Half-Year Accounts as at 31 December 2024
Released
Released
Announcement PDF
Half Year Financial Report
Six Months Ended 31 December 2024
Half-Year Financial Report - 31 December 2024
Theta Gold Mines Limited
Corporate Directory
DIRECTORS
Bill Guy
Richie Yang
Brett Tang
Byron Dumpleton
Executive Chairman
Non-Executive Director
Non-Executive Director
Non-Executive Director
COMPANY SECRETARY
Brent Hofman
AUDITOR
Hall Chadwick (NSW)
40/2 Park Street
Sydney NSW 2000
Australia
STOCK EXCHANGE LISTINGS
ASX: TGM
REGISTERED OFFICE
Suite 80 Level 35
International Tower One
100 Barangaroo Avenue
Sydney NSW 2000
Australia
Tel: +61 2 8046 7584
Email: info@thetagoldmines.com
SHARE REGISTRY
Boardroom Pty Limited
Grosvenor Place
Level 12, 225 George Street
Sydney NSW 2000
Australia
Tel: 1300 737 760 (within Australia)
+61 2 9290 9600 (outside Australia)
Fax: +61 2 9290 9655
AUSTRALIAN BUSINESS NUMBER
30 131 758 177
INVESTOR RELATIONS
Australia: Ben Jarvis, Six Degrees Investor Relations:
+61 (0) 413 150 448
WEBSITE
www.thetagoldmines.com
INTERACTIVE INVESTOR HUB
http://investors.thetagoldmines.com
Half-Year Financial Report - 31 December 2024
2
Theta Gold Mines Limited
Directors’ Report
Your Directors present their report, together with the financial statements of Theta Gold Mines Limited
and its controlled entities (“Consolidated Entity”) for the half year ended 31 December 2024.
DIRECTORS
The names of the Directors of Theta Gold Mines Limited during the half year and up to the date of this
report are:
Charles William (Bill) Guy
Bill Richie Yang
Guyang (Brett) Tang
Byron Dumpleton
Executive Chairman
Non-Executive Director (Audit Committee Chair)
Non-Executive Director
Non-Executive Director
Executive Management Changes
No changes to the management of Theta Gold Mines Limited occurred during the half year ended 31
December 2024.
REVIEW OF OPERATIONS
Summary
The current status is that the gold plant footprint and MR 83 are fully permitted. The final design for the
gold plant is completed. MR 83 hosts the first 3 mines, Beta, CDM and Frankfort, which is more than 80%
of the current mine schedule. Theta is now ready to mine post-funding.
During the last 6 months, the company has focused on funding packages, safety, operational readiness,
design and planning the construction of the gold processing plant and identifying an Engineering
Procurement and Construction (“EPC”) Builder.
The team has completed the final design work for the gold plant and the plant footprint and updated costs.
The final design for the tailing dam is in progress, and after that work, an updated Feasibility Study will be
released, expected in May at $2,180 USD Gold Price. The update feasibility study will include the surface
source of gold in the mine schedule.
In total, 174,000 gold ounces sit on the surface, in tailings dams and surface rock dumps surrounding the
TGME gold plant, including 140,600 ounces of Indicated Resources in various tailings dams. Theta is
working on adding the surface gold resources into the mine schedule.
Operational readiness is complete with the Mine Health and Safety Act, 1996 (Act 29 of 1996) (“MHSA”)
and all other applicable South African legislation in place. OH&S policies and procedures are in place to run
as a functioning mine site. As of 31 January 2025, TGME has achieved 1,557 Progressive Safe Return Shifts
(Accident-Free Days).
Half-Year Financial Report - 31 December 2024
3
Theta Gold Mines Limited
We completed the following tasks on-site as part of preparing to build the gold plant and finalising the
execution documentation. (see table 1 below)
Description
Completed
Plant process design Engineers Appointed – RM Process
✓
Tailings and Environmental Engineers Appointed – Eco Elementum
✓
Additional Metallurgical Test Work
✓
Updated Process Plant Flowsheet
✓
Final Process Plant and Engineering design
✓
Process Plant footprint layouts and Civils works
✓
Draft schedules for the plant construction
✓
Draft schedule for the dewatering plant, water management and tailings
deposition
✓
Tender process and Requests for Quotes (RFQ)
✓
NDAs signed with all vetted possible Original Equipment Supplies (OEM’s)
✓
Long leading items identified completion
✓
Project Execution Plan completion
✓
Table 1: Provides a summary of the completed design and planning stages of the plant.
