Quarterly Activities and Cashflow Report 31 December 2023
Released
Released
Announcement PDF
31 January 2024
ASX ANNOUNCEMENT
(ASX:TGM)
QUARTERLY REPORT
1 October 2023 to 31 December 2023
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM | OTC: TGMGF) is pleased to report
on its activities for the quarter ended 31 December 2023.
HIGHLIGHTS
DURING THE DECEMBER 2023 QUARTER:
•
•
•
1
2200 tons of fresh ore mined, and 2120 tons of historical mine sweepings extracted.
Final Environmental Authorisation (EA) received for Mining Right 83 from the Department of
Mineral Resource and Energy (DMRE) of South Africa (Subject to 90-day review ).1,2
The Company continues to progress the due diligence process for the A$110 million (US$70
million) non-binding Term Sheet (“TGME Stream”) signed with Sprott Streaming and Royalty
Corporation (“Sprott Streaming”)3.
Refer to ASX Release dated 26 July 2023 titled, “Final Environmental Authorisation Granted for MR83”.
Refer to ASX Released dated 11 September 2023 Titled, Environmental Authorisation Update”.
3
Refer to ASX Release dated 19 October 2022 titled, “Theta Gold Executes a A$110M (US$70M) Non-Binding Funding Term Sheet with
Sprott Streaming for its TGME Gold Project”.
2
OPERATIONS AND DEVELOPMENT UPDATE
Commercial Bulk Sample Project Update
The Company advises that the mining of the commercial bulk sample (2200 tonnes) at Frankfort Mine
is completed. Mining of the fresh ore was completed successfully with no safety incidents.
The Bulk Sampling program commenced in May 2023 with labour recruitment and procurement
process of all mining and engineering requirements. All engineering labour was recruited by the end
of May 2023. Infrastructure was installed at Frankfort mine and mining commenced in July 2023.
Drill and blasting activities also commenced in July 2023 and blast design was done in conjunction with
AECI, who are the explosives manufacturers and suppliers. The design considered the density of the
rock to be blasted, the desired fragmentation, the planned cleaning method, the planned transport
mode, and the cost of the explosives. Emulsion explosives were chosen due to their intrinsic safety
properties. The explosives accessories included:
●
Shock-tubes
●
Reef masters
●
Electric detonators and
●
Tamping
Blast holes with an effective hole length of 80cm were drilled at an internal burden of 70cm this was
necessitated by the low Uniaxial Compressive Strength (UCS) of the reef. The blast holes needed to be
drilled at a certain angle to the hanging and footwall. This is required to avoid drilling into the
hangingwall to prevent developing poor hangingwall conditions which would pose a safety risk.
Figure 1 below indicates the mined area overlaid on the block model as per the JORC report.
Bulk Sample Mining Area
Figure 1: Frankfort mined area overlaid on the block model
2
Following the completion of the Bulk Sampling program, Theta Gold will explore its options to expedite
early cash flow opportunities from the Frankfort Mine. The bulk sample will undergo metallurgical test
work as part of the marketing strategy for the ore.
Details of mining are attached below in Frankfort Gold Mine Bulk Sampling Safety and Background.
Figures 2 to 5: Pictures of Ore loading and transporting .
3
Figure 6: Drill and blast activity underway at Frankfort Gold Mine
Frankfort Gold Mine Bulk Sampling Safety and Background
Before the bulk sampling program could commence at Frankfort Mine in South Africa, it was necessary
to obtain permits and comply (See Table 1) with all current mining legislation. Safety measures, such
as roof supports, ventilation, and water management systems, were also installed in order to ensure
the safety of the mine.
Table 1: Operation and Tasks completed in support of Frankfort Bulk Sample
Tasks
Successfully Completed
Mine usage and storage Explosive Licence
✓
Explosive Transport Licence
✓
Mine Induction and Competency training for all new employees
✓
Electrical power and compressed air supply tender and contract award
✓
Installation of surface critical infrastructure to support Mining activities
✓
Safe-making activities and getting the Mine production-worthy
✓
Drill and Blast Design with explosives manufacturer
✓
Survey and Sampling of all intended Mining areas
✓
4
Mining activities to create the required volumes
✓
Earthmoving equipment tender and contract award
✓
Earthworks and construction of Dense Media Separation and Crushing Plan
footprints
✓
Construction of Water Management Systems and Return Water Dams
✓
Rehabilitation and re-construction of 21km of gravel road
✓
Designed, manufactured and commissioned a 25t/hour 2-stage crushing plant
✓
Designed, manufactured and commissioned a 25t/hour Dense Media Separation
Plan
✓
Gold-bearing Ore transport tender and contract award
✓
Additionally, 30 local miners underwent safety training, and all South African mining regulations were
implemented. Finally, the mine had to pass a safety inspection from the regional Mines inspector.
