investors, industry peers and stakeholders and provided an opportunity to showcase the
significant advancement made by the Company in the last 12 months.
Issue of Unlisted Options to 2Invest AG
The following unlisted options were issued to long-term investor, 2Invest AG as consideration for the
extension of time to pay interest owing on the Bond.
•
•
•
1,000,000 unlisted options, expiry date 30 June 2024, exercise price $0.115
1,000,000 unlisted options, expiry date 30 July 2024, exercise price $0.11
1,000,000 unlisted options, expiry date 28 August 2024, exercise price $0.12
AU$110m (US$70m) non-binding Term Sheet with Sprott Streaming and Royalty Corporation
The Company continues to advance its due diligence efforts with Sprott Streaming. The terms of the
transaction can be found on the Company’s ASX release date 19 October 2022 10.
10
Refer to ASX Release dated, 19 October 2023 titled, “Theta Gold Executes A$110M Term Sheet with Sprott Streaming”.
6
Cash Position and Subsequent Funding
As of 31 March 2024, the Group had US$93,000 in cash.
Furthermore, as announced previously on 25 March 2021, the Company entered into an At-The-Market
Subscription Deed (“ATM”) with Acuity Capital. The ATM was renewed on 31 July 2023 and extended for
a further 3 years to 31 July 2026 and may provide the Company with additional standby equity capital of
up to A$15,000,000 (US$9,958,500) available under the facility. There are no requirements on the
Company to utilise the ATM and the Company may terminate the ATM at any time, without cost or penalty.
As security for the ATM, the Company has issued 24 million TGM collateral shares to be held by Acuity
Capital on 25 March 2021. As of the date of this report, this facility remains available and undrawn.
In accordance with ASX Listing Rules 5.3.1 and 5.3.2, the Company provides the following summary of
expenditures incurred during the Quarter:
Mining exploration costs (including exploration labour)
Mining Production and Development Costs (including trial mining)
Licence to Operate Costs
Total
US
US
US
US
$ 322,805
$ 36,790
$ 13,530
$ 373,125
The Company’s Quarterly Appendix 5B reported nil payments to related parties and their associates as
noted in the Appendix 5B this payment was for directors' fees and consulting fees (including payments
relating to current and prior quarters).
Capital Structure
The current capital structure of the Company at 31 March 2024 is as follows:
Fully paid ordinary shares (ASX: TGM | OTC: TGMGF)
Unlisted options, performance rights, and bonds (see “Annexure C”)
Number
711,539,838
82,010,000
The market capitalisation of TGM was A$128 million 11 (US$84m) as at 31 March 2024.
This announcement was authorised for release by the Board of Directors.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
11 Calculated as 711,539,838 fully-paid ordinary shares on issue at the closing price of AU$0.18 cents per share as at 31 March
2024 converted at the RBA exchange rate of AUD:USD of 0.6532.
7
Theta Gold Mines' Interactive Investor Hub
The Company encourages shareholders to please join the Theta Investor Hub which allows you to ask
questions directly to the Company, view video’s and keep up to date on progress of the TGME Gold Project
at http://investors.thetagoldmines.com.
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
8
Competent Persons Statement
Mineral Resources and Ore Reserves
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects,
the information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc
Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South
African Council for Natural Scientific Professions and Mr Daniel van Heerden (B.Ing (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director of
Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg. No.
37309).
Metallurgical results
The information in this report relating to exploration results is based on, and fairly reflects, the information
and supporting documentation compiled by Mr Phil Bentley (MSc (Geol), MSc (MinEx), Pr.Sci.Nat. No.
400208/05, FGSSA), a consultant to the Company and a member of the South African Council for Natural
Scientific Professions.
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” dated 16 May 2019,
“Optimised Mine Schedule for Theta Open Pit Starter Project Delivers Significant Improvements” dated 20
April 2020, “Excellent Bulk Metallurgical Results Provides Confidence For Underground PFS” and “Initial
Maiden Underground Mining Reserve 419,000 oz Gold” dated 8 April 2021 were released to the Australian
Securities Exchange (ASX) on those dates. The Company confirms that:
•
•
it is not aware of any new information or data that materially affects the information included in the
ASX announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcements continue to apply and have not materially changed.
9
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM ) is a gold development company that holds a range of prospective
gold assets in a world-renowned South African gold mining region. These assets include several surface
and near-surface high-grade gold projects which provide cost advantages relative to other gold producers
in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit
(Capital City of Mpumalanga Province).
