Theta Gold Investor Presentation for IMARC
Released
Released
Announcement PDF
2 November 2022
ASX ANNOUNCEMENT
(ASX:TGM)
THETA GOLD PRESENTING AT IMARC
Theta Gold Mines Limited (“Theta Gold” or the “Company”) (ASX: TGM| OTC: TGMGF) is
pleased to advise that Byron Dumpleton, director of Theta Gold, will be presenting at the
2022 International Mining and Resources Conference (IMARC) held in Sydney on
Wednesday, 2 November 2022.
A copy of the Theta Gold presentation is attached to this notice for investors and
shareholders.
[ENDS]
This announcement was approved for release by Theta Gold Mines Limited’s Board.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: + 61 2 8046 7584 E: billg@thetagoldmines.com
Investor Relations
Australia: Ben Jarvis, Six Degrees Investor Relations: +61 (0) 413 150 448
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
1
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTCQB: TGMGF) is a gold development company that holds a range
of prospective gold assets in a world-renowned South African gold mining region. These assets include
several surface and near-surface high-grade gold projects which provide cost advantages relative to other
gold producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in Mpumalanga
Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit (Capital City of
Mpumalanga Province). Following small scale production from 2011 – 2015, the Company is currently
focussing on the construction of a new gold processing plant within its approved footprint at the TGME
plant, and for the processing of the Theta Open Pit oxide gold ore. Nearby surface and underground mines
and prospects are expected to be further evaluated in the future.
The Company aims to build a solid production platform to over 160kozpa based primarily around shallow,
open-pit or adit-entry shallow underground hard rock mining sources. Theta Gold has access to over 43
historical mines and prospect areas that can be accessed and explored, with over 6.7Moz of historical
production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“TGSA”). TGSA
holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty)
Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”) entities.
The South African Mining Charter requires a minimum of 26% meaningful economic participation by the
historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie Mines is
comprised of a combination of local community trusts, an employee trust and a strategic entrepreneurial
partner.
2
IMARC Presentation – Sydney
November 2022
DFS TO RECOVER 1.08Moz Au OVER 12.9 YEARS LOM INITIALLY
AT TGME UNDERGROUND MINE
6.1Moz GOLD RESOURCE & GROWING
Disclaimer
FORWARD LOOKING AND CAUTIONARY STATEMENTS
DISCLAIMER AND COMPETENT PERSONS STATEMENT
This presentation may refer to the intention of Theta Gold Mines regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such as
“Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”, “Predicted”,
“Estimated” or similar expressions. Forward looking statements, opinions and estimates included in this
announcement are based on assumptions and contingencies which are subject to change without notice, and may
be influenced by such factors including but not limited to funding availability, market-related forces (commodity
prices, exchange rates, stock market indices and the like) and political, environmental or economic events (including
government or community issues, land owners, global or systemic events). Forward looking statements are provided
as a general reflection of the intention of the Company as at the date of release of the document, however are subject
to change without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its nature,
and related activities including mineral exploration, are subject to a large number of variables and risks, many of
which cannot be adequately addressed, or be expected to be assessed, in this document. Work contained within or
referenced in this report may contain incorrect statements, errors, miscalculations, omissions and other mistakes.
For this reason, any conclusions, inferences, judgments, opinions, recommendations or other interpretations either
contained in this announcement, or referencing this announcement, cannot be relied upon. There can be no assurance
that future results or events will be consistent with any such opinions, forecasts or estimates. The Company believes
it has a reasonable basis for making the forward looking statements contained in this document, with respect to any
production targets, resource statements or financial estimates, however further work to define Mineral Resources or
Reserves, technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the sufficiency or
completeness of the information, opinions or beliefs contained in this announcement.
