Half-Year Accounts as at 31 December 2025
Released
Released
Announcement PDF
Half-Year Financial Report - 31 December 2025
Half-Year Financial Report
Six Months Ended 31 December 2025
Theta Gold Mines Limited (ABN 30 131 758 177)
Level 35, Tower One, 100 Barangaroo Avenue
Barangaroo, Sydney, NSW 2000
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 2
Corporate Directory
DIRECTORS
Bill Guy Executive Chairman
Richie Yang Executive Director
Brett Tang Non-Executive Director
Byron Dumpleton Non-Executive Director
Hansjoerg Plaggemars Non-Executive Director
COMPANY SECRETARY
Brent Hofman
AUDITOR
Hall Chadwick (NSW)
40/2 Park Street
Sydney NSW 2000
Australia
STOCK EXCHANGE LISTINGS
ASX: TGM
AUSTRALIAN BUSINESS NUMBER
30 131 758 177
INVESTOR RELATIONS
Australia: Engage IR – Joe Kaderavek
Joe.kaderavek@engageir.com
INTERACTIVE INVESTOR HUB
http://investors.thetagoldmines.com
REGISTERED OFFICE
Suite 80 Level 35
International Tower One
100 Barangaroo Avenue
Sydney NSW 2000
Australia
Tel: +61 2 8046 7584
Email: info@thetagoldmines.com
SHARE REGISTRY
Boardroom Pty Limited
Grosvenor Place
Level 12, 225 George Street
Sydney NSW 2000
Australia
Tel: 1300 737 760 (within Australia)
+61 2 9290 9600 (outside Australia)
Fax: +61 2 9290 9655
WEBSITE
www.thetagoldmines.com
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 3
Directors’ Report
Your Directors present their report, together with the financial statements of Theta Gold Mines Limited
and its controlled entities (“Consolidated Entity”) for the half year ended 31 December 2025.
DIRECTORS
The names of the Directors of Theta Gold Mines Limited during the half year and up to the date of this
report are:
Charles William (Bill) Guy Executive Chairman
Bill Richie Yang Executive Director
Guyang (Brett) Tang Non-Executive Director
Byron Dumpleton Non-Executive Director
Hansjoerg Plaggemars Non-Executive Director
Board / Executive Management Changes
Bill Richie Yang announced on 8 September 2025 that he would be assuming a role of Executive Director
having served as a Non-Executive Director since 2015. Richie will continue to lead financing and funding
initiatives, and in addition, to take on project development responsibilities in supporting the TGME
project build. Richie has extensive corporate finance, business and project development experience in
the mining sector since 2007.
Hansjoerg Plaggemars was also appointed as a Non-Executive Director on 8 September 2025 and joins
the Board as a representative of long-term institutional investors Deutsche Balaton, Delphi, and Sparta
Group. He brings extensive expertise in corporate finance, debt structuring, and capital markets. His
career spans senior M&A roles at a global professional services firm, followed by board-level leadership
across a diverse range of listed and private companies in the mining, agriculture, shipping, construction,
and investment sectors.
REVIEW OF OPERATIONS
TGME Gold Mine Project – Progress Summary
The current status is that the gold plant footprint and MR 83 are fully permitted. The final design for the
gold plant has been completed and construction of the processing plant is well underway in late 2025 and
into 2026. MR 83 hosts the first 3 mines, Beta, CDM and Frankfort, which is more than 80% of the current
mine schedule. Theta will be in a position to mine post-funding.
During the last 6 months, the company has focused on completion of funding packages, earthworks, civils
and construction of the gold processing plant at the TGME gold mine.
During the Six Months the Company has completed or progressed the following:
• Construction advancing - with bulk earthworks, civil works, water systems, platforms and
gold-room foundations progressing on schedule and on budget.
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 4
• Gold plant build schedule - Plant commissioning on target end of Q4 2026.
• Strong operational performance and quality assurance - with all engineering inspections and
concrete strength tests meeting project specification.
