Quarterly Activities and Cashflow Report 30 June 2023
Released
Released
Announcement PDF
31 July 2023
ASX ANNOUNCEMENT
(ASX:TGM)
QUARTERLY REPORT
1 April 2023 to 30 June 2023
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM | OTC: TGMGF) is pleased to
report on its activities for the period from 1 April 2023 to 30 June 2023.
HIGHLIGHTS
DURING THE JUNE 2023 QUARTER:
•
•
•
•
The Company completed a A$5 million (US$3.3 million) financing package and the signing
of a commercial bulk sampling trial for its Frankfort gold mine project1.
Received the Water Use License for its TGME Gold Project over Mining Right 83 from the
Department of Water and Sanitation (DWS) of South Africa2.
Frankfort Mine commercial bulk sample mining preparation and operations initiated3.
The Company continues to progress the due diligence process for the A$110 millon
(US$70 million) non-binding Term Sheet (“TGME Stream”) signed with Sprott Streaming
and Royalty Corporation (“Sprott Streaming”)4.
POST QUARTER
•
•
•
Final Environmental Authorisation (EA) received for Mining Right 83 from the Department
of Mineral Resource and Energy (DMRE) of South Africa.
Drill, blast and mining at Frankfort Mine commenced5.
A$5 million (US$3.3 million) Private Placement completed with strategic professional and
sophisticated investors.
1 Refer to ASX Release date 3 April 2023 titled, “5M to Fund Sampling Trial at Theta’s Frankfort Mine”.
2 Refer to ASX Release dated 11 April 2023 titled, “Theta Received Water Use Licence for Mining Right 83”.
3 Refer to ASX Release dated 15 May 2023 titled, “Operational Update”.
4
Refer to ASX Release dated 19 October 2022 titled, “Theta Gold Executes a A$110M (US$70M) Non-Binding Funding Term
Sheet with Sprott Streaming for its TGME Gold Project”.
5 Refer to ASX Release dated 19 July 2023 titled, “Drill and Blast at Frankfort Gold Mine Commences”.
Theta Gold Mines Limited ABN 30 131 758 177
Suite 80, Level 35 (Servcorp), International Tower One, 100 Barangaroo Avenue, Sydney NSW 2000
Tel: +61 2 8046 7584 Email: info@thetagoldmines.com
www.thetagoldmines.com
OPERATIONS AND DEVELOPMENT UPDATE
Commercial Bulk Sampling Ore Milling Agreement
Theta Gold announced on 3 April 20236 it had executed a 3,000 tons commercial bulk sampling
ore delivery contract with Barberton Mines (Pty) for its fully permitted Frankfort Mine. The
contract schedules for TGME to deliver from its Frankfort Mine 3,000 tons of ore as a bulk trial
sample.
TGME will cover its own mining and delivery costs. Once delivered and accepted at the Barberton
gold plant, a revenue split (Gold Split) between the parties will apply, subject to the average
recovered grade of gold ore delivered. Provided the average grade delivered to the plant is above
3g/t Au, the parties will be paid in accordance with the Gold Split, and no other toll/milling costs
are required from the Supplier post-delivery. If the recovered grade of less than 3g/t is achieved,
the Gold Split will cease and a processing cost per ton will be payable.
The A$5 million (US$3.3 million) funding package was to finance the bulk trial sampling program.
The funding was raised with strategic long-term investors via three separate unsecured
Convertible Loan Agreements (‘Agreements’) to fund the bulk trial sampling program at the
Frankfort Mine along with working capital for the Company.
Figure 1: The Chairman thanking a miner at Frankfort Gold Mine on the day of the first blast (July 2023)
6
Refer to ASX Release dated 3 April 2023 titled “$5 million financing and financing and signing of commercial bulk sampling
trial run with Pan African Resources’ Barberton Mines Gold Plant".
2
Project Permits and Approvals
In light of the latest round of successful license applications, the Company continues to advance
the long-term environmental approvals process for MR83 following the release of its definitive
Feasibility Study7 completed in 2022.
