30 September 2020
ASX ANNOUNCEMENT
QUARTERLY REPORT
1 JULY TO 30 SEPTEMBER 2020
Theta Gold Mines Limited (“Theta Gold” or “Company”) (ASX: TGM, TGMO | OTCQB: TGMGF) is
pleased to report on its activities for the period from 1 July 2020 to 30 September 2020.
The Company is pleased with the progress for the development of the Theta Open Pit Starter
Project, including completion of geotechnical work programs, strengthening the development
team and the amendment application for Mining Right 83 to enable open pit mining.
Post the quarter-end, the South African Department of Mineral Resources and Energy (DMRE)
informed the Company that it supports the amendment application for MR83 and aim to finalise
its review and formalise its decision by the end of November 2020.
HIGHLIGHTS
Preferred mining contractor selected
Geotechnical assessment and geophysical survey completed in
preparation for development
Development team strengthened with appointment of two ex-Harmony
Gold Specialists to Leadership Team
DTC-Eligibility granted for the OTC ticker “TGMGF”
DMRE decision on amendment to Environmental Authorisation for MR83
to permit open pit mining expected by end November 2020
NEXT QUARTER WORK PROGRAM
Expecting CIL plant funding & construction solution by November
o Detailed Engineering Design for the CIL plant
o Ball Mill refurbishment work to commence
Pre-Feasibility Study on numerous underground mines including
Rietfontein and Beta Mines
Initial underground sampling work
metallurgical test work
o Advanced underground mining methods analysed and considered
for underground mines, across the goldfield
o Engineering drilling for underground mines
Theta Gold Mines Limited ABN 30 131 758 177
Suite 80, Level 35 (Servcorp), International Tower One, 100 Barangaroo Avenue, Sydney NSW 2000
Tel: +61 2 8046 7584 Email: info@thetagoldmines.com
www.thetagoldmines.com
THETA OPEN PIT DEVELOPMENT GEOTECHNICAL PROGRAM
Geotechnical Assessment
As part of the detailed engineering design for the mining structures, a geotechnical assessment
was carried out at the footprints for the waste rock dumps and pollution control dams for the
project. The geotechnical assessment included a 35-hole RC and diamond drill program for
geotechnical studies.
The main areas assessed were the Iota Waste Rock Dump North, Iota Pollution Control Dam,
Wishbone Waste Rock, the dump which will accommodate the Browns and Theta Pits initial
waste, and Wishbone Pollution Control Dam.
Figure 1: Triple core diamond drill rig collecting orientated core for engineering studies
2
Figure 2: Test pits for ground stability
Geophysical Survey
To accurately locate the boreholes required for the geotechnical work, a geophysical assessment
was done over the footprints of the various structures proposed. The work was done using a
Scintrex CG5 gravimeter whilst a Differential GPS (DGPS) recorded station locations for a total of
94.8 ha assessed.
The program included the following geophysical survey work to inform waste rock dumps and
pollution control dams –
Completion of 11 geotechnical test pits;
Completion of a 5 km2 gravity survey.
The geotechnical drilling and geophysical program assessment was positive, with no issues
identified on the mine site, plant build area, pollution control dams or waste rock dump.
3
Figure 3: Location map of TGME gravity surveys. Plant (red), Balancing PCD (blue), Wishbone SW Dam
& FSL (yellow), IOTA PCD (green), Wasterock N (purple), Wasterock S (cyan) & fault lines (white)
The following images show the interpreted results from the geophysical assessment of the
various areas proposed for further assessment.
Figure 4: Mine site Gravity Map
Geophysical Processing
(Standard processing procedures were applied, firstly reducing the data to relative Bouguer values by
applying Earth Tide (ET), elevation and Bouguer corrections. Geosoft’s proprietary terrain corrections
software was used to apply terrain corrections to the data using a high resolution DTM (digital terrain
model) made available by the client. The regional gravity field, calculated by fitting a 1st order plane to the
data, was removed from the Bouguer gravity to produce a residual gravity map. In some cases a vertical
4
derivative was applied to the residual gravity which has the effect of enhancing subtle changes while
further removing a trend, this was done to facilitate a general interpretation.)