The Bulk Sampling project commenced in May 2023 with labour recruitment and procurement process
of all mining and engineering requirements. All engineering labour was recruited by the end of May
2023. Infrastructure was installed at Frankfort mine and mining commenced in July 2023.
Drill and blasting activities also commenced in July 2023 and blast design was done in conjunction with
AECI, who are the explosives manufacturers and suppliers, the design considered the density of the
rock to be blasted, the desired fragmentation, the planned cleaning method, the planned transport
mode, and the cost of the explosives. Emulsion explosives were chosen due to their intrinsic safety
properties. The explosives accessories included, Shock-tubes, Reef masters, Electric detonators and
Tamping.
Blast holes with an effective hole length of 80cm were drilled at an internal burden of 70cm this was
necessitated by the low UCS of the reef. The blast hole needed to be drilled at a certain angle to the
hanging and footwall to avoid drilling into the hangingwall and damaging it as this would have created
bad hangingwall conditions which would pose a safety risk. Furthermore, poor fragmentation would
be the result if the blast holes are not drilled according to the planned angles and directions.
The mine design was based on ledging both sides of the existing roadway for 4.5 m, the ledges were
blasted sequentially in a staggered pattern until they reached their limit to comply with the rock
mechanics designs and minimize the possibility of rockfalls or roof breaks. This is especially important
in shallow mining areas due to the lack of clamping forces.
The 1st blast was taken in July 2023, the length of the blasted panel was 30m, with a planned stoping
width of 09m and a planned advance of 0.8m, this generated about 80 tons. Blasting took place over
a period of 9 weeks generating 4320 tons inclusive of old sweeping tons.
Once a panel is blasted, it would then be cleaned by means of the water jet, the water jet would move
the blasted rock into the roadway, from which it would then be cleaned by means of an LHD Scoop.
The LHD Scoop would transport the ore from the blasting area to a tipping point underground, from
where the ore would later be transported to the tipping point on the surface. After a panel has been
5
cleaned, the crew would then come and install temporary and permanent support units to get the
panel ready for the next blast.
From the surface tipping point, the blasted ore (run-of-mine) was loaded into a dump truck and
transported to the DMS area, where the ore was crushed and screened. The product was then put
through the DMS to separate the gold-bearing material from the waste material. This is done based
on the difference in the densities of the waste material and the gold-bearing material.
Figures 7 and 8 Show Drilling and Blasting Preparation at Frankfort Mine
Figure 9: DMS Arriving on-site at Frankfort.
Figure 10: DMS being offloaded on site.
6
Figure 11: Crusher offloaded into position.
Figure 12: Construction and commissioning of DMS.
Project Permits and Approvals Update
Water Use Licence:
The WUL is issued in accordance with Chapter 4 of the National Water Act, 1998 (Act 36 of 1998)
for a period of 12 years. The WUL forms an integral part of the TGME Underground Project since
it authorises the extension of the current Tailings Storage Facility and all planned water use
activities within the MR83 area.
The approval of the WUL is a result of comprehensive environmental specialist studies conducted
with detailed engineering designs that satisfy the extensive regulatory requirements relating to
water and waste management in South Africa.
7
The DWS will inform all interested and affected parties of the issuing of this licence, which lead
to a 90-day public review and objection period that ended on the 30th of June 2023. The company
has received notice from DWS that the WUL has been granted after successfully completing the
90-day review process.
The communications with the Department of Forest, Fishery and Environment (DFFE) for the
continuation of mining remain in progress4.
Environmental Authorisation (EA):
The Company announced on 26 July 20235 that it has received its Environmental Authorisation
(EA) and that the South African Department of Minerals Resources and Energy (DMRE) has
granted the Company’s EA application over MR83.
As a result of the DMRE approval, three (3) of the four (4) mines within the initial TGME
Underground Gold Project are now fully permitted, subject to a 90-day public participation and
appeal period which enables interested and affected parties an opportunity to review and/or
lodge an appeal to the DMRE decision to approve the EA for MR83.