DISCLAIMER
This announcement or presentation has been prepared by and issued by Theta Gold Mines Limited (ASX:TGM |
OTCQB: TGMGF) to assist in informing interested parties about the Company and should not be considered as an
offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer
or invitation with respect to those securities. No agreement to subscribe for securities in the Company will be entered
into on the basis of this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to support
the estimation of Ore Reserves. There is no assurance that the intended development referred to will proceed as
described, and will rely on access to future funding to implement. Theta Gold Mines believes it has reasonable grounds
the results of the Feasibility Study. At this stage there is no guarantee that funding will be available, and investors are
to be aware of any potential dilution of existing issued capital. The production targets and forward looking statements
referred to are based on information available to the Company at the time of release, and should not be solely relied
upon by investors when making investment decisions. Theta Gold cautions that mining and exploration are high
risk, and subject to change based on new information or interpretation, commodity prices or foreign exchange rates.
Actual results may differ materially from the results or production targets contained in this release. Further evaluation
is required prior to a decision to conduct mining being made. The estimated Mineral Resources quoted in this release
have been prepared by Competent Persons as required under the JORC Code (2012). Material assumptions and
other important information are contained in this release. The Company confirms that all material assumptions
underpinning the production target, or the forecast financial information derived from the production target continue
to apply and have not materially changed from that released in the definitive Feasibility Study released to ASX on 27
July 2022.
This announcement or presentation may contain forward looking statements. Whilst Theta Gold Mines has no reason
to believe that any such statements and projections are either false, misleading or incorrect, it does not warrant
or guarantee such statements. Nothing contained in this announcement constitutes investment, legal, tax or other
advice. This overview of Theta Gold Mines does not purport to be all inclusive or to contain all information which its
recipients may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to making
any investment decision. To the maximum extent permitted by law, the Company makes no representation and gives
no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for,
the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omissions, from any information,
statement or opinion contained in this announcement. This announcement contains information, ideas and analysis
which are proprietary to Theta Gold.
COMPETENT PERSONS STATEMENT
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects, the
information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc Hons (Geol.),
Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South African Council for
Natural Scientific Professions and Mr Daniel van Heerden (B.Ing (Mining M.Com (Business Management), member
of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director of Minxcon (Pty) Ltd and a fellow of
the South African Institute of Mining and Metallurgy (FSAIMM Reg. No. 37309).
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” dated 16 May 2019, “Optimised
Mine Schedule for Theta Open Pit Starter Project Delivers Significant Improvements” dated 20 April 2020 and “Initial
Maiden Underground Mining Reserve 419,000 oz Gold” dated 8 April 2021 were released to the Australian Securities
Exchange (ASX) on those dates. The Company confirms that:
•
•
it is not aware of any new information or data that materially affects the information included in the ASX
announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX announcements
continue to apply and have not materially changed.
AUTHORISATION
This announcement was authorised for release by the Board of Theta Gold Mines Limited.
NOTE BUSINESS ARRANGEMENT
Theta Gold Mines holds 100% issued capital of its South African subsidiary Theta Gold SA (Pty) Ltd (“TGSA”).
TGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines (Pty)
Ltd (“Sabie Mines”). TGME holds the various exploration and mining permits. The balance of shareholding is held
by Black Economic Empowerment (“BEE”) entities. The South African Mining Charter requires a minimum of 26%
meaningful economic participation by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding
in TGME and Sabie Mines is comprised of a combination of local community trusts, an employee trust and a strategic
entrepreneurial partner.
2
South Africa’s “Newest” Gold Field
The Transvaal Gold System sits
geological on the eastern side of
Bushveld Complex the largest layered
igneous intrusion on earth. Our
goldfield already produced ~7Moz Au
since 1870s.
Theta have generated and delivered
one of the largest undeveloped gold
resources 6.1Moz on the ASX, a ”NEW”
kid on the block.
SA host the 3rd largest gold
reserves in the world, mostly
within this Witwatersrand gold
field region (~6,000T Au)
3
Theta Gold Highlights
HIGH GROWTH GOLD INVESTMENT OPPORTUNITY
Existing Historic Goldfield - Multiple pre-developed, shallow, high grade historic gold mines –
ready to be brought back into production
Large, Growing Resource - 6.1Moz gold resource @ 4.17g/t and continuously growing, with
more than 40 other existing pre-developed shallow underground mines not yet reflected in the
stated resource
Low Capital Start-up - < US$100m capital required to reach >90koz/a within 2 years
Organic Growth - Self-funded expansion to >160koz within 5 years
Lowest-Cost Quartile Producer - Forecasted operating cost half the current gold price
(<US$900/oz) to become the lowest cost producer in South Africa and Australia
Competent Execution Team - Executive team that have successfully developed and optimised
many mines in South Africa and other developing countries
Execution-Ready - FS completed with full front-end engineering designs (FEED)¹ – ready for
execution²
Funding – Non-binding funding Term Sheet executed with Sprott Streaming and Royalty
Corporation for up to US$70m stream funding arrangement to bring the TGME Gold Project into
production.