DEVELOPMENT TEAM STRENGTHENED
The project development team has been strengthened with the appointment of two ex-Harmony
Gold specialists to the South African leadership team. From 1 October 2020, Mr Mitford Mundell
has assumed the role of Chief Executive Officer - Africa and Mr Jacques Du Triou as Chief
Operating Officer.
Mr Mundell has extensive experience in the mining sector and specialises in asset optimisation,
strategic planning, stakeholder management, project building, and change management in open
pit and underground mining contexts. He has worked and consulted to some of Africa’s largest
mining companies including Harmony Gold, De Beers Mining Corporation, Namakwa Diamonds
and Anglo American.
At Harmony, South Africa’s largest gold company, Mr Mundell gained extensive hands-on
experience beginning as a miner and rising through to Shift Boss, Mine Captain, Mine Manager,
General Manager and Business Coach. Amongst others, Mr Mundell was Mine Manager at the
Kalgold Project, Harmony’s open-pit gold operation in South Africa. He was responsible for
commissioning multiple mines and establishing one of Harmony’s mines as the lowest cost
producer in the group.
Most recently as CEO of Namakwa Diamonds, Mr Mundell led the commissioning and expansion
of its Kao Diamond Mine. He delivered a new plant and took Namakwa to profitability, increased
plant throughput and extended the initial three-year mine life to +20 years, tripling the company’s
valuation.
Mr Du Triou has over 28 years experience in the South African mining industry across all stages
of a mine’s lifecycle. He specialises in project and financial evaluations, construction, mine
expansion, risk assessments, due diligence, execution and commissioning to full nameplate
capacity.
He began his career with Harmony and progressed to General Manager (2009-2015). During this
time, he led the Doornkop South Reed deepening project which had an estimated capital cost of
R1.2Bn (~A$990m) from feasibility to peak production. He also worked extensively on Harmony’s
Kalgold project.
Both executives have extensive proven track records in project development and project delivery.
Mr Mundell and Mr Du Triou’s appointments strengthen the Company’s in country operations
team and their skill sets align to the Company’s near term development and pending production
activities.
MINING RIGHT 83 (MR83) ENVIRONMENTAL AUTHORISATION APPROVAL
The Theta Open Pit Starter Project is situated on MR83, an approved and executed mining right
and has an approved Environmental Authorisation for underground mining activities, as well as
approval for processing of ore and deposition of residues onto an existing tailings dam.
5
To conduct open pit mining, the Company had applied to the DMRE for an amendment to the
Environmental Authorisation for MR83. Subsequent to the end of the quarter and as announced
on 27 October 2020, the DMRE has advised the Company that –
The application for Environmental Authorisation to permit open-pit mining on MR83 is
being reviewed and the record of decision should be finalized on or before the end of
November 2020.
The DMRE supports Theta Gold’s investment and would do the necessary to ensure
appropriate permits are processed and granted expeditiously.
The DMRE acknowledged and appreciate the progress Theta Gold has made in relation to
its mining investment which has potential benefits to the South African economy and the
local municipal area in particular.
The mining sector has been identified as one of the most important catalyst to stimulate
economic growth in South Africa post Covid-19.
PROPOSED UNDERGROUND DEVELOPMENT
Theta Gold has considerable optionality across its vast asset base and the upside value is
significant.
In Q4 2020, the Company will be looking at ways to accelerate its 5 Year strategy (Figure 5) beyond
the Theta Open Pit Starter Project (Stage 1) and in particular, at ways of bringing forward Stages
3 and 4 into production sooner to take advantage of the strong gold price. In this connection, the
Company has commenced a Pre-Feasibility Study on the Rietfontein and Beta Mines. This study
will build on the Scoping Study that was completed on those mines in May 2017 (refer ASX
announcement 16 May 2017).