RM Processing (“RMP”) was appointed to prepare a comprehensive cost estimate for completing the
detailed engineering of the TGME Gold Processing Plant. This facility is designed to process "gold ore,
based on recent feasibility studies by Theta Gold and Met63. The project focuses on treating TGME
underground ores, tailings material and surface waste rock dumps to produce a Doré bar.
Highlights from the Metallurgical Test Work completed by MAK Analytical are as follows:
Composite samples were collected for metallurgical test work. These samples obtained from the main
tailings dam were collected from drill samples and additional samples were collected from historic surface
rock dumps via trenching.
Table 2: Highlights the best laboratory results for the composite samples.
Sample No.
Type
Head Grade
Gold Recovery %
Gold (g/t)
TGME A
Tailings Dam Material
1.24 g/t
58.95%
Beta and Peach Tree
Surface Rock Dump
0.94 g/t
95.43%
Vaalhoek 1
Surface Rock Dump
1.19 g/t
95.46%
Refer to ASX released dated 30 July 2024 titled, “Metallurgical Test Results Confirm That Gold is Recoverable from the TGME Tailings
Storage Facility and Rock Dumps (174,000 OZ AU)”.
Half-Year Financial Report - 31 December 2024
4
Theta Gold Mines Limited
The project also involved geotechnical assessments for plant infrastructure, focusing on dolomite stability
at the TSF and Plant site. Kipaje Geotechnical Consulting led the dolomite feasibility study, combining the
2020 gravimetric survey data with infill drilling.
Exploratory drilling was conducted around the TSF and plant area to enhance studies on dolomite
formations as part of the process plant and TSF designs as shown below.
Figure 1: Exploratory drilling
On finalising the geotechnical assessment, the plant’s footprint was designed, enabling Bulk Earthworks
and civil construction to commence once funding becomes available. The plant design incorporates a 2meter loss allowance beneath the raft foundations.
Eco Elementum Engineering (“ECOE”) was appointed on 1 July 2024, as the design consultants for the
remining of the TSF and the design of a Dewatering Plant. The remining project is structured in phases,
with the initial phase covering the Concept and Pre-Feasibility Study (“PFS”), followed by
Engineering/Feed, Procurement, Dewatering Detailed Design and Integration, and Construction.
The project began in July, with dolomite studies and samples from the TSF processed by MAK Analytical
Services to mimic the final tails product. These samples were handed to suppliers of dry-stacking
dewatering plants for testing and design purposes.
ECOE was appointed to conduct a PFS on the underground deposition of tailings from the TGME process
plant. The solution involves using underground voids around the Beta Mine for tailings storage, which will
also allow for the permanent closure of the old mined areas, enabling uninterrupted mining operations in
other areas.
The PFS aims to develop a cost-effective tailings disposal solution by utilizing these underground voids,
with key objectives including:
• Providing adequate capacity for tailings storage.
• Ensuring ongoing mining operations by managing tailings effectively.
Half-Year Financial Report - 31 December 2024
5
Theta Gold Mines Limited
•
Facilitating the environmental rehabilitation of old mined areas.
A backfill plant will be constructed on the surface, and a conveyor or wet transfer system may be
implemented for efficient material handling. A dewatering step will be necessary to ensure that tailings
are prepared with the correct moisture content for backfilling. The environmental approval process for
the backfill project is linked to the completion of the PFS.
Environmental, Social and Governance (“ESG”)
Figure 2: TGME Environmental Sustainability Strategy
An Ecological Compensation Programme - Implementation Agreement
Independent Environmental Scientist has been requested to provide us with a proposal to develop a
guideline for the execution of the compensation programme that was developed in 2022. This plan will
include recommendations on the Implementation Agreement.