• Long Lead equipment secured - Twin Titan GDM3065 Ball Mills currently being built at
MechProTech along with processing plant equipment items from Kemix (Pty) Ltd and MIP
Industries (Pty) Ltd, both are local manufacturers within 4 hours of the site. Further orders
placed for agitators, electrowinning circuit, thickeners and other plant equipment.
• Workforcegrowth and localimpact - over 70% of non-specialist personnel sourced from nearby
communities and 500+ jobs expected at full production.
• SMPP Contract Issued: achieves progress milestone at the TGME Gold Project as we enter
Phase 2 of construction. Theta Gold has signed the SMPP contract with industry leaders PICM
and RM Process. The SMPP contracts cover structural steel, mechanical components and piping
• Modular: All fabricated steelworks are completed off-site at PICM’s facilities. This approach
streamlines transportation and on-site installation, reducing risk and accelerating timelines.
• Cost Savings: PICM and RM Process teams already on site, busy with earthworks and civils,
synergy savings targeted.
• Equipment: Mobile and stationary cranes purchased to assist with construction work
• Project remains on schedule and within budget - with clear visibility to first gold and continued
progress across all critical path activities.
• Debt funding - Debt syndication process progressing with debt financiers to cover construction
capital costs. A non‑binding funding agreement for US$80m has been reached with Nebari
Partners LLC as part of a broader TGME Project debt tendering process.
Strategic procurement of cutting-edge dual-Titan GDM3065 – 900kW Ball Mill Circuit from MechProTech
(a leading South African engineering firm) executed with build underway. This high-impact order reflects
TGM’s commitment to world-class processing technology and sets the stage for rapid construction
progress.
Figure 1: Right to left, COO Jacques Du Triou with MechProTech representative to oversee progress of construction
of 2x Titan GDM3065 Ball Mills.
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 5
Strong momentum continues, with bulk earthworks and civil engineering packages advancing on schedule
and within budget. These works are critical path items and mark a major milestone toward building the
TGME Gold Plant.
Since project commencement, significant ground movement has been achieved across terraces 2, 3, and 4,
with over 12,000 cubic meters of material relocated and positive engineering compaction results delivered.
Bulk excavations for concrete retaining walls are complete, and all but one base has been cast, with
reinforcement of the final base underway. Project remains firmly on track for commissioning by Q4 2026.
Construction of the gold room platform is advancing (Figure 2), with backfilling and base construction
scheduled shortly. Work on bund wall extensions is progressing well; all bases are cast, five vertical
extensions completed, and the remainder due shortly. These efficiencies leveraged on existing
infrastructure and in-house resources, delivering significant cost savings without compromising quality.
Structural (12) concrete inspections have been completed, with all blinding, steel fixing, and pre-concrete
inspections passing the required checks. Concrete test cube results received from the laboratory confirm
that all samples have achieved target strength.
Every stage is subject to rigorous engineering sign-off and inspections by the engineering team, ensuring
world-class standards and operational integrity.
All personnel already mobilised to site and plans for 500+ jobs at full production, the TGME Gold Project is
driving local employment and economic uplift, supported by AI-driven training and a clear path to
production.
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 6
Figure 2: Civil works underway for Gold Room foundations.
Figure 3: Removing old engineering structures
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 7
Figure 4: Retaining wall foundation steelworks
We completed the following tasks on-site as part of preparing to build the gold plant and finalising the
execution documentation. (see table 1 below)
Table 1: Provides a summary of the completed design and planning stages of the plant.
Description Completed
Plant process design Engineers Appointed – RM Process ✓
Tailings and Environmental Engineers Appointed – Eco Elementum ✓
Additional Metallurgical Test Work ✓
Updated Process Plant Flowsheet ✓
Final Process Plant and Engineering design ✓
Process Plant footprint layouts and Civils works ✓
Draft schedules for the plant construction ✓
Draft schedule for the dewatering plant, water management and tailings deposition ✓
Tender process and Requests for Quotes (RFQ) ✓
NDAs signed with all vetted possible Original Equipment Supplies (OEM’s) ✓
Long leading items identified completion ✓
Project Execution Plan completion ✓
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 8
RM Processing (“RMP”) was appointed to prepare a comprehensive cost estimate for completing the
detailed engineering of the TGME Gold Processing Plant. This facility is designed to process "gold ore,
based on recent feasibility studies by Theta Gold and Met63. The project focuses on treating TGME
underground ores, tailings material and surface waste rock dumps to produce a Doré bar.