1. Refer to ASX Release dated 20 June 2022 “TGME Underground Gold Update”
2. Refer to ASX Release dated 27 July 2022 “ Theta’s TGME Project Definitive FS Confirms NPV10% of A$432 million at US$1,642 oz Gold price”
3. Refer to ASX Release dated 19 October 2022 “Theta Gold executes a A$110m (US$70m) non-binding funding Term Sheet with Sprott for its TGME Gold
Project”
4
Getting Ready for Construction/Production - Deliverables
Initial startup Definitive Feasibility Study (FS) completed in July 20221 for to produce 1.24Moz Gold
with a FS Life of Mine of 12.9 years.
Streaming funding non-binding Term Sheet executed with Sprott for US$70m (A$110m)2, due
diligence now in progress.
Strong support from stakeholders including local NGOs, farmers, neighboring enterprises,
government departments, final Environmental Impact Assessment and Water Use License pending
Very significant ESG Initiatives and coverage:
• Environmental offsets offered with a portion of project cashflow to fund the improvement of the
township, local river and general landscape, and
• A project designed to have a very small surface footprint – already existing plant zoning, existing
TSF, designed for future underground tailings deposal, and
• Regular Community Forums and the long needed local jobs creations as we will be the only
commercial mining operator within the local area.
1. Refer to ASX Release dated 27 July 2022 “ Theta’s TGME Project Definitive FS Confirms NPV10% of A$432 million at US$1,642 oz Gold price”
2. Refer to ASX Release dated 19 October 2022 “Theta Gold executes a A$110m (US$70m) non-binding funding Term Sheet with Sprott for its TGME Gold Project”
5
Sprott Stream Funding Term Sheet
NON-BINDING TERM SHEET EXECUTED WITH SPROTT – US$70m (A$110m)
Stream funding Term Sheet signed with Sprott Streaming and Royalty Corporation.
Use of Funds – Stream funding is to be used for pre-development, development capital and operating expenditure to bring the
initial stage TGME Gold Project into production and reach positive cash flows.
About Sprott – Sprott Resource Streaming and Royalty Corporation is a Tier-1 project financing partner in the mining industry
from Canada; Canada’s #1 gold/silver financing brand name. It’s parent company Sprott Inc. has offices in Toronto, New York
and London and is dual-listed on both NYSE and TSX.
Key Terms – Sprott to provide US$70m cash in return for a gold stream on Theta’s TGME Gold Project to deliver to Sprott up to
100,000 ounces of gold over its Life-of-Mine (LOM), for which Sprott will pay Theta 10% of the gold price per ounce delivered
under the stream. Any funds advance prior to production will incur interest payable semi-annually at 9.5% per annum which can
be repaid in either cash or script (at 10% discount to 5 day VWAP). Furthermore, Theta may buyback 50% of the Stream for a
pre-agreed price, and after full delivery of the balance, the Stream will be fixed to 2% of production ongoing.
Condition Precedents – Under the Term Sheet, conditions precedent to closing includes the completion of technical, legal and
environmental and social due diligence, definitive documentation and final regulatory permits and approvals.
1. Refer to ASX Release dated 19 October 2022 “THETA GOLD EXECUTES A A$110M (US$ 70M) NON-BINDING FUNDING TERM SHEET
WITH SPROTT FOR ITS TGME GOLD PROJECT”
6
Progress towards production
Q1 2023
COMPLETE
FUNDING
Q1 2023
FINALISE
PERMITTING
Q2 2023
EXECUTION
COMMENCEMENT
Q2 2024
FIRST GOLD
Q3 2022
DFS
Note: First gold produced timing will be subject to securing funding and obtaining all necessary regulatory permitting approvals.