Following small scale production from 2011 – 2015, the Company is currently focussing on the construction
and financing of a new gold processing plant within its approved footprint at the TGME plant. The
company has completed a FS in July 2022 for the first four mines Beta, CDM, Frankfort and Rietfontein
(TGME Underground Project). The Base Case LOM plan will comprise a 12.9-year mining operation starting
in 2023 and delivering production of 1.24 million ounces of contained gold.
The estimated development capital or peak funding requirement is USD77 million (AUD102 million), with
the Project forecast to generate a pre-tax NPV10% of USD324 million (AUD432 million) and pre-tax Internal
Rate of Return (IRR) of 65% at the forecast gold price of averaging USD1,642/oz over the LOM. The
Company aims to build a solid production platform to over next 5 years to 160kozpa based primarily
around shallow, open-pit or adit-entry shallow underground hard rock mining sources. Theta Gold has
access to over 43 historical mines and prospect areas that can be accessed and explored, with over 6.7Moz
of historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“TGSA”).
TGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines
(Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”)
entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation
by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie
Mines is comprised of a combination of local community trusts, an employee trust and a strategic
entrepreneurial partner.
10
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe for
or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to
those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of
this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe that
any such statements and projections are either false, misleading or incorrect, it does not warrant or guarantee
such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to
making any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or
any errors in or omissions, from any information, statement or opinion contained in this announcement. This
announcement contains information, ideas and analysis which are proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such
as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
and may be influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection
of the intention of the Company as at the date of release of the document, however are subject to change
without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables and risks,
many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for
making the forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to
support the estimation of Ore Reserves. There is no assurance that the intended development referred to will
proceed as described, and will rely on access to future funding to implement. Theta Gold believes it has
reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee that funding will be
available, and investors are to be aware of any potential dilution of existing issued capital. The production
targets and forward looking statements referred to are based on information available to the Company at the
time of release, and should not be solely relied upon by investors when making investment decisions. Theta
Gold cautions that mining and exploration are high risk, and subject to change based on new information or
interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the
results or production targets contained in this release. Further evaluation is required prior to a decision to
conduct mining being made. The estimated Mineral Resources quoted in this release have been prepared by
11
Competent Persons as required under the JORC Code (2012). Material assumptions and other important
information are contained in this release.
The Company confirms that all material assumptions underpinning the production target, or the forecast
financial information derived from the production target continue to apply and have not materially changed
from that released in the definitive Feasibility Study released to ASX on 27 July 2022.
12
ANNEXURE A
Mineral Resource and Mining Reserves
Table 1: Combined Underground and Open Pit Ore Reserves as at 1 February 2021
Grade
g/t
Operation
Beta
Frankfort
CDM
Open Pit (MR83)
Total
Notes:
1.
Tonnes
kt
6.51
4.13
2.31
2.74
3.98
Au Content
kg
1,662
319
385
2,164
4,530
10,822
1,317
889
4,996
18,023
koz
347.94
42.33
28.58
160.61
579.46
The information pertaining to the Ore Reserve estimation is detailed in the notes of the Ore Reserve tabulation for the
individual operations.
Table 2: Combined Mineral Resource as at 1 February 2021
Combined Mineral Resource
Resource
Classification
Measured
Type of Operation
Tonnage
Gold Grade
Mt
g/t
Underground
Open pit
Tailings
Total Measured
Indicated
Underground
Open Pit
Tailings
Total Indicated
Inferred
Underground
Open pit
Tailings
Rock Dump
Total Inferred
Grand Total
Notes:
1.
2.
3.
4.
5.
6.
Gold Content
Kg
koz
0.091
5.37
489
15.7
0.091
4.774
8.109
5.244
18.128
21.452
4.907
0.023
0.885
27.267
45.485
5.37
6.21
2.14
0.83
2.84
5.22
5.11
0.57
1.20
5.06
4.17
489
29 661
17 364
4 373
51 398
111 880
25 057
13
1 059
138 009
189 896
15.7
953.7
558.2
140.6
1652.5
3597.0
805.6
0.4
34.0
4 437.0
6 105.2
Columns may not add up due to rounding.
Gold price used for the cut-off calculations is USD1,500/oz.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35
g/t.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
Mineral Resources are stated as inclusive of Ore Reserves.
Mineral Resources are reported as total Mineral Resources and are not attributed.
Table 3: Beta Underground Ore Reserve as at 1 February 2021
Ore Reserve Category
Probable
Total
Notes:
7.
8.
9.
Grade
g/t
Tonnes
kt
6.51
6.51
Au Content
kg
1,662
1,662
10,822
10,822
koz
347.94
347.94
An Ore Reserve cut-off of 170 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Mineral Reserves and are not attributed.
13
Table 4: Frankfort Underground Ore Reserve as at 1 February 2021
Grade
g/t
Ore Reserve Category
Proved
Probable
Total
Notes:
1.