The South African Department of Water and Sanitation (DWS) has granted a Water Use License
(WUL) for the Company’s Mining Right (MR) 83, which covers the initial TGME Underground Gold
Project mining schedule as per our Feasibility Study.
The WUL is issued in accordance with Chapter 4 of the National Water Act, 1998 (Act 36 of 1998)
for a period of 12 years. The WUL forms an integral part of the TGME Underground Project since
it authorises the extension of the current Tailings Storage Facility and all planned water use
activities within the MR83 area.
The approval of the WUL is a result of comprehensive environmental specialist studies conducted
with detailed engineering designs that satisfy the extensive regulatory requirements relating to
water and waste management in South Africa.
The DWS will inform all interested and affected parties of the issuing of this licence, which lead
to a 90-day public review and objection period that has ended on the 30th of June 2023. The
company is still awaiting notification and the outcome of the 90-day review process from DWS.
Updated Environmental Approvals for MINING RIGHT (MR) 83 – Progress Table
Environmental Approvals for Mining Right (MR) 83
Status
Submit application for EA
✓
Submit draft scoping report
✓
Specialists EIA Studies Completed
✓
DMRE acceptance of final Scoping report
✓
Draft EIA/EMPr submitted for public review
✓
Draft IWWMP submitted for public review
✓
Air Quality Emissions approval
✓
Water use approvals
✓
EIA approvals
✓
The communications with the Department of Forest, Fishery and Environment (DFFE) for the
continuation of mining remain in progress8.
7
Refer to ASX release dated 27 July 2022 titled “Theta Gold's TGME Project DFS confirms NPV10% of AUD432 Million”.
8 Refer to ASX release date 18 July 2022 titled “Permitting Update TGME Underground Gold Project”.
3
The Company announced on 26 July 20239 that it has received its Environmental Authorisation
(EA) and that the South African Department of Minerals Resources and Energy (DMRE) has
granted the Company’s EA application over MR83.
As a result of the DMRE approval, three (3) of the four (4) mines within the initial TGME
Underground Gold Project are now fully permitted, subject to a 90-day public participation and
appeal period which enables interested and affected parties an opportunity to review and/or
lodge an appeal to the DMRE decision to approve the EA for MR83.
Theta Gold is now able to commence mine planning, subject to securing funding for the
development and construction of its gold operations. While the Company actively seeks to
finalise funding packages, it will commence delivery of a series of bulk samples from its fully
approved Frankfort mine to the Barberton gold plant to begin early cashflow generation for the
Company10.
Key Feasibility Study Highlights for TGME Gold Mine Project
On 27 July 202211, the TGME Underground Project Definitive Feasibility Study (“FS”) was released
to ASX with an NPV10% of $A432 million at US$1,642 / oz gold price. Key features of FS include:
•
•
TGME Feasibility Study delivers 1.24Moz contained gold, underpinning an initial 12.9-year
mine life.
Strong financial return (based on LOM Plan), including (at a gold price of A$2,189/oz, with
first production targeted for 202412, including:
o Undiscounted free cash flows of US$508m, (A$678m), pre-tax US$717, (A$956m);
o NPV (at a 10% discount rate) of US$219m (A$292m), pre-tax US$324m, (A$432m);
o Capital payback period of 31 months;
o Pre-tax IRR of 65%;
o Combined Underground Projects have an AISC of US$834/oz (A$1,112/oz);
o Peak Capital requirement is US$77m (A$103m), total LOM capital requirements US$174m
(A$232m).
o Table 1 demonstrates the key economics of the project based on various gold price
assumptions.