7
Project Economics at Various Gold Prices – Base Case (AUD)
Unit
Forecast
(USD1,642/ oz
Avg)
USD1,500/oz
USD1,600/oz
USD1,800/oz
USD2,000/oz
USD2,200/oz
NPV @ 10% (real) Pre-tax
AUDm
432
339
405
536
669
802
NPV @ 10% (real) Post-tax
IRR (%) Pre-tax
IRR (%) Post-tax
AUDm
292
232
274
359
447
533
%
%
65%
57%
57%
50%
64%
56%
77%
67%
90%
78%
102%
87%
AUD/oz
1,112
1,096
1,107
1,129
1,149
1,167
EBITDA annual average
AUDm
92
77
87
107
128
148
EBIT annual average
AUDm
80
66
76
96
116
136
Free Cash Flow (Pre-tax)
AUDm
956
768
897
1,158
1,421
1,686
Free Cash Flow (Post-tax)
AUDm
678
550
638
814
996
1,175
AUDm
102
102
102
102
102
102
AUDm
49
49
49
49
49
49
Months
31
33
31
28
25
24
%
422%
332%
395%
524%
653%
783%
%
285%
226%
268%
351%
437%
521%
Project Economics at gold price
AISC
Development Capital – Peak Funding
Capital Sustaining
Payback post-tax
Capital Efficiency (Pre-Tax NPV/Dev Capital
Capital Efficiency (Post-Tax NPV/Dev Capital
Note: Converted to AUD from using AUD:USD exchange rate of 1.333
8
8
FS Project Economics at Various Gold Prices – Base Case (USD)
Project Economics at gold price
Unit
Base Forecast
(USD1,642/oz USD1,500/oz USD1,600/oz USD1,800/oz USD2,000/oz USD2,200/oz
LoM Avg)
NPV @ 10% (Pre-tax)
USDm
324
255
304
402
501
601
NPV @ 10% (Post-tax)
USDm
219
174
206
269
335
400
IRR (Pre-tax)
%
65%
57%
64%
77%
90%
102%
IRR (Post-tax)
%
57%
50%
56%
67%
78%
87%
All-in Sustaining Costs (AISC)
USD/oz
834
822
831
847
862
876
EBITDA annual average
USDm
69
58
66
81
96
111
EBIT annual average
USDm
60
49
57
72
87
102
Free Cash Flow (Pre-tax)
USDm
717
576
673
869
1 066
1 264
Free Cash Flow (Post-tax)
USDm
508
412
478
611
747
881
Average Payback Period (from Start of Mining)
Months
31
33
31
28
25
24
Peak Funding Requirement
USDm
77
77
77
77
77
77
Sustaining Capital
USDm
37
37
37
37
37
37
Capital Efficiency (Pre-Tax NPV/Dev Capital*)
%
422%
332%
395%
524%
653%
783%
Capital Efficiency (Post-Tax NPV/Dev Capital*)
%
285%
226%
268%
351%
437%
521%
9
FS – Key Metrics Base/Ore Reserve Cases
Units
Base Case
Ore Reserve Case
Project Targeted Start Date
Quarter-yyyy
Q1 2023
Q1 2023
Commercial Production Start Date
Quarter-yyyy
Q2 2024
Q2 2024
Production build up period
Months
14
14
Life of mine
years
12.9
7.3
Underground ore mined (LOM)
Mt
6.46
2.85
Mined Grade
g/t
5.95
6.09
Gold Mined (LOM)
Moz
1.24
0.56
Production Rate
Kt/a
540
540
Production Rate
Kt/m
45
45
Grind size
µ
106
106
Gold recovered (average LOM)
%
87
87
Gold recovered (LOM)
Moz
1.08
0.49
Description
Cautionary Statement for the LOM Base Case – The Base Case is presented as potential upside to the Project. However, the Base Case is supported by a significant portion of Inferred Mineral Resources. Inferred Mineral Resources
inherently have a lower level of confidence and although it would be reasonable to expect that the majority of Inferred Mineral Resources would upgrade to Indicated Mineral Resources with continued exploration, it should not be
assumed that such upgrading will occur. The realization of the full potential of the Base Case as presented thus cannot be guaranteed.