CORPORATE GOVERNANCE AND FUNDING UPDATE
TGME Project Financing Update During the Six Months to 31 December 2025:
US$4 million Private Placement - Completed:
On 3 July 2025 1
the Company announced the completion of a Private Placement for US$4 million
(~AU$6.022 million) before costs.
The Company issued 47,337,278 fully paid ordinary shares (Placement Shares) to existing and supportive
institutional investor, Hong Kong Ruihua Green Development Limited, along with 23,668,639 attaching
unlisted options (Placement Options)3
In addition, the Company also issued 1,869,231 fully paid ordinary shares to Consultants, (Consultant
Shares). These shares will be held in voluntary escrow for a period of 3 months from issue. All new shares
issued rank equally with existing fully paid ordinary shares of Theta Gold.
Three-Tranche Cornerstone Investment and Private Placements:
During the quarter, the Company announced it had received equity and debt funding commitments totaling
A$60.7 million, (US$39.9 million), before costs.
Summary of that funding is as follows:
• On 7 October 2025 the Company announced it has received funding commitments by way of equity
and debt for up to A$51.4 million, (US$33.9 million) made up of an equity component of A$36.3
million, (US$23.9 million) and a debt component of A$15.2 million, (US$10 million); and
• On 21 October 2025 the Company announced it had received a further equity commitment of A$9.3
million, (US$6 million) to two new Cornerstone Investors.
Share Purchase Plan (SPP)
On 19 November 20254
, the Company announced the completion of Share Purchase Plan (SPP) which raised
$120,000 (before costs) through the issue of 571,425 new fully paid ordinary shares (SPP Shares).
In addition, SPP participants will receive 1 free attaching option (SPP Option) for every 2.38 SPP shares
subscribed for in the SPP. As a result, the Company issued SPP Options will have an exercise price of A$0.32
(32 cents) and expiry date that is 18 months from date of grant the Company has advised that it intends to
apply for quotation of the SPP Options.
1 Refer to ASX Release dated 3 July 2025 titled, “Successful Completion of US$4 million Private Placement”.
2 The conversion price of (USD:AUD) was based on the closing spot price(s) published by the RBA on the date placement proceeds were received
which was an average of 0.65.
3 Each Placement Option will have an exercise price equal to an 8% discount to the 15-Day VWAP to the last closing price at the time of exercise,
(but no less than $0.13 cents), and expiry date 2 years from the date of issue.
4 Refer to ASX Release dated 19 November 2025, titled “Completion of Share Purchase Plan and Options Offer”.
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 9
Use of Funds:
The Company will use funds from the equity raised from Placements completed above to:
• Progress bulk earthworks and complete plant site terraces
• Progress civil engineering works and construction
• Purchase of Long-Lead items of equipment
• Purchase Geosynthetic Stabilenka – a geotextile used for reinforcement
• Finalise water management systems;
• Complete Debt Funding Transaction; and
• Support working capital needs
Commercial Lender’s Syndication Underway
TGM has engaged specialist advisors to support the process of securing the remaining project‑level funding
required to complete plant construction. As part of this broader engagement, on 16 December 2025 the
Company announced that it had entered into a non‑binding term sheet (“Term Sheet”) with Nebari Partners,
LLC or its affiliates (“Nebari” or the “Lender”) for a proposed US$80 million (~A$120 million) senior secured
loan facility (the “Proposed Facility”) to support the development and commissioning of the TGME Gold
Mine Project.
Upon closing of the facility agreement, TGM will be fully-funded which will allow the Company to complete
the construction and commissioning phase of the TGME Gold Processing Plant. The Proposed Facility
provides flexibility in amount and timing of funding drawdowns, with Tranche 1 of US$45 million expected
to be available early 2026 with the option to draw down Tranche 2 of up to US$35 million at the request of
the Borrower as early as 3 months after closing, subject to achieving certain conditions precedent and
milestones.