Some key points to be addressed as part of the Ecological Program
•
Integrated rehab plan for upper catchments and coordination capacity
•
On Nature Reserves, control dense Invasive Alien Plant Species (“IAPS”) and revegetate
•
Install, and maintain fire breaks
•
Biocontrol development and release programs
•
Erosion control measures
•
Measure to improve hydrogeology of local catchment
Half-Year Financial Report - 31 December 2024
6
Theta Gold Mines Limited
Social and Labour Plan
To mine in South Africa, companies must develop a Social and Labour Plan (“SLP”). This integrated process
involves discussion with the community, local council, and Department of Mines and Energy.
The SLP focus on community needs and economic uplift for the host community. Table 3 below shows the
work in progress.
Task
Due date
Appointment of SLP Consultant
✓
15 January – 31 January 2024
TGME provides background information
✓
29 January – 02 February 2024
Kick-Off Meeting
✓
05 February – 09 February 2024
Final Socio-Economic Study
✓
09 February 2024
Consultant Document Review
✓
07 February – 20 February 2024
Consultant submit Legal Review
✓
21 February 2024
Workshop session
✓
21 February 2024
Compilation of Draft SLP document
✓
22 February – 10 April 2024
Preparation for SLP Consultations
✓
22 February – 12 April 2024
SLP Consultations
✓
18 - 20 April 2024
Project Priority Lists from Ward Councillors
✓
06 May 2024
Compilation of Final SLP document
✓
22 April – 31 August 2024
TGME Review SLP
✓
02 September – 30 November 2024
Update of SLP based on TGME comments
✓
2 – 6 December 2024
Mine Manager review SLP
✓
09 – 20 December 2024
COO review SLP
✓
07 – 10 January 2025
Submit Final SLP to Board for approval
14 - 28 January 2025
Final approved SLP Document
03 February 2025
Submit endorsement letters to the Municipality
03 February 2025
for signature
Present SLP during EIA phase if necessary
4 March – 8 May 2025
Submission of final EIA/EMPR Report, SLP
19 May 2025
and MWP to the DMRE
Table 3: Social and Labour Plan (SLP)
Half-Year Financial Report - 31 December 2024
7
Theta Gold Mines Limited
Permitting
Rietfontein Integrated Environmental Authorization
TGME submitted an integrated EA application to the DMRE on 10 October 2023 to authorize the NEMA and
NEMWA listed activities for the proposed Rietfontein project.
The scoping report was submitted for public review to all registered I&APs on 12 October 2023. During the
scoping phase public review period stakeholders were identified and scoping phase meetings were
conducted to ensure that all stakeholders understood the proposed project and project related
information. The scoping report was accepted by the DMRE on 4 April 2024 and TGME continued with the
EIA phase of the project.
As part of the EIA phase, the following detailed specialist studies were undertaken:
Figure 3: List of Rietfontein specialist studies
Figure 4: Stakeholder Engagement Meetings – Rietfontein Scoping phase
Half-Year Financial Report - 31 December 2024
8
Theta Gold Mines Limited
Completion of Feasibility Study
Feasibility Study (TGME Underground Gold Mine Project)
The Company’s Feasibility Study (FS)1 for the TGME Project was delivered on 27 July 2022, confirming
Theta Gold’s potential to be a significant near-term, high-margin, low-cost gold producer with
opportunities for future growth. Based on the FS results, the Project will provide robust financial returns
from a long-life large underground mining operation for a modest capital investment given the scale of
operations envisaged.
The Project Life of Mine ‘LOM’ will initially comprise a 12.9-year mining operation starting in Q2, 2023
and delivering LOM production of 1.24 Moz of contained gold. The estimated peak development Capital
Expenditure (“Capex”) is US$77 million, (A$103 million), with the Project forecast to generate a pre-tax
NPV10% of US$324 million, (A$432 million) and pre-tax internal Rate of Return (IRR) of 65% at a forecast
average gold price of US$1,642, (A$2,189) per ounce. Based on these metrics, the Project has a projected
capital payback period of 31 months.
The FS paves the way for a Final Investment Decision (‘FID’) by the Theta Gold Board in respect to
funding negotiations and on-going discussions with financiers with respect to full/partial debt and equity
funding options. Theta Gold has appointed a debt funding advisor to manage this important process and
will provide updates in due course.