Start date will be subject too securing necessary funding and approval of regulatory permits.
10
FS - Operating Costs in Dollar per Ton (Project over LoM)
Operational Cost
Mine Cost
Plant Costs
Other Costs
Royalties
Adjusted Operating Costs
Renewals and Replacements
Reclamation
Off-mine Overheads
All-in Sustaining Costs (AISC)
AUD/Milled
tonne
USD/Milled
tonne
• Adjusted Operating Costs against the milled tonnes per year
• The increase in feed tonnes in years 9 to 12 is due to Frankfort mine being mined, and the tonnes
reflected are prior to the Density Media Separation.
96
72
41
31
20
15
15
11
172
128
8
6
3
2
4
3
187
139
Average AUD:USD conversion rate for Adjusted Operating Costs is 1.333
Average AUD:USD conversion rate for All-in Sustaining Costs (AISC) is 1.333
Average ZAR:USD conversion rate for Adjusted Operating Costs is 15.52
Average ZAR:USD conversion rate for All-in Sustaining Costs (ASIC) is 15.50
11
FS - Project Sensitivities (Based on real cash flow in USD)
2022 FS
Assumption Base
Case
Current (November % Change
2022)
Gold Price (USD)
$1,643 / oz
$1,646 / oz
+ -%
USD / ZAR
Exchange Rate
$16.00
$18.27
+ 14%
• Based on the real cash flow calculated in the financial model, a singleparameter sensitivity analyses are used to ascertain the impact on the
NPV.
• The bars represent various inputs into the model, each being increased or
decreased by 15%.
• The left-hand side of the graph indicates a negative 15% change in the
input while the right-hand side of the graph indicating a positive 15%
change in the input
• the gold price, exchange rate and grade have the biggest impact on the
sensitivity of the Project followed by the mining and plant operating costs
• The Project is least sensitive to capital expenditure changes.
12
FS - Phase 1 Plant Rendering
13
FS - Free Milling Ore Process Plant
14
FS - Process Selection and Metallurgical Test Work
Individual Mine
Metallurgical Test Work
% of 1.24M Oz into Mine
Schedule
Test Work Recovery
DFS Recovery Used
Comments
Beta
60.4%
87-95%
88%
• Beta showed to be amenable to
conventional CIL processing with 86-95%
recoveries
Rietfontein
27.3%
88-93%
90%
• Rietfontein showed to be amenable to
conventional
Frankfort
7.4%
61-82%
69%
• 82% CIL recovery of sulphide flotation
• 61% CIL recovery on sulphide float tails
CDM
4.9%
93-95%
88%
• Dukes from CDM orebody indicated total
recoveries of 93% and higher with
combined flotation and CIL processing
• Additional Metallurgical test work is currently ongoing on all the Mines with the objective to improve on the current recovery grades.
• Average gold recovery rate is 87.1%.
15
Strategy to build up to >160,000oz/a Au production profile within 5
years (only 6 of >40 pre-developed mines)
CURRENT
DFS PHASE 1
90,000 oz/a
• 4 mining production units
• 45 kt/m Metallurgical plant
• Recommission existing Tailings
Storage Facility (TSF)
• Production from UG (Beta,
Rietfontein, Frankfort, CDM,)
• Production 90 koz/a
PHASE
2
>160,000 oz/a
• Expand to 7 mining production
units
• Expand gold plant to 80 kt/m
• Expand production to Vaalhoek,
Desire, and Glynn’s Mines
• Production >160 koz/a
Assess other >40 old mines, expand reserves through on-reef exploration, development
and drilling on operating mines and new exploration targets
16
ENVIRONMENTAL, SCOPING REPORT SUBMITTED,
Environmental
Approvals
Progress MR83
COMMUNITY SUPPORTS
CONTINUES
1 Forestry permits for the continuation of mining are in progress – refer to ASX Release dated 18 July 2022
² Refer to ASX Release dated 6 September 2022 “Two License Approvals Granted for TGME Underground Project”
17
Timeline To Production
Task Description
Q2, 2022
Q3, 2022
Q4, 2022
Q1, 2023
ü
ü
ü
ü
ü
Q2 2023
Q3, 2023
Q4, 2023
Q1, 2024
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
Q2, 2024
Definitive Feasibility Study
Environmental and Water Approvals
Gold Plant Construction /
Commissioning
Tailings Dam Upgrading
Electrical Power Lines
Surface Dam Construction
Water Management Construction
Backfill Plant Construction
Surface Infrastructure Beta Mine
Development at Beta Mine
Rock Waste Dump Construction
Stoping at Beta Mine
First Gold from Beta Mine
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
Note: Plant construction and commissioning subject to securing funding for project and permitting approvals.