Key Indicative Terms of the Proposed Facility
• Tranche 1: US$45 million, (A$68 million) to be funded at closing;
• Tranche 2: up to US$35 million, (A$52 million) (at Borrower’s discretion) available after 3 and up to
24 months of closing, subject to satisfaction of agreed conditions precedent and operational
milestones;
• Term: five (5) years (60 months) from draw-down;
• Interest: 3-month SOFR (subject to a 3.75% floor) plus 10.0% per annum.);
• Arrangement fee: 1.25% is payable;
• Interest roll-up: 12 months interest capitalisation from the date of Tranche 1 payout;
• Amortisation: No amortisation for the first 18 months from the Closing Date, after which straight-
line amortisation shall be payable for each calendar month at a fixed monthly amount equal to 1.5%
of the original principal amount;
• Original Issue Discount (“OID”): 3.0% on each tranche;
• Security: first-ranking security interest over substantially all assets of the Company and its
subsidiaries; all subsidiaries will provide guarantees;
• Warrants: warrants to subscribe for ordinary shares in Theta Gold equal to 27% of the funded
amount, exercisable at a 40% premium to the 20-day VWAP at signing or announcement (as
applicable), expiring 48 months after each funding tranche.
Conditions Precedent
Funding under the Proposed Facility will be subject to customary conditions precedent, including:
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 10
• Completion and satisfactory outcome of due diligence by Nebari;
• Approval by Nebari’s investment committee;
• Execution of binding loan, guarantee and security documentation;
• Receipt of all required regulatory, board and shareholder approvals;
• Completion of Tranche Two and Three Cornerstone Investor Subscription Agreements as
previously announced on 7 and 21 October 20255
΄6
and already approved by shareholders at the
2025 AGM for the remaining balance of US$13 million in equity funding prior to closing.
The Company will continue to provide updates with regards to due diligence progress or terms with debt
funders.
Cash Position
As of 31 December 2025, the Group had US$12.5 (A$19) million in cash.
Capital Structure
The current capital structure of the Company at 31 December 2025 is as follows:
Number
Fully paid ordinary shares (ASX: TGM) (see note 6) 1,046,552,399
Listed /Unlisted options and performance rights (see note 6) 225,162,680
The estimated market capitalisation of TGM was A$183 million 7
(US$123 million) as at 31 December 2025.
Environmental, Social and Governance (“ESG”)
5 Refer to ASX Release dated 7 October 2025, titled “TGM Secures A$51M Debt & Equity Funding for TGME Gold Mine”.
6 Refer to ASX Release dated 21 October 2025, titled “Additional US$6M Secured and Conversion of Convertible Loans”.
7 Calculated as 1,046,552,399 fully-paid ordinary shares on issue at the closing price of AU$0.175 cents per share as at 31 December 2025
converted at the RBA exchange rate of AUD:USD of 0.6693.
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 11
Figure 5: TGME Environmental Sustainability Strategy
An Ecological Compensation Programme - Implementation Agreement
Independent Environmental Scientist has been requested to provide us with a proposal to develop a
guideline for the execution of the compensation programme that was developed in 2022. This plan
includes recommendations on the Implementation Agreement.
Some key points to be addressed as part of the Ecological Program
• Integrated rehab plan for upper catchments and coordination capacity
• On Nature Reserves, control dense Invasive Alien Plant Species (“IAPS”) and revegetate
• Install, and maintain fire breaks
• Biocontrol development and release programs
• Erosion control measures
• Measure to improve hydrogeology of local catchment
Social and Labour Plan
To mine in South Africa, companies must develop a Social and Labour Plan (“SLP”). This integrated process
involves discussion with the community, local council, and Department of Mines and Energy.
The SLP focus on community needs and economic uplift for the host community. Table 2 below shows the
work in progress.