Stage 1 Theta
Starter-pits
(Feasibility Study
completed to
recover 234Koz
Au surface ore)
Stage 2 Theta
Extension Pits
(Reserve
Definition Drilling
planned targeting
further 500Koz
Au surface ore)
Stage 3
Rietfontein
Shallow
Underground
- 780Koz @
8.5g/t Au JORC
Resources
- Scoping Study
completed
Stage 4 Beta
Shallow
Underground
1.1Moz @ 6g/t
Au JORC
Resources
(Scoping Study
completed)
Figure 5: Five Year Plan and target production profile
6
Underground investigations of multiple mines
Many mines owned by the Company present opportunities to restart close to surface,
predeveloped mining faces, and due to the generally good ground conditions many of the old
workings are still in good accessible condition, in spite of standing for so long. This has been
confirmed by management, consultants and equipment suppliers, as they conducted practical
underground investigations. The pictures below were taken on some of these investigations.
Figure 6: Outcrop mined out at one of the Frankfort Bevett’s North Adits
Figure 7: Main Adit Frankfort
7
Figure 8: Vaalhoek Reef Nek Section
underground exposure
Figure 9: Pictures below indicating the good
ground conditions and access at Beta Mine
Figure 10: Main Access Beta Mine
8
Figure 11: Clewer Dukes Morgons Mine Access Portal
CORPORATE
Cash Position and Funding
As at 30 September 2020, the Group had US$973,000 in cash.
During the quarter, the Company raised US$2,872,000 (A$4,000,100) from a share placement of
16,667,084 fully paid ordinary shares at an issue price of A$0.24 per share. The Company also
received a further US$80,000 (A$113,200) from the exercise of 595,788 options at A$0.19 per
share.
Project Finance
The Company continues to pursue funding for the project development with potential
financiers. In this connection it is expecting to finalise the CIL plant funding and construction
solution by November 2020. The Company has also received an indicative term sheet from a
local Sovereign Fund for additional debt finance.”
Annual Report 2020
The 2020 Annual Report was released on 1 October 2020 and is available for download from the
Company’s website ( www.thetagoldmines.com ).
9
Annual General Meeting
The 2020 Annual General Meeting will be held on Tuesday 17 November 2020 at 2.00pm (AEDT)
at –
Boardroom Pty Limited
Level 12, 225 George Street
SYDNEY NSW 2000
OTC Markets – DTC Eligibility
The Company’s shares are dual listed on the ASX and the OTCQB market in the United States
(ASX: TGM, TGMO | OTCQB: TGMGF), with the primary listing being on the Australian Securities
Exchange.
As announced on 20 July 2020, the Company has received approval for its shares listed on the
OTCQB market to be eligible for electronic clearing and settlement through The Depository Trust
Company (“DTC”) in the United States.
DTC eligibility is expected to simplify the process of trading and enhance liquidity of the
Company's shares on the OTCQB by greatly broadening the pool of brokerage firms that will allow
their clients to trade the stock. Online brokers such as Ameritrade, Fidelity Investments, Charles
Schwab, Tradestation and Etrade all offer OTCQB trades.
Capital Structure
The following are movements in the capital structure since the end of the previous quarter and
up to the date of this report –
a)
b)
c)
d)
e)
16,667,084 fully paid ordinary shares were issued at A$0.24 each pursuant to a share
placement
595,788 fully paid ordinary shares were issued at A$0.19 each following the exercise of
options;
400,000 unlisted options exercisable at $0.35 and $0.40 each lapsed on 19 July 2022;
8,425 unlisted options exercisable at $0.19 each lapsed on 13 August 2020;
4,000,000 unlisted performance rights expiring 27 June 2024 lapsed on 5 August 2020.