On 11 September 20236 the Company advised that the South African Department of Forestry,
Fisheries and the Environment (DFFE) has received a notice of objection from a private individual
against the EA granted by the DMRE over MR83. As per the announcement of 26 July 20237, there
is a normal appeal process that enables interested and affected parties an opportunity to lodge
an appeal.
Theta Gold has engaged legal counsel to assist in responding to the objection against the granting
of the EA for MR83.
Updated Environmental Approvals for MINING RIGHT (MR) 83 – Progress Table
Environmental Approvals for Mining Right (MR) 83
Status
Submit application for EA
✓
Submit draft scoping report
✓
Specialists EIA Studies Completed
✓
DMRE acceptance of final Scoping report
✓
Draft EIA/EMPr submitted for public review
✓
Draft IWWMP submitted for public review
✓
Air Quality Emissions approval
✓
Water use approvals
✓
EIA approvals
✓
4 Refer to ASX release date 18 July 2022 titled “Permitting Update TGME Underground Gold Project”.
5 Refer to ASX Release dated, 26 July 2023 titled, “Final Environmental Authorisation Granted for MR83”.
6
Refer to ASX Release dated, 11 September 2023 titled, “Environmental Authorisation Update for MR83”.
7 Refer to ASX Announcement dated 26 July 2023, titled “Final Environmental Authorisation Granted for MR83 at our Flagship
TGME Gold Mine”.
8
Stakeholder Management and Social Investment
The Company’s focus remains to work closely with our stakeholders and communities to
strengthen the existing relationships and, to establish a mutually beneficial relationship that is
healthy and sustainable. The TGME Stakeholder Forum continues to gain good momentum with
open and honest communications between all parties.
The environmental authorisation permitting process for the Rietfontein underground project
kicked off in Q3 of 2023 and is currently nearing the end of the scoping phase. Effective
stakeholder engagement is very important during the scoping public review period to ensure that
all stakeholders understand the proposed project and project-related information.
Comprehensive stakeholder engagement was therefore conducted from October to December
2023 with our various stakeholders.
Focus group meetings were held with the Municipal Ward Councillors, the Sabie Business
Chamber, the Sabie Rate Payers Association, SAFCOL (South African Forestry Company SOC Ltd),
Vanaxe Residents and the Department of Public Works and Infrastructure. In general, the
stakeholders were very supportive of the project and welcomed the much-needed jobs in Sabie.
The consensus was that it is an easy project to support since Rietfontein is an existing
underground mine that will be redeveloped and due to the small surface footprint area that will
be impacted. The stakeholders also indicated their appreciation of the transparent and
comprehensive project information that was presented and shared during the meetings.
A very successful public open day was held in Sabie on 28 October 2023. Feedback from the open
day was very positive and the community is very excited about the local job opportunities and
economic upliftment that will be created by the project. There were some good questions, but
overall, the sentiment was positive towards the proposed project. With the significant turnout at
the open day it can be concluded that the procedural requirement to consult during the scoping
phase is satisfied.
Digby Wells has been appointed for the development of the new Social and Labour Plan (SLP) for
the Rietfontein Underground Mine. A thorough and robust broad-based community and
stakeholder consultation process will be undertaken as part of the development of the new SLP.
The purpose of this process is not only to ensure legislative compliance but to establish and
maintain sustainable partnerships with communities and stakeholders, in line with the
requirements of a transparent, inclusive and equitable achieving a social license to operate.
Key Feasibility Study Highlights for TGME Gold Mine Project
On 27 July 20228, the TGME Underground Project Definitive Feasibility Study (“FS”) was released
to ASX with an NPV10% of $A432 million at US$1,642 / oz gold price. Key features of FS include:
•
•
TGME Feasibility Study delivers 1.24Moz contained gold, underpinning an initial 12.9-year
mine life.
Strong financial return (based on LOM Plan), including (at a gold price of A$2,189/oz, with
first production targeted for 20249, including:
o Undiscounted free cash flows of US$508m, (A$678m), pre-tax US$717, (A$956m);
8 Refer to ASX release dated 27 July 2022 titled “Theta’s TGME Project FS confirms NPV10% of A$432 Million at US$1,642 / Oz
Gold Price”.
9 First gold production will be subject to financing, permitting and regulatory approvals.
9
o
o
o
o
o
NPV (at a 10% discount rate) of US$219m (A$292m), pre-tax US$324m, (A$432m);
Capital payback period of 31 months;
Pre-tax IRR of 65%;
Combined Underground Projects have an AISC of US$834/oz (A$1,112/oz);
Peak Capital requirement is US$77m (A$103m), total LOM capital requirements US$174m
(A$232m).
o Table 1 demonstrates the key economics of the project based on various gold price
assumptions.