Table 2: Social and Labour Plan (SLP)
Task Due date
Appointment of SLP Consultant ✓ 15 January – 31 January 2024
TGME provides background information ✓ 29 January – 02 February 2024
Kick-Off Meeting ✓ 05 February – 09 February 2024
Final Socio-Economic Study ✓ 09 February 2024
Consultant Document Review ✓ 07 February – 20 February 2024
Consultant submit Legal Review ✓ 21 February 2024
Workshop session ✓ 21 February 2024
Compilation of Draft SLP document ✓ 22 February – 10 April 2024
Preparation for SLP Consultations ✓ 22 February – 12 April 2024
SLP Consultations ✓ 18 - 20 April 2024
Project Priority Lists from Ward Councillors ✓ 06 May 2024
Compilation of Final SLP document ✓ 22 April – 31 August 2024
TGME Review SLP ✓ 02 September – 30 November 2024
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 12
Update of SLP based on TGME comments ✓ 2 – 6 December 2024
Mine Manager review SLP ✓ 09 – 20 December 2024
COO review SLP ✓ 07 – 10 January 2025
Submit Final SLP to Board for approval 14 - 28 January 2025
Final approved SLP Document 03 February 2025
Submit endorsement letters to the Municipality
for signature
03 February 2025
Present SLP during EIA phase if necessary 4 March – 8 May 2025
Submission of final EIA/EMPR Report, SLP and
MWP to the DMRE
19 May 2025
Permitting
Rietfontein Integrated Environmental Authorisation
TGME submitted an integrated EA application to the DMRE on 10 October 2023 to authorize the NEMA and
NEMWA listed activities for the proposed Rietfontein project.
The scoping report was submitted for public review to all registered I&APs on 12 October 2023. During the
scoping phase public review period stakeholders were identified and scoping phase meetings were
conducted to ensure that all stakeholders understood the proposed project and project related
information. The scoping report was accepted by the DMRE on 4 April 2024 and TGME continued with the
EIA phase of the project.
As part of the EIA phase, the following detailed specialist studies were undertaken:
Figure 6: List of Rietfontein specialist studies
✓
✓
✓
✓
✓
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 13
Figure 7: Stakeholder Engagement Meetings – Rietfontein Scoping phase
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 14
COMPLETION OF REVISED FEASIBLITY STUDY
Revised Feasibility Study (TGME Underground Gold Mine Project)
On 3 February 20268
the Company delivered a major uplift in project value with its Revised Feasibility
Study for its TGME Gold Mine Project (‘Project’), confirming a 13.1-year Life of Mine (LoM) and positioning
it as a high-margin, long-life gold operation in one of the world’s premier gold regions.
Table 3: Project Economics at Various Gold Prices – Base Case (AUD)
Project Economics at AU$
Gold Price
Unit
Forecast
(USD2,884 /
oz Avg)
USD
2,500/oz
USD
3,000/oz
USD
3,500/oz
USD
4,000/oz
USD
4,500/oz*
USD
5,000/oz
Gold Price AUD / oz9
AUD/oz 4,365 3784 4,541 5,298 6,055 6,812 7,568
NPV @ 10% (real) Pre-tax AUDm 991 758 1,070 1,382 1,695 2,008 2,321
NPV @ 10% (real) Post-tax AUDm 689 526 742 954 1,166 1,379 1,591
IRR (%) Pre-tax % 84% 69% 86% 102% 117% 131% 146%
IRR (%) Post-tax % 77% 63% 78% 92% 105% 118% 130%
AISC AUD/oz 1,787 1750 1,800 1,848 1,896 1,943 1,990
EBITDA annual average AUDm 163 131 175 219 263 307 351
EBIT annual average AUDm 148 116 160 204 248 292 336
Free Cash Flow (Post-tax) AUDm 1,413 1102 1,525 1,941 2,358 2,775 3,193
Development Capital – Peak
Funding
AUDm 116 131 116 116 116 116 116
Capital Sustaining AUDm 65 65 65 65 65 65 65
Payback post-tax Months 29 34 30 27 25 24 23
Capital Efficiency (Pre-Tax
NPV/Dev Capital
% 855% 580% 924% 1,194% 1,463% 1,734% 2,004%
Capital Efficiency (Post-Tax
NPV/Dev Capital
% 595% 403% 641% 824% 1,007% 1,190% 1,374%
* Note: at the time of release of this study, Spot Gold Price was trading in excess of USD4,500 /
oz.