Table 1: Project Economics at Various Gold Prices – Base Case (AUD)
Project Economics at
gold price
NPV @ 10% (real) Pre-tax
NPV @ 10% (real) Posttax
IRR (%) Pre-tax
IRR (%) Post-tax
AISC
EBITDA annual average
EBIT annual average
Free Cash Flow (Pre-tax)
Free Cash Flow (Post-tax)
Unit
AUDm
Forecast
USD1,500/ USD1,600/ USD1,800/ USD2,000/ USD2,200/
(USD1,642/
oz
oz
oz
oz
oz
oz Avg)
432
339
405
536
669
802
AUDm
292
232
274
359
447
533
%
%
AUD/oz
AUDm
AUDm
AUDm
AUDm
65%
57%
1,112
92
80
956
678
57%
50%
1,096
77
66
768
550
64%
56%
1,107
87
76
897
638
77%
67%
1,129
107
96
1,158
814
90%
78%
1,149
128
116
1,421
996
102%
87%
1,167
148
136
1,686
1,175
9 Ref to ASX Release dated, 26 July 2023 titled, “Final Environmental Authorisation Granted for MR83”
10 Ref to ASX Release dated, 3 April 2023 titled, “$5 million to fund Bulk Sampling Trial at Theta’s Frankfort mine”.
11 Refer to ASX release dated 27 July 2022 titled “Theta’s TGME Project FS confirms NPV10% of A$432 Million at US$1,642 / Oz
Gold Price”.
12 First gold production will be subject to financing, permitting and regulatory approvals.
4
Development Capital –
Peak Funding
Capital Sustaining
Payback post-tax
Capital Efficiency (Pre-Tax
NPV/Dev Capital
Capital Efficiency (PostTax NPV/Dev Capital
NOTES:
1.
2.
AUDm
102
102
102
102
102
102
AUDm
Months
49
31
49
33
49
31
49
28
49
25
49
24
%
422%
332%
395%
524%
653%
783%
%
285%
226%
268%
351%
437%
521%
Converted to AUD from USD using AUD:USD exchange rate of 1.333.
Due to rounding, numbers presented throughout this document may not add up precisely to the totals, provided and percentages
may not precisely reflect the absolute figures.
Onsite Environmental Activities
A detailed environmental monitoring program has been established for the TGME operations.
This programme includes dust monitoring, surface water and groundwater monitoring,
biomonitoring and resource consumption monitoring.
The monitoring program is based on general legal requirements, commitments in the various
approved Environmental Management Programmes (“EMPrs”) and the requirements of the
Integrated Water Use Licenses (“WUL’s”) that were granted to TGME.
Dust Monitoring
A dustfall monitoring network, comprising four (4) single dustfall units is in place at the TGME
Tailings Storage Facility (“TSF”). Dust samples are collected monthly by the TGME Environmental
Department and taken to Regen Waters Laboratory in Witbank for analysis.
Figure 2: Dust Monitoring March 2023
5
Firebreaks
Working On Fire (Pty) Ltd has been appointed to assist with the implementation of the firebreaks
at Rietfontein.
Figure 3: Implementation of the firebreaks at Rietfontein
New Miners Training
All new mine employees were provided with company induction training during May 2023.
Particular emphasis was placed on health and safety standards, competency and human
resources policies. Training and experience will also be gained through ongoing ‘on-the-job’
training.
Access cards were issued to new miners, and they were trained on the use of the cards and the
access control procedures.
6
Figure 4: Induction training provided to new miners.
Local Economic Development Programme
The Company has continued to sponsor Pilgrim’s Rest Primary School and Pilgrim’s Rest City
Secondary School, even though no revenue is being generated.
It came to the Company’s attention in the past that both schools are short-staffed with educators
and the school’s academic overall performance became poor. Over the years we have witnessed
enormous improvement in overall academic performance as well as the matric pass rate. For the
first time in history, Pilgrim’s Rest City Secondary School was able to obtain a second position in
the Sabie Circuit, this would not have been possible without the Company’s assistance.
Both schools are grateful for the support they receive from the Company. Regular visits to the
schools are conducted to have a glimpse at the progress that the schools are making.
Figure 5: Pilgrim’s Rest Primary School
7
CORPORATE GOVERNANCE AND FUNDING UPDATE
A$5m (US$ 3.3 million) Funding Package signed and led by long-term Strategic Investor
Deutsche Balaton AG
Funding of A$5 million (US$3.3 million) to initiate the bulk trial sampling program and ore milling
agreement with Pan African Resources13 was raised with strategic long-term investors via three
separate unsecured Convertible Loan Agreements (‘Agreements’). The Agreements were with
Deutsche Balaton AG (DB) for A$3.5 million, Golden Asia Investment Group Ltd (“GAIG”) for A$1
million, and Aus Agriculture Pty Ltd (“AAPL”) for A$500,000 respectively.