2.
3.
Tonnes
kt
4.24
4.11
4.13
Au Content
kg
60
259
319
koz
8.16
34.16
42.33
254
1,063
1,317
An Ore Reserve cut-off of 150 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 5: CDM Underground Ore Reserve as at 1 February 2021
Grade
g/t
Ore Reserve Category
Probable
Total
Notes:
1.
2.
3.
Tonnes
kt
2.31
2.31
Au Content
kg
385
385
koz
28.58
28.58
889
889
An Ore Reserve cut-off of 121 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 6: Ore Reserves for the Open pit Operations as at 1 February 2021
Ore Reserve Category
in LoM Plan
Probable
Probable
Probable
Total
Notes:
1.
2.
3.
Grade
g/t
2.61
2.43
1.62
2.31
Pit
Browns Hill
Iota
Theta Hill
Reef Tonnes
kt
279
1,490
395
2,164
Au Content
kg
koz
728
23
3,628
117
640
21
4,996
161
An Ore Reserve cut – off of 0.4 g/t was applied.
A gold price of USD 1,300 / oz was used for the cut - off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 7: Total Theta Project - Mineral Resources, 1 February 2021
Resource
Classification
Indicated
Open Pit Mine
Reef
Inferred
Reef
Width
Content
Reef
Tonnes
g/t
1.02
cm
200
cmgt
204
Mt
0.397
Au Content
Kg
404
koz
13.0
Theta & Browns Hill
Shale
Theta & Browns Hill
Theta & Browns Hill
Bevett's
Upper Theta
1.08
223
241
0.856
925
29.7
2.41
100
241
0.651
1 571
50.5
Theta & Browns Hill
Lower Theta
3.79
100
379
0.839
3 178
102.2
Theta & Browns Hill
Beta
2.51
100
251
0.373
938
30.1
Columbia Hill
Bevett's
2.98
114
340
0.108
323
10.4
Columbia Hill
Upper Rho
2.33
402
937
0.897
2 090
67.2
Columbia Hill
Lower Rho
2.51
520
1306
0.981
2 464
79.2
Columbia Hill
Upper Theta
1.06
114
121
0.163
173
5.6
2.29
258
591
5.267
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Theta & Browns Hill
Shale
g/t
1.12
cm
215
cmgt
240
Mt
0.600
Theta & Browns Hill
Theta & Browns Hill
Bevett's
1.17
217
254
Upper Theta
1.86
100
Theta & Browns Hill
Lower Theta
8.06
100
Total Indicated
Resource
Classification
Reef
Grade
Open Pit Mine
Reef
12 066
387.9
Au Content
Kg
668
koz
21.5
0.451
528
17.0
186
0.948
1 762
56.6
806
1.384
11 153
358.6
14
Theta & Browns Hill
Beta
2.17
100
217
0.778
1 686
54.2
Columbia Hill
Upper Rho
5.12
134
687
0.131
673
21.6
3.84
129
497
4.292
Reef
Grade
Reef
Width
Content
Reef
Tonnes
cm
258
cmgt
591
Mt
5.3
Kg
12 066
koz
387.9
Total Inferred
Resource
Classification
Open Pit Mine
Reef
16 470
529.5
Au Content
Indicated
Total Theta Project
All
g/t
2.29
Inferred
Total Theta Project
All
3.84
129
497
4.3
16 470
529.5
2.99
200
598
9.6
28 535
917.4
Total Indicated and Inferred
Notes:
1.
2.
3.
4.
5.
6.
7.
Theta Project (Theta Hill, Browns Hill and Iota) cut-off is 0.35 g/t;
The gold price used for the cut-off calculations is USD 1,500 / oz;
Geological losses applied are 10% for inferred and 5% for Indicated and Measured;
Theta Hill and Browns Hill - Upper Theta Reef, Lower Theta Reef and Beta Reef are diluted grades over 100cm;
Historical mine voids have been depleted from the Mineral Resource;
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion thereof w ill be
converted to Ore Reserves;
Mineral Resources fall within the mining right 83MR and 341MR.
15
ANNEXURE B
Mining Rights and Applications for Mining Rights
MR No
Description
Farms
Effective Date
Expiry Date
Remarks
16-Oct-13
15-Oct-23
Granted
Refer Note 1
Refer Note 1
Granted
10-Jul-13
09-July-23
Granted
25-Sep-19
16-Feb-22
Granted
NORTHERN TENEMENTS (MR83, MR330, MR340, MR341, MR10167)
Portions 1, 2, 3, 4, 5 and the Remaining
Extent of Frankfort 509KT