Table 1: Project Economics at Various Gold Prices – Base Case (AUD)
Project Economics at
gold price
NPV @ 10% (real) Pre-tax
NPV @ 10% (real) Posttax
IRR (%) Pre-tax
IRR (%) Post-tax
AISC
EBITDA annual average
EBIT annual average
Free Cash Flow (Pre-tax)
Free Cash Flow (Post-tax)
Development Capital –
Peak Funding
Capital Sustaining
Payback post-tax
Capital Efficiency (Pre-Tax
NPV/Dev Capital
Capital Efficiency (PostTax NPV/Dev Capital
NOTES:
1.
2.
Unit
AUDm
Forecast
USD1,500/ USD1,600/ USD1,800/ USD2,000/ USD2,200/
(USD1,642/
oz
oz
oz
oz
oz
oz Avg)
432
339
405
536
669
802
AUDm
292
232
274
359
447
533
%
%
AUD/oz
AUDm
AUDm
AUDm
AUDm
65%
57%
1,112
92
80
956
678
57%
50%
1,096
77
66
768
550
64%
56%
1,107
87
76
897
638
77%
67%
1,129
107
96
1,158
814
90%
78%
1,149
128
116
1,421
996
102%
87%
1,167
148
136
1,686
1,175
AUDm
102
102
102
102
102
102
AUDm
Months
49
31
49
33
49
31
49
28
49
25
49
24
%
422%
332%
395%
524%
653%
783%
%
285%
226%
268%
351%
437%
521%
Converted to AUD from USD using AUD:USD exchange rate of 1.333.
Due to rounding, numbers presented throughout this document may not add up precisely to the totals, provided and percentages
may not precisely reflect the absolute figures.
CORPORATE GOVERNANCE AND FUNDING UPDATE
Conversion of Unlisted Options
Theta Gold announced during the quarter that 2 Invest AG, a significant investor and shareholder
in Theta Gold has elected by notice to exercise unlisted options into fully paid ordinary shares in
the Company as follows:
•
1,000,000 ordinary shares to be allotted upon the exercise of 1,000,000 unlisted options
issued on 9 November 2023 with an exercise price of $0.066 and expiry date of 29
November 2023, and
• 1,000,000 ordinary shares to be allotted upon the exercise of 1,000,000 unlisted options
issued on 12 December 2023 with an exercise price of $0.068 and an expiry date of 31
December 2023.
The funds raised totalling A$134,000 (US$91,656) from the conversion of options were used to
further advance the Frankfort gold mine bulk sample programme.
10
AU$110m (US$70m) non-binding Term Sheet with Sprott Streaming and Royalty
Corporation
The Company continues to advance its due diligence efforts with Sprott Streaming. The terms of
the transaction can be found on the Company’s ASX release date 19 October 2022 10.
Cash Position and Subsequent Funding
As of 31 December 2023, the Group had US$634,000 in cash.
Furthermore, as announced previously on 25 March 2021, the Company entered into an At-TheMarket Subscription Deed (“ATM”) with Acuity Capital. The ATM was renewed on 31 July 2023
and extended for a further 3 years to 31 July 2026 and may provide the Company with additional
standby equity capital of up to A$15,000,000 (US$9,958,500) available under the facility. There
are no requirements on the Company to utilise the ATM and the Company may terminate the
ATM at any time, without cost or penalty. As security for the ATM, the Company has issued 24
million TGM collateral shares to be held by Acuity Capital on 25 March 2021. As of the date of
this report, this facility remains available and undrawn.
In accordance with ASX Listing Rules 5.3.1 and 5.3.2, the Company provides the following
summary of expenditures incurred during the Quarter:
Mining exploration costs (including exploration labour)
Mining Production and Development Costs (including trial mining)
Licence to Operate Costs
Total
US
US
US
US
$422,602
$122,907
$ 38,504
$584,013
The Company’s Quarterly Appendix 5B reported nil payments to related parties and their
associates as noted in the Appendix 5B this payment was for directors' fees and consulting fees
(including payments relating to current and prior quarters).