Deutsche Balaton AG is the controlling entity to the Company’s existing significant shareholder,
2Invest AG who holds above 6% equity interest in TGM. This new funding deal came just after
the decision makers of DB visited Theta’s TGME mining camp following this year’s February 2023
Cape Town Mining Indaba Conference.
GAIG is an existing long-term shareholder of the Company based out of Hong Kong who’s been
very supportive of Theta’s business plans and funding activities throughout the years. AAPL is
also an existing long-term shareholder in the Company.
A$5m (US$3.3 million) Private Placement with Strategic Sophisticated and Professional
Investors
The Company announced on 4 July 2023, following a trading halt on 30 June 2023, it had raised
A$5.0 million 14 (US$3.3 million) through a private placement (Placement) to strategic
professional and sophisticated investors.
Hong Kong Ruihua Investment Management Limited (“Ruihua”) cornerstoned A$3.0 million of
the placement. Ruihua is a wholly-owned subsidiary to its Nanjing based parent company Jiangsu
Ruihua Investment Holding Group Co., Ltd (since 2003), a fund manager with over US$3 billion
AUM who specialises in the equity market , including secondary market trading, private
placements, venture capital and private equity activities.
The Company issued 76,923,077 new fully paid TGM Ordinary Shares at the issue price of
A$0.065 15 cents per share to the investors using the Company’s existing placement capacity
pursuant to Listing Rule 7.1.
AU$110m (US$70m) non-binding Term Sheet with Sprott Streaming and Royalty Corporation
The Company continues to make advance the due diligence efforts with the Sprott Streaming
which is expected to be complete during the September 2023 quarter. The terms of the
transaction can be found on the Company’s ASX release date 19 October 202216.
Cash Position and Subsequent Funding
As of 30 June 2023, the Group had US$1.9 million in cash.
13
Ref to ASX Release dated, 3 April 2023 titled, “$5 million to fund Bulk Sampling Trial at Theta’s Frankfort mine”.
Ref to ASX Release dated 4 July 2023 titled, $5 million private placement and corporate update”.
15 Shares issue price of $0.065 cents is 4% discount to the 14 day VWAP just prior to completion of the capital raising.
16
Ref to ASX Release dated, 19 October 2023 titled, “Theta Gold Executes A$110M Term Sheet with Sprott Streaming”.
14
8
Furthermore, as announced previously on 25 March 2021, the Company entered into an At-TheMarket Subscription Deed (“ATM”) with Acuity Capital. The ATM was renewed on 31 July 2023
and extended for a further 3 years to 31 July 2026 and may provide the Company with additional
standby equity capital of up to A$15,000,000 (US$9,958,500) available under the facility. There
are no requirements on the Company to utilise the ATM and the Company may terminate the
ATM at any time, without cost or penalty. As security for the ATM, the Company has issued 24
million TGM collateral shares to be held by Acuity Capital on 25 March 2021. As of the date of
this report, this facility remains available and undrawn.
In accordance with ASX Listing Rules 5.3.1 and 5.3.2, the Company provides the following
summary of expenditures incurred during the Quarter:
Mining exploration costs (incl exploration labour)
Mining Production and Development Costs (incl trial mining)
Licence to Operate Costs
Total
US
US
US
US
$382,418
$284,711
$7,552
$674,681
The Company’s Quarterly Appendix 5B reported US$124,451 payments to related parties and
their associates as noted on the Appendix 5B this payment was for directors' fees and consulting
fees (including payments relating to current and prior quarters).
Capital Structure
The current capital structure of the Company at 30 June 2023 is as follows:
Number
Fully paid ordinary shares (ASX: TGM | OTC: TGMGF)
Unlisted options, performance rights, and bonds (see “Annexure C”)
623,151,930
113,681,433
The market capitalisation of TGM was A$41 million 17 (US$27m) as at 30 June 2023.