The Base Case Production Targetand forecast financial information shown above and disclosed in this study
are based on Mineral Resources that include a proportion of Inferred Mineral Resources and the realisation
of the full potential of the Base Case as presented cannot be guaranteed. Inferred Mineral Resources are
considered too speculative geologically to have the economic considerations applied to them that would
enable them to be classified as Ore Reserves. There is no certainty that further exploration work or
evaluation studies will result in the conversion of Inferred Mineral Resources to Indicated or Measured
Mineral Resources or Ore Reserves.
8 Refer to ASX release dated 3 February 2026 titled, “Revised Feasibility Study Confirms A$1.4B Free Cash Flow”.
9 Exchange rate USD:AUD applied throughout this document is 0.6606.
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 15
FEASIBILITY STUDY BASE CASE HIGHLIGHTS:
Key operational results of the Revised Feasibility Study (FS):
❖ Production Start: Q1 2027 (TGME Gold Plant currently under construction)
❖ Head Grade LoM: 4.96g/t Base Case
❖ Base Case - Production: 871 Koz 4.28 g/t recovered grade (86.2% recovery)
❖ Base Case - Production: 1.06 Moz @ 4.40 g/t mined grade
❖ Production Ramp-up: Peak Production over 115 koz
❖ Ore Reserve Plan: 514 koz @ 4.11 g/t recovered grade (85.2% recovery)
❖ Gold plant: Plant construction underway
❖ Infrastructure: Existing surface/underground works, permitting in place
Robust Base Case Financials: (Gold price (avg) US$2,884/oz, (A$4,36510
/oz)) (Update 7 October 2025)
❖ Free Cashflow: US$0.9 billion, (A$1.4 billion)
❖ Post-tax NPV10%: (at a 10% discount rate) of US$455 m, (A$689 m)
❖ Revenue: US$2.5 billion, (A$3.8 billion)
❖ Post-tax IRR: 77%
❖ Life of Mine (LOM): 13.1 years
❖ All in sustaining cost: US$1,181/oz, (A$1,787/oz)
❖ Project payback: 29 months (from start of mining)
❖ Peak funding: US$77 m, (A$116 m)
Table 4 : Comparison of Base Case Financial Metrics – Feasibility Studies 2022 vs 2026
Project Economics at Gold Price US$
(Base Case)
Unit FS - Jul’ 2211
FS - *Feb’ 26 % or Absolute
Life of Mine years 12.9 13.1 flat
Revenue USDbn 1.75 2.49 42%
Gold Price USD/oz 1,642 2,884 +1,242/oz
NPV @ 10% (real) Pre-tax USDm 324 654 102%
NPV @ 10% (real) Post-tax USDm 219 455 108%
IRR (%) Pre-tax % 65% 84% 29%
IRR (%) Post-tax % 57% 77% 35%
All In Sustaining Cost (AISC) USD/oz 834 1,181 42%
EBITDA (LoM) USDm 891 1,508 69%
EBITDA annual average USDm 69 115 67%
Free Cash Flow (Post-tax) USDm 508 933 84%
Development Capital – Peak Funding USDm 77 77 flat
Capital Sustaining USDm 37 44 7
Payback Post-tax Months 31 28 flat
10 Exchange rate USD:AUD applied throughout this document is 0.6606.
11 Ref to ASX Release dated 27 July 2022 titled, “Theta Gold’s TGME Project DFS confirms NPV of AUD432 Million”.
Key Assumptions: Long term average spot gold price of US$2,884 applied in Base Case scenario over LOM / AISC estimation of US$1,181/oz at
+/- 15% level of accuracy.
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 16
Due to rounding, numbers presented throughout this document may not add up precisely to the totals
provided and percentages may not precisely reflect the absolute figures.
* - Mine Plan revised
Cost Control/Value Focus:
TGM continues to deliver strong project execution and disciplined cost management. The TGME Project’s
post-tax value has surged to US$455 million—animpressive US$236 million uplift over the 2022 FS—driven
largely by higher gold prices. This pricing strength has unlocked the ability to profitably mine lower-grade
ore. The project is gold price sensitive offering strong leverage as clearly demonstrated in tables 1 and 2
above.