The current capital structure of the Company is as follows –
Fully paid ordinary shares (ASX: TGM | OTCQB: TGMGF)
Listed options exercisable at $0.30 each on or before 31 October
2020 (ASX: TGMO)
Unlisted options and performance rights (Refer Annexure B)
Number
458,919,457
33,754,663
22,525,000
This announcement was authorised for release by Mr Bill Guy, Chairman.
10
For more information please visit www.thetagoldmines.com or contact:
Bill Guy, Chairman
Theta Gold Mines Limited
T: +61 2 8046 7584
billg@thetagoldmines.com
Investor Relations:
Australia – Ben Jarvis, Six Degrees Investor Relations: +61 (0) 431 271 538
United States - Michael Porter, Porter, LeVay & Rose Inc: +1 212 564 4700,
theta@plrinvest.com
https://twitter.com/ThetaGoldMines
https://www.linkedin.com/company/thetagoldmines/
Competent Persons Statement
Mineral Resources
The information in this report relating to Mineral Resources is based on, and fairly reflect, the
information and supporting documentation compiled by Mr Uwe Engelmann (BSc (Zoo. & Bot.), BSc
Hons (Geol.), Pr.Sci.Nat. No. 400058/08, MGSSA), a director of Minxcon (Pty) Ltd and a member of the
South African Council for Natural Scientific Professions.
Mr Engelmann has sufficient experience that is relevant to the style of mineralisation under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves. Mr Engelmann consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
Ore Reserves
The information in this report relating to Ore Reserves is based on, and fairly reflects, the information
and supporting documentation compiled by Mr Daniel van Heerden (B Eng (Min.), MCom (Bus. Admin.),
MMC, Pr.Eng. No. 20050318, FSAIMM, AMMSA), a director of Minxcon (Pty) Ltd and a member of the
Engineering Council of South Africa.
The original reports titled “Theta Gold increases Mineral Resource to over 6Moz” and “Positive
Feasibility Study for Theta Project” were dated 16 May 2019 and were released to the Australian
Securities Exchange (ASX) on that date. The Company confirms that –
it is not aware of any new information or data that materially affects the information included in
the ASX announcements; and
all material assumptions and technical parameters underpinning the estimates in the ASX
announcements continue to apply and have not materially changed.
11
Annexure A
Mineral Resource - Theta Project MR 83
Mineral Resource
Category in LoM
Plan
Indicated
Inferred
Subtotal
Indicated
Inferred
Subtotal
Indicated
Inferred
Subtotal
Indicated
Inferred
Subtotal
Total Indicated
Total Inferred
Total
Pit
Browns Hill
Iota section of
Columbia Hill
Theta Hill
Dumps
Grade
g/t
2.30
2.03
2.23
2.38
5.53
2.53
1.60
1.32
1.48
1.49
1.49
2.21
1.81
2.09
Reef
Tonnes
kt
489
181
670
1 696
83
1 778
557
438
995
418
418
2 741
1 119
3 861
Au Content
kg
1 124
368
1 492
4 033
457
4 490
891
579
1 470
622
622
6 049
2 026
8 075
oz
36 135
11 831
47 967
129 673
14 694
144 367
28 662
18 604
47 266
20 007
20 007
194 470
65 137
259 607
Notes:
1.
2.
3.
4.
5.
6.
7.
Theta Project (Theta Hill, Browns Hill and Iota) cut-off is 0.35 g/t;
The gold price used for the cut-off calculations is USD 1,500/oz;
Geological losses applied are 10% for inferred and 5% for Indicated and Measured;
Theta Hill and Browns Hill - Upper Theta Reef, Lower Theta Reef and Beta Reef are diluted grades over 100 cm;
Geological losses applied are, 10% for inferred and 5% for Indicated and Measured;
Historical mine voids have been depleted from the Mineral Resource;
The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion
thereof will be converted to Ore Reserves;