Feasibility Highlights:
•
TGME Feasibility Study2 delivers 1.24Moz contained gold production, underpinning an initial 12.9-year
mine life.
•
Strong financial return based on LOM plan (at average gold price of US$1,642, (A$2,189) /oz) with first
production targeted for Q2, 20243 including:
o
Undiscounted free cash flows of US$508m, (A$678m), pre-tax US$717m, (A$956m);
o
NPV (at a 10% discount rate) of US$219m, (A$292m), pre-tax US$324m, (A$432m);
o
Capital payback period of 31 months;
o
Pre-tax IRR of 65%; and
o
Peak production over 100,000 oz Gold.
•
All-in-sustaining Cost (AISC) of US$834/oz (A$1,112/oz) over LOM sits on the bottom quartile of South
Africa and Australian gold producers;
•
Peak Capital requirement is US$77m, (A$103m), total capital requirements US$174m, (A$232m);and
•
Front-End Engineering Design (FEED) of the TGME gold plant completed, forming an important input
towards the finalisation of the FS of the TGME underground project4.
1 Refer to ASX Release dated 27 July 2022 titled “Theta’s TGME Project Definitive FS Confirms NPV(10%) of A$432 Million at US$1,642 / Oz Gold
Price”
2 Ref to ASX release dated 27 July 2022 titled “Theta’s TGME Project Definitive FS Confirms NPV10% of A$432 million at US$1,642 /Oz Gold price”
3 First gold produced timing will be subject to securing funding and obtaining all necessary regulatory permitting approvals.
4 Refer to ASX release dated 20 June 2022 titled “TGME Gold Project Update”
Half-Year Financial Report - 31 December 2024
9
Theta Gold Mines Limited
Table 4: Key Project Metrics
Description
Units
Base Case
Reserve Plan
Project Start Date5
Year
2024
2024
Commercial Production Start Date
Year
2025
2025
Production build up period
Months
14
14
Life of mine
years
12.9
7.3
Underground ore mined (LOM)
Mt
6.46
2.85
Mined Grade
g/t
5.95
6.09
Gold Mined (LOM)
Moz
1.24
0.56
Production Rate
Kt/a
540
540
Production Rate
Kt/m
45
45
Grind size
µ
106
106
Gold recovered (average LOM)
%
87
87
Gold recovered (LOM)
Moz
1.08
0.49
Project economics below shows the sensitivities to the various gold price estimates and demonstrates the robust
financial returns of the Project. The FS completed in July 2022 used an average gold price of US$1,642 / Oz as a
base case.
Table 5: Project Economics at Various Gold Prices – Base Case (USD)
Project Economics at gold price
NPV @ 10% (real) Pre-tax
NPV @ 10% (real) Post-tax
IRR (%) Pre-tax
IRR (%) Post-tax
AISC
EBITDA annual average
EBIT annual average
Free Cash Flow (Pre-tax)
Free Cash Flow (Post-tax)
Development Capital – Peak
Funding
Capital Sustaining
Payback post-tax
Capital Efficiency (Pre-Tax
NPV/Dev Capital
Capital Efficiency (Post-Tax
NPV/Dev Capital
Forecast
USD1,600/ USD1,800/ USD2,000/ USD2,200/
(USD1,642/ USD1,500/oz
oz
oz
oz
oz
oz Avg)
USDm
324
255
304
402
501
601
USDm
219
174
206
269
335
400
%
65%
57%
64%
77%
90%
102%
%
57%
50%
56%
67%
78%
87%
USD/oz
834
822
831
847
862
876
USDm
69
58
66
81
96
111
USDm
60
49
57
72
87
102
USDm
717
576
673
869
1066
1264
USDm
508
412
478
611
747
881
Unit
USDm
77
77
77
77
77
77
USDm
Months
37
31
37
33
37
31
37
28
37
25
37
24
%
422%
332%
395%
524%
653%
783%
%
285%
226%
268%
351%
437%
521%
5 Project start date will be dependent on the Company securing the necessary funding and permitting approvals.
Half-Year Financial Report - 31 December 2024
10
Theta Gold Mines Limited
Table 6: Project Economics at Various Gold Prices – Base Case (AUD)
Project Economics at gold price
NPV @ 10% (real) Pre-tax
NPV @ 10% (real) Post-tax
IRR (%) Pre-tax
IRR (%) Post-tax
AISC
EBITDA annual average
EBIT annual average
Free Cash Flow (Pre-tax)
Free Cash Flow (Post-tax)
Development Capital – Peak
Funding
Capital Sustaining
Payback post-tax
Capital Efficiency (Pre-Tax
NPV/Dev Capital
Capital Efficiency (Post-Tax
NPV/Dev Capital
NOTES:
1.