This announcement was authorised for release by the Board of Directors.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
17 Calculated as 623,151,930 fully-paid ordinary shares on issue at the closing price of AU$0.066 cents per share as at 30 June
2023 converted at the RBA exchange rate of AUD:USD of 0.6639.
9
Theta Gold Mines' Interactive Investor Hub
The Company encourages shareholders to please join the Theta Investor Hub which allows you
to ask questions directly to the Company, view video’s and keep up to date on progress of the
TGME Gold Project at http://investors.thetagoldmines.com.
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
Competent Persons Statement
Mineral Resources and Ore Reserves
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects,
the information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc
Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South
African Council for Natural Scientific Professions and Mr Daniel van Heerden (B.Ing (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director of
Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg. No.
37309).
Metallurgical results
The information in this report relating to exploration results is based on, and fairly reflects, the information
and supporting documentation compiled by Mr Phil Bentley (MSc (Geol), MSc (MinEx), Pr.Sci.Nat. No.
400208/05, FGSSA), a consultant to the Company and a member of the South African Council for Natural
Scientific Professions.
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” dated 16 May 2019,
“Optimised Mine Schedule for Theta Open Pit Starter Project Delivers Significant Improvements” dated 20
April 2020, “Excellent Bulk Metallurgical Results Provides Confidence For Underground PFS” and “Initial
Maiden Underground Mining Reserve 419,000 oz Gold” dated 8 April 2021 were released to the Australian
Securities Exchange (ASX) on those dates. The Company confirms that:
•
•
it is not aware of any new information or data that materially affects the information included in the
ASX announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcements continue to apply and have not materially changed.
10
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTC: TGMGF) is a gold mining development company that holds a range
of prospective gold assets in a world-renowned South African gold mining region. These assets include several
surface and near-surface high-grade gold projects which provide cost advantages relative to other gold
producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga
Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). The Company aims to build a solid production platform to over 160 kozpa based
primarily around shallow adit/stope-entry hard rock mining sources. Theta Gold has access to over 43 historical
mines and prospect areas that can be accessed and explored, with over 6.7Moz of historical production
recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“SGSA”). SGSA
holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty) Ltd
(“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”) entities. The BEE
shareholding in TGME and Sabie Mines is comprised of a combination of local community trusts, an employee
trust and a strategic entrepreneurial partner.
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe for
or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to
those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of
this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe that
any such statements and projections are either false, misleading or incorrect, it does not warrant or guarantee
such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to
making any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or
any errors in or omissions, from any information, statement or opinion contained in this announcement. This
announcement contains information, ideas and analysis which are proprietary to Theta Gold.
11
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such
as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
and may be influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection
of the intention of the Company as at the date of release of the document, however are subject to change
without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables and risks,
many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for
making the forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to
support the estimation of Ore Reserves. There is no assurance that the intended development referred to will
proceed as described, and will rely on access to future funding to implement. Theta Gold believes it has
reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee that funding will be
available, and investors are to be aware of any potential dilution of existing issued capital. The production
targets and forward looking statements referred to are based on information available to the Company at the
time of release, and should not be solely relied upon by investors when making investment decisions. Theta
Gold cautions that mining and exploration are high risk, and subject to change based on new information or
interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the
results or production targets contained in this release. Further evaluation is required prior to a decision to
conduct mining being made. The estimated Mineral Resources quoted in this release have been prepared by
Competent Persons as required under the JORC Code (2012). Material assumptions and other important
information are contained in this release.
The Company confirms that all material assumptions underpinning the production target, or the forecast
financial information derived from the production target continue to apply and have not materially changed
from that released in the definitive Feasibility Study released to ASX on 27 July 2022.
12
ANNEXURE A
Mineral Resource and Mining Reserves
Table 1: Combined Underground and Open Pit Ore Reserves as at 1 February 2021
Grade
g/t
Operation
Beta
Frankfort
CDM
Open Pit (MR83)
Total
Notes:
1.