8. Mineral Resource fall within the mining right 83MR and 341MR.
9. No Geological losses applied to dumps
10. The inferred Mineral Resources have a high degree of uncertainty and it should not be assumed that all or a portion
thereof will be converted to Ore Reserves;
12
JORC Global Mineral Resources
Mineral Resources for Underground Operations as at 1 May 2019
Resource
Classification
Measured
Mine
Frankfort
Reef
Bevetts
Total Measured
Reef
Grade
Stope
Grade
Reef
Width
Stope
width
Content
Reef
Tonnes
Stope
Tonnes
g/t
g/t
cm
cm
cmgt
Mt
Mt
7.13
5.37
73
103
520
0.069
0.091
7.13
5.37
73
103
520
0.069
0.091
Au Content
Kg
489
489
koz
15.7
15.7
Frankfort
Bevetts
7.86
5.13
58
96
452
0.243
0.373
CDM
Rho
13.19
3.80
23
90
307
0.258
0.895
Beta
Beta
21.66
6.58
23
90
499
0.716
2.357
Rietfontein
Rietfontein
14.57
8.20
52
92
755
0.517
0.919
Vaalhoek
Vaalhoek
13.90
6.34
36
90
499
0.064
0.140
Olifantsgera
amte
Olifantsger
aamte
16.97
4.62
25
90
416
0.026
0.091
Total Indicated
16.26
6.21
36
91
591
1.824
4.774
29,661
953.7
Total Measured & Indicated
15.93
6.20
38
91
600
1.893
4.865
30,150
969.4
Reef
Grade
Stope
Grade
Reef
Width
Stope
width
Content
Reef
Tonnes
Stope
Tonnes
Indicated
Resource
Classification
Inferred
UG Mine
Reef
1,912
3,401
15,506
7,534
887
422
61.5
109.4
498.5
242.2
28.5
13.6
Au Content
g/t
g/t
cm
cm
cmgt
Mt
Mt
Kg
koz
Frankfort
Bevetts
7.41
4.27
48
93
356
0.343
0.596
2,543
81.8
CDM
Rho
10.06
3.02
24
90
244
0.544
1.811
5,472
175.9
Beta
Beta
16.51
5.43
25
90
414
1.107
3.367
18,285
587.9
Rietfontein
Rietfontein
14.06
8.52
57
94
803
1.190
1.962
16,721
537.6
Olifantsgera
amte
Olifantsger
aamte
18.33
4.68
23
90
422
0.059
0.248
1,162
37.3
Vaalhoek
Vaalhoek
16.28
4.77
22
90
361
0.873
2.980
14,209
456.8
Vaalhoek
Thelma
Leaders
12.18
9.47
96
123
1166
0.023
0.030
284
9.1
Glynns
15.87
5.19
25
90
397
3.218
9.833
51,078
1,642.2
Portuguese
13.26
3.99
22
90
287
0.064
0.213
849
27.3
Theta
7.22
3.24
34
90
244
0.099
0.220
714
23.0
Sandstone
5.54
2.92
41
90
225
0.101
0.193
562
18.1
14.68
5.22
31
91
458
7.622
21.452
111,880
3,597.0
Glynns
Lydenburg
Ponieskrantz
*
Frankfort
Theta*
Nestor*
Total Inferred
Note: * Manual Mineral Resources
13
Mineral Resources for Open Pit Operations as at 1May 2019
Resource
Classification
Indicated
Open Pit Mine
Reef
Inferred
Total Inferred
Reef
Width
Content
Reef
Tonnes
Au Content
g/t
cm
cmgt
Mt
Kg
koz
0
0
0.505
905
29.1
Hermansburg
Elluvial
1.79
DG1
Elluvial
1.37
0
0
0.159
217
7.0
DG2
Elluvial
0.76
0
0
1.174
892
28.7
Vaalhoek
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Vaalhoek
17.25
33
574
0.111
1920
61.7
1.02
200
204
0.439
402
12.9
1.10
221
244
0.891
886
28.5
Upper Theta
2.41
100
241
0.724
1568