2.
Unit
AUDm
AUDm
%
%
AUD/oz
AUDm
AUDm
AUDm
AUDm
Forecast
USD1,600/ USD1,800/ USD2,000/ USD2,200/
(USD1,642/ USD1,500/oz
oz
oz
oz
oz
oz Avg)
432
339
405
536
669
802
292
232
274
359
447
533
65%
57%
64%
77%
90%
102%
57%
50%
56%
67%
78%
87%
1,112
1,096
1,107
1,129
1,149
1,167
92
77
87
107
128
148
80
66
76
96
116
136
956
768
897
1,158
1,421
1,686
678
550
638
814
996
1,175
AUDm
102
102
102
102
102
102
AUDm
Months
49
31
49
33
49
31
49
28
49
25
49
24
%
422%
332%
395%
524%
653%
783%
%
285%
226%
268%
351%
437%
521%
Converted to AUD from USD using AUD:USD exchange rate of 1.333 used in the FS.
Due to rounding, numbers presented throughout this document may not add up precisely to the totals, provided and percentages may
not precisely reflect the absolute figures.
Figure 5: Annual Gold Production – Base Case
Half-Year Financial Report - 31 December 2024
11
Theta Gold Mines Limited
Figure 6: Annual and Cumulative Cash Flow (Post-Tax) – Base Case (AUD)
NOTES:1. Forecast Prices averaging USD1,642/oz over LOM.
2. Converted to AUD from USD at exchange rate of 1.333 AUD:USD.
Historical Project Summary
The TGME Project targets to restart historical underground gold mines located in a historically prolific gold mining
region in the Mpumalanga Province of South Africa. The Project Areas are centred in the town of Pilgrims Rest,
some 370 km due northeast of Johannesburg, and vast majority of the tenements were under TGME’s ownership
since the late 1800s.
The Project targets the Beta (including the Beta North, Beta Central and Beta South sections), Rietfontein,
Frankfort and Clewer-Dukes Hill-Morgenzon (“CDM”) mines. A significant amount of gold resources remain
underground which were not mined historically due to technological limitations or limiting ore characteristics.
Beta is scheduled as the first operation to commence production, followed by Rietfontein, and finally CDM and
Frankfort simultaneously. In comparison to CDM and Frankfort, Beta and Rietfontein are higher-grade mines.
A gold plant, which acts as the central processing plant for all the historical operations, is situated in close
proximity with a maximum distance to operations of approximately 40km. A new facility will be established on
this footprint to treat all the ore from the surrounding operations.
Two scheduling strategies have been investigated in the FS. The Base Case considers a LOM plan targeting the
total Mineral Resources (Measured, Indicated and Inferred). The Ore Reserve Case considers a LOM plan
targeting only Measured and Indicated Mineral Resources.
This FS demonstrates the ability to achieve optimised cash flows by scheduling production from the operations.
The mine designs and associated costs per operational element feed into a combined operations financial model.
The Ore Reserve Case supports the declaration of compliant JORC Code 2012 Ore Reserves.
TGME Underground Gold Mine Development
As part of the preparation for the installation of the first phase new gold plant, TGME had appointed the services
of Jet Demolition to remove the redundant plant equipment. The process started in the second week of January
2022. Specialised equipment was utilised for demolition, after which it was reduced in size and made ready for
Half-Year Financial Report - 31 December 2024
12
Theta Gold Mines Limited
transport to scrap merchants. The project to remove the old plant is now complete6.
Processing consultants Met63 was contracted to do a detailed design and costing of a processing plant designed
for a feed capacity of 45,000 tons per month which is equivalent to 67 tons per hour at 92% availability. A flow
schematic is shown in Figure 7.