18
Catalysts – 6 months Game-plan
Catalysts for a re-rating
Permitting completion for Mining Right 83 (EIA, WUL)
Completion of Sprott due diligence Binding Streaming Agreement
Commercial Bulk Sampling
Early Cashflow Discussions
Project Full-funded
Final Investment Decision (FID)
Construction Commencement
19
CORPORATE
OVERVIEW
20
Environmental, Social & Governance (ESG)
ESG IS INTEGRAL TO THE DEVELOPMENT STRATEGY AND IS
BASED ON:
•
•
•
•
Holistic risk management
Zero harm approach to health and safety
Environmental stewardship
•
•
•
Conservation of biodiversity
Responsible production practices
Positive impact on host communities
Transparent stakeholder engagement and reporting
ENVIRONMENT
•
•
Creating regional
SOCIAL
•
26% of project ownership held by
Environmental
Development Trusts for
local labour force, host communities
and strategic black entrepreneur
alien invasive plants removals
Establish nature reserves and
targeted environmental study
programs
partners
Projects structured for broad based
•
GOVERNANCE
•
•
Ethical business practices
Culture of high ethical standards
throughout the organisation
economic participation
•
•
Alleviation of poverty
TGME will be the biggest employer
in the area
21
ASX Listing
Ordinary
Shares ASX: TGM
Out-of-the-money
unlisted options and
management performance
rights
632M¹
73M
Market
Capitalisation1
(undiluted)
~A$51M (~US$33M)
Top Shareholders:
BNP PARIBAS NOMINEES PTY LTD
14.6%
ZENITH (HK) HOLDING LIMITED
8%
CITICORP NOMINEES PTY LIMITED
7.3%
2INVEST AG
6.3%
TASMAN FUNDS MANAGEMENT LTD 5.6%
Note: 1 As of 31 October 2022 (includes shares from placement and SPP announced on 27 October 2022) using the last closing price of $0.08 on 31 October 2022 and RBA Exchange rate of 0.6420.
22
Corporate Directory
BOARD OF DIRECTORS
REGISTERED AND PRINCIPLE OFFICE
Bill Guy
Executive Chairman (Economic Geology)
Richie Yang
NED (Corporate Finance)
Bryon Dumpleton NED (Resource Geology)
Simon Liu
NED (Funds Mgmt)
Brett Tang
NED (Funds Mgmt)
Level 35, International Tower One
100 Barangaroo Avenue
Barangaroo, Sydney, NSW 2000
SENIOR MANAGEMENT & LOCAL BOARD
Jacques du Triou Chief Operating Officer (Mining Engineer)
Terence Mokale SA Director (Law)
Puseletso Matete SA Director (ESG)
Brent Hofman
Company Secretary & Financial Controller (AUS)
Telephone: 02 8046 7584
Email: info@thetagoldmines.com
Website: www.thetagoldmines.com
ASX Code: TGM
OTC Code: TGMGF
23
APPENDICES
24
Combined Minerals Resource Statement (~6.1Moz)
Combined Mineral Resource
Resource Classification
Type of Operation
Underground
Tonnage
Gold Grade
Mt
g/t
Gold Content
Kg
koz
0.091
5.37
489
15.7
0.091
5.37
489
15.7
Underground
4.774
6.21
29 661
953.7
Open Pit
8.109
2.14
17 364
558.2
Tailings
5.244
0.83
4 373
140.6
18.128
2.84
51 398
1652.5
Underground
21.452
5.22
111 880
3597.0
Open pit
4.907
5.11
25 057
805.6
Tailings
0.023
0.57
13
0.4
Rock Dump
0.885
1.20
1 059
34.0
Total Inferred
27.267
5.06
138 009
4 437.0
Grand Total
45.485
4.17
189 896
6 105.2
Measured
Open pit
Tailings
Total Measured
Indicated
Total Indicated
Inferred
Notes:
1.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and rock dumps at 0.35 g/t.