Tonnes
kt
6.51
4.13
2.31
2.74
3.98
Au Content
kg
1,662
319
385
2,164
4,530
10,822
1,317
889
4,996
18,023
koz
347.94
42.33
28.58
160.61
579.46
The information pertaining to the Ore Reserve estimation is detailed in the notes of the Ore Reserve tabulation for the
individual operations.
Table 2: Combined Mineral Resource as at 1 February 2021
Combined Mineral Resource
Resource
Classification
Measured
Type of Operation
Tonnage
Gold Grade
Mt
g/t
Underground
Open pit
Tailings
Total Measured
Indicated
Underground
Open Pit
Tailings
Total Indicated
Inferred
Underground
Open pit
Tailings
Rock Dump
Total Inferred
Grand Total
Notes:
1.
2.
3.
4.
5.
6.
Gold Content
Kg
koz
0.091
5.37
489
15.7
0.091
4.774
8.109
5.244
18.128
21.452
4.907
0.023
0.885
27.267
45.485
5.37
6.21
2.14
0.83
2.84
5.22
5.11
0.57
1.20
5.06
4.17
489
29 661
17 364
4 373
51 398
111 880
25 057
13
1 059
138 009
189 896
15.7
953.7
558.2
140.6
1652.5
3597.0
805.6
0.4
34.0
4 437.0
6 105.2
Columns may not add up due to rounding.
Gold price used for the cut-off calculations is USD1,500/oz.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35
g/t.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
Mineral Resources are stated as inclusive of Ore Reserves.
Mineral Resources are reported as total Mineral Resources and are not attributed.
Table 3: Beta Underground Ore Reserve as at 1 February 2021
Ore Reserve Category
Probable
Total
Notes:
7.
8.
9.
Grade
g/t
Tonnes
kt
6.51
6.51
Au Content
kg
1,662
1,662
10,822
10,822
koz
347.94
347.94
An Ore Reserve cut-off of 170 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Mineral Reserves and are not attributed.
13
Table 4: Frankfort Underground Ore Reserve as at 1 February 2021
Grade
g/t
Ore Reserve Category
Proved
Probable
Total
Notes:
1.
2.
3.
Tonnes
kt
4.24
4.11
4.13
Au Content
kg
60
259
319
koz
8.16
34.16
42.33
254
1,063
1,317
An Ore Reserve cut-off of 150 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 5: CDM Underground Ore Reserve as at 1 February 2021
Grade
g/t
Ore Reserve Category
Probable
Total
Notes:
1.
2.
3.
Tonnes
kt
2.31
2.31
Au Content
kg
385
385
koz
28.58
28.58
889
889
An Ore Reserve cut-off of 121 cm.g/t has been applied.
A gold price of USD 1,465 / oz and exchange rate of 16 ZAR / USD was used for the cut-off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 6: Ore Reserves for the Open pit Operations as at 1 February 2021
Ore Reserve Category
in LoM Plan
Probable
Probable
Probable
Total
Notes:
1.
2.
3.
Grade
g/t
2.61
2.43
1.62
2.31
Pit
Browns Hill
Iota
Theta Hill
Reef Tonnes
kt
279
1,490
395
2,164
Au Content
kg
koz
728
23
3,628
117
640
21
4,996
161
An Ore Reserve cut – off of 0.4 g/t was applied.
A gold price of USD 1,300 / oz was used for the cut - off calculation.
Ore Reserves are reported as total Ore Reserves and are not attributed.
Table 7: Total Theta Project - Mineral Resources, 1 February 2021
Resource
Classification
Indicated
Open Pit Mine
Reef
Inferred
Reef
Width
Content
Reef
Tonnes
g/t
1.02
cm
200
cmgt
204
Mt
0.397
Au Content
Kg
404
koz
13.0
Theta & Browns Hill
Shale
Theta & Browns Hill
Theta & Browns Hill
Bevett's
Upper Theta
1.08
223
241
0.856
925
29.7
2.41
100
241
0.651
1 571
50.5
Theta & Browns Hill
Lower Th