Capital Structure
The current capital structure of the Company at 31 December 2023 is as follows:
Number
Fully paid ordinary shares (ASX: TGM | OTC: TGMGF)
Unlisted options, performance rights, and bonds (see “Annexure C”)
707,075,007
92,610,000
The market capitalisation of TGM was A$81.3 million 11 (US$55.6m) as at 31 December 2023.
10
Refer to ASX Release dated, 19 October 2023 titled, “Theta Gold Executes A$110M Term Sheet with Sprott Streaming”.
11 Calculated as 707,075,007 fully-paid ordinary shares on issue at the closing price of AU$0.115 cents per share as at 31
December 2023 converted at the RBA exchange rate of AUD:USD of 0.6840.
11
General Meetings
Extraordinary General Meeting
The Company announced on 13 October 2023 that all 17 resolutions had been unanimously
approved by shareholders in a Notice of Meeting dated 12 September 2023. Results of the
meeting were released on 13 October 2023.
Annual General Meeting
On 25 October 2023, the Company announced that its Annual General Meeting will be held on
28 November 2023. All 6 resolutions were unanimously approved by shareholders at the Annual
General Meeting including the refresh of the Company capacity under Listing Rule 7.1.
This announcement was authorised for release by the Board of Directors.
For more information, please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
Theta Gold Mines' Interactive Investor Hub
The Company encourages shareholders to please join the Theta Investor Hub which allows you
to ask questions directly to the Company, view video’s and keep up to date on progress of the
TGME Gold Project at http://investors.thetagoldmines.com.
Webpage: www.thetagoldmines.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
12
Competent Persons Statement
Mineral Resources and Ore Reserves
The information in this report relating to mineral resources and ore reserves is based on, and fairly reflects,
the information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc
Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the South
African Council for Natural Scientific Professions and Mr Daniel van Heerden (B.Ing (Mining M.Com (Business
Management), member of Engineering Council of South Africa (Pr.Eng. Reg. No. 20050318)), a director of
Minxcon (Pty) Ltd and a fellow of the South African Institute of Mining and Metallurgy (FSAIMM Reg. No.
37309).
Metallurgical results
The information in this report relating to exploration results is based on, and fairly reflects, the information
and supporting documentation compiled by Mr Phil Bentley (MSc (Geol), MSc (MinEx), Pr.Sci.Nat. No.
400208/05, FGSSA), a consultant to the Company and a member of the South African Council for Natural
Scientific Professions.
The original reports titled “Theta Gold Increases Mineral Resource to over 6Moz” dated 16 May 2019,
“Optimised Mine Schedule for Theta Open Pit Starter Project Delivers Significant Improvements” dated 20
April 2020, “Excellent Bulk Metallurgical Results Provides Confidence For Underground PFS” and “Initial
Maiden Underground Mining Reserve 419,000 oz Gold” dated 8 April 2021 were released to the Australian
Securities Exchange (ASX) on those dates. The Company confirms that:
•
•
it is not aware of any new information or data that materially affects the information included in the
ASX announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcements continue to apply and have not materially changed.
13
ABOUT THETA GOLD MINES LIMITED
Theta Gold Mines Limited (ASX: TGM | OTCQB: TGMGF) is a gold development company that holds a range
of prospective gold assets in a world-renowned South African gold mining region. These assets include
several surface and near-surface high-grade gold projects which provide cost advantages relative to other
gold producers in the region.
Theta Gold’s core project is located next to the historical gold mining town of Pilgrim’s Rest, in
Mpumalanga Province, some 370km northeast of Johannesburg by road or 95km north of Nelspruit
(Capital City of Mpumalanga Province).
Following small scale production from 2011 – 2015, the Company is currently focussing on the construction
and financing of a new gold processing plant within its approved footprint at the TGME plant. The
company has completed a FS in July 2022 for the first four mines Beta, CDM, Frankfort and Rietfontein
(TGME Underground Project). The Base Case LOM plan will comprise a 12.9-year mining operation starting
in 2023 and delivering production of 1.24 million ounces of contained gold.
The estimated development capital or peak funding requirement is USD77 million (AUD102 million), with
the Project forecast to generate a pre-tax NPV10% of USD324 million (AUD432 million) and pre-tax Internal
Rate of Return (IRR) of 65% at the forecast gold price of averaging USD1,642/oz over the LOM. The
Company aims to build a solid production platform to over next 5 years to 160kozpa based primarily
around shallow, open-pit or adit-entry shallow underground hard rock mining sources. Theta Gold has
access to over 43 historical mines and prospect areas that can be accessed and explored, with over 6.7Moz
of historical production recorded.