50.4
Lower Theta
3.70
100
370
0.888
2956
95.0
Beta
2.49
100
249
0.383
859
27.6
Iota
Bevetts
2.89
114
330
0.105
303
9.7
Iota
Upper Rho
2.43
393
956
0.808
1965
63.2
Iota
Lower Rho
2.51
550
1381
0.815
2047
65.8
Iota
Upper Theta
1.08
114
123
0.158
171
5.5
2.11
179
378
7.161
15,091
485.2
Reef
Grade
Reef
Width
Content
Reef
Tonnes
Shale
Bevetts
Total Indicated
Resource
Classification
Reef
Grade
Open Pit Mine
Reef
Au Content
g/t
cm
cmgt
Mt
Kg
koz
Elluvial
0.88
0
0
0.110
97
3.1
DG1
Elluvial
2.95
0
0
0.293
864
27.8
DG5
Elluvial
0.76
0
0
0.101
77
2.5
Vaalhoek
Vaalhoek
20.32
43
880
0.213
4,319
138.9
Vaalhoek
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Theta & Browns
Hill
Thelma Leaders
14.25
97
1,388
0.293
4,172
134.1
Shale
1.11
216
240
0.703
666
21.4
Bevetts
1.07
213
227
0.648
589
19.0
Upper Theta
1.86
100
186
1.071
1692
54.4
Lower Theta
8.11
100
811
1.643
11329
364.3
Beta
2.23
100
223
0.748
1417
45.6
Iota
Upper Rho
5.13
106
544
0.099
507
16.3
4.35
115
502
5.922
25,730
827.3
Hermansburg
14
Mineral Resources for Tailings Dams as at 1 May 2019
Resource
Classification
Indicated
Surface
Operation
Reef
Tonnage
Gold
Grade
Mt
g/t
Kg
koz
Glynn’s
Lydenburg
Tailings
1.211
0.80
972
31.3
Blyde 1
Tailings
0.590
0.73
434
14.0
Blyde 2
Tailings
0.280
0.83
234
7.5
Blyde 3
Tailings
0.316
0.87
275
8.8
Blyde 4
Tailings
0.164
0.72
119
3.8
Blyde 5
Tailings
0.022
0.61
14
0.4
TGME Plant
Tailings
2.661
0.87
2,325
74.8
5.244
0.83
4,373
140.6
Tonnage
Gold
Grade
Total Indicated
Resource
Classification
Inferred
Gold Content
Surface
Operation
Blyde 3a
Reef
Tailings
Total Inferred
Gold Content
Mt
g/t
Kg
koz
0.023
0.57
13
0.4
0.023
0.57
13
0.4
Mineral Resources for Rock Dumps as at 1 May 2019
Mineral
Resource
Category
Inferred
Surface
Operation
Vaalhoek
Reef
Tonnage
Gold
Grade
Mt
g/t
Kg
koz
0.121
1.64
199
6.4
0.121
1.64
199
6.4
Rock Dump
Total Inferred
Gold Content
Notes:
1.
Columns may not add up due to rounding.
2.
Gold price used for the cut-off calculations is USD1,500/oz.
3.
UG Mineral Resources are reported at a cut-off of 160 cm.g/t, open pit at 0.5 g/t and 0.35 g/t, tailings and
rock dumps at 0.35 g/t.
4.
Fault losses of 5% for Measured and Indicated, 10% for Inferred Mineral Resources.
5.
Mineral Resources are stated as inclusive of Ore Reserves.
6.
Mineral Resources are reported as total Mineral Resources and are not attributed.
Ore Reserve - Theta Project (MR83 only) 1 May 2019
Browns Hill
Grade
g/t
3.24
Reef Tonnes
kt
564
Probable
Iota
2.54
1,253
3,189
102,513
Probable
Theta Hill
2.76
493
1,362
43,798
2,310
6,377
205,010
Mineral Resource
Category in LoM Plan
Probable
Pit
Total
2.76
The Ore Reserves exclude Inferred Mineral Resources.