Figure 7: Process Flow Schematic Phase 1
The FS has been split into three phases, allowing for various processing scenarios aligned with the mining
development program. The design of each phase is based on a stand-alone processing facility aligned with the
mining plan of the ore body.
•
Phase 1 – Carbon-in-Leach (CIL) Plant (Free-milling ore is process for the first 7 Years, see figure 7).
The design and costing of a 45,000 tons per month oxide ore processing plant including crushing, milling,
CIL and elution with gold Doré produced on site. Testwork undertaken on various “free-milling” ores has
indicated high undissolved gold losses, indicating the presence of small amounts of sulphidic
constituents. This was particularly evident when completing standard cyanidation bottle roll trials on the
CDM mine samples. Subsequent additional testwork supports this. As a result, the Phase 1 circuit will
include a flash flotation stage post-milling to remove sulphide associated materials before conventional
cyanidation. This flotation mass pull will join the concentrator (production scheduled in Phase 2).
•
Phase 2 – Gold Concentrator Plant
The design and cost of a 20,000 tons per month concentrating plant including crushing, milling, Density
Media separation (DMS) and flotation. The final products consist of a combined carbon and sulphide
flotation concentrate. The carbon flotation concentrate being processed through the CIL plant #3 and
the sulphide flotation concentrate is processed through the CIL plant #1.
6 Ref to ASX release dated 4 March 2022 titled “DFS Update and High-Grade Ore Sweeped from New Historical Mines”.
Half-Year Financial Report - 31 December 2024
13
Theta Gold Mines Limited
•
Phase 3 – Oxidative Leaching of Sulphide Concentrate
The Phase 3 plant includes a 45,000 tons per month Leach-ox processing plant that was designed and
costed, including crushing, milling and carbon/sulphide flotation. The phase 3 plant consists of both the
gold concentrator plant as well as the CIL plant as described in Phase 1 and Phase 2. The carbon flotation
concentrate processed in a dedicated CIL circuit (CIL plant #3), sulphide flotation concentrate oxidized
under atmospheric conditions with liquid oxygen injection and high shear reactors. Oxidised product to
be treated in a separate batch CIL process (CIL #1) with the tails treated in a larger CIL (CIL plant #2), that
also processes the flotation tails as well as “free-milling” ore feed. This option allows for all recovered
gold to be produced as Doré on-site with no concentrate produced.
Although there are some shared infrastructure and processing equipment between the phases, for the purposes
of this FS the phase-one plant will be constructed first to treat Beta, Rietfontein and CDM ore with phase-three
being constructed at a later stage before mining of Frankfort ore commences.
The plant will be developed by an Engineering, Procurement and Construction (EPC) contractor. The Company
will run a tender process to evaluate contracts for the construction and upgrade of existing infrastructure
including detailed engineering for the plant, procurement, fabrication and delivery to site of plant, equipment
and materials and construction of the process plant facilities.
Project Finance
EPC Contract, Equity and Debt Funding
The Company continues to advance planning and discussions with Power China towards the completing the
detailed engineering for the TGME Gold Plant, construction tenders, finalising the previously announced planned
EPC contract for the plant and TSF build, completing debt funding packages and completion of due diligence with
institutional debt funders with the assistance of debt advisors.
In addition, the company is in discussions with existing and new institutional and professional investors to
provide part or all of the equity component required for the CAPEX requirements for the plant build.
Project Permits and Approvals
Mining Right (MR) 83 is now fully permitted for mining. MR 83 includes the Beta Mine, CDM Mine, and Frankfort
Mine, three of the four mines included in the mining schedule of the Feasibility Study7.
Theta now has all the required approvals for MR 83 to start mining:
•
Explosive licence for transport and usage
•
Forrest Licence (Frankfort)
•
MR 83 Environmental Authorisation (EA)
•
Water Use Licence (WUL) (Tailings, Plant, Mining)
•
Environmental Rehabilitation guarantee for MR 83
•
Updated Social and Labour Plan for MR 83
•
Heritage Record of Decision.