Theta Gold holds 100% issued capital of its South African subsidiary, Theta Gold SA (Pty) Ltd (“TGSA”).
TGSA holds a 74% shareholding in both Transvaal Gold Mining Estates Limited (“TGME”) and Sabie Mines
(Pty) Ltd (“Sabie Mines”). The balance of shareholding is held by Black Economic Empowerment (“BEE”)
entities. The South African Mining Charter requires a minimum of 26% meaningful economic participation
by the historically disadvantaged South Africans (“HDSAs”). The BEE shareholding in TGME and Sabie
Mines is comprised of a combination of local community trusts, an employee trust and a strategic
entrepreneurial partner.
14
DISCLAIMER
This announcement has been prepared by and issued by Theta Gold Mines Limited to assist in informing
interested parties about the Company and should not be considered as an offer or invitation to subscribe for
or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to
those securities. No agreement to subscribe for securities in the Company will be entered into on the basis of
this announcement.
This announcement may contain forward looking statements. Whilst Theta Gold has no reason to believe that
any such statements and projections are either false, misleading or incorrect, it does not warrant or guarantee
such statements. Nothing contained in this announcement constitutes investment, legal, tax or other advice.
This overview of Theta Gold does not purport to be all inclusive or to contain all information which its recipients
may require in order to make an informed assessment of the Company’s prospects. Before making an
investment decision, you should consult your professional adviser, and perform your own analysis prior to
making any investment decision. To the maximum extent permitted by law, the Company makes no
representation and gives no assurance, guarantee or warranty, express or implied, as to, and take no
responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or
any errors in or omissions, from any information, statement or opinion contained in this announcement. This
announcement contains information, ideas and analysis which are proprietary to Theta Gold.
FORWARD LOOKING AND CAUTIONARY STATEMENTS
This announcement may refer to the intention of Theta Gold regarding estimates or future events which could
be considered forward looking statements. Forward looking statements are typically preceded by words such
as “Forecast”, “Planned”, “Expected”, “Intends”, “Potential”, “Conceptual”, “Believes”, “Anticipates”,
“Predicted”, “Estimated” or similar expressions. Forward looking statements, opinions and estimates included
in this announcement are based on assumptions and contingencies which are subject to change without notice,
and may be influenced by such factors as funding availability, market-related forces (commodity prices,
exchange rates, stock market indices and the like) and political or economic events (including government or
community issues, global or systemic events). Forward looking statements are provided as a general reflection
of the intention of the Company as at the date of release of the document, however are subject to change
without notice, and at any time. Future events are subject to risks and uncertainties, and as such results,
performance and achievements may in fact differ from those referred to in this announcement. Mining, by its
nature, and related activities including mineral exploration, are subject to a large number of variables and risks,
many of which cannot be adequately addressed, or be expected to be assessed, in this document. Work
contained within or referenced in this report may contain incorrect statements, errors, miscalculations,
omissions and other mistakes. For this reason, any conclusions, inferences, judgments, opinions,
recommendations or other interpretations either contained in this announcement, or referencing this
announcement, cannot be relied upon. There can be no assurance that future results or events will be
consistent with any such opinions, forecasts or estimates. The Company believes it has a reasonable basis for
making the forward looking statements contained in this document, with respect to any production targets,
resource statements or financial estimates, however further work to define Mineral Resources or Reserves,
technical studies including feasibilities, and related investigations are required prior to commencement of
mining. No liability is accepted for any loss, cost or damage suffered or incurred by the reliance on the
sufficiency or completeness of the information, opinions or beliefs contained in this announcement.
The Feasibility Study referred to in this announcement is based on technical and economic assessments to
support the estimation of Ore Reserves. There is no assurance that the intended development referred to will
proceed as described, and will rely on access to future funding to implement. Theta Gold believes it has
reasonable grounds the results of the Feasibility Study. At this stage there is no guarantee that funding will be
available, and investors are to be aware of any potential dilution of existing issued capital. The production
targets and forward looking statements referred to are based on information available to the Company at the
time of release, and should not be solely relied upon by investors when making investment decisions. Theta
Gold cautions that mining and exploration are high risk, and subject to change based on new information or
interpretation, commodity prices or foreign exchange rates. Actual results may differ materially from the
results or production targets contained in this release. Further evaluation is required prior to a decision to
15
conduct mining being made. The estimated Mineral Resources quot
Share your feedback
Discover