Au Content
kg
oz
1,826
58,699
Notes:
1. Totals in the Ore Reserve may not add-up due to rounding.
2. Mineral Resources are for MR83 only and excludes MR341.
3. No Inferred Mineral Resources are included in the Ore Reserve.
15
Annexure B
Theta Gold Mines Limited
Unlisted Options and Performance Rights
Number
OPTIONS
2,325,000
800,000
3,125,000
Performance Hurdle/Vesting Date
(if applicable)
Options will vest on 1 October 2021
TOTAL OPTIONS
PERFORMANCE RIGHTS
50,000
All systems, licences, insurances, regulatory and
statutory compliance in place to meet South
Africa Mining regulations, laws, Mining Charter
111, commercial contacts. (Mine ready).
3,220,000
Delineating a total of 300,000 ounces of gold
ore reserves (in accordance with the JORC Code
20121) at grade of at least 2.5g/t Au, amenable
to open-cut mining on Mining Right 83, Mining
Right 341 and Mining Right 10167 (under
application).
4,420,000
Decision to Mine (Board approval to commence
development of a gold mining operation) with
all regulatory approvals secured.
This performance hurdle must be achieved on
or before 27 Dec 2020, being 18 months from
the date of issue of the performance right.
5,730,000
Achieving annualised production of 50,000
ounces of gold per annum over a consecutive
period of 3 months.
This performance hurdle must be achieved on
or before 27 Dec 2021, being 30 months from
the date of issue of the performance right.
5,980,000
Achieving annualised production of 100,000
ounces of gold per annum over a consecutive
period of 3 months.
This performance hurdle must be achieved on
or before 27 Jun 2023, being 48 months from
the date of issue of the performance right.
19, 400,000
TOTAL PERFORMANCE RIGHTS
22,525,000
TOTAL OPTIONS AND PERFORMANCE RIGHTS
Exercise
Price
Expiry Date
$0.40
$0.30
27 Apr 2022
30 Sep 2022
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Nil
27 Jun 2024
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
THETA GOLD MINES LIMITED
ABN
Quarter ended (“current quarter”)
30 131 758 177
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation (if expensed)
30 September 2020
Current quarter
$US’000
Year to date
(3 months)
$US’000
(219)
(219)
(d) staff costs
(111)
(111)
(e) administration and corporate costs
(includes Sydney, Johannesburg and
Pilgrim’s Rest minesite offices)
(813)
(813)
(1,143)
(1,143)
(c) property, plant and equipment
(26)
(26)
(d) exploration & evaluation (if capitalised)
(642)
(642)
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) entities
(b) tenements
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$US’000
Year to date
(3 months)
$US’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
35
35
(633)
(633)
2,952
2,952
(312)
(312)
(38)
(38)
2,602
2,602
147
147
(1,143)
(1,143)
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(633)
(633)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
2,602
2,602
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$US’000
973
Current quarter
$US’000
Year to date
(3 months)
$US’000
973
Previous quarter
$US’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
973
147
973
147
Current quarter
$US'000
230(1)
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of,
and an explanation for, such payments
(1) Payments to related parties in item 6.1 above are for salaries, director fees and consulting
fees.
ASX Listing Rules Appendix 5B (01/12/19)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$US’000
Amount drawn at
quarter end
$US’000
2,957
2,957
2,957
2,957
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
Details of the loan facilities are set out in Note 14 of the Company’s Financial Report for the year
ended 30 June 2020.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (Item 1.9)
8.2
Capitalised exploration & evaluation (Item 2.1(d))
8.3
Total relevant outgoings (Item 8.1 + Item 8.2)
8.4
Cash and cash equivalents at quarter end (Item 4.6)
8.5
Unused finance facilitie