Importantly, while higher gold prices have led to increased royalties, they’ve also contributed positively to
project economics. Around 18% of the AISC increase (US$62/oz of the total US$347/oz) is influenced by
gold price impacts—underscoring the strong value capture for shareholders.
Project Summary:
The TGME Gold project, located in the Mpumalanga province of South Africa, is shown below.
Figure 8: Regional Geological Setting
Minxcon (Pty) Ltd (“Minxcon”) completed a Revised Feasibility Study for Theta Gold Mines Limited to
restart the following historical underground projects situated in Mpumalanga Province, South Africa:-
• Beta;
• Frankfort;
• Clewer-Dukes Hill-Morgenzon (“CDM”); and
• Rietfontein.
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 17
In addition to the underground projects, the Theta Gold Mine Plant Tailings Storage Facility (“TGM Plant
TSF”), and the Theta Gold Mine rock dumps (“Rock Dumps”) have now been included in the revised
Feasibility Study.
Two scheduling strategies have been investigated, namely:
• Base Case: life of mine plan targeting the total Mineral Resources (Measured, Indicated and
Inferred); and
• Ore Reserve Plan: LOM plan targeting only Measured and Indicated Mineral Resources and
Indicated Mineral Resource only.
Beta is scheduled as the first operation to commence production, followed by Rietfontein, then CDM and
finally Frankfort. Beta and Rietfontein are higher-grade mines compared to CDM and Frankfort. During the
Beta development and ramp-up period, Theta Gold Mine rock dumps and Plant Tailings Storage Facility will
be remined and processed as early gold potential, filling the plant to capacity.
The Base Case LOM plan will comprise a 13.1-year mining operation starting in 2026 and delivering
production of 1.01 million ounces of contained gold. The estimated development capital or peak funding
requirement is USD77 million (AUD116 million)12,
with the Project forecast to generate a pre-tax NPV10% of
USD654 million (AUD991 million) and pre-tax Internal Rate of Return (IRR) of 84% at the forecast gold price
of averaging USD2,884/oz over the LOM. Based on these metrics, the Project has a projected payback period
of 29 months. First gold production is planned for Q1 2027.
Key Project Components:
• The Mineral Resource13
in the Base Case LoM Plan of 1,010 koz of gold now includes an additional
58koz (109koz available) of surface ore from historic rock dumps and MR83 tailings storage facility
(TFS) which was previously never recognised in the mining plan and provides early cashflow
opportunities.
• Phase 1 launches with four mines—Beta, Frankfort, CDM, and Rietfontein—leveraging the skilled
mining workforce of Pilgrim’s Rest and Sabie, 370 km northeast of Johannesburg.
• Over 43 historical mines underpin a long-term growth pipeline, with 3.6 Moz of Inferred Resources
available for future development—none included in the current Base Case.
• Execution-ready: Front-End Engineering Design (FEED) is complete, supporting modular expansion.
The plant build will use modular, plug-and-play equipment, significantly reducing construction risk and
enabling faster, more reliable commissioning.
• Site works underway: Old plant decommissioned; contracts for earthworks, civils, roads, and water
management signed in September 2025.
• Multi-phase ramp-up: Production will build to 45 ktpm across underground operations, following the
FS Base Case plan (Measured, Indicated, and Inferred Resources).
12 TGM is currently in advanced discussion with debt financiers and has engaged experienced debt advisors to assist in the negotiation of term-
sheets for funding of the Project. Further equity raises are also planned to fund working capital and part of the project capital if required, which
may lead to further dilution to existing shareholders.
13 Including Inferred Resources.
Theta Gold Mines Limited
Half-Year Financial Report - 31 December 2025 18
Beta Mine leads off: Mining starts with 18 months of pre-development at Beta before stoping begins.
• Phase 1 entails the initial 13.1-year Base Case LOM plan at the processing rate of 540 ktpa with key
physical parameters including;
o Gold ore production build up to 45 ktpm, for the first 18 months will be from the initial 109K
oz of surface ore contained in historical rock dumps and tailings to provide early cashflow
while underground mine development is completed;
o First underground gold within 18