7 ASX release 27 July 2022 “Theta Gold’s TGME Project DFS confirms NPV of AUD432 million”.
Half-Year Financial Report - 31 December 2024
14
Theta Gold Mines Limited
Key Features of the Gold Process Plant:
•
•
•
•
•
•
•
•
•
The new gold processing plant is designed to have a milling capacity of 540,000 tons per annum. The
plant design consists of two individual processing streams, capable of processing free-milling and
sulphide ore separately.
The new gold processing plant is designed to fit into the current plant footprint which forms part of
MR83, therefore no additional environmental permitting will be required.
The new processing plant components include three-stage crushing, milling, reagent, flotation, CIL,
elution, and gold room sections.
The gold plant will produce dore gold bars.
Engineering and costing have been completed to the required level of accuracy for the FS.
The completed design includes water and power reticulation with the scope to increase the capacity
with modular units for future plant expansions, consistent with the Company’s strategy to reach its gold
production target of 160,000 ounces per annum within five years.
The latest proven available automation technologies were incorporated into the gold processing plant
design which will reduce labour requirements and enhance productivity levels.
The tailings disposal will be moved onto the existing tailings storage facility located some 150 metres
from the plant.
Some existing plant infrastructures were incorporated into the new gold processing plant.
Figure 8: Existing Plant Drone View (post demolition of old sections)
FINANCIAL RESULTS
The consolidated loss after income tax for the six months ended 31 December 2024 was US$10,769,000
(31 December 2023: US$3,201,000). The loss largely represents the consolidated entity’s operating costs
for the half year, including exploration expenditure, trial mining operations, design and engineering for
gold processing plant and TSF, finance costs, fair value adjustment to its investments, general
Half-Year Financial Report - 31 December 2024
15
Theta Gold Mines Limited
administration and corporate costs as well as non-cash share-based payment expense.
FINANCIAL POSITION, FUNDING AND CASH BALANCE
Power China Memorandum of Understanding for EPC
Theta Gold continues discussions with Power China in regard to advancing EPC contract for the
construction of Stage one of TGME Gold Plant. In an MOU executed between the parties, Power China
will fund up to US$30 million in funding towards the Capex requirements of the product.
Private Placements and Funding
During the half-year ended 31 December 2024, the Company completed several Private Placements
(Placements) raising a total of US$12 million (A$17.9 million) before costs as follows:
US$4 million Private Placement:
Following the approval of resolutions 15 and 16 by shareholders at a General Meeting held on 28 October
2024, the Company has issued 46,276,113 new TGM fully paid Ordinary Shares at the issue price of $0.13
(13 cents per share) and granted 23,138,057 unlisted attaching options on 31 October 2024 in relation to
a US$4 million (AU$6.02 million) (before costs) Private Placement which was originally announced on 6
May 2024.
Each Option issued will have an exercise price equal to an 8% discount to the 15-day VWAP to the last
closing price at the time of exercise (but no less than $0.13 cents), and an expiry date 2 years from the
date of issue. Options issued under the Placement will not be quoted.
US$2 million Oversubscribed Private Placement:
On 3 October 2024 announced it had completed an oversubscribed Private Placement for an additional
US$2 million (~AU$2.938 million) before costs and is pleased to advise that the full proceeds in the
Placement had been received.
The Company has issued 22,475,136 new TGM fully paid Ordinary Shares at the issue price of $0.13 (13
cents per share) along with 11,237,568 unlisted attaching options on 2 October 2024 to a sophisticated
and professional investor on the same terms as those applied in the two-tranche Placement announced
on 11 June 2024.
Each Placement Option will have an exercise price equal to an 8% discount to the 15-day VWAP to the
last closing price at the time of exercise (but no less than $0.13 cents), and expiry date 2 years from the
date of issue. Options issued under the Placement will not be quoted.
8 The conversion price of (USD:AUD) was based on the closing spot price(s) published by the RBA on the date placement proceeds were received
which was 0.68445.
Half-Year Financial Report - 31 December 2024
16
Theta Gold Mines Limited
US$10 million Two-Tranche Placement:
Tranche 1 Placement
The Company announced on 16 September 2024 that it had received all proceeds under Tranche 1
Placement of US$6 million (~AU$8.99 million) from Hong Kong Ruihua Green Development Limited
(“HRGD”), a sist
Share your feedback
Discover