2.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
3.
Gold price used for the cut-off calculations is USD1,500/oz.
4.
Mineral Resources are stated as inclusive of Ore Reserves.
5.
Mineral Resources are reported as total Mineral Resources and are not attributed.
25
Total Mineral Resources of the 4 Mines included in the DFS Combined as of 1 February 2021
Mineral Resource
Classification
Measured
Total Measured
Indicated
Mine
Reef
Frankfort
Bevetts
Frankfort
CDM
Beta
Rietfontein
Bevetts
Rho
Beta
Rietfontein
Total Indicated
Total Measured & Indicated
Mineral Resource
Classification
Inferred
UG Mine
Frankfort
CDM
Beta
Rietfontein
Total Inferred
Reef
Bevetts
Rho
Beta
Rietfontein
Reef
Grade
g/t
7.13
7.13
7.86
13.19
21.66
14.57
16.35
16.00
Stope
Grade
g/t
5.37
5.37
5.13
3.80
6.58
8.20
6.24
6.22
Reef
Width
cm
73
73
58
23
23
52
30
32
Stope
width
cm
103
103
96
90
90
92
91
92
Reef
Grade
g/t
7.41
10.06
16.51
14.06
13.51
Stope
Grade
g/t
4.27
3.02
5.43
8.52
5.56
Reef
Width
cm
48
24
25
57
39
Stope
width
cm
Content
cm.g/t
520
520
452
307
499
755
540
540
Content
93
90
90
94
92
cm.g/t
356
244
414
803
524
Reef
Tonnes
Mt
0.069
0.069
0.243
0.258
0.716
0.517
1.734
1.803
Stope
Tonnes
Mt
0.091
0.091
0.373
0.895
2.357
0.919
4.543
4.634
Reef
Tonnes
Mt
0.343
0.544
1.107
1.190
3.184
Stope
Tonnes
Mt
0.596
1.811
3.367
1.962
7.736
Au Content
kg
489
489
1,912
3,401
15,506
7,534
28,352
28,841
koz
15.7
15.7
61.5
109.4
498.5
242.2
912
927
Au Content
kg
2,543
5,472
18,285
16,721
43,022
koz
81.8
175.9
587.9
537.6
1,383.2
Notes:1.
Mineral Resource cut-off of 160 cm.g/t applied.
2.
3.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
Gold price used for the cut-off calculations is USD1,500/oz.
4.
5.
6.
cm.g/t and g/t figures will not back calculate due to variable densities in reef and waste rock.
Mineral Resources are stated as inclusive of Ore Reserves.
Mineral Resources are reported as total Mineral Resources and are not attributed.
26
Mineral Resource Statement – Underground Only (~4.5Moz)
Mineral Resource
Classification
Mine
Reef
Reef Grade
Stope Grade
Reef Width
Stope width
Content
Reef Tonnes
Stope Tonnes
g/t
g/t
cm
cm
cm.g/t
Mt
Mt
Au Content
7.13
5.37
73
103
520
0.069
0.091
489
koz
15.7
7.13
5.37
73
103
520
0.069
0.091
489
15.7
7.86
13.19
21.66
14.57
13.90
16.97
5.13
3.80
6.58
8.20
6.34
4.62
58
23
23
52
36
25
96
90
90
92
90
90
452
307
499
755
499
416
0.243
0.258
0.716
0.517
0.064
0.026
0.373
0.895
2.357
0.919
0.140